Loading...
HomeMy WebLinkAboutNC0073741_Inspection_20180518EPA United States Environmental Protection Agency Washington, D.C. 20460 Water Compliance Inspection Report Form Approved. OMB No. 2040-0057 Approval expires 8-31-98 Section A: National Data System Coding (i.e., PCS) Transaction Code NPDES yr/mo/day Inspection Type Inspector Fac Type 1 N 52 NC0073741 18/05/15 C S31112171819 20 21 66 Inspection Work Days Facility Self-Monitoring Evaluation Rating B1 QA ----------------------Reserved------------------- N67707172 73 74 75 80 Section B: Facility Data Name and Location of Facility Inspected (For Industrial Users discharging to POTW, also include POTW name and NPDES permit Number) Mountain Valley WWTP NCSR 1171 Etowah NC 28729 Entry Time/Date Permit Effective Date Exit Time/Date Permit Expiration Date 11:25AM 18/05/15 15/12/01 Name(s) of Onsite Representative(s)/Titles(s)/Phone and Fax Number(s) /// Vincent L Edwards/ORC/828-697-3077/ Other Facility Data 12:05PM 18/05/15 20/11/30 Name, Address of Responsible Official/Title/Phone and Fax Number Patty Carland,117 Kira Ln Hendersonville NC 28739//828-890-4810/Contacted No Section C: Areas Evaluated During Inspection (Check only those areas evaluated) Permit Flow Measurement Operations & Maintenance Self-Monitoring Program Effluent/Receiving Waters Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary) (See attachment summary) Name(s) and Signature(s) of Inspector(s)Agency/Office/Phone and Fax Numbers Date Daniel J Boss ARO WQ//828-296-4658/ Signature of Management Q A Reviewer Agency/Office/Phone and Fax Numbers Date EPA Form 3560-3 (Rev 9-94) Previous editions are obsolete. Page#1 DocuSign Envelope ID: C00559A0-C770-422A-A223-349D78E2BA31 5/18/2018 NPDES yr/mo/day 18/05/15 Inspection Type C3111218 1 Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary) On 5/15/2018, I (Daniel Boss) conducted a compliance evaluation inspection at Mountain Valley WWTP. I met with the ORC, Vince Edwards, for the inspection. Overall the plant appears to be operated well. A small leak was discovered in a pipe that runs out of the chlorine contact chamber. This needs to be fixed. There was not a sampler on site. Vince said they bring one to the site for composite sampling. The flow meter is working but the sampling is not done flow proportionally because a permanent sampler is not set up. Vince said that the sampler they typically use for flow proportional sampling has been broken for "months" and he has continued to make maintenance requests throughout that time. Please fix this quickly as flow proportional sampling is required by your permit. The outfall needs to be accessible. Vince and I could not find the effluent pipe. NC0073741 17 (Cont.) Page#2 DocuSign Envelope ID: C00559A0-C770-422A-A223-349D78E2BA31 Permit:NC0073741 Inspection Date:05/15/2018 Owner - Facility: Inspection Type: Mountain Valley WWTP Compliance Evaluation Permit Yes No NA NE (If the present permit expires in 6 months or less). Has the permittee submitted a new application? Is the facility as described in the permit? # Are there any special conditions for the permit? Is access to the plant site restricted to the general public? Is the inspector granted access to all areas for inspection? Comment: Operations & Maintenance Yes No NA NE Is the plant generally clean with acceptable housekeeping? Does the facility analyze process control parameters, for ex: MLSS, MCRT, Settleable Solids, pH, DO, Sludge Judge, and other that are applicable? Vince analyzes D.O. and settleable solids twice per month. There is a leaking pipe that needs to be repaired. Comment: Aeration Basins Yes No NA NE Mode of operation Ext. Air Type of aeration system Diffused Is the basin free of dead spots? Are surface aerators and mixers operational? Are the diffusers operational? Is the foam the proper color for the treatment process? Does the foam cover less than 25% of the basin’s surface? Is the DO level acceptable? Is the DO level acceptable?(1.0 to 3.0 mg/l) Foam covers about 60% of the surface.Comment: Secondary Clarifier Yes No NA NE Is the clarifier free of black and odorous wastewater? Is the site free of excessive buildup of solids in center well of circular clarifier? Are weirs level? Is the site free of weir blockage? Is the site free of evidence of short-circuiting? Is scum removal adequate? Page#3 DocuSign Envelope ID: C00559A0-C770-422A-A223-349D78E2BA31 Permit:NC0073741 Inspection Date:05/15/2018 Owner - Facility: Inspection Type: Mountain Valley WWTP Compliance Evaluation Secondary Clarifier Yes No NA NE Is the site free of excessive floating sludge? Is the drive unit operational? Is the return rate acceptable (low turbulence)? Is the overflow clear of excessive solids/pin floc? Is the sludge blanket level acceptable? (Approximately ¼ of the sidewall depth) Comment: Disinfection-Tablet Yes No NA NE Are tablet chlorinators operational? Are the tablets the proper size and type? Number of tubes in use?2 Is the level of chlorine residual acceptable? Is the contact chamber free of growth, or sludge buildup? Is there chlorine residual prior to de-chlorination? Comment: De-chlorination Yes No NA NE Type of system ?Tablet Is the feed ratio proportional to chlorine amount (1 to 1)? Is storage appropriate for cylinders? # Is de-chlorination substance stored away from chlorine containers? Comment: Are the tablets the proper size and type? Are tablet de-chlorinators operational? Number of tubes in use?2 Comment: Effluent Sampling Yes No NA NE Is composite sampling flow proportional? Is sample collected below all treatment units? Is proper volume collected? Is the tubing clean? Page#4 DocuSign Envelope ID: C00559A0-C770-422A-A223-349D78E2BA31 Permit:NC0073741 Inspection Date:05/15/2018 Owner - Facility: Inspection Type: Mountain Valley WWTP Compliance Evaluation Effluent Sampling Yes No NA NE # Is proper temperature set for sample storage (kept at less than or equal to 6.0 degrees Celsius)? Is the facility sampling performed as required by the permit (frequency, sampling type representative)? The facility sampler is broken and has been for "months" according to Vince. A sampler is being brought to the site for composite sample collection, but it is not taken as a flow proportional sample. Comment: Flow Measurement - Effluent Yes No NA NE # Is flow meter used for reporting? Is flow meter calibrated annually? Is the flow meter operational? (If units are separated) Does the chart recorder match the flow meter? Comment: Effluent Pipe Yes No NA NE Is right of way to the outfall properly maintained? Are the receiving water free of foam other than trace amounts and other debris? If effluent (diffuser pipes are required) are they operating properly? Could not locate outfall.Comment: Page#5 DocuSign Envelope ID: C00559A0-C770-422A-A223-349D78E2BA31