HomeMy WebLinkAboutNC0004979_Email - 5 day Notification_20180517Strickland, Bev
From: Glenn, Elizabeth <Elizabeth.Glenn@duke-energy.com>
Sent: Thursday, May 17, 2018 9:06 AM
To: Tuvia, Ori A
Subject: [External] Plant Allen - Gaston Co. NC0004979 - 5 Day Notification
Follow Up Flag: Follow up
Flag Status: Flagged
Good morning, Mr. Tuvia —
On 05/13/18 at 20:40 PM, a sheen observed at WW outfall 004 could possibly be of a petroleum nature, even though
onsite testing methods indicated otherwise. Samples were collected and returned on 5/14/18 as non -
detect. Notification was made to the NRC at 2045, incident # 1212036. Notification was made to the DEQ weekend
hotline at 2104, and Chris Creighton was the contact.
On 05/15/18, site personnel making rounds noted a sheen at 1000. Oil test paper produced a positive
result. Notification to DEQ— Mooresville office was made at 1330 and a voicemail left for Ron Taraban.
The suspected source is the boiler feed pump service water cooler system. These coolers were isolated and repairs are
underway.
New oil booms have been deployed to mitigate any residual oil in the piping.
Please let me know if you have any further questions.
Thanks,
J. Elizabeth Glenn
CCP EHS Permitting & Compliance
Office: (980) 373 0530
Cell: (864) 642 8833
1