Loading...
HomeMy WebLinkAboutNC0023086_Final Drawing_20180316WASTEWATER TREATMENT • I -•• • 11 `' 111• GRAHAM COUNTY, NORTH CAROLINA Nwilvill Wit Fit, P Flo ;`��'`�; .:� a � � � �' = �� ~ter f }, �'�� � r�� � � 1 1 • • "-�� "`��-fir- , _'_��� �1- `+ u r ,/ �� —� � ��� -, ~'�µT Y � ` a 1 . - - - - • • _ i.. • i.s ., ' ei .,I ._. it ' ,>� ��� - r •- • •- • : - . . . • �� i _�✓.. ON- mlg'Wl r=tel`'_ ..,r �� _ _ 1 ' • NOTE: w -FINAL DRAWING FOR REVIEW PURPOSES ONLY NOT RELEASED FOR CONSTRUCTION - � r R f 111 j 55 BROAD STREET ASHEVILLE, NC 28801 PH. (828) 252-0575 FIRM LICENSE # C-0459 FEBRUARY 2018 (CONT.) RECP ROLLED EROSION CONTROL PRODUCT (NAG S75) RR RR RR RIPRAP LINED DITCH GL GL GRASS LINED DITCH P P PAVED DITCH - - - - - - - - - - ROOF LEADER Q:Standards/Legends/ECSD-McGILL Legend.dwg S GENERAL SEWER NOTES 34 UPDATED MARCH, 2017 1. ALL CONSTRUCTION OUTSIDE RIGHTS-OF-WAY SHALL TAKE PLACE WITHIN THE PERMANENT AND TEMPORARY ACCESS EASEMENTS SHOWN. 2. CONTRACTOR SHALL REPAIR ALL DISTURBED AREAS TO EQUAL OR BETTER CONDITION THAN THE ORIGINAL SITE, OR AS NOTED. 3. LOCATIONS OF EXISTING UTILITIES AS SHOWN ARE APPROXIMATE ONLY. EXACT LOCATIONS ARE TO BE VERIFIED IN THE FIELD BY THE CONTRACTOR. AT LEAST THREE DAYS PRIOR TO CONSTRUCTION, CONTRACTOR MUST NOTIFY EXISTING UTILITY OWNERS. CALL 811 BEFORE YOU DIG. 4. ALL WORK NEAR AND AROUND WATERWAYS MUST CONFORM TO THE RULES OF THE STATE OF NORTH CAROLINA. 5. CONTRACTOR MUST PROVIDE EROSION CONTROL DEVICES TO CONTROL RUNOFF FROM THE CONSTRUCTION SITE. CONTRACTOR WILL BE RESPONSIBLE FOR ANY FINES THAT MAY BE LEVIED DUE TO POLLUTION CREATED DURING CONSTRUCTION. 6. CONTRACTOR SHALL FOLLOW ALL FEDERAL, STATE AND LOCAL HEALTH AND SAFETY REGULATIONS PERTAINING TO CONSTRUCTION OPERATIONS. 7. SEWER FORCE MAINS AND WATER LINES SHALL HAVE 3'-0" MINIMUM COVER UNLESS OTHERWISE SHOWN ON THE DRAWINGS. 8. WATER AND SEWER LINES SHALL HAVE A MINIMUM 10' HORIZONTAL SEPARATION OR A MINIMUM 18" VERTICAL SEPARATION WITH THE WATER OVER SEWER, OR BOTH WATER AND SEWER LINES SHALL BE DUCTILE IRON PIPE 10' EITHER SIDE OF THE CROSSING. 9. SEWER AND STORM SEWER LINES SHALL HAVE A MINIMUM 24" SEPARATION. IF 24" SEPARATION IS NOT OBTAINABLE, DUCTILE IRON PIPE SHALL BE USED FOR THE SEWER LINE OR A SUPPORTING MATERIAL SUCH AS FLOWABLE FILL SHALL BE INSTALLED BETWEEN THE PIPES. 10. SEE PROJECT SPECIFICATIONS FOR ADDITIONAL INFORMATION. 11. UNLESS OTHERWISE NOTED, ALL BURIED PIPE SHALL BE INSTALLED WITH PUSH -ON JOINTS AND EXPOSED PIPING SHALL BE FLANGED JOINT. 12. LEGAL DESCRIPTIONS FOR PROPOSED EASEMENTS BY OTHERS. 13. SITE TOPOGRAPHIC AND BOUNDARY SURVEY PROVIDED BY SURVEYOR NOTED ON PLANS. 14. CONTRACTOR SHALL NOTIFY THE PROPER LOCAL AUTHORITIES 24 HOURS PRIOR TO ANY ROAD BEING CLOSED FOR CONSTRUCTION, INCLUDING BUT NOT LIMITED TO LOCAL NEWSPAPER, RADIO STATION, FIRE DEPARTMENT, COUNTY SHERIFF'S DEPARTMENT, AMBULANCE, AND COUNTY EMERGENCY AGENCY. ALL TRAFFIC CONTROL SHALL CONFORM TO THE REQUIREMENTS OF THE NORTH CAROLINA DEPARTMENT OF TRANSPORTATION. 15. CONTRACTOR SHALL NOTIFY THE ENGINEER AFTER EXISTING BURIED UTILITIES HAVE BEEN LOCATED AND 24 HOURS PRIOR TO CONSTRUCTION. 16. LOCATIONS SHOWN FOR SANITARY SEWER SERVICES ARE ASSUMED. COORDINATE LOCATIONS OF ALL PROPOSED SEWER SERVICE CONNECTIONS WITH PROPERTY OWNER PRIOR TO CONSTRUCTION. 17. CONTRACTOR SHALL FIELD VERIFY ALL PROPOSED MANHOLE TOP ELEVATIONS AND EXISTING MANHOLE INVERTS PRIOR TO CONSTRUCTION AND NOTIFY ENGINEER OF ANY DISCREPANCIES. CONTRACTOR SHALL ADJUST ALL PROPOSED SEWER STRUCTURES TO MATCH FINISHED PAVEMENT ELEVATIONS. COSTS OF RAISING STRUCTURES SHALL BE CONSIDERED INCIDENTAL TO OTHER WORK ON THE PROJECT. 18. MANHOLES AND CASTINGS SHALL MEET THE REQUIREMENTS OF OWNER AS WELL AS THE PROJECT SPECIFICATIONS. 19. 4" SANITARY SEWER SERVICE LINES SHALL BE INSTALLED AT 2.0% MINIMUM SLOPE AND SHALL BE DUCTILE IRON IN PAVED AREAS. 20. ALL FENCE DAMAGED DURING CONSTRUCTION SHALL BE REPLACED WITH LIKE MATERIALS IN A WORKMANLIKE MANNER AND IN ACCORDANCE WITH STANDARD FENCE CONSTRUCTION PRACTICES AT THE CONTRACTOR'S EXPENSE. 21. CONTRACTOR SHALL FIELD LOCATE ALL BURIED TELEPHONE LINE IN CONFLICT WITH THE PROPOSED UTILITY LINE. WHERE NECESSARY, EXISTING BURIED TELEPHONE LINE SHALL BE TEMPORARILY MOVED DURING CONSTRUCTION OF THE PROPOSED UTILITY LINE AND RE-LAID AT NO ADDITIONAL COST TO THE OWNER. 22. CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE TO EXISTING ROADS DURING CONSTRUCTION AND SHALL REPAIR ROADS PER REQUIREMENTS OF THE NORTH CAROLINA DEPARTMENT OF TRANSPORTATION. NO OPEN CUTS OF EXISTING ROADS SHALL BE ALLOWED EXCEPT WHERE INDICATED ON THE DRAWINGS OR WHERE SPECIFIC PERMISSION IS GRANTED BY THE NORTH CAROLINA DEPARTMENT OF TRANSPORTATION. SAND OR A SIMILAR MATERIAL APPROVED BY THE NORTH CAROLINA DEPARTMENT OF TRANSPORTATION SHALL BE PLACED ON THE ROAD TO AID IN THE CLEAN UP AFTER CONSTRUCTION. A MINIMUM OF 2" OF SAND SHALL BE PLACED ON THE ROAD PRIOR TO STOCKPILING SPOIL MATERIAL ON THE ROAD SURFACE TO FACILITATE CLEANUP. 23. CONTRACTOR SHALL MAINTAIN SEWAGE FLOW IN SEWER SYSTEM AT ALL TIMES AND SHALL PROVIDE BYPASS PUMPING AND/OR PIPING AS REQUIRED. NO SANITARY SEWER OVERFLOWS ARE PERMITTED. NOTE: FINAL DRAWING - FOR REVIEW PURPOSES ONLY - NOT RELEASED FOR CONSTRUCTION EXISTING CONDITIONS LEGEND TELEPHONE PEDESTAL PROPOSED EROSION CONTROL ELECTRIC PEDESTAL C GENERAL EROSION CONTROL NOTES CABLE TV PEDESTAL ® 43 UPDATED MARCH, 2017 AND STORM DRAINAGE LEGEND UNDERGROUND CABLE TV SIGN MON UNDERGROUND FIBER OPTIC CABLE SIGN 0RBF UNDERGROUND TELEPHONE CABLE SIGN ROCK PIPE INLET PROTECTION 1. FINISH GRADE TOLERANCES SHALL BE AS NOTED IN THE SPECIFICATIONS. THE ENGINEER MAY UNDERGROUND ELECTRIC LINE SIGN ®CPHUB MAKE GRADE CHANGES AS REQUIRED IN THE FIELD WITHOUT EFFECTING THE UNIT BID PRICE 0 UTILITY POLE FOR UNCLASSIFIED EXCAVATION. GUY WIRE ANCHOR coo) O MANHOLE TEMPORARY EXC. DROP INLET PROTECTION 2. UNLESS OTHERWISE STATED, ALL FILL AREAS SHALL BE CONSTRUCTED IN LAYERS OF 8" MAXIMUM STORM DRAIN MANHOLE A THICKNESS, WITH WATER ADDED OR SOIL CONDITIONED TO THE OPTIMUM MOISTURE CONTENT AS 40 COMMUNICATION MANHOLE DETERMINED BY THE ENGINEER AND COMPACTED WITH A SHEEP'S FOOT ROLLER TO A COMPACTION ■ ■ ■ ■ 66 EQUAL TO OR GREATER THAN 95% (100% IN THE TOP 2' OF THE SUB GRADE BELOW ROADWAYS AND TEMPORARY BLOCK & GRAVEL INLET PROTECTION JUNCTION BOX PARKING LOTS) OF THE DENSITY OBTAINED BY COMPACTING A SAMPLE OF THE MATERIAL IN Q ELEVATION ACCORDANCE WITH THE STANDARD PROCTOR METHOD OF MOISTURE -DENSITY RELATIONSHIP TEST, O C.O. SEWER CLEAN-OUT ASTM D698 OR AASHTO-99 UNLESS SPECIFIED IN OTHER SPECIFICATIONS. ELECTRIC SERVICE STUB -OUT 3. ENTIRE AREA TO BE GRADED SHALL BE CLEARED AND GRUBBED. NO FILL SHALL BE PLACED ON SOD DROP INLET PROTECTION CATCH BASIN ANY AREA NOT CLEARED AND GRUBBED. CURB INLET 0 WATER METER A 4. ALL SOIL EROSION CONTROL MEASURES REQUIRED BY THE GRADING PLAN SHALL BE PERFORMED ® ROCK DOUGHNUT INLET PROTECTION Ia BLOW OFF VALV. PRIOR TO GRADING, CLEARING OR GRUBBING. ALL EROSION CONTROL DEVICES SUCH AS SILT b GAS METER FENCES, ETC., SHALL BE MAINTAINED IN WORKABLE CONDITION FOR THE LIFE OF THE PROJECT GAS VALVE D° AND SHALL BE REMOVED AT THE COMPLETION OF THE PROJECT ONLY ON THE ENGINEER'S D4 POST INDICATOR VALVE APPROVAL. PAYMENT SHALL BE CONSIDERED INCIDENTAL TO CLEARING AND GRUBBING. IF DURING '����■���i#, �: THE LIFE OF THE PROJECT, A STORM CAUSES SOIL EROSION WHICH CHANGES FINISH GRADES OR :� TEMPORARY SEDIMENT TRAP CREATES "GULLIES" AND "WASHED AREAS", THESE SHALL BE REPAIRED AT NO EXTRA COST, AND WI.- ALL SILT WASHED OFF OF THE PROJECT SITE ONTO ADJACENT PROPERTY SHALL BE REMOVED AS DIRECTED BY THE ENGINEER AT NO EXTRA COST. THE CONTRACTOR SHALL ADHERE TO ANY TOP &TOE LINES APPROVED EROSION CONTROL PLANS WHETHER INDICATED IN THE CONSTRUCTION PLANS OR UNDER SEDIMENT BASIN SEPARATE COVER. 5. DISPOSABLE MATERIAL A. CLEARING AND GRUBBING WASTES SHALL BE REMOVED FROM THE SITE AND PROPERLY ROCK DAM DISPOSED OF BY THE CONTRACTOR AT HIS EXPENSE, UNLESS SPECIFIED OTHERWISE. Z B. SOLID WASTES TO BE REMOVED, SUCH AS SIDEWALKS, CURBS, PAVEMENT, ETC., MUST BE PLACED IN SPECIFIC DISPOSAL AREAS DELINEATED ON THE PLANS OR REMOVED FROM THE WATTLE TYPE CHECK DAM SITE AS REQUIRED BY THE SPECIFICATIONS. THIS MATERIAL SHALL HAVE A MINIMUM COVER OF 2'. THE CONTRACTOR SHALL MAINTAIN SPECIFIED COMPACTION REQUIREMENTS IN THESE U - - - - - CTV- AREAS. WHEN DISPOSAL SITES ARE NOT PROVIDED, THE CONTRACTOR SHALL REMOVE THIS CTV- APPROXIMATE LOCATION OF WASTE FROM THE SITE AND PROPERLY DISPOSE OF IT AT HIS EXPENSE. SKIMMER SEDIMENT BASIN C. ABANDONED UTILITIES SUCH AS CULVERTS, WATER PIPE, HYDRANTS, CASTINGS, PIPE Z APPURTENANCES, UTILITY POLES, ETC., SHALL BE THE PROPERTY OF THE SPECIFIC UTILITY AGENCY, OR COMPANY HAVING JURISDICTION. BEFORE THE CONTRACTOR CAN REMOVE, POROUS BAFFLES DESTROY, SALVAGE, REUSE, SELL OR STORE FOR HIS OWN USE ANY ABANDONED UTILITY, HE MUST PRESENT TO THE OWNER WRITTEN PERMISSION FROM THE UTILITY INVOLVED. CTV D. ON SITE BURNING IS AN ACCEPTABLE METHOD OF DISPOSING OF FLAMMABLE WASTES. WHEN BURNING IS ANTICIPATED, THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING ALL STABILIZED CONSTRUCTION ENTRANCE NECESSARY PERMITS AND MEETING GOVERNING CODES. THE CONTRACTOR SHALL NOTIFY THE ENGINEER OR HIS REPRESENTATIVE AS TO THE SPECIFIC LOCATION OF BURNING. -----FOC-----FOC- Q STORM MANHOLE APPROXIMATE LOCATION OF UNDERGROUND FIBER OPTIC CABLE LINE AFTER BURNING IS COMPLETED, PURE ASH MAY BE DISPOSED OF BY MIXING WITH FILL Wa DIRT. ALL MATERIAL NOT TOTALLY BURNED SHALL BE DISPOSED OF AS SPECIFIED IN "B" O JUNCTION BOX ABOVE. THE CONTRACTOR SHALL NOT HOLD UP WORK PROGRESS FOR THE PURPOSE OF JB WAITING FOR A "BURNING DAY". 6. IN THE EVENT EXCESSIVE GROUNDWATER OR SPRINGS ARE ENCOUNTERED WITHIN THE LIMITS OF J CONSTRUCTION, THE CONTRACTOR SHALL INSTALL NECESSARY UNDER DRAINS AND STONE O ----E-----E AS DIRECTED BY THE ENGINEER. ALL WORK SHALL BE PAID BASED UPON UNIT BIDS, APPROXIMATE LOCATION OF UNDERGROUND ELECTRIC LINE UNLESS SPECIFIED OTHERWISE. Q:Standards/Legends/ECSD-McGILL Legend.dwg 7. THE CONTRACTOR IS RESPONSIBLE FOR THE COORDINATION OF ADJUSTMENT OF ALL UTILITY Z Z SURFACE ACCESSES WHETHER HE PERFORMS THE WORK OR A UTILITY COMPANY PERFORMS THE WORK. 8. THE CONTRACTOR SHALL CONTROL ALL "DUST" BY PERIODIC WATERING AND SHALL PROVIDE ACCESS AT ALL TIMES FOR PROPERTY OWNERS WITHIN THE PROJECT AREA AND FOR EMERGENCY VEHICLES. ALL OPEN DITCHES AND HAZARDOUS AREAS SHALL BE CLEARLY MARKED IN ACCORDANCE WITH THE E SPECIFICATIONS. 9. ALL AREAS WHERE THERE IS EXPOSED DIRT SHALL BE SEEDED, FERTILIZED AND MULCHED ACCORDING TO THE SPECIFICATIONS. THE FINISHED SURFACE SHALL BE TO GRADE AND SMOOTH, O FREE OF ALL ROCKS LARGER THAN 3", EQUIPMENT TRACKS, DIRT CLODS, BUMPS, RIDGES AND PROPOSED EROSION CONTROL T GOUGES PRIOR TO SEEDING; THE SURFACE SHALL BE LOOSENED TO A DEPTH OF t4"-6" TO ACCEPT SEED. THE CONTRACTOR SHALL NOT PROCEED WITH SEEDING OPERATIONS WITHOUT FIRST OBTAINING THE ENGINEER'S APPROVAL OF THE GRADED SURFACE. ALL SEEDING SHALL BE AND STORM DRAINAGE L E G E N D PERFORMED BY A MECHANICAL "HYDRO -SEEDER". HAND SEEDING SHALL BE AUTHORIZED ON AN AREA UNDERGROUND TELEPHONE LINES BY AREA APPROVAL BY THE ENGINEER. I -um 10. WHERE SPECIFIED, STORM DRAIN PIPE SHALL BE CORRUGATED METAL PIPE (CMP) CONFORMING TO CURB INLET WITH T AASHTO M-36, WITH RE -ROLLED ENDS TO ACCOMMODATE CORRUGATED COUPLING BANDS. 18" PIPE APPROXIMATE LOCATION OF SHALL BE 16 GAUGE, 24" AND 30" PIPE SHALL BE 14 GAUGE AND 36" PIPE AND OVER SHALL BE CI TEMPORARY INLET PROTECTION 12 GAUGE AS SPECIFIED ON THE PLANS, PIPE AND COUPLING BANDS SHALL CONFORM TO NCDOT 1032-3 z FOR PLAIN PIPE OR 1032-4 (A) FOR BITUMINOUS COATED AND PARTIALLY PAVED PIPE. DIMPLE BANDS DROP INLET WITH SHALL NOT BE USED. ® DI/Yl TEMPORARY INLET PROTECTION WHERE SPECIFIED, STORM DRAIN PIPE SHALL BE REINFORCED CONCRETE PIPE (RCP) CONFORMING TO "B" DROP INLET WITH TEMPORARY AASHTO M-170, AS CONTAINED IN NCDOT STANDARD SPECIFICATION 1032-9 FOR WALL TYPE. O WHERE SPECIFIED, ALL STORM DRAIN PIPE SHALL BE HIGH DENSITY POLYETHYLENE (HDPE). SMOOTH INLET PROTECTION (WATTLE) TREELINE SHRUBLINE WALL INTERIOR, WITH WATER TIGHT JOINTS, BACKFILLED WITH # 57 WASHED STONE UP TO MIN. 6" OVER W THE TOP OF THE PIPE. HDPE PIPE USED FOR STORM DRAINAGE DETENTION SYSTEMS SHALL BE LIMITS OF DISTURBED AREA U "HANCOR BLUE SEAL" OR APPROVED EQUAL. TEMPORARY SILT FENCE ALL CORRUGATED METAL STORM DRAIN PIPE (CMP) SHALL BE ALUMINIZED TYPE 2 CORRUGATED STEEL < MANUFACTURED IN ACCORDANCE WITH THE REQUIREMENTS OF AASHTO M-36. THE PIPE SHALL BE LEVEL SPREADER - - MANUFACTURED FROM ALUMINIZED STEEL TYPE 2 MATERIAL CONFORMING TO THE REQUIREMENTS OF PROPERTY LINE NOT SURVEYED AASHTO M-274. ALL PIPE SHALL BE FURNISHED WITH RE -ROLLED ENDS AND SHALL BE JOINED WITH j HUGGER BANDS. THE USE OF DIMPLE BANDS WILL NOT BE ALLOWED. PIPE THROUGH 24" DIAMETER 000000000000000000000000 SHALL BE 16 GAUGE, PIPE THROUGH 42" DIAMETER SHALL BE 14 GAUGE, PIPE THROUGH 54" DIAMETER STORM DRAINAGE PIPE SHALL BE 12 GAUGE. Z STORM DRAINAGE PIPE WITH 11. CONTRACTOR SHALL VERIFY ALL ELEVATIONS BEFORE INSTALLATION OF FACILITIES. STREAM LINE FLARED END SECTION AND 12. CATCH BASINS CAST -IN-PLACE SHALL CONFORM TO THE REQUIREMENTS OF NCDOT STANDARD RIPRAP OUTLET PROTECTION - SPECIFICATIONS FOR ROADS AND STRUCTURES (LATEST EDITION) ARTICLES 840-1 THROUGH 840-3. CENTERLINE ROADS CURB INLET CATCH BASIN SHALL CONFORM TO NCDOT STANDARD DETAILS 840.02 THROUGH 840.04. DROP INLETS SHALL CONFORM TO STANDARD DETAIL 840.14. JUNCTION FLARED END SECTION WITH BOXES SHALL CONFORM TO STANDARD DETAIL 840.31. RIPRAP OUTLET PR0TECTI0N 13. CURB INLET FRAME, GRATE AND HOOD SHALL BE NEENAH R -3233D, PRODUCTS BY DEWEY BROS., U.S. FOUNDRY OR EQUAL. DROP INLET FRAME AND GRATE SHALL BE NEENAH R -3339A OR EQUAL. FIELD INLET COVER SHALL CONFORM TO NCDOT STANDARD DETAIL 840.04, OPENING FACING UPSTREAM. -mm TEMPORARY SLOPE DRAIN 14. CONCRETE AND MASONRY SHALL MEET THE REQUIREMENTS OF APPROPRIATE SECTION OF NCDOT CENTERLINE OTHER THAN ROADS STANDARD SPECIFICATIONS FOR ROAD AND STRUCTURES (LATEST EDITION). CONCRETE SHALL BE CLASS A OR B, 4000 PSI MINIMUM, MEETING THE REQUIREMENTS OF SECTION 1000, CHECK DAM CONSTRUCTED IN ACCORDANCE WITH SECTION 825. MASONRY SHALL MEET THE REQUIREMENTS SWAM PLINE/WETLANDS OF SECTION 1040, CONSTRUCTED IN ACCORDANCE WITH SECTION 830 AND/OR 834. TD --+ TD TEMPORARY DIVERSION DITCH 15. TOPS OF PROPOSED FRAMES AND GRATES SHALL BE FLUSH WITH FINISHED GRADE. PD SPD PERMANENT DIVERSION DITCH 16. TINDALL PRE CAST CONCRETE BOXES ARE ACCEPTABLE ALTERNATIVES FOR PROPOSED CATCH BASINS. IPS RECP ROLLED EROSION CONTROL PRODUCT (NAG S75) RR RR RR RIPRAP LINED DITCH GL GL GRASS LINED DITCH P P PAVED DITCH - - - - - - - - - - ROOF LEADER Q:Standards/Legends/ECSD-McGILL Legend.dwg S GENERAL SEWER NOTES 34 UPDATED MARCH, 2017 1. ALL CONSTRUCTION OUTSIDE RIGHTS-OF-WAY SHALL TAKE PLACE WITHIN THE PERMANENT AND TEMPORARY ACCESS EASEMENTS SHOWN. 2. CONTRACTOR SHALL REPAIR ALL DISTURBED AREAS TO EQUAL OR BETTER CONDITION THAN THE ORIGINAL SITE, OR AS NOTED. 3. LOCATIONS OF EXISTING UTILITIES AS SHOWN ARE APPROXIMATE ONLY. EXACT LOCATIONS ARE TO BE VERIFIED IN THE FIELD BY THE CONTRACTOR. AT LEAST THREE DAYS PRIOR TO CONSTRUCTION, CONTRACTOR MUST NOTIFY EXISTING UTILITY OWNERS. CALL 811 BEFORE YOU DIG. 4. ALL WORK NEAR AND AROUND WATERWAYS MUST CONFORM TO THE RULES OF THE STATE OF NORTH CAROLINA. 5. CONTRACTOR MUST PROVIDE EROSION CONTROL DEVICES TO CONTROL RUNOFF FROM THE CONSTRUCTION SITE. CONTRACTOR WILL BE RESPONSIBLE FOR ANY FINES THAT MAY BE LEVIED DUE TO POLLUTION CREATED DURING CONSTRUCTION. 6. CONTRACTOR SHALL FOLLOW ALL FEDERAL, STATE AND LOCAL HEALTH AND SAFETY REGULATIONS PERTAINING TO CONSTRUCTION OPERATIONS. 7. SEWER FORCE MAINS AND WATER LINES SHALL HAVE 3'-0" MINIMUM COVER UNLESS OTHERWISE SHOWN ON THE DRAWINGS. 8. WATER AND SEWER LINES SHALL HAVE A MINIMUM 10' HORIZONTAL SEPARATION OR A MINIMUM 18" VERTICAL SEPARATION WITH THE WATER OVER SEWER, OR BOTH WATER AND SEWER LINES SHALL BE DUCTILE IRON PIPE 10' EITHER SIDE OF THE CROSSING. 9. SEWER AND STORM SEWER LINES SHALL HAVE A MINIMUM 24" SEPARATION. IF 24" SEPARATION IS NOT OBTAINABLE, DUCTILE IRON PIPE SHALL BE USED FOR THE SEWER LINE OR A SUPPORTING MATERIAL SUCH AS FLOWABLE FILL SHALL BE INSTALLED BETWEEN THE PIPES. 10. SEE PROJECT SPECIFICATIONS FOR ADDITIONAL INFORMATION. 11. UNLESS OTHERWISE NOTED, ALL BURIED PIPE SHALL BE INSTALLED WITH PUSH -ON JOINTS AND EXPOSED PIPING SHALL BE FLANGED JOINT. 12. LEGAL DESCRIPTIONS FOR PROPOSED EASEMENTS BY OTHERS. 13. SITE TOPOGRAPHIC AND BOUNDARY SURVEY PROVIDED BY SURVEYOR NOTED ON PLANS. 14. CONTRACTOR SHALL NOTIFY THE PROPER LOCAL AUTHORITIES 24 HOURS PRIOR TO ANY ROAD BEING CLOSED FOR CONSTRUCTION, INCLUDING BUT NOT LIMITED TO LOCAL NEWSPAPER, RADIO STATION, FIRE DEPARTMENT, COUNTY SHERIFF'S DEPARTMENT, AMBULANCE, AND COUNTY EMERGENCY AGENCY. ALL TRAFFIC CONTROL SHALL CONFORM TO THE REQUIREMENTS OF THE NORTH CAROLINA DEPARTMENT OF TRANSPORTATION. 15. CONTRACTOR SHALL NOTIFY THE ENGINEER AFTER EXISTING BURIED UTILITIES HAVE BEEN LOCATED AND 24 HOURS PRIOR TO CONSTRUCTION. 16. LOCATIONS SHOWN FOR SANITARY SEWER SERVICES ARE ASSUMED. COORDINATE LOCATIONS OF ALL PROPOSED SEWER SERVICE CONNECTIONS WITH PROPERTY OWNER PRIOR TO CONSTRUCTION. 17. CONTRACTOR SHALL FIELD VERIFY ALL PROPOSED MANHOLE TOP ELEVATIONS AND EXISTING MANHOLE INVERTS PRIOR TO CONSTRUCTION AND NOTIFY ENGINEER OF ANY DISCREPANCIES. CONTRACTOR SHALL ADJUST ALL PROPOSED SEWER STRUCTURES TO MATCH FINISHED PAVEMENT ELEVATIONS. COSTS OF RAISING STRUCTURES SHALL BE CONSIDERED INCIDENTAL TO OTHER WORK ON THE PROJECT. 18. MANHOLES AND CASTINGS SHALL MEET THE REQUIREMENTS OF OWNER AS WELL AS THE PROJECT SPECIFICATIONS. 19. 4" SANITARY SEWER SERVICE LINES SHALL BE INSTALLED AT 2.0% MINIMUM SLOPE AND SHALL BE DUCTILE IRON IN PAVED AREAS. 20. ALL FENCE DAMAGED DURING CONSTRUCTION SHALL BE REPLACED WITH LIKE MATERIALS IN A WORKMANLIKE MANNER AND IN ACCORDANCE WITH STANDARD FENCE CONSTRUCTION PRACTICES AT THE CONTRACTOR'S EXPENSE. 21. CONTRACTOR SHALL FIELD LOCATE ALL BURIED TELEPHONE LINE IN CONFLICT WITH THE PROPOSED UTILITY LINE. WHERE NECESSARY, EXISTING BURIED TELEPHONE LINE SHALL BE TEMPORARILY MOVED DURING CONSTRUCTION OF THE PROPOSED UTILITY LINE AND RE-LAID AT NO ADDITIONAL COST TO THE OWNER. 22. CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE TO EXISTING ROADS DURING CONSTRUCTION AND SHALL REPAIR ROADS PER REQUIREMENTS OF THE NORTH CAROLINA DEPARTMENT OF TRANSPORTATION. NO OPEN CUTS OF EXISTING ROADS SHALL BE ALLOWED EXCEPT WHERE INDICATED ON THE DRAWINGS OR WHERE SPECIFIC PERMISSION IS GRANTED BY THE NORTH CAROLINA DEPARTMENT OF TRANSPORTATION. SAND OR A SIMILAR MATERIAL APPROVED BY THE NORTH CAROLINA DEPARTMENT OF TRANSPORTATION SHALL BE PLACED ON THE ROAD TO AID IN THE CLEAN UP AFTER CONSTRUCTION. A MINIMUM OF 2" OF SAND SHALL BE PLACED ON THE ROAD PRIOR TO STOCKPILING SPOIL MATERIAL ON THE ROAD SURFACE TO FACILITATE CLEANUP. 23. CONTRACTOR SHALL MAINTAIN SEWAGE FLOW IN SEWER SYSTEM AT ALL TIMES AND SHALL PROVIDE BYPASS PUMPING AND/OR PIPING AS REQUIRED. NO SANITARY SEWER OVERFLOWS ARE PERMITTED. NOTE: FINAL DRAWING - FOR REVIEW PURPOSES ONLY - NOT RELEASED FOR CONSTRUCTION EXISTING CONDITIONS LEGEND IL TELEPHONE PEDESTAL ° ELECTRIC PEDESTAL ® CABLE TV PEDESTAL ® SIGN ®DOT UNDERGROUND CABLE TV SIGN MON UNDERGROUND FIBER OPTIC CABLE SIGN 0RBF UNDERGROUND TELEPHONE CABLE SIGN o PK NL UNDERGROUND GAS LINE SIGN UNDERGROUND ELECTRIC LINE SIGN ®CPHUB LIGHT POLE 0 UTILITY POLE v GUY WIRE ANCHOR coo) O MANHOLE CP/NL GPS SANITARY SEWER MANHOLE 0CP/TEMP STORM DRAIN MANHOLE A STAKE FOUND 40 COMMUNICATION MANHOLE APPROXIMATE LOCATION OF INTERSTATE HIGHWAY 66 ELECTRICAL MANHOLE x JUNCTION BOX 1' Q ELEVATION SPIGOT/YARD HYDRANT O C.O. SEWER CLEAN-OUT 0 E.SS ELECTRIC SERVICE STUB -OUT 0 G.SS GAS SERVICE STUB -OUT ® CATCH BASIN ® CURB INLET 0 WATER METER A FIRE HYDRANT WATER VALVE Ia BLOW OFF VALV. BLOW OFF VALVE b GAS METER b GAS VALVE D° IRRIGATION CONTROL VALVE D4 POST INDICATOR VALVE ® ELECTRIC JUNCTION BOX OR OUTLET IL CALCULATED POINT 0 1/2" REBAR SET WITH CAP ® CONCRETE MONUMENT ® RIGHT-OF-WAY MONUMENT ®DOT x x MON D.O.T. CONTROL POINT 0RBF REBAR FOUND o PK NL PK NAIL FOUND / SET SPINDLE FOUND / SET ®CPHUB I-7 0 HUB & TACK SET I --I CONTROL POINT NAIL SET / FOUND coo) O CP/NL GPS CONTROL POINT/NAIL SET GPS 0CP/TEMP CONTROL POINT TEMPORARY MARK A STAKE FOUND 40 s APPROXIMATE LOCATION OF INTERSTATE HIGHWAY 66 x U.S. HIGHWAY FFE Q ELEVATION FINISHED FLOOR ELEVATION o MW MONITORING WELL 0 PIEZOMETER 0 LANDFILL GAS MONITORING PROBE 0 SURFACE WATER SAMPLING LOCATION 6m LANDFILL GAS VENT O LANDFILL GAS COLLECTION WELLHEAD POTABLE WATER WELL MAILBOX OR PAPER BOX °PB POSTAL DROP BOX .) SAT DISH SATELLITE DISH OYARD ORNAMENT STATUE, BIRD BATHS, ETC. '^ U) TREES O�/ SHURBS / BUSHES NO. I DATE I BY I REVISION DESCRIPTION SHEET G-002 CULVERT W� x x x FENCE SILT FENCE H� I-7 O -o -o -o -o -o -o -o -o I --I cv'v oc N coo) O a r � o oc °O - - - - s- U s APPROXIMATE LOCATION OF a x w Q - - - - w W I -I on d Q O w � NO. I DATE I BY I REVISION DESCRIPTION SHEET G-002 CULVERT x x x FENCE SILT FENCE -o -o -o -o -o -o -o -o -o -o -o -o -o -o- GUARD RAIL - - - - s- - - - - s APPROXIMATE LOCATION OF - - - - - w- - - - - W EXISTING SEWER LINES APPROXIMATE LOCATION OF EXISTING WATER LINES Q Z J -----G-----G- APPROXIMATE LOCATION OF EXISTING GAS LINES z '^ U) O�/ WI.- TOP &TOE LINES Ld_ _ DL----- DL----- DITCH LINES � Z Q U - - - - - CTV- - - - - CTV- APPROXIMATE LOCATION OF LLI Z UNDERGROUND CABLE TV LINE APPROXIMATE LOCATION OF < 2 CTV OVERHEAD CABLE TV LINE -----FOC-----FOC- APPROXIMATE LOCATION OF UNDERGROUND FIBER OPTIC CABLE LINE Wa I„I„I \ J O ----E-----E APPROXIMATE LOCATION OF UNDERGROUND ELECTRIC LINE O Z Z E APPROXIMATE LOCATION OF OVERHEAD ELECTRIC LINE n/ LLLL E O ----T - - - - - T APPROXIMATE LOCATION OF W > UNDERGROUND TELEPHONE LINES I -um 7 T APPROXIMATE LOCATION OF z T -----ROW-----ROW- OVERHEAD TELEPHONE LINES RIGHT-OF-WAY 3:LL O TREELINE SHRUBLINE W Z O U < C - - - - PROPERTY LINE NOT SURVEYED r/1_j v� 000000000000000000000000 R OCK LI N E Z - - - - STREAM LINE N - - CENTERLINE ROADS V CENTERLINE OTHER THAN ROADS O SWAM PLINE/WETLANDS IPS IRON PIN SET RBF REBAR FOUND OTIPF OPEN TOP IRON PIN FOUND CTIPF CRIMPED TOP IRON PIN FOUND CMU CONCRETE MASONRY UNIT U) R/ W RIGHT OF WAY co CD 00 Y _ W W CENTERLINE N m N > >Lu C CURVE (SEE CURVE TABLE) Lu w LuLL } Lu uj 0 0 POB POINT OF BEGINNINGO Z uj m Z C) 0 Z C� z c CP CALCULATED POINTmp 0 CD Lu Q w w OZ Lu CD N PB PLAT BOOK 0 0 0 0 U LL o DB DEED BOOK L LINE (SEE LINE TABLE) BLDG BUILDING CIP CAST IRON PIPE Q CMP CORRUGATED METAL PIPE Z CONC CONCRETE CMU CONCRETE MASONRY UNIT Q CPP CORRUGATED PLASTIC PIPE DIP DUCTILE IRON PIPE E&T ELECTRIC & TELEPHONE W U) FOC FIBER OPTIC CABLE Q GIP GALVANIZED IRON PIPE O Z 0/H OVERHEAD RCP REINFORCED CONCRETE PIPE z W U/G UNDERGROUND (D VCP PVC VITRIFIED CLAY PIPE PIPE W FFE POLYVINYL CHLORIDE FINISHED FLOOR ELEVATION J PG PAGE uj REF REFERENCE DOT DEPARTMENT OF TRANSPORTATION z NGS NATIONAL GEODETIC SYRVEY j NCSP NORTH CAROLINA STATE PLANE (D NO. I DATE I BY I REVISION DESCRIPTION SHEET G-002 \\\\ \\\\ \\\\ \ � ��// / / / / � I III \\ \\ ''��' �/ / _/ / ' \ I I I\ \\ \\\\ \\\\ \`� I \ PROPOSED SILT FENCE IN ,����' / /��\\\ \\\� \ \\`��\\\\�,\ \\ '�%� i // 1 \ \ \\ \ \� \ \\\\\ \ \\\\ \ \ \\� \\\ \ \\ (PER DETAIL EC1) \----- EXISTING `\\\\\ \\\\ \\� \ \ CHLORINATION BUILDING \ \\\ \ \ \\ \ \\ \ \ \\\\\ \\\N \ \ \ I \\ \\ \ \\ \\� \ \\`�� \\\\ \ I \\ PROPOSED \\ \� \ \\\\� \ \ \� \ \ \ \\\ �\ `\ DRAIN AND CLEAN EXISTING \ \ SLUDGE OUT OF CHLORINE \ CONTACT CHAMBER �/ \\ 11 \ i PROPOSED I // / I\ \\ \ \ \ \ \\\\\ `\\ \`,11 I \\ ,' \ I / \ \ \ \ \ \ \\ \� \ `\\ \\ I EXISTING CHLORINE CONTACT TANK NEW FIBERGLASS / / / \ \ \ \\ \ \ I \ \\ 1\ 1\ I\ CHLORINATION/ i i \ ` \ \\\` ` \�` \� \ \ \ \ \\ \` DECHLORINATION I I I / \ ` \� \ \\\ ` ` \'N \ \ `-- �� \\ \\ \\ \\ \\ \\ BUILDING I I I / / \\\ \\ \\\\ \`\ \ \\\\ I \\ PROPOSED \\ ` NN` ` \\ \\ \ i \\ REPLACE MECHANICAL `I `� \`\�� \ \\\ \\\ ` EQUIPMENT IN CLARIFIER \ \ \ \\ \ \\ \ \ \\ \ \ \ \ \ \ \ \ \ \ \ \ \ I \ \ \ \ \ \ \ \ \ \ \\ \\ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \\ \ \\IN \ \ \ \ -- \ \ \ \ \ \ \ \ \ \ \ \ `\ \ \ \`\ \ \ \\ `\ I \ �OPOSED \ \ \ \ \ \ \ \ \ I \ \ \ \ \\\\ \ \\ I IN REPLACE EXISTING \\ \\ \\\ \\ \\ \\ \\ \\ \\ \\ \\\` �� \ \�� \ \\\� \\ \\ \`\ \ BLOWER AND \ \ \ \ \ `\ `\ \ \ \ :\ \ \\ \ \ \ \ \ �\ \ N N N. IN EMERGENCY GENERATOR \ \ \ \ \ \ —\ \ \ \ \\ \ \ \ \ \ \ \ `\ \\ \ \\ \ \ \ / \� \ \ \\\ \ \ \\ `\ EXISTING \ ��� \\ N, \ \ \ \ IN EXISTING CLARIFIERS 20 0 10 20 GRAPHIC SCALE PROPOSED DRAIN AND CLEAN EXISTING SLUDGE OUT OF BOTH CLARIFIERS AND REPLACE SLUDGE PUMPS 40 60 I INCH = 20 FEET I\ \\ \ \ \ \ \ \\ AERATION \ \\ \ \ "t \ /s P \ \ \_\\ \\\\ \ \ \ \ \ \ \ \ \ TANKS \ \ I I \ \ \ \ I l \ \ \ \ \ \ IN \ \ \\ \ \ \ \_ \� / \ \ \\ \ \\ j \\ \IN \ \\ \\ `\ \\ \ \`\ \\_ \� 1 \\ ��\ \— \ \ \ �� \\\\\\ \ I\\ I \ \ \\ \ \ \ \\ \\ I �� \ \ \`\ \\\\ \ \ \\ \\ I \ II \ \\ \ \ \ \ \ I \ `\`\ \\\\ \\\ \\ \ \ `\ PROPOSED \ \ \ \ \ \ \\ \ \\ ` \ \\\ \ \\ \\ \\ ` ABAONDON IN \ \ \\ \ \ \ \ \ PLACE EXISTING \\ \ \\ IN \ \\ \\ \\\\\\ 1 \� \ \ \\ `\�� \ \\` \\ \ \�� \\ 8 CIP FROM \ \\\�\ �P I \\ \ \ \ \ \ \\ \ \\ \ \ \ \ SLUDGE TANK \ \ \ \ I I \ \\ \ ` \\\ \ \ \ / / M \ \ \ \\ �� I 1 \\\ \\\ \\\ \ \ \\\\\ \ \\ \ TO DRYING BEDS \\ \ / \ \\ \\ I I \ \\ o\\ \ \\ \\ \\\\ \ \\\\ IN \\ \\ \ I / I \ \ \\\ \ \ \ `\ I I / / / `\ \ \ \ \ \ \ \\ \ \ 'I, \ \ I\ \ 41� \ \ \ `\ `\ \ \\ \` \ \ \`\\ \ \ \ q�,��qY I \ \\ \ \ \ \ \ \ IIN N \ \ \\\\\ \\ \ \\ \\ \ \ EXISTING / / F ` �� ► \ \ I / \ \ \ \ \ \ \ \ \ \\ \ I \ EXISTING SLUDGE �\l - \-- \\ \\\\;BLOWER BUILDING I / / EL: ) I I \ \ \ I \ \ \ \ \ \ \ \\ \ \ I ` DRYING BEDS \ �I\\\\�\ \\� \ \ \ \ / 10001 ss 1q�� I \ \ \ \ 1 \ \ \ \ \ \ \ \ \ ��\\\\\\ \\\ \ \ I` �/ / / �ULr �qI I \ \ \ \\ \ ( \\ \\ \ \ \ \ \ \ I \\ \ \\\\ \ \ \ \ \\ \ \ \ \ \ \\\\ \\\\ \\\\ \ \\ \\\\` EXISTING / T \\ \ \ \ \ I \ \ \ \ \ \ \ \\ \\\\ \\\\ \\\\\ \\ \ / / \ \ \ \ \ \ \ \ \\ \\\\ \\\\ \\\\ \ ` INFLUENT CHANNEL \ / \ \ `� \ \ \ ` \ \ \ \\\ \\\\ \\ \` \\ \` \\ \ / °`' / 'moo \\ \ \ \ \ \ \ `\ \ \ \ \ \ \ \ \ \\ \ \ PROPOSED � \\\\ \\\\ \�\\`\\�\\\ \`. AND BAR SCREEN I ��' — _ \\ \ \\ \\�wy oN E > P \ \ ` \ \ \ \ \ \ \\ SLUDGE TRUCK �\\\\ \� \\`\\` \`� \ \` \ ` \ 1 \ — r 1 \ / \ \ \ \ \ \ \ \\\\ \\\\ \\\\ \\ \\\\\ \ \ \ \ \ I \ \ \ \ \ \ OFFLOADING STATION \\ \\ \ `\\ \\\ \ \ \ \ \\ \ \ \ / \ _ __i .WV \) \ I.E.: 12 70,V \\ \ \ \\\\\ \\ \\ \\\\ \\" \\\\ \ \ `\\ \ \ \ \ \ , EXISTING \ '� — �,ti / I TANK I I I I \ \ \ \ \ \ \ \ \\\ \\\ \\\ I \ \ \\\\ \ \\\\ \\" \`\\ \\\\ �\\ \\ \ \ \\ \\ \EQUALIZATION _ \ / \ \ \\\ \ `� - - - - \\ \\\ \\ \ \ \\ — — \ I / / otic _ _ i I I _ _ _ \ \ \ ` \\\ \ \\\\ \\\\ \\\\ \ \ \ \\ \ \ \ \ \ \TANK \ I _ I \W — — \ \ \\ \ \ \ I \ \ \ \ \ \\ \\\\ \\ \ \ \ \ / — / I I \ \ \ \\\ \ \\\ \\ \ \\\ \\\ \\ \ \ \\ \ \ \ \ \ \ \ - - 3" DIP CO CRETE \ I \ \ \ \ \\\ \ \ \\ \ \ \N.\\\ \\\\ \\\\ \\ \\\\ \ \ \\\ \ \ \ \ \ \ \ / r W \ NI \ \ \ \ \ \ ` \ I I / / - - I 11 I \ \ I \ \ \ \\ \ \ \ \ \ \ \ \\ \\\\\\ \ \\\\ \\\\ \\\\ \ \ \ \ \ \ I i / \ \ \ \ \\ \ \ \ \ \ \ \ \ \ \\\` \` \ \ \ \ \\ \ \ I / TOP 3" DIP TOP EL .5� 1 - MANI \ \ \ \ \ \ \ \ \ \ \ \ \ \ \\\ \\\\ \\ \ \\\ \ \ \ \ 1 I l / \ \ \ J ------ \ \ \ \ \ \ \ \ \ \\ \\ \ \\\\\ \\\\ \\\ \ \ \\ \ \ I \ _ \ \ \ \ \ \\\\ \\ \ \ \\\ \ \ \ \ \\ \\ \ \ \ \ \ \ \ \ \ \ \ \ / : 1300.23' cy \ \ - - \ \ \ \ \\ \ \ \ \ \ \\\\ IN IN \\\ \\ \ \ 1-1 \\ \ \ \ \ ti� I \ \ \ —��— I \ \ \\\ \ \\\ \ \\ \\ \\ \\ \\\ \ \\\ \\ \ \ \\\ \ \ \ \ \ \ \ / / / FF ) \ \ \ \ \ \ \ \ \ \\ \\\\\\\ \\\\\ \\\\\ \ \ \\ \\ \ \ \\\ \ \ \ \ \ \ \ \ \ / ti I I \ \ \ \ \ \\\ \ \ \ \\ \ \ \ \\\ \ \ \\ \ / \ I \ \ \ \ \\ \\ \ \\ \ \ \\ \\ \ \ \ \ ` \ \ \ \ / i — I \\ \ I \\ \ \ \ \ \ \\ \\\ \\ \\ \\\\\ \ \ \ \ \\ \ \ \\\ \ \ NN NN NN \ \ \\ \ \ / ° l \ \\ \ \ \\� \\\\\\\\\\ \\\\ \\\\ \\ \\ \\\\IN IN IN NN \ \\\ \ \\ \ \ \ \ I I ' / / ��� \ \ \_ PROPOSED ` `\\ \`\�� ` \ \\ \ ` \\\\\\ \\\\ \ \\\ \ \\ \ \ �\\ 1 I / / \ \ I \ \ \ \\ \` \\ \ \ \ \ \ \ \ \ \ \ \\ \\ \\ \ \ \ \ \ \ \ \ \ \ < / \ \ \ \ \ \ \ \ \ \ \ \\\\ \\ \\\ \ \ \\ \ \\\ \ \ \ \ \ r \ REPLACE PUMPS \ \ \ \\ \ \ \ \ \\ \ \\ \\\\ \ \\ \ \\ \\\ \ \\\\ \ \\ \ \ \\\ \ \ / \ \ \ \ \ ` \\` \\\ \ \\\\ \\ \\ \\ \\ \\\\\ \ \\ I \ \ \ \ \ \ \\\\\ \ \ \ \ \\\ \\ \\ \\\ \ \ \ \ \ \ \ \ \ \ \ \ I N WET WELL \ \ \ \\ \ \\\` \ \\\ \ \ \\\ \ \\ \ \ I \ \ \ \ \\ \\SINN\\\ \\\ \�\ \\\ \\\ �\ \ \ \\ \ \\ \ \ \ I / / �� \\ I I I \ \ \\ \ \`\\�\ \\� \ \ I \ \\\ \\ \ \ \\\\ \\ \\ \\\ \\ \ \ \\ \ \ \\ \\ \\\ \\\ \\ \ \ \\\ \ \ \ \\ \ \\ \ I ` \\ \\ \\ \ \ \ \ \ \\\ \ N, -N-\ '-NN'\ \ \ \ \ \ I 1 I I \ \ \ \ \\\ \ \ \ \ \ \ \ / � EXISTING ` I \\\\ \\\ \\\\\ \\\\\\\ \\\\\\\\\\ \\ \\\\ \\ \\ \\\\\\\�\ \\\� \ \\ \ \ \\\ \ \ \ I I I / DIGESTER I \\\\ \\\\\ \ \ \ \ \ \ \ \\\ \ \ \\\\\ \\ \\ \ \\\\\\ \\\ \\ \\ \\\ \ \\ \ \ \ \\ \ \ \ 11 '10\ \ \ \�� \ \ \\\ \ \�\`�\ `N�\\`\�\\\ \ \\\ �\ I I 1 \ \ \ \ \ \ \ \ \\\\\ \\\ \\ \\ \\\ \\ \\ \ \\\ \ \\ \\\ \\ \\ \ \ \ / \ \ \ PROPOSED \ \\ \\ \\ \ \ \\\ \\\ \\\\\\\\ \\\\\\�\\\\\\\ \���\ "\�\ \`��\ \�\\\ \�� ` \ \\ DRAIN AND CLEAN EXISTING \ \ \\ \ \ \\\ \\ \\ \\\ \\IN \ \ \\\` \\ \\ \ \\\ SLUDGE OUT OF DIGESTER IN \ I / \\ \\\ \\\ \ \ \\\\ \\ \\ \\\ \\ \ \ \ \\ \\\\ \\ \\ \ \\\ \\\\ \ \\\\\\ \\ \\\\ \\ \\\\ \\\ \ \\ \ \ \\ \\\\ \\ \\ \ \\\ \\\\ \ \ AND REPLACE DIGESTER,,\\` \ \ \� \ ! < / / ► ► I \ > > AIR PIPING AND \\ \ \\\ \\\ \ \ \\\ \\ \\ \\\ \\ \ \ \ \\ \\ \\\\ \\ \\ \ \ \\ \ \\� \ \\ \\\\\\\\\\\ DIFFUSERS � \ \ \\ \ \ \ �\ . .. \ \ `\\ \ \\ �\ \\`�\ \�\\\�\\\\�� \�\\ \\ \ \ \ \ \ \ \\\ \`��\ \ \\\ \\\ \\ \\ \\\\\\\ \ \\\\\\\\\\\ \\\\ \\\ \\\ \\\\ \\\\ \\ N. \ \\ \\\\ \\\\ \ \\ \ \\ \ \ \ \\ \ \ IN \\\\\ \\\\\\ \\\\\\\ \\\\\\\\\\\\\\\\ \\\\\\\\\\\ \\ \\ \\\\ \\\�\ \\\\ \\\\ \\\\ \\\\ \\ \\\ \ \\\\\ \\� \\\ --� \\\\\\ \\\\\\\ \ \\\\\ \ \\ \\\\ \ \\ \ \ \\ \\\\ \\ \\\ \\\\ \\ \ \\\ \ \ \\\ \ \ \\ \ \ \ \ \_ \ \ \ \ I \ \\\ \ \ \ \\\\\\\\ \\\ \ \ \\\\\\\\ \\\ \ \\ \` \ `\ \ \\\\ \\\\ \\ \ \\\ \\\\ \\ \\ \\\` \ \ \\ \ \\ \ \ \ \ \ \\\IN \ \\\\\ \\\\\\ \ \\\ \ \ \\ \ \ \\ \ \\ \\ \ \\ \ \ \ \ I I \ \ \ 1 \\ \ \ \\\ \ \ \\ \`\````\` \`\\ \\ \\ \\\ \\\ \\\ \\� \ \ \\ \\ \\\\ \\ \\ \ \\\ \\ \\ \\ \ \\ `\ \ ` \ \ \ �\ \ \\ \ \ \ \ \\\\ \ \\\\\\ \\\\ \ \\\\\\\\\\ \\\ \\\\\ \\ \\\ \\\\ \\ \\ \\\\ \\ \\\ \\ \\ \� \\ \� \\ \\ \ \\\ \ \\ \�\ \ \ \ \ \ \\\\\\ \\\ `\ \\\\\\\\ `\ \\\\\\\\\ \\ \ \\\ \\\ \\\\ \\ \\ \\\\ \\ \\ \ \\\\\ \ \ \ \\\ \\ \ \ \�\\ \\ \ \ \ \ \ \ \ \ \ \ \ \ \\ \ \ \ \ \ \\ \ \ \ \ \ \ \\ \\\\ \ \ \\\\ \\\\ \\\\ \ \ \ \ \ \\ \\ \\\\\``\\\\\\\\\ \\\\`\\\\�"\\\\\\ �� \\\\\ \\\\ \\\\ \\\�\ \\\\ \\\\�\ \`\\\ \\ \\ \ \ \� \ \� \\"` `\\ \ \ \ \ \ \ \ \ 1 \ \ \ \ \ \\\ \ \ \ \ \ \\ \\\\ \\ \\ \\\ \\ \ \ \\ \ \ \ \ \ \ \ \\ \ \\\\\ \ \ \ \\ \ \ \\\ \ \ \ \ \ \\\\ \\\\ \\ \\ \ \ \ \ \ ` 1 \ \ \ \ \ \ \ \ \ \\\\\\\\ \ \ \\ \ \ \ \\\\\\ \\\ \ \\\\ \ \\ \\\\ \ \\ \\ \\ \\\\\\\ \\\\ \\\\ \\ \\ \\\ \ \\\\ \ \ \ \ \ \ \ 1 \ \\ _ \\\\ \\\\ \\ \ \ \\\ \ \ \ \ \ \\ \\ \\ \\\ \\ \\\ \\\\ \ \ \ \ \ \ \ \ \ \ \ I \ \ \ \ \ \ — I INI.N II \ \\ \\ \\ \\ \\\ \\ \\\\\\ \\\\ \\\\ \\\\ \�\ \\ \\ \\\\ \\ \ \ \ \ \ \\ \ \ \\ \ \ \ \ _ \\\\\\\\\\\ \\\\\\ \\\\\\\\ \�\\�\\\\\��\\\\\�\\\\\\`\ \\\\ \\\\ \�\ \\ \\ \\\\ \\\\ \\\\\\\ \\ \\\\ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ / 1 \ \ \\ \\� \\ \\\\ \\\\ \\ \ \ \ \\\\ \\\\ \\\\\\\\ \\\\ \\\\ \\\\ \\\ \\\\ \\\\ \\\ \ \ \ \ \ \\ \\ \\\\ \\ \ \ \ \ \ \ \ \ \\ \ \ \ \\ \ \ \ \ \ \ \ \— \\ \\\\ \\\\ \ \ \ \ \ \\ \ \ \ \ \ \ \ \\\\ \ \\\ \ \ \ \ \ \ \\ \ \ \ \ \ \ \ \\ \ \\ \ \\ \\ \ \\\\\\ \\\\\\\\ \\\\\\\\\\\\ \\\ \\\\ \\\\ \\\\ \\ \\ \\\\ \\ \ \ \ \ \\ \ \ \\ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \\\ \ \\ \ \\ \\ \ \ \ \ \ \ \ \ \ \ \\\ \ \ \ \ \ \ \ \\ \\ \\ \\ \ \ \ \ \ \ \ \ \ \ I N - \\ I \\\� .\\\ \\\ \ \\\\ \\\\ \\\, \,\\ �\\\ \�\\ \\\\ \\\ \\ � \ \\ \ \ \ \ \ \ \ \ NOTE: FINAL DRAWING — FOR REVIEW PURPOSES ONLY — NOT RELEASED FOR CONSTRUCTION 1 02-21-18 KMS IREVISED PER NCDEQ COMMENTS DATED 02-12-2018 NO. DATE BY I REVISION DESCRIPTION SHEET C-100 �W a U� W4,� �Q co wco z Q � N z� LLj Fm > I --I z v o N N 0 �x � a°00 0 ° N LLLL� a� � z �Za a O Q W� zF-.: Qaz WW p z �cn � o Q z 0 W� SHEET C-100 a Zoo Lu �Q co wco z Q � Y LLj Fm > �LU z o O � � m LLLL� a� i m O Q zF-.: Qaz p z m Q z 0 0 Fm SHEET C-100 co wco Y 0 O N m i i m zF-.: p z m Q z 0 z Incn p v� z w p Q w Q w O J --j p p U p U IL SHEET C-100 PROPOSED 4" CLEANOUT PROPOSED TWO (2) 8'-0"X8'-0" PREFABRICATED FIBERGLASS BUILDINGS FOR LIQUID CHLORINATION AND DECHLORINATION FEED EQUIPMENT ON A 10'-0" X 19'-0" X 8" THICK REINFORCED CONCRETE PAD. (SEE DETAILS) PROPOSED 4" SCH. 40 PVC DRAIN TO EXISTING 3" FLOOR DRAIN LINE. INSTALL CLEANOUT AT 3" FLOOR DRAIN LINE. INCLUDE 4" CHECK VALVE PRIOR TO CONNECTION. PROPOSED 4' SIDEWALK (SEE DETAIL ST19) EXISTING 3' SIDEWALK EXISTING STORM DRAIN PROPOSED 2" PVC DECHLORINATION LINE EXISTING 6" AIR HEADER EXISTING 2" PVC WATER LINE EXISTING 4" G.I.P. II II I II II II II II II II II II II II II II II II EXISTING 4" DIFFUSER (NON-FUNCTIONAL) PROPOSED 2" PVC DIFFUS IL_ � PROPOSED 4" TRANSITION COUPLING (TYP.) I -------------------- -------- 7T---� I I I I I I I I I I I I I I I I LL L I I I I I I I I I I I I I I I I I /Jill, I I1�--------------- \/trI/ Ii EXISTING EXISTING 6" AIR HEADER 8" AIR HEADER NOTE: FINAL DRAWING - FOR REVIEW PURPOSES ONLY - NOT RELEASED FOR CONSTRUCTION 5 0 2.5 5 GRAPHIC SCALE 10 15 I INCH = 5 FEET PROPOSED 2" PVC CHLORINATION LINE EXISTING 8"X6" TEEI - --- ---------- PROPOSED 4" PLUG VALVE DEMOLISH EXISTING 4" GIP (TYP) DEMOLISH EXISTING 3" CHECK VALVE, REDUCER AND GATE VALVE(TYP) ---------- ----L-- DEMOLITION PART PLAN NOT TO SCALE EXISTING MUD VALVE (TYP.) ------------� PROPOSED U � EXISTING Zoo INSTALL NEW 2" PVC Lu EXISTING 8 D.I.P. WATER LINE. CONNECT Q 3" PVC II PROPOSED I I Y TO EXISTING LINE AT Fm FLOOR DRAIN ABANDON EXISTIN� N 00 N 00 0 W EXISTING STRUCTURE. II CHLORINATION I I o O N �O � z II II EQUIPMENT I I I I m I-, w EXISTING II I O WW SCALE PIT cncn o p z m z W� Q z 0 EXISTING Fm II I I I I I I 12"X12" WASHED �• __—_ _ _ _ -------- _' I I w STONE DRAIN J H I --,�,- - -------- - - - - - - CHLORINATION DECHLORINATION I ''• ' • I I EXISTING �•'• I I 4" DIFFUSER (NON-FUNCTIONAL) .: '; . �� '' ' :. • . ' �'; . ' ti :';' I PROPOSED ,° . ' ; ' •,'; �' • :�,. j 2" PVC DIFFUSE t ,' I I I I II I I O PROPOSED 4' SIDEWALK (SEE DETAIL ST19) EXISTING 3' SIDEWALK EXISTING STORM DRAIN PROPOSED 2" PVC DECHLORINATION LINE EXISTING 6" AIR HEADER EXISTING 2" PVC WATER LINE EXISTING 4" G.I.P. II II I II II II II II II II II II II II II II II II EXISTING 4" DIFFUSER (NON-FUNCTIONAL) PROPOSED 2" PVC DIFFUS IL_ � PROPOSED 4" TRANSITION COUPLING (TYP.) I -------------------- -------- 7T---� I I I I I I I I I I I I I I I I LL L I I I I I I I I I I I I I I I I I /Jill, I I1�--------------- \/trI/ Ii EXISTING EXISTING 6" AIR HEADER 8" AIR HEADER NOTE: FINAL DRAWING - FOR REVIEW PURPOSES ONLY - NOT RELEASED FOR CONSTRUCTION 5 0 2.5 5 GRAPHIC SCALE 10 15 I INCH = 5 FEET PROPOSED 2" PVC CHLORINATION LINE EXISTING 8"X6" TEEI - --- ---------- PROPOSED 4" PLUG VALVE DEMOLISH EXISTING 4" GIP (TYP) DEMOLISH EXISTING 3" CHECK VALVE, REDUCER AND GATE VALVE(TYP) ---------- ----L-- DEMOLITION PART PLAN NOT TO SCALE EXISTING MUD VALVE (TYP.) ------------� U � I Zoo I I I I Lu �Q I I I I i i I I I I O O i I I I I I I I I I I I I I I I I I I I I I I I I I I I I I EXISTING 12" MUD VALVES I PROPOSED I EXISTING 2" PVC WATER LINE PROPOSED SUBMERSIBLE SOLIDS HANDLING PUMP (TYP) EXISTING SCUM PIT PROPOSED SLUDGE COLLECTOR MECHANISM MOTOR PROPOSED 4"DIP PROPOSED SUBMERSIBLE SOLIDS HANDLING PUMP WITH RAIL (TYP) PROPOSED 3" CHECK VALVE (TYP), 3" PLUG VALVE (SEE DETAIL S29) REFER TO DEMOLITION PART PLAN FOR DEMOLITION OF EXISTING PIPING EXISTING 4" GIP �W U � I Zoo I I I I Lu �Q I PROPOSED I EXISTING 2" PVC WATER LINE PROPOSED SUBMERSIBLE SOLIDS HANDLING PUMP (TYP) EXISTING SCUM PIT PROPOSED SLUDGE COLLECTOR MECHANISM MOTOR PROPOSED 4"DIP PROPOSED SUBMERSIBLE SOLIDS HANDLING PUMP WITH RAIL (TYP) PROPOSED 3" CHECK VALVE (TYP), 3" PLUG VALVE (SEE DETAIL S29) REFER TO DEMOLITION PART PLAN FOR DEMOLITION OF EXISTING PIPING EXISTING 4" GIP �W U � Zoo Lu �Q co co z Q � co Y LLj Fm rr \ V �LU N 00 N 00 0 W o } ►-� a°00 o O N �O � z �Za a� m I-, w LuQ W� O WW � cncn o p z m z W� Q NE Q z J 0 L.L Q U 1rAr' I..Y_ 0 z z D 0 U Q 2 Q 0 3"x4" TEE (TYP.) � z z0 0�~ Q z QZLCUz z � G Q — 0 � J 0=C) J U w = w U r) SHEET 1 02-21-18 KMS REVISED PER NCDEQ COMMENTS DATED 02-12-2018 El M=301 NO. DATE BY REVISION DESCRIPTION a Zoo Lu �Q co co z Q � co Y LLj Fm > �LU z W o } �O � LL a� m LL LuQ O U) _j p z m z Q z 0 Fm Q z J 0 L.L Q U 1rAr' I..Y_ 0 z z D 0 U Q 2 Q 0 3"x4" TEE (TYP.) � z z0 0�~ Q z QZLCUz z � G Q — 0 � J 0=C) J U w = w U r) SHEET 1 02-21-18 KMS REVISED PER NCDEQ COMMENTS DATED 02-12-2018 El M=301 NO. DATE BY REVISION DESCRIPTION co co co Y ON W W cO } m p z m z Q z z p Q w Q w O J Q z J 0 L.L Q U 1rAr' I..Y_ 0 z z D 0 U Q 2 Q 0 3"x4" TEE (TYP.) � z z0 0�~ Q z QZLCUz z � G Q — 0 � J 0=C) J U w = w U r) SHEET 1 02-21-18 KMS REVISED PER NCDEQ COMMENTS DATED 02-12-2018 El M=301 NO. DATE BY REVISION DESCRIPTION C�)W U� Woc, g 00 N c� N rr \ 1--I4NN 1 1 V 00 0 a°00 ° N � z �Za d � x W� WW EXISTING 8" PIPE SKIMMER o W� PROPOSED DEMOLISH EXISTING1p, BAFFLE WALL ��`� �� p,L'•��%50 �cq ° d ° °d O l ✓ Li S ~ 5 — — — — — — — — — — — — — — — — — — — — — d 8 °a W. L.1302.25' — — — — — — — — — — — — — — d < d ° A. d a ° Qa e d a ° EXISTING ° ° d n STRUCTURE AND d °d `°° a HANDRAIL a ° d W.L. 1300.25' Q -- — — —— --—————————————————————————------—————————————————————————— — — — — — —— EXISTING ° 2" PVC z J O 4 4 .4 lo — — — — uJ ()� I'd° 1 �wZ� d d ' I '. a ° , C`1 '�/�r' ° ada w w li >FO d PROPOSED 1 44 REPLACE EXISTING I d EXISTING O Z Z SLUDGE COLLECTOR I 12" INLET PIPE MECHANISM I w O I d EXISTING Z ° MANHOLE STEPS Q — °d a �� 1 °` LimO I a �� �a w z O I 1 a PROPOSED Q d i 1 PUMP GUIDE RAIL Z 2 A.i 1 (TYP OF 4) QAA 0 — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — Q _ _ OEL. 1290.2 ° ° O d ° ° d e ° , ° — — — — — --- ° ° d e ° A°-�< < < ° d ° c ° d ° ° e < d < d ° ° d < v c < ° <° ° ° ° d °d° d ° c °a ° d , ° ad ° ° a ° d ° C a ° ° o ° PROPOSED co 00 U) d " ° A4d°, ` SUBMERSIBLE SOLIDS o Y2i w w HANDLING PUMP m ow w Li EL. 1286.25 (TYP OF 4) Lu p 'L z m z Q z w U' p U' cn z PROPOSED m cn o cn z w p Q w Q w O J 3" DIP PUMP " DISCHARGE U) PROPOSED FILL SUMP WITH z CONCRETE TO Aw Z DEPTH OF 2' w O LL Lu — �wI-- > U JOw U � � SECTION 2 0 1 2 4 6 GRAPHIC SCALE 1 INCH = 2 FEET SHEET NOTE: FINAL DRAWING — FOR REVIEW PURPOSES ONLY — NOT RELEASED FOR CONSTRUCTION M=302 NO. DATE BY REVISION DESCRIPTION PROPOSED 3" D.I.P. FLP ADAPTOR 3" PLUG Vf 6" D.I.P FROM A HEADER PROPOSED ABANDON IN PLACE mm n POS E D JTALL 4" DIP Lf �_.1.r. FROM CLARIFIER SLUDGE DIGESTER PLAN 3 0 1.5 3 6 9 GRAPHIC SCALE I INCH = 3 FEET POSED -ALL 4" MALE "K CONNECT FOR CK LOADING ROPOSED DRE DRILL CONCRETE ALL WITH 6" OPENING � D INSTALL MECHANICAL =AL SYSTEM (LINK SEAL R EQUIVALENT PER DETAIL 42). INSTALL 4" DIP DECANT �E AND CUT INTO EXISTING JERFLOW LINE �OPOSED _IND FLANGE WITH _USHING CONNECTION 'ER DETAIL M44) )POSED CHAIN OPERATED G VALVE R DETAIL S29) 8" OVERFLOW TO DRYING BED DRAIN PIT PROPOSED CORE DRILL CONCRETE WALL WITH 6" OPENING AND INSTALL MECHANICAL SEAL SYSTEM (LINK SEAL OR EQUIVALENT PER DETAIL M42). INSTALL 4" DIP DECANT LINE AND CUT INTO EXISTING OVERFLOW LINE PROPOSED 8"x4" TEE EXISTING 8" C.I.P. FRCA A SLUDGE DIGE EXISTING 4" PVC PIPE PROPOSED REPLACE PIVE PII AND FITTINGS BETWEEN PUMP EXISTING PIPE AS NEEDED WET WELL SECTION 37.95' PROPOSED REPLACE TWO (2) EXISTING PUMPS WITH NEW (TYP.) EXISTING 5-0" DIAMETER MANHOLE 3 0 1.5 3 6 9 GRAPHIC SCALE I INCH = 3 FEET NOTE: FINAL DRAWING - FOR REVIEW PURPOSES ONLY - NOT RELEASED FOR CONSTRUCTION �W U� z Woc,� PROPOSED INSTALL 4" MALE wJO co co QUICK CONNECT FOR U) J W co Y rr \ 1 1 V 1--I4NN N 00 00 0 PROPOSED w Wo a°00 ° N —"'—='- I—III—III—III-I_ I—III— � z �Za d =III III III III I III—III — a • . � w Q W� C) m WW W C7 =III =1 � � �-1 � Z o z W� H Z � W � 2 Z H W W 2i� W �O w� � Q C/) J Q 0— :f-7 i a 0 Q z FmQ z 0 LL LL 0 • z PROPOSED INSTALL 4" MALE wJO co co QUICK CONNECT FOR U) J W co Y w U 0 oN PROPOSED w w w —"'—='- I—III—III—III-I_ I—III— } =III III III III I III—III — a • . FOR TRUCK LOADING Q Lli C) m STATION W 3:z =III =1 � � �-1 � z 0 p z m 0 z Q z I—III—I � Q z 1 1 1 1 I I=II 1 1 .. _— llllilllllilllllilllllilllllilllllilllllilllllilllllilllllilllllilllllilllllil=l• , lilllllill Ililll I Illllilllliil _lil- =_ =_ I I 1 1 11= illlII11 1 I 1lll1lll1 11=1 I J U J p Q w Q w O J • z PROPOSED INSTALL 4" MALE wJO 4 C.I.P. QUICK CONNECT FOR U) J W FROM CLARIFIER .° TRUCK LOADING w U PROPOSED w —"'—='- I—III—III—III-I_ I—III— 8"x4" TEE AND 4" DIP =III III III III I III—III — a • . FOR TRUCK LOADING Q Lli C) ° IIIIIIIIIIII� 1IIII I III— '• III=III=III=1 I=1 1= • ' �° " STATION W 3:z =III =1 � � �-1 � 0 —IIIIII— I II I I—III I I II I "• _ •. °. •,° • . • ° .— ° : I I —IIIIIIIIIIII—III- 0 z z _IIIIII _ _ —III—III I.I—III—III—III—III—III—III—III—III � • = Q I—III—I � Q Q 1 1 1 1 I I=II 1 1 .. _— llllilllllilllllilllllilllllilllllilllllilllllilllllilllllilllllilllllilllllil=l• , lilllllill Ililll I Illllilllliil _lil- =_ =_ I I 1 1 11= illlII11 1 I 1lll1lll1 11=1 I J U J JLUUVC UIVCJ I CK 0 �_.1.r• SLUDGETO SECTION A -A DRYING EDS 3 0 1.5 3 6 9 GRAPHIC SCALE I INCH = 3 FEET PROPOSED ABANDON IN PLACE 8" CIP TO SLUDGE DRYING BEDS. INSTALL MJ PLUG AND ADAPTOR NO. I DATE I BY REVISION DESCRIPTION SHEET Q z J O Q U O z z D O U Q 2 Q 0 M-303 C�)W U� Woc, g t 00 N c� N V 00 • ° 0 �. EXISTING '� cc �a00 GAS ENGINE EXISTING RESTROOM z GENERATOR ° a EXISTING W w AERATION BLOWERS Z �Qn a f � o a W AA ° AA - ca ,y C? • T .i tom& (o 10 a• PROPOSED EXISTING EXISTING BLOWER • °TO BE REMOVED • 12" D.I.P. AND REPLACED (TYP) Q • • • • , . ° • ° . • • • , ° O • .• . ,• • • ° • Z 4 • • • • f ' ° ° • , • • ° • °• Z J C� O 2Z Q I- Lu Z U <2i EXISTING W W ~ SIDEWALK > Fm 0 �0ZZ lo� 0 >: Lu � PLAN LL z NOTE: Lim 0 U FINAL DRAWING — FOR REVIEW PURPOSES ONLY — NOT RELEASED FOR CONSTRUCTION W Z O Lu Z `) Z = Q Q EXISTING O AIR FILTERS co 00 Y --------------------- — ----------- — — — — — — — — — — — — — — — — — — — e °--------- � pp p W W W EXISTING Lu W 0 12"x6" TEE ° , o U)z 0 Q w Q w O J 0 EXISTING U U u- 6" FLEXIBLE ' COUPLING • A EXISTING 6" CHECK Z Z EXISTING VALVE W O 6" BUTTERFLY CC VALVE G U W V . . . . . . .a . . °.• • ' • . 4 4 : W Z wQ Z OQ J J SECTION A -A 00 SHEET 3 0 1.5 3 6 9 GRAPHIC SCALE 1 INCH = 3 FEET M=304 HNODATE BY REVISION DESCRIPTION 520 CFM EXHAUST FAN CHEMICAL FEED PUMPS AND PIPING (SEE SODIUM BISULFATE FEED SCHEMATIC) SODIUM BISULFATE CONTAINER (TYP. 2) 6"x6" CONCRETE CONTAINMENT WALL -- 2" PVC WATER LINE r ----M- 2" GATE VALVE (TYP.) I� BACKFLOW PREVENTER __ __________�T� _____ SO2 SOLUTION LINE ISI TO EXISTING FEED LINE I I ••. I •,� I I � I I I I •� I I I • fiI II '� SLOPE __ _ I 8" REINFORCED FLOOR LDRAIN 0 i i�4„ _ CONCRETE SLAB 1500 W DRAIN HEATER EMERGENCY EYEWASH FIBERGLASS STATION SCREENED INTAKE LOUVER BUILDING I I I I ao I L— — — — — — — — — — —v — — — — — — — J CHLORINE GAS ALARM LIGHT AND AUDIBLE WARNING DETECTOR (MOUNT ALARM IN WEATHERPROOF BOX 8" ABOVE FLOOR) EXTERNAL FAN CONTROL SWITCH 3/0 X 6/4 DOOR WITH 1 LIGHT AND PANIC HARDWARE DECHLORINATION BUILDING FLOOR PLAN NOT TO SCALE �H SCR INTP LOU -- � 2" PVC WATER LINE r ----M- 2" GATE VALVE (TYP.) 520 CFM EXHAUST FAN I� CHEMICAL FEED PUMPS AND PIPING (SEE SODIUM HYPOCHLORIDE FEED SCHEMATIC) SODIUM HYPOCHLORIDE CONTAINER (TYP. 2) 6"x6" CONCRETE CONTAINMENT WALL BACKFLOW PREVENTER ___ NaOCI SOLUTION LINE iTi TO EXISTING FEED LINE I I I •f I ljj I I • f• I • I I II '1 ' � I I •: r 6'-8„ M l • SLOPE FLOOR TO 8" REINFORCED DRAIN f 1 1/4" _ CONCRETE SLAB 1500 W / DRAIN HEATER EMERGENCY EYEWASH STATION FIBERGLASS —,Z I I SCREENED INTAKE LOUVER BUILDING I L----------- - - CHLORINE GAS DETECTOR (MOUNT 8" ABOVE FLOOR) ao I ALARM LIGHT AND AUDIBLE WARNING ALARM IN WEATHERPROOF BOX EXTERNAL FAN CONTROL SWITCH 3/0 X 6/4 DOOR WITH 1 LIGHT AND PANIC HARDWARE CHLORINATION BUILDING FLOOR PLAN NOT TO SCALE NOTE: LDING TO CONCRETE IANUFACTURER'S )NS. NCRETE SLAB > @ 12" O. C. E. W., \ND BOTTOM ct�W a U� \ \\\ \\ \\\ Wof,� U) Lu �Q z0 Q � z 8" #57 STONE 0 < co LLj > Fm rr \ 1 1 V Q N 00 N 00 000� o o w ►-� a00 00 N � } Z �Za a H� W LuQ W� O m WW Q � cn o BUILDING ELEVATIONSz W� 0 oo \Y CJt�ltc�V ` Z•d Z. NE Q z J 0 Q U 0 z z D 0 U Q Q O \\\\a a a \ \\\ \\ \\\ Zoo U) Lu �Q z0 Q � z 8" #57 STONE 0 < co LLj > Fm �LU Q z 0 oN o o w w J � } LL a� w LL LuQ O m 0 Q a z BUILDING ELEVATIONSz 0 w p z Fm Q z J 0 Q U 0 z z D 0 U Q Q O \\\\a a \ \\\ \\ \\\ — U) z0 co co 8" #57 STONE 0 co Y 3/0 X 6/4 DOOR WITH 1 LIGHT— ~ Q (D 0 oN AND PANIC HARDWARE Q w w J } z ip w Fy 0 m 0 z = BUILDING ELEVATIONSz w p z m z Q z NOT TO SCALE z J p Q w Q w O J --j o 0 U c U u - Q z J 0 Q U 0 z z D 0 U Q Q O \\\\a a \ \\\ \\ \\\ 7 z0 8" #57 STONE 0 w 3/0 X 6/4 DOOR WITH 1 LIGHT— ~ Q (D LLj AND PANIC HARDWARE Q Z z J z ip w Fy 0 CHLORINATION / DECHLORINATION 0 z = BUILDING ELEVATIONSz U z Q NOT TO SCALE J NOTE: FINAL DRAWING — FOR REVIEW PURPOSES ONLY — NOT RELEASED FOR CONSTRUCTION NO. I DATE I BY REVISION DESCRIPTION SHEET M-331 V)Wq� U Wz� TO PULSATION PIPs �� DAMPENER PVG G� Off. 60 pEG �PTER H Z o OTA E U 500 CC CALIBRATION CHAMBER 00 HOSE BARB ADAPTER & CLAMP (TYP) a z DIAPHRAGM METERING PUMPS (TYP.) Z a � x WQ 500 CC BALL VALVE (TYP) CALIBRATION Z CHAMBER W� Ss 55 GALLON SODIUM HYPOCHLORIDE FLEXIBLE TUBING CHEMICAL CONTAINER (TYP. 2) ''�►,rr��ti��``� Q Q � Z z Q wJ SODIUM HYPOCHLORIDE PIPING SCHEMATIC CCQ NOT TO SCALE G z U �wZ Q�Q= ww >�o �0 Z z �0� > 0 PULSATION IHS Ew0 R �_ LL z DAMPENER IT, PGHPt Q D 60 PTJOH LL O 5GH•ORI o w Z O U pEG�� TER [-- Q 2 BSE v�P (/) J Z 2 PO��E Q Q 500 CC F�US� CALIBRATION ss CHAMBER O HOSE BARB ADAPTER &CLAMP (TYP) DIAPHRAGM METERING PUMPS (TYP.) �.- co oo Y Ss W W_ m W W LLI 500 CC u- z m z BALL VALVE (TYP) CALIBRATION Oz w (D 0 (D 0 z CHAMBER m[-- co 0 co z w p Q w Q w 0 � 0 0 0 0 0 li 4ip 55 GALLON SODIUM BISULFITE FLEXIBLE TUBING z CHEMICAL CONTAINER Z 0 c/) (TYP. 2) 0 U Q Z — Q z w 2i Q z 0 2i �0�w 0=c= J U w U SODIUM BISULFITE PIPING SCHEMATIC = w (j) NOT TO SCALE U Q NOTE: SHEET FINAL DRAWING — FOR REVIEW PURPOSES ONLY — NOT RELEASED FOR CONSTRUCTION M=332 NO. DATE BY REVISION DESCRIPTION BACKFILL MATERIAL COMPACTED IN 6" LIFTS BACKFILL MATERIAL COMPACTED IN 3" LIFTS No.12 COATED COPPER TRACI WIRE`u`v EARTH v STANDARD EXCAVATION APPROVED WARNING TAPE 24" ABOVE PIPE APPROVED WARNING TAPE 24" ABOVE PIPE BACKFILL MATERIAL��/��/��/��/��/��/�\/��/' COMPACTED /%/%/%% IN 6" LIFTS i \\//\\//\\//\\//\\ \\//\ ...... .....� BACKFILL MATERIAL COMPACTED IN 3" LIFTS , No.12 COATED COPPER TRACING WIRE 6\ UNDISTURBED EARTH OVERCUT EXCAVATION DUCTILE IRON PIPE APPROVED WARNING TAPE BACKFILL 24" ABOVE PIPE MATERIAL COMPACTED��z/��/ IN 6" LIFTS SPRING LINE \%/\\j/\\j% OF PIPE \\�\\�\\�\\/ O\P �� 6 \ .MIN No.12 COATED COPPER TRACING j v WIRE o 6" MIN CLASS I v EMBEDMENT x\/�\/ UNDISTURBED EARTH STANDARD EXCAVATION PVC PIPE APPROVED WARNING TAPE 24" ABOVE PIPE BACKFILL BACKFILL MATERIAL COMPACTED OMPACTED MATERIAL COMPACTED 6" LIFTS IN 6" LIFTS STANDARD EXCAVATION IN WET CONDITIONS APPROVED WARNING TAPE 24" ABOVE PIPE 6" DEPTH JCREMENTS IN UNDISTURBED J EARTH UNDERCUT EXCAVATION IN UNSTABLE SOILS TYPES PIPE IN WET OR UNSTABLE CONDITIONS ALL PIPE TYPES (AS DIRECTED BY ENGINEER) NOTES: 1. CONSTRUCTION OF TRENCHES SHALL COMPLY WITH ALL FEDERAL, STATE AND LOCAL SAFETY AND HEALTH REGULATIONS WHICH HAVE JURISDICTION AT THE PROJECT SITE. IT IS THE CONTRACTOR'S RESPONSIBILITY TO BE FAMILIAR WITH THE APPLICABLE REGULATIONS AND FOLLOW THEM ACCORDINGLY. 2. FOR UNIT PRICE CONTRACTS ONLY, PAYMENT FOR ROCK EXCAVATION AND SELECT BACKFILL IN TRENCH SHALL BE FOR ACTUAL QUANTITIES AND SHALL NOT EXCEED THE WIDTH OF TRENCH SHOWN ON THIS DETAIL. 3. FOR UNIT PRICE CONTRACTS ONLY, PAYMENT FOR FOUNDATION STONE UNDERCUT SHALL BE FOR THE LENGTH OF THE TRENCH REQUIRING UNDERCUT X 6" DEPTH INCREMENTS TO THE DEPTH REQUIRED. 4. CLASS I EMBEDMENT SHALL BE NCDOT STANDARD # 67 STONE OR APPROVED EQUAL. FOUNDATION STONE SHALL BE NCDOT STANDARD # 57, # 67 STONE, RAILROAD BALLAST OR APPROVED EQUAL. PIPE TRENCHING DETAILS UPDATED MARCH, 2017 NOT TO SCALE A 1/2" EXPANSION JOINT row—B 1/2" EXPANSION JOINT SAWGUT EDvE 0E" ° E`%STPNG WALK ' TOOLED JOINT ; a :CONCRETE SIDEWALK, SAWCUT EDGE OF • , . •d " TOOLED JOINT EXISTING WALK .4. , ' A ° ASPHALTIC EXPANSION JOINT ® 30' O.C. SEALi� FINISH GRADE WITH RUBBERIZED ASPHALT B PLAN BROOM FINISH SURFACE PERPENDICULAR TO DIRECTION OF TRAFFIC V—SHAPED 5' TOOLED JOINT 1/8" TO 1/4" 4" CONCRETE SIDEWALK JOINT SEALER 1/8" RADIUS 1,. SLOPE 1/4" PER FOOT 1 119" JOINT FILLER �I� 1 /2" �N\EXPANS APED 30' 0. C. SIDEWALK H & ADJACEON JOINTS NT TOOLED JOINSSPACING TO ALL RIGID OBJECTS AT WIDTH OF SIDEWALK 4" MIN. COMPACTED ABC SECTION A -A SECTION B -B CONSTRUCTION NOTES: 1. SIDEWALK SHALL BE CONSTRUCTED WITH 4000 PSI CONCRETE. 2. SIDEWALK SURFACE SHALL BE GIVEN A LIGHT BROOM FINISH WITH THE BRUSH MARKS PERPENDICULAR TO THE TRAFFIC. CONCRETE SIDEWALK UPDATED MARCH, 2017 NOT TO SCALE NOTE: FINAL DRAWING — FOR REVIEW PURPOSES ONLY — NOT RELEASED FOR CONSTRUCTION FINISH GRADE 5' STE (MIN. 8' MAX. STANDARD STRENGTH FABRIC WITH WIRE FENCE (MIN. 14 GAUGE 6"X6" WIRE) 6' MAX EXTRA STRENGTH FABRIC WITHOUT WIRE FENCE WIRE FENCE FILTER FABRIC EXISTING STEEL GROUND POST BACKFILL TRENCH AND COMPACT THOROUGHLY UPSLOPE (DISTURBED AREA) N SLOPE SLOPE LENGTH(FT) MAXIMUM AREA(SQFT) <2% 100 10,000 2 TO 5% 75 7,500 5 TO 10% 50 5,000 10 TO 20% 25 2,500 >20% 15 1,500 JG NOTES: 1. FILTER BARRIERS SHALL BE INSPECTED IMMEDIATELY AFTER EACH RAINFALL AND DAILY DURING PROLONGED RAINFALL. REPAIR SHALL BE MADE AS NECESSARY. 2. FABRIC SHALL BE REPLACED PROMPTLY IF FOUND TO BE IN DISREPAIR. 3. SEDIMENT DEPOSITS SHALL BE REMOVED AFTER EACH STORM EVENT AND WHEN DEPOSITS REACH APPROXIMATELY 1/3 HEIGHT OF BARRIER. 4. REFERENCE NCDEQ LAND QUALITY SECTION DESIGN MANUAL: 6.62. K*E"­C SILT FENCE Q -.,) UPDATED MARCH, 2017 NOT TO SCALE REVISION DESCRIPTION PLAN SYMBOL \ j\j\j\j \, 6" MIN j j, LINE OFRING PIPELINE U OFRPI EING No.12 COATED v v v \ No.12 COATED COPPER TRACING Y COPPER TRACING WIRE\ v 6" MIN X WIRE CLASS I EMBEDMENT CLASS I Fm �> o EMBEDMENT v-� o c� c� UNDISTURBED) � FOUNDATION STONE\ r � EARTH o °° °O FOR UNDERCUT i � U z w� EXCAVATION ONLY 0 r—+ AS DIRECTED BY a w Q ENGINEER STANDARD EXCAVATION IN WET CONDITIONS APPROVED WARNING TAPE 24" ABOVE PIPE 6" DEPTH JCREMENTS IN UNDISTURBED J EARTH UNDERCUT EXCAVATION IN UNSTABLE SOILS TYPES PIPE IN WET OR UNSTABLE CONDITIONS ALL PIPE TYPES (AS DIRECTED BY ENGINEER) NOTES: 1. CONSTRUCTION OF TRENCHES SHALL COMPLY WITH ALL FEDERAL, STATE AND LOCAL SAFETY AND HEALTH REGULATIONS WHICH HAVE JURISDICTION AT THE PROJECT SITE. IT IS THE CONTRACTOR'S RESPONSIBILITY TO BE FAMILIAR WITH THE APPLICABLE REGULATIONS AND FOLLOW THEM ACCORDINGLY. 2. FOR UNIT PRICE CONTRACTS ONLY, PAYMENT FOR ROCK EXCAVATION AND SELECT BACKFILL IN TRENCH SHALL BE FOR ACTUAL QUANTITIES AND SHALL NOT EXCEED THE WIDTH OF TRENCH SHOWN ON THIS DETAIL. 3. FOR UNIT PRICE CONTRACTS ONLY, PAYMENT FOR FOUNDATION STONE UNDERCUT SHALL BE FOR THE LENGTH OF THE TRENCH REQUIRING UNDERCUT X 6" DEPTH INCREMENTS TO THE DEPTH REQUIRED. 4. CLASS I EMBEDMENT SHALL BE NCDOT STANDARD # 67 STONE OR APPROVED EQUAL. FOUNDATION STONE SHALL BE NCDOT STANDARD # 57, # 67 STONE, RAILROAD BALLAST OR APPROVED EQUAL. PIPE TRENCHING DETAILS UPDATED MARCH, 2017 NOT TO SCALE A 1/2" EXPANSION JOINT row—B 1/2" EXPANSION JOINT SAWGUT EDvE 0E" ° E`%STPNG WALK ' TOOLED JOINT ; a :CONCRETE SIDEWALK, SAWCUT EDGE OF • , . •d " TOOLED JOINT EXISTING WALK .4. , ' A ° ASPHALTIC EXPANSION JOINT ® 30' O.C. SEALi� FINISH GRADE WITH RUBBERIZED ASPHALT B PLAN BROOM FINISH SURFACE PERPENDICULAR TO DIRECTION OF TRAFFIC V—SHAPED 5' TOOLED JOINT 1/8" TO 1/4" 4" CONCRETE SIDEWALK JOINT SEALER 1/8" RADIUS 1,. SLOPE 1/4" PER FOOT 1 119" JOINT FILLER �I� 1 /2" �N\EXPANS APED 30' 0. C. SIDEWALK H & ADJACEON JOINTS NT TOOLED JOINSSPACING TO ALL RIGID OBJECTS AT WIDTH OF SIDEWALK 4" MIN. COMPACTED ABC SECTION A -A SECTION B -B CONSTRUCTION NOTES: 1. SIDEWALK SHALL BE CONSTRUCTED WITH 4000 PSI CONCRETE. 2. SIDEWALK SURFACE SHALL BE GIVEN A LIGHT BROOM FINISH WITH THE BRUSH MARKS PERPENDICULAR TO THE TRAFFIC. CONCRETE SIDEWALK UPDATED MARCH, 2017 NOT TO SCALE NOTE: FINAL DRAWING — FOR REVIEW PURPOSES ONLY — NOT RELEASED FOR CONSTRUCTION FINISH GRADE 5' STE (MIN. 8' MAX. STANDARD STRENGTH FABRIC WITH WIRE FENCE (MIN. 14 GAUGE 6"X6" WIRE) 6' MAX EXTRA STRENGTH FABRIC WITHOUT WIRE FENCE WIRE FENCE FILTER FABRIC EXISTING STEEL GROUND POST BACKFILL TRENCH AND COMPACT THOROUGHLY UPSLOPE (DISTURBED AREA) N SLOPE SLOPE LENGTH(FT) MAXIMUM AREA(SQFT) <2% 100 10,000 2 TO 5% 75 7,500 5 TO 10% 50 5,000 10 TO 20% 25 2,500 >20% 15 1,500 JG NOTES: 1. FILTER BARRIERS SHALL BE INSPECTED IMMEDIATELY AFTER EACH RAINFALL AND DAILY DURING PROLONGED RAINFALL. REPAIR SHALL BE MADE AS NECESSARY. 2. FABRIC SHALL BE REPLACED PROMPTLY IF FOUND TO BE IN DISREPAIR. 3. SEDIMENT DEPOSITS SHALL BE REMOVED AFTER EACH STORM EVENT AND WHEN DEPOSITS REACH APPROXIMATELY 1/3 HEIGHT OF BARRIER. 4. REFERENCE NCDEQ LAND QUALITY SECTION DESIGN MANUAL: 6.62. K*E"­C SILT FENCE Q -.,) UPDATED MARCH, 2017 NOT TO SCALE REVISION DESCRIPTION PLAN SYMBOL Cn D O W C) Z J Q J W W � U W 10 SHEET Q z J O L.L Q U N� L.L O z z D O CU G Q Q M-501 cn a U Wz� �Q M co Y z Q � N z Fm �> o H v-� o c� c� m � > r � a o °° °O p � U z w� 0 r—+ W a w Q z WW z F-� r� v O 0 o O 0 w � Cn D O W C) Z J Q J W W � U W 10 SHEET Q z J O L.L Q U N� L.L O z z D O CU G Q Q M-501 cn a Zoo w �Q M co Y z Q � 0 0 Fm �> o z a0 m � > LLLL� a� Qp m p � w� 0 a 2 Qa z Z z F-� < z w 0 o O 0 Z m� Fm Cn D O W C) Z J Q J W W � U W 10 SHEET Q z J O L.L Q U N� L.L O z z D O CU G Q Q M-501 cn M co Y >I 0 0 N m > > Qp m p � w� 2 p z m z F-� < z w 0 o 0 0 Z m� w 0 0 Z W p < W < w 0 --j m m U D U u- Cn D O W C) Z J Q J W W � U W 10 SHEET Q z J O L.L Q U N� L.L O z z D O CU G Q Q M-501 ADHESIVE ANCHOR W/ NUT AND LOCK WASHER (TYP.) ANCHOR DIA.='C' HOLE DIA.='C' PLUS Y6" — 'D' FLAT BAR 'C' BOLT DIA. m NOTES: 1. WHEN USED WITH FLANGED PIPING, INCREASE 'B' DIMENSION BY 2 IN. MINIMUM TO PROVIDE 2" MINIMUM CLEARANCE FROM CONCRETE FACE. 2. THIS PIPE SUPPORT DETAIL IS SUITABLE FOR PIPE SIZES 3/4 IN. THRU 6 IN. DIAMETER ONLY. FINISHED GRADE w w u WORD "SEWER" CAST IN TOP 24"x24"x4" CONCRETE PAD \\ VALVETBOXECAST (SCREW RTOYPE) COMPACTED BACKFILL SUPPORT BRICK tl II /,r—CONCRETE BRICKSUPPORT I ` O O "B" SEE NOTE 2 "C" BOLT DIA. "D„ FLAT BAR SIZE MAX. SUPPORT SPACING (FEET) 3/4 5 15/16 2 Y2 3/8 36X1 Y4 4 < e 6 Y4 2 5/8 a d 36X1 Y4 ° ° e 5 1Y6 <d a 3/8 36X1 Y4 ° d 6 15/16 a COMPACTED BACKFILL LUG VALVE CONCRETE SUPPORT PAD 6" LARGER THAN VALVE (REQUIRED ON VALVES 10" AND LARGER ONLY) rS-"' PLUG VALVE 29 UPDATED MARCH, 2017 NOT TO SCALE CAST OR CORE DRILLED HOLE INSTALLATION M LINK -SEAL INSTALLATION 4`Z UPDATED MARCH, 2017 NOT TO SCALE ALL ERIC SEAL ELEMENT L (C, L, S-316, 0 OS -316, T) RE PLATE PIPE DIMENSIONS IN INCHES NOMINAL PIPE DIA. "A" "B" SEE NOTE 2 "C" BOLT DIA. "D„ FLAT BAR SIZE MAX. SUPPORT SPACING (FEET) 3/4 5 15/16 2 Y2 3/8 36X1 Y4 4 1 6 Y4 2 5/8 3/8 36X1 Y4 4 1 Y4 5 1Y6 2 3/4 3/8 36X1 Y4 4 1 Y2 6 15/16 3 3/8 36X1 Y4 4 2 8 5/16 3 3/16 Y2 Y4X1 Y4 4 2 Y2 8 7/8 3 �/16 Y2 Y4X1 Y4 4 3 9 Y8 3 3/4 Y2 Y4x1 Y4 4 4 10 51'6 4 Y4 Y2 Y4x1 Y4 4 6 14 3/8 5 5/6 5/8 3/8x1 Y2 4 M OFFSET PIPE CLAMP DETAIL 43 MODIFIED FOR THIS PROJECT NOT TO SCALE I I ^A I PIP m:a*111 FLANGE PIPE OR PIPE FITTING VARIES) DRILL AND TAP FOR '.T 1Y2 GATE VALVE THREADED ENDS 1Y2 BRASS ADAPTER %" LONG STD. PIPE THREAD ON VALVE SIDE 1Y2 BRASS NIPPLE %" LONG j!Z TYPICAL 1-1/2" FLUSHING CONNECTION \L4j MODIFIED FOR THIS PROJECT NOT TO SCALE NOTE: FINAL DRAWING — FOR REVIEW PURPOSES ONLY — NOT RELEASED FOR CONSTRUCTION REVISION DESCRIPTION V ) D O W C) Z J Q J W L� C) C/)/ 10 SHEET Q z J O Q U O z M-502 cn a U Wz� w �Q Q�z z >I oN I� `r o �o W_ N O � � x a I-� a00 o 00 N � � z a� Z w a co � w WQ 0 WW Q a Z p Z o ZF-� W� O V ) D O W C) Z J Q J W L� C) C/)/ 10 SHEET Q z J O Q U O z M-502 cn a Zoo w �Q Q�z Y >I oN > Fm �o W_ z 0 a0 � m LLLL� a� > co a 0 Q a Z p Z m ZF-� O Z LLI0 Fm V ) D O W C) Z J Q J W L� C) C/)/ 10 SHEET Q z J O Q U O z M-502 cn M co Y >I oN 2i W W_ 0 . m > > co p Z m ZF-� Q Z LLI0 p 0 0 Z m P (n o (n Z W p Q w Q w 0 � --j m m o D o u - V ) D O W C) Z J Q J W L� C) C/)/ 10 SHEET Q z J O Q U O z M-502