Loading...
HomeMy WebLinkAbout20040544 Ver 2_Staff Comments_20090506Lucas, Annette From: Lucas, Annette Sent: Wednesday, May 06, 2009 10:36 AM To: Mcmillan, Ian Cc: Lucas, Annette Subject: 04-0544v2 River Run SD Dear Ian: I have reviewed this project and I approve the applicant's proposed approach of treating the stormwater with sand filters to meet both stormwater and diffuse flow requirements. The City of Raleigh will be reviewing the detailed stormwater BMP design. Therefore, when you are ready to issue the 401 Certification for this project, please place a condition on the approval that the impact may not commence until the DWQ has received a copy of the approved SMP and proof of approval from the Clty. Sincerely, Annette Annette Lucas, PE NC Division of Water Quality - 401 Oversight/Express Unit 2321 Crabtree Boulevard, Suite 250 Raleigh, North Carolina 27604 Phone: (919) 715-3425 Fax: (919) 733-6893 Email correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. Mcmillan, Ian From: Todd Preuninger [TPreuninger@withersravenel.com] Sent: Thursday, May 28, 2009 11:46 AM To: Mcmillan, Ian Subject: RE: River Run Buffer Impacts Attachments: image001.gif; image002.gif; image003.gif; image004.gif 10-4 The total for the entire project (including the new impacts): 181 linear feet of stream + 49 LF (new impact) = 230 feet of stream Total buffer impacts for entire project: Z1: 10,725 + Z2 : 27,621 SF = 38,346 SF The new impacts for buffers (road, sewer, g reenway, swales) - Zonel : 5,456 and Zone 2 : 6,480 SF I apologize for the confusion - let me know if you need anything else. Thanks for your patience on this one, i realize it's a pain. Todd From: Mcmillan, Ian [mailto:ian.mcmillan@ncdenr.gov] Sent: Thursday, May 28, 2009 11:34 AM To: Todd Preuninger Subject: RE: River Run Buffer Impacts Please give me total Zone 1 and Total Zone 2 for entire project, plus total Zone 1 and Total Zone 2 for new impacts only. Thanks, Ian McMillan Ian J. McMillan, PWS, GISP Coordinator 401/Wetlands Permitting and Oversight Unit 2321 Crabtree Blvd. Suite 250 Raleigh, NC 27604 Office: (919) 715-4631 Far: (919) 733-6893 Email: ian.mcmillan(a,ncdenr.eov E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Todd Preuninger [mailto:TPreuninger@withersravenel.com] Sent: Thursday, May 28, 2009 10:31 AM To: Mcmillan, Ian Subject: RE: River Run Buffer Impacts Yes - that is correct - plus the new buffer impacts for the road - if your just lumping them all together. todd From: Mcmillan, Ian [mailto:ian.mcmillan@ncdenr.gov] Sent: Thursday, May 28, 2009 10:27 AM To: Todd Preuninger Subject: RE: River Run Buffer Impacts Okay, I'm getting 6,164 + 696 = 6,860 SF Zone 1; and 21,662 + 376 = 22,038 SF for Zone 2 Is this correct? Ian J. McMillan, PWS, GISP Coordinator 401/Wetlands Permitting and Oversight Unit 2321 Crabtree Blvd. Suite 250 Raleigh, NC 27604 Office: (919) 715-4631 Fax: (919) 733-6893 Email: ian.mcmillan(&ncdenr.Eov E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Todd Preuninger [mailto:TPreuninger@withersravenel.com] Sent: Thursday, May 28, 2009 10:14 AM To: Ian McMillan Subject: River Run Buffer Impacts Ian, I'm going to do my best to explain the old vs. new buffer impacts, without confusing you. I can't exactly get the numbers to match up with the original permit - but I can guarantee that I can give you the total buffer impacts needed to complete the project, so that what they need approved is included in the Modification Temporary Sewer Impacts approved in the original application - 98 linear feet of stream, 19,630 SF (no break down on Zonel or Zone 2 in the 401 approval). For some reason, and remember S&EC did the original permit, it looks like they should have actually applied for 21,952 SF (Z1 6,204, Z2: 15,478) of impact. I may have an outdated map, but these are the numbers I'm coming up with and I hope this doesn't cause any problems. We did not not construct Sewer Crossing 'O' as indicated on the original plans - Sewer crossing O was 27 linear feet, so in reality, the temporary stream impacts were: 98 - 27= 71 feet for sewer Buffer impacts at Impact' O' were Z1:935SF and Z2:501 - but were not carried out. If I subtract these numbers from the original totals and then add in the buffer impacts for the new sewer line i get: 6,164 SF for Zone 1 andl5,498 for Zone 2 (21,662 SF) to complete the temporary impacts for the sewer lines for the entire project. In addition to the sewer line impacts we also need to include the impacts for the BMP Swales. The impacts for all 3 swales are = Z1:696 SF and Z2: 376 SF. Have I thoroughly confused you? Please do not hesitate to call if you have questions, but this is the best I can do, since I don't have the original impact maps - but I feel pretty confident it covers the work they need to get done out there. Todd