Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
NC0023086_List of Equipment_20180316
List of Proposed Equipment for Fontana Dam WWTP Upgrades In -Kind Replacements: -Centrifugal Aeration Blower -Secondary Clarifier Sludge Collector Mechanism Modified Treatment Units (description of modification): -Secondary Clarifier Sludge Pumps (Flowrate modified) -Secondary Clarifier Scum Pump (Flowrate modified) -Digester Wet Well Pumps (Flowrate modified) -Chlorine Dosing Equipment (Liquid sodium hypochlorite system replacing existing gas system) New Treatment Units: -Dechlorination (Sodium Bisulfite) Dosing Equipment