Loading...
HomeMy WebLinkAbout20180400 Ver 1_More Info Received_20180507Strickland, Bev From: Amy Black <ablack@jewellengr.com> Sent: Monday, May 07, 2018 4:36 PM To: Homewood, Sue Subject: RE: [External] Winston Salem CCUC Multi Site Sewer Crossing Stabilization Project Yikes, there should have been a second line on that form. Stream A is the main channel and will have 205 LF of impact. Using the stationing shown on the plans, the work begins at approximately STA 40 and ends at approximately 245. Stream B will have approximately 55 LF of temporary impact, for a total of 260 for both streams. Let me know if you need anything else to further clarify this site. Sorry for that oversight. Amy Black, PE JEWELL Engineering Consultants ablack@Oewellengr.com 336-996-9974 x 107 From: Homewood, Sue <sue.homewood@ncdenr.gov> Sent: Monday, May 07, 2018 3:26 PM To: Amy Black <ablack@jewellengr.com> Subject: RE: [External] Winston Salem CCUC Multi Site Sewer Crossing Stabilization Project That's sufficient for me, if he changes his mind just let me know and I'll issue a correction. On site 8&9, the impact table states 205 linear feet but the plans seem to indicate 250 feet of stream work. And that's just one of the two channels. Can you break it down for me, how much impact to Trib A, how much to Trib B and just call one of them the main channel and include the length after they merge. Thanks, Sue Homewood Division of Water Resources, Winston Salem Regional Office Department of Environmental Quality 336 776 9693 office 336 813 1863 mobile Sue. Homewood@ncdenr.gov 450 W. Hanes Mill Rd, Suite 300 Winston Salem NC 27105 1 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Amy Black [mailto:ablack@iewellengr.com] Sent: Monday, May 7, 2018 3:20 PM To: Homewood, Sue <sue.homewood@ncdenr.gov> Subject: RE: [External] Winston Salem CCUC Multi Site Sewer Crossing Stabilization Project When I spoke with him over the phone about the projects before we submitted the packages, he said they should all be under 27. 1 have not heard anything different from him since he got the packages, but we haven't gotten permits yet. Amy Black, PE JEWELL Engineering Consultants ablack@iewellengr.com 336-996-9974 x 107 From: Homewood, Sue <sue.homewood@ncdenr.gov> Sent: Monday, May 07, 2018 3:16 PM To: Amy Black <ablack@iewellengr.com> Subject: RE: [External] Winston Salem CCUC Multi Site Sewer Crossing Stabilization Project Hi Amy, I'm working on these 401s and have a quick question. Did Bryan confirm that he's going to cover these under a N W P27? Thanks, Sue Homewood Division of Water Resources, Winston Salem Regional Office Department of Environmental Quality 336 776 9693 office 336 813 1863 mobile Sue. Homewood@ncdenr.gov 450 W. Hanes Mill Rd, Suite 300 Winston Salem NC 27105 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Amy Black [mailto:ablack@iewellengr.com] Sent: Monday, March 26, 2018 1:03 PM To: Homewood, Sue <sue.homewood@ncdenr.gov> Subject: [External] Winston Salem CCUC Multi Site Sewer Crossing Stabilization Project External email. Do not click links or open attachments unless verified. Send all suspicious email as an attachment to Report Spam. Hi Sue, We submitted the PCN for Sites 8 and 9 (one package) last week for both ACE and DWR review. The remaining 8 PCN packages were submitted to the Corps this morning. The files are too large to send as one email, so I had to send them in 8 individual emails. I will be happy to send them to you the same way, but I put them on our FTP site in a folder with your name in case you would rather get them all at once from that site. ftp://jewel lengr.ftpaccess.cc User Name: ftpuser Password: FTP4J3w311 The project originally included 17 sites, but has been reduced to 14. Here is a summary of the Sites: Sites 1, 11, 17 have been dropped from the project. Sites 6, 12, and 16 do not require PCN submittals. They include sewer work only and will be completed as maintenance. Sites 8 & 9 require DWR certification as well and have been submitted on-line using the e-pcn. Sites 2, 3, 4, 5, 7, 101, 13/14, and 15 require a PCN submittal but no DWR certification. If you have any questions regarding these submittals, or if you prefer that I email them individually, please let me know. Thanks Amy Black, PE JEWELL Engineering Consultants ablack@iewellengr.com 336-996-9974 x 107