HomeMy WebLinkAboutNCG020929_Email RE WiRO Comments_20180515Ventaloro, Julie
From: Snider, Holley
Sent: Thursday, May 17, 2018 4:10 PM
To: Ventaloro, Julie
Subject: FW: 67-80 DWR REVIEW SHEET 2013
Attachments: 20180515_151139.jpg
Follow Up Flag: Follow up
Flag Status: Flagged
FYI
From: Snider, Holley
Sent: Wednesday, May 16, 2018 1:45 PM
To: Wehner, Judy <judy.wehner@ncdenr.gov>
Cc: Sams, Dan <dan.sams@ncdenr.gov>; Mairs, Robb L <robb.mairs@ncdenr.gov>; Gregson, Jim
<jim.gregson@ncdenr.gov>
Subject: RE: 67-80 DWR REVIEW SHEET 2013
Afternoon Judy,
I almost forgot.... The site is currently being used for inert debris disposal. I observed (and photographed) a tractor
trailer with a large container dumping material to the south and east of the pond on the highground finger on land
between the wetlands. Let me know if you need anything else.
Sincerely,
Holley Snider
Environmental Specialist
Land Quality Section
Division of Energy, Mineral, & Land Resources
Department of Environmental Quality
910.796.7315 office
holley.snider@ncdenr.gov
127 Cardinal Dr. Extension
Wilmington, NC 28405
-�_-^Nothtng Compares
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties
From: Snider, Holley
Sent: Wednesday, May 16, 2018 12:16 PM
To: Wehner, Judy <iudy.wehner@ncdenr.gov>
Cc: Sams, Dan <dan.sams@ncdenr.gov>; Mairs, Robb L <robb.mairs@ncdenr.gov>; Gregson, Jim
<iim.�re�son@ncdenr.�ov>
Subject: RE: 67-80 DWR REVIEW SHEET 2013
Good Morning Judy,
I made a visit to the site yesterday May 15, 2018 and have attached a map and photos for your review. Based on Google
Earth imagery and my observations, it appears that the entire site was timbered within the last year. It does not appear
that BMPS were utilized when the site was timbered, no silt fence is present and the clearing and grubbing extends to
the edge of and possibly within the wetlands labeled on the submitted map. Additionally, the wetland boundary shown
on the map was delineated by Pittman Soil Consulting and does not appear to have been approved by the USACOE. The
areas that have been cleared and grubbed include the areas labeled on the submitted map as "50' Undisturbed
Buffer". It does not appear that any portion of the 50' buffer has been left undisturbed (see attached photos). The
location of the existing pond does not appear to provide the required 50 buffer from the wetlands. The existing pond is
equipped with an outlet pipe that connects to the ditch shown on photo #3 neither of which are depicted on the
submitted plan. It is unclear if the ditch connects to Goose Creek Branch. The ditching within 404 wetlands may be a
Violation of State Water Quality Standards, I have copied Robb Mairs, with DWR for help with the ditch. I hope this
information is helpful. Please feel free to call or email me if you have any questions or I may be of assistance to you in
any way.
Sincerely,
Holley Snider
Environmental Specialist
Land Quality Section
Division of Energy, Mineral, & Land Resources
Department of Environmental Quality
910.796.7315 office
holley.snider@ncdenr.gov
127 Cardinal Dr. Extension
Wilmington, NC 28405
`•--othing Compares
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties
From: Wehner, Judy
Sent: Monday, April 23, 2018 4:20 PM
To: Gregson, Jim <lim.gregson@ncdenr.gov>
Cc: Sams, Dan <dan.sams@ncdenr.gov>; Snider, Holley <holley.snider@ncdenr.gov>
Subject: 67-80 DWR REVIEW SHEET 2013
Here's the review sheet for the new Wallman Mine in Onslow County.