Loading...
HomeMy WebLinkAbout20170732 Ver 3_Modification_20180518Action History (UTC-05:00) Eastern Time (US & Canada) �brrrit by Anonymous User 5/18/2018 5:32:44 PM (Message Start Event) Accept by Carpenter,Kristi 5/18/2018 5:33:22 PM (DOT project) . The task was assigned to Carpenter,Kristi. The due date is: May 23, 2018 5:00 PM 5/18/2018 5:32 PM Water Resources ENVIRONMENTAL �UPLITV Staff Review ID#* Version* 3 20170732 Is this project a public transportation project? * �' Yes �' No Reviewer List:* Dave Wanucha:eads\djwanucha Select Reviewing Office:* Winston-Salem Regional Office -(336) 776-9800 Submittal Type:* Modifications Does this project require a request for payment to be sent? * l' Yes r• No Project Submittal Dated 5/18/2018 * Please note: fields marked with a red asterisk beloware required. You will not be able to submit the form until all mandatory questions are ans�red. Project Type:* �' New Project C' Pre-Application Submittal C' More Information Response r Other Agency Comments l' For the Record Only (Courtesy Copy) New Project - Please check the new project type if you are trying to submit a new project that needs an official approval decision. Pre-Application Submittal - Please check the pre-application submittal if you just want feedback on your submittal and do not have the e�ectation that your submittal will be considered a complete application requiring a formal decision. More Information Response - Please check this type if you are responding to a request for information from staff and you have and ID# and version for this response. Other Agency Comments - Please check this if you are submitting comments on an ebsting project. Project Contact Information Name: Email Address:* Project Information Project Name:* Kristi Lynn Carpenter for Amy Euliss Who is subrritting the irrforrration? aeuliss@ncdot.gov US 421/I-40 Bridge Replacements, Improvements, Paving (U-2827B/C-5620A) Is this a public transportation project? * C•' Yes C' No Is the project located within a NC DCM Area of Environmental Concern (AEC)?* C' Ye�" No �' Unknown TI P#: WBS#: U-2827B/C-5620A 34872.3.4 (Applies to DOT projects only) County (ies) * Forsyth Please upload all files that need to be submited. C7ick the upload button or drag and drop files here to attach docurrent U2827 B_Permit_Mod ification_2_Package_051118.. . . 4.42MB Only pdf or Ime files are accepted. Describe the attachments: Sent via email. * fJ By checking the box and signing box below, I certify that: o I have given true, accurate, and complete information on this form; o I agree that submission of this form is a"transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions AcY') o I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions AcY'); o I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND o I intend to electronically sign and submit the online form." Signature: c.{x� rr� �j.rN C''rr r,�vrr�r Submittal Date: STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION ROY COOPER JAMES H. TROGDON, III GOVERNOR SECRETARY Mailing Address: NC DEPARTMENT OF TRANSPORTATION DIVISION 9 375 SILAS CREEK PARKWAY WINSTON SALEM, NC 27127 Telephone: (336) 896-2330 Fax: (336) 703-6693 Customer Service: 1-877-368-4968 Website: www.ncdot.gov Location: 375 SILAS CREEK PARKWAY WINSTON SALEM, NC 27127 May 11, 2018 U. S. Army Corps of Engineers Raleigh Regulatory Field Office 3331 Heritage Trade Drive, Suite 105 Wake Forest, NC 27587 ATTN: Mr. Bryan Roden-Reynolds NCDOT Division 9 Project Coordinator SUBJECT: Request for Modification #2 to Section 404 General Permit and Section 401 General Water Quality Certification for the proposed US 421/I-40 Business pavement reconstruction, bridge replacements and interchange modifications from west of 4th St. to east of Church St., and a multi-use path from 4th St. to Liberty St., Forsyth County, Division 9. Federal Aid Project No. NHF- 0421(5), TIP Project No. U-2827B / C-5620A. Debit $570.00 from WBS 34872.3.4. References: Section 404 General Permit 198200031, U.S. Army Corps of Engineers Action ID SAW-2009-01193, dated July 11, 2017 (revised February 16, 2018); 401 Water Quality General Certification No. 4088, N.C. Division of Water Resources Project No. 20170732, dated July 13, 2017 (revised February 27, 2018). Dear Sir: The North Carolina Department of Transportation (NCDOT) proposes pavement reconstruction for approximately 1.2 miles of I-40 Business, bridge replacements, interchange modifications, and widening of Peters Creek Parkway in Forsyth County. As part of the project, 8.5 miles of 2- inch parallel fiber optic conduits and signage for ITS communication will be installed. In conjunction with U-2827B, project C-5620A a multi-use path along US 421/I-40 Business from Lockland Avenue to Liberty Street will be constructed. No jurisdictional impacts are proposed for the installation of the fiber optic conduits, signage, and multi-use path. The permit modification #1 application dated February 16, 2018 stated there would be a total of 458 linear feet of permanent stream impact and 216 linear feet of temporary stream impact associated with construction of the roadway project. At that time, total mitigation credits had been acquired for 458 linear feet of stream impacts. Permit modification #2 increases the total impacts to 562 linear feet of permanent stream impacts (50 feet is bank stabilization and non-mitigable), and 226 linear feet of temporary stream impacts associated with construction of the project. Additional mitigation credits for impacts to 54 linear feet of stream have been received from NC Division of Mitigation Services (see attached letter). There will be no temporary or permanent impacts to wetlands. A design change related to the West Fourth Historic District (FY3466) at Site 2 has instigated the need to modify the revised permitted impacts. Site 2 Design Change A minimum 5-foot wide sidewalk on the west side (southbound) of Peters Creek Parkway from the north side of the existing culvert to the intersection at Fourth Street is required by NCDOT. Adding this sidewalk required widening the existing Peters Creek Parkway footprint beyond the original construction limits presented in the original public hearing maps. The addition of sidewalk here resulted in several new elements of work (culvert extension, retaining wall). NCDOT had previously coordinated with SHPO/FHWA and reached concurrence on a No Adverse Effect finding based on using temporary construction easements to construct the improvements. Recent geotechnical and environmental data has revealed poor soil conditions (soft silt and clay), and groundwater located at shallow depths, requiring the retaining wall foundations to be excessively deep. The cost for this wall design became excessive. On March 20, 2018, a meeting between HPO and NCDOT decided excessive wall costs were unnecessary, and the use of fill slopes, and extending the existing culvert onto the historic property would be permitted by HPO under a Conditional No Adverse Effect. The official consultation sign-off form from the HPO meeting is attached. Per HPO requirements, the Design-Build Team is required to landscape with low-maintenance, urban plants and trees, and will not use red tips (Photinia spp.) and privet (Ligustrum spp.) in the landscaping plan. The Design-Build Team will prepare a landscaping submittal to NCDOT for review, coordinate with the Roadside Environmental Unit, and FHWA will review and approve this plan. The commitment to create landscaping plans with regards to historic resources is stated on the project commitments sheets and no project commitments will change for the project due to this project modification. Site 1: Permit Modification USACE Interpretation NCDOT is interpreting impacts at Site 1 as a single and complete linear project. We have discussed this interpretation with Monte Matthews (USACE) on May 1, 2018, and understand him to be in agreement. Permanent impacts at Site 1 are associated with a 42” pipe extension. This pipe extension is necessary for the widening of Peters Creek Parkway on the north side of Business 40, and not a result of the loops for the interchange or acceleration or deceleration lanes. Sites 2: Permit Modification USACE Interpretation NCDOT is interpreting impacts at site 2 and 3 as a single and complete linear project. We have discussed this interpretation with Monte Matthews (USACE) on May 1, 2018, and understand him to be in agreement. Permanent impacts at sites 2 (upstream of Peters Creek Parkway) and 3 are associated with the installation of a 66” pipe (site 2) and 48” pipe (site 3). As stated in the first permit modification request dated January 26, 2018, the 66” pipe at site 2 is needed to minimize long term maintenance concerns by removing guardrail, flattening slopes and reducing stream bank erosion. Site 3 is needed to tie the channel into the pipe system at site 2. Permanent impacts on the downstream side of Peters Creek Parkway are needed for slope stability. Permanent impacts at both of these sites are necessary due to impacts associated with the widening of Peters Creek Parkway on the south side of Business 40, and not a result of the loops for the interchange or acceleration or deceleration lanes. Impact Summary Table 1 shows changes in impacts from original impacts, permit modifications #1 and permit modification #2. Previously, permit modification #1 impacts were 458 linear feet of permanent stream impacts and 216 linear feet of temporary stream impacts. Permit modification #2 increases the total impacts to 562 linear feet of permanent stream impacts (50 feet is bank stabilization and non-mitigable), and 226 linear feet of temporary stream impacts associated with construction of the project. Therefore, mitigation credits for an additional 54 linear feet of stream impacts will be requested from NC Division of Mitigation Services. Table 1. U-2827B / C-5620A Stream Impacts Changes Site Temporary Fill in Perennial Streams (linear feet) Permanent Fill in Perennial Streams (linear ft) Total Stream Impact (linear feet) Stream Impacts Requiring Mitigation (linear feet) Dewater Excavation Culvert Bank Stabilization Relocation 1 No change in original impact - 10 214 - - 224 214 2 Original Impacts - 10 50 33 - 50 50 2 Modification #1 Additional Impacts - - 124 - - 124 124 2 Modification #2 Additional Impacts - 10 73 31 - 114 73 3 Original Impacts - 10 - - 42 10 - 3 Modification #1 Additional Impacts - - 51 *19 - 70 51 4 No change in original impacts 196 - - - - 196 - Totals 196 30 512 50 747 **512 *Previously culvert impact, during design changes this impact was converted to bank stabilization and was inadvertently counted as mitigable ** Mitigation for 458 linear feet of permanent impacts to streams had already been received. By copy of this letter, we also request 401 review and approval from the NC Division of Water Resources with one copy of the application package provided to Amy Chapman, Transportation Permitting Unit Supervisor, and Dave Wanucha, DOT Project Coordinator. Please charge the application fee of $570 to WBS Project No. 34872.3.4. A copy of this permit modification will be posted on the NCDOT Website at https://connect.ncdot.gov/resources/Environmental/Pages/default.aspx, under Quick Links > Permit Applications. A copy of the CE is also available at the above website address under Quick Links > Environmental Documents. Thank you for your assistance with this project. If you have any questions or need additional information, please contact me at aeuliss@ncdot.gov either or (336) 747-7800. Sincerely, Amy Euliss Division 9 Environmental Officer cc: Mezak Tucker, PE, NCDOT David Wanucha, NCDENR DWR Amy Chapman, NCDENR DWR Beth Harmon, Division of Mitigation Services Michael Penney, NCDOT Design-Build (Version 2.05; Released April 2016)34872.3.4TIP No.:U-2827B / C-5620ACounty(ies):Forsyth Page 1 of 3TIP Number:Date:Phone:Phone:Email:Email:County(ies):CAMA County?NoDesign/Future: Year:2040Existing: Year:Aquatic T&E Species?NoComments:No N/AN/AN/ADeck Drains Discharge Over Water Body?(If yes, provide justification in the General Project Narrative) (If yes, describe in the General Project Narrative; if no, justify in the General Project Narrative)(If yes, provide justification in the General Project Narrative)ac.4 lane divided freeway w/ an 11ft median: (2) 12 foot outside paved shoulders, (2) 12 foot travel lanes, (2) 5.5 foot paved median shoulders - Total width 0f 83'96,400james.rice@hdrinc.comProject Includes Bridge Spanning Water Body? Deck Drains Discharge Over Buffer? Dissipator Pads Provided in Buffer?NRTR Stream ID:Annual Avg Daily Traffic (veh/hr/day):Existing SiteProject Length (lin. miles or feet): ac.Surface Water Body (1): Class CNCDWR Surface Water Classification for Water BodyN/ABuffer Rules in Effect:SANone74,8004 lane divided freeway w/ an 11 ft median: (2) 10 foot outside paved shoulders, (2) 12 foot travel lanes, (2) 5.5 foot paved median shoulder - Total width of 79'Waterbody Information2011NCDWR Stream Index No.:34872.3.4Impairments:Other Stream Classification: Primary Classification: Project Built-Upon Area (ac.)The project consists of pavement reconstruction of approximately 1.2 miles of I-40 Business, bridge replacements, interchange modifications, construction of multi-use path, and widening of Peters Creek Parkway. There are two culvert extensions for a box culvert under Peters Creek Parkway, the upstream side has an attached junction box while the downstream was needed due to a retaining wall not being feasible, a pipe extension on the same tributary upstream of I-40 business where a supplemental pipe will be required, and a stream relocation for a small tributary that ties to the Peters Creek Tributary. An existing pipe that carries Tar Branch will also need to be replaced within the ROW limits of the project. There will be an additional 5.0 acres of impervious area added to the project due to the widening of Peters Creek Parkway. Stormwater control measures in the form of Media Filters have been proposed in this area to incorporate some stromwater treatment for part of this additional impervious area. In other areas of the project, there has been a decrease of impervious area by 7.0 acres due to the removal of select ramps and loops (see plans). The proposed project has a net reduction in Impervious area of 2.0 acres. The Design-Build Team has also flattened proposed ditches whenever possible to aide in as much treatment as possible. 555 Fayetteville St., Suite 900North Carolina Department of TransportationHighway Stormwater Program STORMWATER MANAGEMENT PLAN FOR NCDOT PROJECTSProject Type:1020 Birch Ridge Dr.Address:General Project InformationU-2827B / C-5620AWBS Element:Pavement ReconstructionWBS Element:James RiceNCDOT Contact:919-707-6703Raleigh, NC 27601Contractor / Designer:919-232-6621mslauffer@ncdot.govAddress:4/26/2018ForsythWinston SalemMatt LaufferRaleigh, NC 27610River Basin(s): City/Town:30.2Typical Cross Section Description: Surrounding Land Use: General Project Narrative:(Description of Minimization of Water Quality Impacts)NoUrbanUT to Peters CreekNA - Peters Creek: 12-94-12-832.21.26Project DescriptionProposed ProjectYadkin-Pee DeeNoneSupplemental Classification: NoneWetlands within Project Limits? (Version 2.05; Released April 2016)North Carolina Department of TransportationHighway Stormwater Program STORMWATER MANAGEMENT PLAN FOR NCDOT PROJECTS34872.3.4TIP No.:U-2827B / C-5620ACounty(ies):Forsyth Page 2 of 3Aquatic T&E Species?NoComments:No N/AN/AAquatic T&E Species?Comments:Aquatic T&E Species?Comments:Aquatic T&E Species?Comments:(If yes, provide justification in the General Project Narrative) (If yes, describe in the General Project Narrative; if no, justify in the General Project Narrative)Deck Drains Discharge Over Water Body?(If yes, provide justification in the General Project Narrative)NRTR Stream ID:Surface Water Body (4): Impairments:Buffer Rules in Effect:WBS Element:Surface Water Body (2): Buffer Rules in Effect:N/AAdditional Waterbody InformationTar BranchNCDWR Stream Index No.:NCDWR Stream Index No.:12-94-12-7NoneNRTR Stream ID:Class CPrimary Classification: NCDWR Surface Water Classification for Water BodySupplemental Classification: Other Stream Classification: Impairments:Project Includes Bridge Spanning Water Body? Deck Drains Discharge Over Buffer? Dissipator Pads Provided in Buffer?Supplemental Classification: Supplemental Classification: Other Stream Classification: SCNRTR Stream ID:Impairments:Buffer Rules in Effect:Other Stream Classification: Buffer Rules in Effect:NCDWR Surface Water Classification for Water BodyPrimary Classification: (If yes, describe in the General Project Narrative; if no, justify in the General Project Narrative)Surface Water Body (5): NCDWR Stream Index No.:(If yes, provide justification in the General Project Narrative)NCDWR Stream Index No.:Primary Classification: Other Stream Classification: NoneSupplemental Classification: Primary Classification: NRTR Stream ID:Impairments:NoneSurface Water Body (3): Project Includes Bridge Spanning Water Body? Deck Drains Discharge Over Buffer? Dissipator Pads Provided in Buffer?N/ANCDWR Surface Water Classification for Water Body(If yes, provide justification in the General Project Narrative) (If yes, describe in the General Project Narrative; if no, justify in the General Project Narrative)(If yes, provide justification in the General Project Narrative)Deck Drains Discharge Over Water Body?NCDWR Surface Water Classification for Water Body(If yes, provide justification in the General Project Narrative)Project Includes Bridge Spanning Water Body? Deck Drains Discharge Over Buffer? Dissipator Pads Provided in Buffer?Deck Drains Discharge Over Water Body?(If yes, provide justification in the General Project Narrative)(If yes, provide justification in the General Project Narrative)(If yes, describe in the General Project Narrative; if no, justify in the General Project Narrative)Project Includes Bridge Spanning Water Body? Deck Drains Discharge Over Buffer? Dissipator Pads Provided in Buffer?Deck Drains Discharge Over Water Body? (Version 2.05; Released April 2016)34872.3.4TIP No.:U-2827B / C-5620ACounty(ies):Forsyth Page 3 of 3Sheet No.Surface Water BodyDrainage Area(ac)New Built-Upon Area(ac)Volume Treated(ac-ft)North Carolina Department of TransportationHighway Stormwater ProgramSTORMWATER MANAGEMENT PLANFOR NCDOT PROJECTSOther Best Management PracticesAdditional Comments0.110.1336.090372 / -80.256302NoFiltration Basin 1.444.646.1 1.2Filtration Basin1.161.17WBS Element:Precipitation Depth Treated over NBUA(in)BMP Associated w/ Buffer Rules?NoBMP TypeStation & Coordinates (Road and Non Road Projects)-L- 18+30 Rt.36.089239 / -80.256948-L- 21+95 Lt.(1)UT to Peters Creek(1)UT to Peters Creek NC811 AS PER NC811AS PER SIG NGWGWGWGWGW GW TO S. GREEN E ST.TO FIRST S T.NC811AS PER NC 811AS PER INACCESSIBLE INV=843.26' INACCESSIBLEINACCESSIBLEINACCESSIBLENC811AS PER NC811 AS PER NC811AS PER NC811 AS PER SIG NGWGWGWGWGW GW BUS-45AASHTO 2011 (US) BUS-45AASHTO 2011 (US) INCOMPLETE PLANS DO NOT USE FOR R/W ACQUISITION DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED 0 0 0 PROFILE (HORIZONTAL) PROJECT LENGTH RIGHT OF WAY DATE: LETTING DATE: STATE STATE PROJECT REFERENCE NO. STATE PROJ. NO.F. A. PROJ. NO.DESCRIPTION NO. TOTAL SHEETS N.C. SHEET 1 DESIGN DATA SIGNATURE: SIGNATURE: P.E. P.E.DIVISION OF HIGHWAYS 2012 STANDARD SPECIFICATIONS PROJECT ENGINEER PROJECT DESIGN ENGINEER GRAPHIC SCALES PLANS PROFILE (VERTICAL) HYDRAULICS ENGINEER ENGINEER ROADWAY DESIGN LOCATION: TYPE OF WORK:09/08/99DIVISION OF HIGHWAYS STATE OF NORTH CAROLINA 0 00 1000 Birch Ridge Dr., Raleigh NC, 27610 CONTRACT:TIP PROJECT:ARTMEN N ASO H DEPT O F TRA SPORTTIONTATEOFNRTCAR O LI NAHDR Engineering, Inc. of the Carolinas N.C.B.E.L.S. License Number: F-0116 555 Fayetteville St, Suite 900 Raleigh, N.C. 27601 North_Carolina_Dept_of_Transportation\U_2827BA_BB_Bus_I_40_Reconstruction_in_WS_DB\6.0_CAD_BIM\6.2_Work_in_Progress\U-2827B\Hydraulics\PERMITS_Environmental\Drawings\U2827B_PRM_TSH.dgnCMYERS4/24/2018NCDOT_pdf_color_eng_100.plt10:08:23 AMNCDOT_TSH.tblPENTABLE:TIME:DATE:PLOT DRIVER:USER:FILE:Blythe 4 5 6 7 7 8 9 10CreekCherry St.St.LibertySt.MainSt.ChurchSt.MLKJr. WINSTON-SALEMMarshallPkwyPeters150 421 158S 8 311 52 NorfolkSouthernBEGIN PROJECT END PROJECT BUS 40 BUS 40 VICINITY MAP (NOT TO SCALE) K ERN ERSV ILLETO CLE M M O NS TO FORSYTH COUNTY U-2827B, C-5620A 34872.3.4 NHP-0421(087) RODNEY MONEY, P.E. FUNC CLASS = FREEWAY STATEWIDE TIER 50 50 10 100 100 20510 2550 2550 ADT 2040 DHV D T = V = = = = =C203862U-2827B, C-5620ADrStEighth Prepared for the Office of: ADT 2011 74,800 96,400 60% 13% * 50 MPH * (TTST 7% + DUALS 6%) 9% AUGUST 30, 2016 LYDIA BUEHRER, P.E. JAMES RICE, P.E. 11 AUGUST 30, 2016 NCDOT CONTACT: K. ZAK HAMIDI, PE, DESIGN BUILD UNIT BRIDGE LENGTH BASED ON CENTERLINE PROJECTION STATION TOTAL LENGTH TIP PROJECT U-2827B = 1.348 MILES LENGTH STRUCTURE TIP PROJECT U-2827B = 0.037 MILES LENGTH ROADWAY TIP PROJECT U-2827B = 1.311 MILES AND MULTI-USE PATH FROM FOURTH STREET TO LIBERTY STREET FROM WEST OF FOURTH STREET TO EAST OF CHURCH STREET; BRIDGE REPLACEMENTS, AND INTERCHANGE MODIFICATIONS US 421 / I-40 BUSINESS PAVEMENT RECONSTRUCTION, SIDEWALKS, SIGNING, SIGNALS, RETAINING WALLS, NOISE WALLS GRADING, DRAINAGE, PAVING, STRUCTURES, CULVERTS, CURB AND GUTTER, THIS IS A CONTROLLED ACCESS PROJECT WITH ACCESS BEING LIMITED TO INTERCHANGES PROJECT PREPARED BY:FINAL PLAN SUBMITTALBRIAN STEFFEN, P.E. SHEET __ OF __ PERMIT DRAWING SITE 1 SITE 3 SITE 2 SITE 4 PERMIT MODIFICATION STREAM IMPACTS WETLAND AND REVISIONS: SITE 2 04-24-2018 -L- STA. 5+92.00 BEGIN TIP PROJECT U-2827B -L- STA. 77+10.96 END TIP PROJECT U-2827B CONC HW5' X 6' BOX CULVERTINV=760.81HW=768.81S d72"CHL & 3SBW30" C&G30" C&GMTLNC 150 PETERS CREEK PARKWAY 39' BSTLTLTLTEXISTING R/WEXISTING R/WS S SCB CB48" CHLSSSSSSCONC BSTGRAVEL BSTBSTBSTBST BSTBST MTLMTL CONCCONCCONCCONC ISL60" CONC60" CONC 60" CONC 60" CONC 72" CHL 72" CHLBSTBSTBST 60" WDGRAVELCONC MTLCONCBSTBST BST BSTGRAVELCONC CONCBSTBSTBST48" CHL48" CHL48" CHL48"WDMTL CANOPY CONCFOUND FOUND 30" C&G 30" C&G CONCBSTBSTBSTBST CONC ISLE LT351W/LT352353W/LTW/LT354355W/LTW/LT356357W/LTW/LT358359W/LTW/LT360361W/LTW/LT364365W/LTW/LT366367W/LT368369370W/LTEXISTING R/W EXISTING R/W EXISTING R/W EXISTING R/W EXISTING R/WEXISTING R/WEXISTING R/W EXISTING R/W15" RCP18" RCP8" CLAY PIPEATTAINABLENO INVERTS FILLED W/ DIRTMTL CANOPY CONC ISLE 72" CMP72" CMPBILLBOARD6" CONC 6" CONC 6" CONC 6" CONC 6" CONC HWY 150 PETERS CREEK PKWY 38' BST HWY 150 PETERS CREEK PKWY 38' BST W EST 4TH ST 23' BST TO FIRST ST.HH12" unknownmmmmmCBDI18" RCP18" VC15" RCP12" RCP15" RCP18" RCP18" VC15" RCP18" RCP18" RCP 15" RCP18" RCP15" RCPCBCBCBCBCBCBCBCBCBCBS 18" HDPE18" VCP15" RCP24" RCP ddddd60" CONC96" MTL96" MTL96" MTLCONC ISL30" C&G60" CONCCONC ISLLTCONC ISLLT60" CONC30" C&G30" C&G60" CONCCONCCONC ISL30" C&G30" C&GU/C72" CHL72" CHL30" C&G30" C&G66" CONCFIRST ST BST6" CONC CURB 30" C&GPETERS CREEK PARKWAY 44' BST 60" CONCCBLT6" CONC CURB CONC ISLW/LTSIG LTW/LTSIG LTW/LTSIG LT66" CONCCONCCONC72" CHLEXISTING R/WEXISTING R/WEXISTING R/WEXISTING R/WEXISTING R/W2"PL2"PL6"DI6"DI6"DI6"DI6"DI4"PL4"PL6"DIINLETYARDINLETYARDLTLTLTLTLTCB24" CONC C&GBSTCONC60" CONC6" HDPE6" HDPEBSTSECOND STEXISTING R/W DB 3128 PG 4324ROADWAY SHEETS FOR PLANSIMPROVEMENTS, SEE EXTENT OF ROADWAY PLANS 025 25 50 GRAPHIC SCALE SEE SHEET 7A SHEET __ OF __ PERMIT DRAWING ( Not to Scale) CHANNEL OUTLET BANK STABILIZATION DETAIL W 1.5' GEOTEXTILE Type of Liner= CL I Rip-Rap with Geotextile 1.0'min. STA. 36+05 -Y1- RT 1.0'min. LEGEND S S SURFACE WATER DENOTES IMPACTS IN TS TS IMPACTS IN SURFACE WATER DENOTES TEMPORARY NAD 83/ NSRS 2007 35 CR203 205 207 206 173 203Z 203Z 203Z 203Z F F F F F F F F C C C C C C F F F F 7 MATCHLINE -Y1- STA. 34+00, SEE SHEET 4MATCHLINE -Y1- STA. 14+50, SEE SHEET 4SEE SHEET 4-Y2A- STA. 14+75 MATCHLINE FINAL ROADWAY REV. 01 (01-08-2018): REVISED PROPOSED R/W LINE FOR PARCELS 215 & 275 FOR PREVIOUSLY REVISED EXISTING R/W LINE. TCE ADDED TO PARCELS 204 & 205.RFC REV. 01 (10-13-2017): REVISED EXISTING R/W LINE FOR PARCEL 275NAD 83/ NSRS 2007 NAD 83/ NSRS 2007 HDR Engineering, Inc. of the Carolinas N.C.B.E.L.S. License Number: F-0116 555 Fayetteville St, Suite 900 Raleigh, N.C. 27601 HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER R/W SHEET NO. SHEET NO.PROJECT REFERENCE NO. INCOMPLETE PLANS DO NOT USE FOR R/W ACQUISITION REVISIONS PENTABLE:FILE:North_Carolina_Dept_of_Transportation\U_2827BA_BB_Bus_I_40_Reconstruction_in_WS_DB\6.0_CAD_BIM\6.2_Work_in_Progress\U-2827B\Hydraulics\PERMITS_Environmental\Drawings\U2827B_PRM_PSH.dgnUSER:CMYERSDATE:4/26/2018NCDOT_pdf_color_eng_100.pltPLOT DRIVER:3:11:04 PMTIME:NCDOT_permits_NOCON.tblDOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED Blythe U-2827B, C-5620A 2040 2011AADT YEAR (VOLUME IN 100s) (-Y1A-) PETER'S CREEK PKWY (-Y1A-) PETER'S CREEK PKWY 3 1 11 6 33 16 177 71 (-Y2A-) FIRST ST. (-Y2A-) FIRST ST. 118 40 249 84 62 37 97 24 NAD 83/ NSRS 2007 CRCRCRCRMEDIAN ISLAND REMOVE EXIST. 201 215 275 C C F F F F F F C C NAD 83/ NSRS 2007 RET AI NRETAI NRETAIN CB(F)15" RCP-III 15" RCP-III 15" RCP-III CB(G) CB(G)RETAINREMOVE CB CB REMOVE DETAIL 'S' SEE SHEET '2D-1' EXCELSIOR MATTING TEMPORARY CB(F) CB(F)W/ 15" RCPAND EXTENDCOLLARCLASS 'I' RIP RAP EST. 48 TONS SEE DETAIL 'W' BANK STABILIZATION CHANNEL OUTLET TIE TO EXISTING RIP RAP 71 SY GEO-TEXTILEDO NOT BURYEX TEND 5' X 6' RCBCSITE 2 Adj. MH CB(F) DI DI CB(G) REMOVE CB RETAIN RETAINRET AI NRETAIN RETAIN RETAIN RETAIN RETAINRETAIN RETAI NSYSTEM RETAIN RETAI NRCP-III15"15" RCP- III R E T A INRETAIN RCP-III 18" MH RETAIN CB ADJUST CONC HW5' X 6' BOX CULVERTINV=760.81HW=768.81S d72"CHL & 3SBW30" C&G30" C&GMTLNC 150 PETERS CREEK PARKWAY 39' BSTLTLTLTEXISTING R/WEXISTING R/WS S SCB CB48" CHLSSSSSSCONC BSTGRAVEL BSTBSTBSTBST BSTBST MTLMTL CONCCONCCONCCONC ISL60" CONC60" CONC 60" CONC 60" CONC 72" CHL 72" CHLBSTBSTBST 60" WDGRAVELCONC MTLCONCBSTBST BST BSTGRAVELCONC CONCBSTBSTBST48" CHL48" CHL48" CHL48"WDMTL CANOPY CONCFOUND FOUND 30" C&G 30" C&G CONCBSTBSTBSTBST CONC ISLE LT351W/LT352353W/LTW/LT354355W/LTW/LT356357W/LTW/LT358359W/LTW/LT360361W/LTW/LT364365W/LTW/LT366367W/LT368369370W/LTEXISTING R/W EXISTING R/W EXISTING R/W EXISTING R/W EXISTING R/WEXISTING R/WEXISTING R/W EXISTING R/W15" RCP18" RCP8" CLAY PIPEATTAINABLENO INVERTS FILLED W/ DIRTMTL CANOPY CONC ISLE 72" CMP72" CMPBILLBOARD6" CONC 6" CONC 6" CONC 6" CONC 6" CONC HWY 150 PETERS CREEK PKWY 38' BST HWY 150 PETERS CREEK PKWY 38' BST W EST 4TH ST 23' BST TO FIRST ST.HH12" unknownmmmmmCBDI18" RCP18" VC15" RCP12" RCP15" RCP18" RCP18" VC15" RCP18" RCP18" RCP 15" RCP18" RCP15" RCPCBCBCBCBCBCBCBCBCBCBS 18" HDPE18" VCP15" RCP24" RCP ddddd60" CONC96" MTL96" MTL96" MTLCONC ISL30" C&G60" CONCCONC ISLLTCONC ISLLT60" CONC30" C&G30" C&G60" CONCCONCCONC ISL30" C&G30" C&GU/C72" CHL72" CHL30" C&G30" C&G66" CONCFIRST ST BST6" CONC CURB 30" C&GPETERS CREEK PARKWAY 44' BST 60" CONCCBLT6" CONC CURB CONC ISLW/LTSIG LTW/LTSIG LTW/LTSIG LT66" CONCCONCCONC72" CHLEXISTING R/WEXISTING R/WEXISTING R/WEXISTING R/WEXISTING R/W2"PL2"PL6"DI6"DI6"DI6"DI6"DI4"PL4"PL6"DIINLETYARDINLETYARDLTLTLTLTLTCB24" CONC C&GBSTCONC60" CONC6" HDPE6" HDPEBSTSECOND STEXISTING R/W DB 3128 PG 4324ROADWAY SHEETS FOR PLANSIMPROVEMENTS, SEE EXTENT OF ROADWAY 751752752753754 755 756757758758759 759 760 760 760760 761761761 762 7 62 763 7 63 764 764 765 76576576 5 7 65 765765766766766 766766767 767 767767 767768768768768768 768768 768769 769 769769769769769770 770770 770770770 7707707707 7 1 771 771 771771772772 772 772772773 773 773773773774 7 74774 774 774774 774775 775775 775 775 775775 775775775 776 776 776 776776776777777 777 777 778 778778 778778779 779 779 779 77978 0780 780780780 780 780 780780781 781781 781782782782 782 783 783 783 783 783784 784 784 784 785 785 7 8 5 785785785 785 785786786786 786787787787 788788 788 789 789 789 790790 790 790 790 790790 790 791 791791791791 791791 792792 792792792793 793 793 794 794 79 4 795 795795795795 796796 797797798799 800 801 802 803 804805 857858859860860861862863864865865866867868869870870871872873874875875875875876876877877878878879880880880881881881882882882 882883883 883884884884 884884885885885885 885 885886886886 886886 886887887887888888888 8 8 9 889889889889 889890890890890890 890 890 890 890891891891891891 891892892892892892 8928938938938 9 3893 893894894894894894 894895895895895895895895 895 895 895895896896896896896897897897897 8978978 9 7 898898898 898898 898898898899 899 899899899899900 9 00 900 900 900900900900900 900901 901 901901902 902 902902902903903903904904 905 905 9 0590590590 6 906907 907908908909909910910910910 911911912912913913914915915 9 1 5 9169179189 1 9920 PLANS 025 25 50 GRAPHIC SCALE SEE SHEET 7A SHEET __ OF __ PERMIT DRAWING ( Not to Scale) CHANNEL OUTLET BANK STABILIZATION DETAIL W 1.5' GEOTEXTILE Type of Liner= CL I Rip-Rap with Geotextile 1.0'min. STA. 36+05 -Y1- RT 1.0'min. LEGEND S S SURFACE WATER DENOTES IMPACTS IN TS TS IMPACTS IN SURFACE WATER DENOTES TEMPORARY NAD 83/ NSRS 2007 SITE 2 35 CR203 205 207 206 173 203Z 203Z 203Z 203Z F F F F F F F F C C C C C C F F F F 7 MATCHLINE -Y1- STA. 34+00, SEE SHEET 4MATCHLINE -Y1- STA. 14+50, SEE SHEET 4SEE SHEET 4-Y2A- STA. 14+75 MATCHLINE FINAL ROADWAY REV. 01 (01-08-2018): REVISED PROPOSED R/W LINE FOR PARCELS 215 & 275 FOR PREVIOUSLY REVISED EXISTING R/W LINE. TCE ADDED TO PARCELS 204 & 205.RFC REV. 01 (10-13-2017): REVISED EXISTING R/W LINE FOR PARCEL 275NAD 83/ NSRS 2007 NAD 83/ NSRS 2007 HDR Engineering, Inc. of the Carolinas N.C.B.E.L.S. License Number: F-0116 555 Fayetteville St, Suite 900 Raleigh, N.C. 27601 HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER R/W SHEET NO. SHEET NO.PROJECT REFERENCE NO. INCOMPLETE PLANS DO NOT USE FOR R/W ACQUISITION REVISIONS PENTABLE:FILE:North_Carolina_Dept_of_Transportation\U_2827BA_BB_Bus_I_40_Reconstruction_in_WS_DB\6.0_CAD_BIM\6.2_Work_in_Progress\U-2827B\Hydraulics\PERMITS_Environmental\Drawings\U2827B_PRM_PSH.dgnUSER:CMYERSDATE:4/26/2018NCDOT_pdf_color_eng_100.pltPLOT DRIVER:3:10:26 PMTIME:NCDOT_permits_CON.tblDOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED Blythe U-2827B, C-5620A 2040 2011AADT YEAR (VOLUME IN 100s) (-Y1A-) PETER'S CREEK PKWY (-Y1A-) PETER'S CREEK PKWY 3 1 11 6 33 16 177 71 (-Y2A-) FIRST ST. (-Y2A-) FIRST ST. 118 40 249 84 62 37 97 24 NAD 83/ NSRS 2007 CRCRCRCRMEDIAN ISLAND REMOVE EXIST. 201 215 275 C C F F F F F F C C NAD 83/ NSRS 2007 RET AI NRETAI NRETAIN CB(F)15" RCP-III 15" RCP-III 15" RCP-III CB(G) CB(G)RETAINREMOVE CB CB REMOVE DETAIL 'S' SEE SHEET '2D-1' EXCELSIOR MATTING TEMPORARY CB(F) CB(F)W/ 15" RCPAND EXTENDCOLLARCLASS 'I' RIP RAP EST. 48 TONS SEE DETAIL 'W' BANK STABILIZATION CHANNEL OUTLET TIE TO EXISTING RIP RAP 71 SY GEO-TEXTILEDO NOT BURYEX TEND 5' X 6' RCBCAdj. MH CB(F) DI DI CB(G) REMOVE CB RETAIN RETAINRET AI NRETAIN RETAIN RETAIN RETAIN RETAINRETAIN RETAI NSYSTEM RETAIN RETAI NRCP-III15"15" RCP- III R E T A INRETAIN RCP-III 18" MH RETAIN CB ADJUST CONC HW5' X 6' BOX CULVERTINV=760.81HW=768.81d72"CHL & 3SBW30" C&G30" C&GMTLNC 150 PETERS CREEK PARKWAY 39' BSTLTCONC ISLLTLTEXISTING R/WEXISTING R/WSSBSTBSTBSTBST MTLMTL CONCCONCCONC60" CONC60" CONC 60" CONC 60" CONC 72" CHL CONC CONCBSTCONC 30" C&G 30" C&G BST 351W/LT352W/LT356357W/LTW/LT360361W/LTEXISTING R/W EXISTING R/W EXISTING R/W CONC ISLE 72" CMPBILLBOARD6" CONC 6" CONC 6" CONC 6" CONC HWY 150 PETERS CREEK PKWY 38' BST HWY 150 PETERS CREEK PKWY 38' BST W EST 4TH ST 23' BSTHH12" unknownELEV=778.44 E=1628390 N=852717 BM #2 HDR Engineering, Inc. of the Carolinas N.C.B.E.L.S. License Number: F-0116 555 Fayetteville St, Suite 900 Raleigh, N.C. 27601 HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER R/W SHEET NO. SHEET NO.PROJECT REFERENCE NO. INCOMPLETE PLANS DO NOT USE FOR R/W ACQUISITION REVISIONS PENTABLE:FILE:North_Carolina_Dept_of_Transportation\U_2827BA_BB_Bus_I_40_Reconstruction_in_WS_DB\6.0_CAD_BIM\6.2_Work_in_Progress\U-2827B\Hydraulics\PERMITS_Environmental\Drawings\U2827B_PRM_PSH.dgnUSER:CMYERSDATE:4/26/2018NCDOT_pdf_color_eng_100.pltPLOT DRIVER:3:14:35 PMTIME:NCDOT_permits_NOCON.tblDOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED Blythe U-2827B 7A NAD 83/ NSRS 2007 LEGEND S S SURFACE WATER DENOTES IMPACTS IN TS TS IMPACTS IN SURFACE WATER DENOTES TEMPORARY SHEET __ OF __ PERMIT DRAWING PLANS 012.5 12.5 25 GRAPHIC SCALE ( Not to Scale) CHANNEL OUTLET BANK STABILIZATION DETAIL W 1.5' GEOTEXTILE Type of Liner= CL I Rip-Rap with Geotextile 1.0'min. STA. 36+05 -Y1- RT 1.0'min. 35 203 205 203Z 203Z 203Z 203Z F F F F C C FF F F FRETAINRETAIN RETAI NCB(F)15" RCP-III 15" RCP-III 15" RCP-III CB(G) CB(G) REMOVE CB DETAIL 'S' SEE SHEET '2D-1' EXCELSIOR MATTING TEMPORARY CB(F) CLASS 'I' RIP RAP EST. 48 TONS SEE DETAIL 'W' BANK STABILIZATION CHANNEL OUTLET TIE TO EXISTING RIP RAP 71 SY GEO-TEXTILEDO NOT BURYEXTEND 5' X 6' RCBCSITE 2 HandExisting Existing Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural Site Station Structure Fill In Fill In in Clearing in SW SWImpacts Impacts StreamNo. (From/To) Size / Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp. Design (ac) (ac) (ac) (ac) (ac) (ac) (ac) (ft) (ft) (ft)1 17+35 -L- LT 48" RCP-IV 0.02 < 0.01 214 10 2 33+90 -Y1- LT 66" RCP-III EXT. TO RCBC 0.03 174 2 35+35 -Y1- RT 5' x 6' RCBC EXT. 0.02 73 2 35+35 -Y1- RT BANK STABILIZATION < 0.01 < 0.01 31 10 3 32+30 -Y1- LT 48" RCP-III < 0.01 < 0.01 51 10 3 32+30 -Y1- LT BANK STABILIZATION 19 4 41+85 -L- 78" CMP DE-WATERING 0.03 196 TOTALS*: 0.08 0.03 562 226 0*Rounded totals are sum of actual impactsNOTES:Revised 2016 09 09SHEET OF WETLAND AND SURACE WATER IMPACTS SUMMARYWETLAND IMPACTSSURFACE WATER IMPACTSFORSYTH COUNTYU-2827B34872.3.4NC DEPARTMENT OF TRANSPORTATIONDIVISION OF HIGHWAYS04/24/2018