Loading...
HomeMy WebLinkAboutWQ0039753_More Info Received_20180509CAPE FEAR ENGINEERING 151 Pools Rd.,SLAN& 100, SeMlle, NC, 28451 TEL (910) 383-1044, FAX (910) 383-1045 www.ospefe eer*V.00m To: NCDEQ -Division of Water Resources PERCS Unit 1617 Mail Service Center Raleigh, NC 27699-1617 Attn: Monti Hassan, P.E. Transmittal Date: May 9, 2018 File: 427-06B "34" Subject: Cameron Woods Phase 6113 Sewer Permitting ❑ As Requested ❑ For Your Files ❑ For Distribution ® For your Review / Action / Approval ❑ Sent via Mail ❑ Sent via Courier Quantity Drawing No. Description 1 Copy Response Letter 1 Copy Pressure Sewer Design Analysis 1 Copy FTSE 2017 Update 1 Copy Email from Brunswick County RECEIVED/DEW MAY 1 Water Re,o .- ermi ing Saction REMARKS Please find the enclosed documents for your review. If you have any questions or require additional information, please contact our office. Thank you. CC: Cape Fear Engineering, File 427-066 "34" Signed: yn Paints Received By: Date: CAPE FEAR ENGINEERING 151 POW* Rd.,Suxs 100, BOM", NC, 28451 TEL (910) 363-1044, FAX (910) 383-1045 www. oom To: NCDEQ -Division of Water Resources PERCS Unit 1617 Mail Service Center Raleigh, NC 27699-1617 Attn: Monti Hassan, P.E. Transmittal Date: May 9, 2018 File: 427-06B "34" Subject: Cameron Woods Phase 6113 Sewer Permitting ❑ As Requested ❑ For Your Files ❑ For Distribution ® For your Review / Action / Approval ❑ Sent via Mail ❑ Sent via Courier Quantity Drawing No. Description 1 Copy Response Letter 1 Copy Pressure Sewer Design Analysis 1 Copy FTSE 2017 Update 1 Copy Email from Brunswick County REMARKS Please find the enclosed documents for your review. If you have any questions or require additional infdrmation, please contact our office. Thank you. CC: Cape Fear Engineering, File 427-06B " 34" Signed: /Iberyn Paint Received By: Date: May 9, 2018 Monti Hassan Environmental Engineer PERCS Unit Division of Water Resources Subject: Cameron Woods — Phase 6B Sewer Permit Response Letter Monti, Below are my responses to your comments on the Cameron Woods Phase 6B sewer permit submittal. Please let me know if you have any additional questions or need anything else. General Review: 1. It appears that section I (d through h) of the submitted FTSE has not been updated since the recently submitted FTSE from Cameron Woods Phase 3B project. Please revise as necessary. Brunswick County has explained the discrepancy and an email has been attached with this submittal. 2. Please provide pipe names, node numbers associated with the proposed Cameron Woods Phase 6B project, as it is not clearly depicted on the provided Waterbrook Woods hydraulic modeling_ A revised copy of the Waterbrook Woods hydraulic modeling with Phase 6B highlighted has been attached. Sincerely, r , 1. VJnJifer'Willia PE BARNES PRESSURE SYSTEMS PRESSURE SEWER DESIGN ANALYSIS FOR CAMERON WOODS NEAR BRUNSWICK COUNTY, NC PREPARED FOR: CAPE FEAR ENGINEERING 151 Poole Road STE 100 Belville, NC 28451 ON BEHALF OF: Pumps Parts & Sei 9325 Forsythe Park Dri Charlotte, NC 28273 PREPARED BY: Nick Spondike Pressure Sewer Specialist Crane Pumps & Systems Crane Pumps & Systems, Ir 1.0 Introduction: This design analysis examines the use of a low pressure sewer system for Cameron Woods. Careful review of the layout plans and profile for this parcel confirm that low pressure sewer is definitely a cost effective alternative versus a conventional gravity system. This approach is not only a technical solution, but also allows for many economic/ cost advantages that can be realized by the Brunswick County. 2.0 System Analysis: Based on the data below, furnished by Cape Fear Engineering, we have performed a complete hydraulic analysis including branch and mainline pipe sizing. This design analysis is based on using the EPA recommended rational method using the simplified equation Q=AN+B. A detailed explanation of this formula is included with this report. The actual model was analyzed with KY Pipe, the gold standard of hydraulic modeling. Data furnished to enable design analysis includes but not limited to: • 210# GPD per connection • 384 Connections • SDR-21 Pipe Type • 120C-Factor • 1 Terminal end location at 11 PSI • 1 Drawing The pump recommended is capable of delivering 31 GPM against a total dynamic head of 0 feet (0 PSIG) and 23 GPM against a total dynamic head of 150 feet (65 PSIG). This pump is also capable of operating at negative total dynamic head without overloading the motor, due to our design including an integral anti -siphon valve. Good engineering practice suggests the installation of cleanouts and flushing connections, which typically are located at the end of each main, at all intersections, and at sharp changes in directions as well. In line connections should be placed at 800 to 1,000 foot intervals depending on terrain and system layout, as recommended by the EPA. 3.0 LPS Major components recommended: • 384 Brunswick County engineered Units with OGP Pump • 38,400 Linear feet of 1 �/2 " SDR-21 ( House laterals) • 12,933 Linear feet of 2" SDR-21 • 2,906 Linear feet of 3" SDR-21 • 2,961 Linear feet of 4" SDR-21 • 2,126 Linear feet of 6" SDR-21 0 384 Lateral Valve Kits CRANE m PUMPS & SYSTEMS Pressure Systems Design How does Crane determine design Flow ? There are various equations, charts, and formulas that exist when trying to determine design flow in a low pressure sewer system. In addition, local departments of environmental regulations may offer site specific guidelines when determining design flow. EPA recognizes the following formula as it "has almost exclusively become the accepted method of practice." Where Q=AN+B Q=Predicted Flow, A=coefficient selected by engineer ( typically .5) B=Factor selected by engineer ( typically 20) N=Number of EDUs or lots EPA Manual 625/1-91/024 CRANE PUMPS & SYSTEMS Pressure Systems Design Rational Method Baseline Formula Q=AN+B • Q = Predicted flow derived from input data below • A = A coefficient that adjusts based on average daily flow Adjusts based on correlation average daily flow versus peak factor EPA national average is 67GPCD or 268 GPD/EDU » Typically 0.5 • N = Number of Equivalent Domestic Units or lots B = Minimum flow one pump will produce with maximum static head and no friction loss • Assures that each beginning mainline will be flushed at least once daily • This condition typically occurs during the middle of the night • This factor is selected by the designer ( Typically 20) • Recommended ranges » PC Pumps (10 —14 GPM) Hi Head centrifugal Pumps (10 — 30 GPM) » Hi Flow centrifugal Pumps (20 - 40 GPM) ASSUMPTIONS FOR DESIGN OF PRESSURE SEWER SYSTEM USING THE RATIONAL METHOD AND INSTRUCTIONS STEP 1: Project Location: BRUNSWICK COUNTY, NC Project Name: rtivL1UJ J G STEP 2: Assume an Average Daily Flow Per Equivalent Domestic Unit (EDU) Gallons per Day per EDU This affects the retention times in the mainlines and the 'A" constant in the Rational Method. I.E., The larger the flow per EDU the higher the Peak Flow Rate will be for a given EDU size. 200 GPD per EDU is recommended. STEP 3: Select the minimum flow one pump will produce with the maximum Static Head and no Friction Loss. AN + B = Q (Q is in Gallons Per Minute) A= 0.525 Constant (Automatically adjusted by the Average Daily Flow per EDU) N= XX Number of EDU's on a given pipe segment B= GPM of one pump This will occur in the middle of the night when that one pump at the beginning of the smallest main comes on. This assures that every beginning main will be flushed at least once per day. Recommended value ranges are, for PC pumps, for high head centrifugal pumps, and 204G for high flow centrifugal pumps. STEP 4: Select the "C" factor for the friction loss in the Hazen -Williams Equation. C=Hazen-Williams Constant A value of is recommended. Date Printed: 5/8/2018 EPA 625 design Master 2 FPS.xIs, Page 1 PIPE TABLES FOR CAMERON WOODS PHASE 3B 2 FPS TABLE 1 PVC SDR 21 (IPS) (200 PSI) EDU = A = 6= NOMINAL NOMINAL PIPE Effective PIPE Volume SIZE Diameter GPM @ SIZE EDU's @ per 100 Ft. (inches) (Inches) 2 FPS (inches) 2 FPS (Gallons) 1.00 1.1814 7 1.00 1 5.69 1.25 1.4925 11 1.25 1 9.09 1.50 1.7092 14 1.50 1 11.92 2.00 2.1354 22 2.00 1 18.60 2.50 2.5846 33 2.50 15 27.25 3.00 3.1460 48 3.00 45 40.38 4.00 4.0463 80 4.00 105 66.80 5.00 5.0012 122 5.00 186 102.04 6.00 5.9551 174 6.00 283 144.68 8.00 7.7558 294 8.00 513 245.40 10.00 9.6667 457 10.00 824 381.23 12.00 11.4653 644 12.00 1,178 536.29 aamm ' ---- PRESSOR NS Models OGP-L & OGP-AUE SYSTE Performance Curve www.cranepumps.com 2HP, 3450RPM, 60Hz CRANE A Crane Co. Company Submersible Grinder Pumps Testing is performed with water, specific gravity 1.0 @ 680 F @ (200C), other fluids may vary performance PUMPS & SYSTEMS USA: (937) 778-8947 • Canada: (905) 457-6223 • International: (937) 615-3598 SECTION A PAGE 3 'DATE 6105 CAMERON WOODS -- I-M] _~•��/�� y 1�� all _ �� err 1i.►�� I • m 1181 �J d <=1.5 <= 2 �CRAN E . - <= 2.5 T PUMPS & SYSTEMS — — 4 PIPE SCHEMATIC ( WITH BACKGROUND) A <=8 ,may � <=10 r O-AN+B — —12 A=.525 : B= 25 : N= 384 : 0= 226.6 GPM > 12 GPD= 210 : C FACTOR= 120 :PIPE P,1AT'L=SDR-21 CAMERON WOODS 0 Phase 6B q A R.� pAt 7 pA0 P'1 d 4 P� P-a Q � Q A Q N ?8 C9 d. A a Pipe Diameter :=0 pa <=12` R. o `= 2 4 CRAM E O .= �''�, d , - = 2 = --Ili PAPS & SYS 1 EMS 3 (� .-=4 PIPE HALIES O <= a 0 = 10 a Ara+B 12 A=.525 : B= 25 : H= 384 : 0= 226.6 GPM 12 GPD= 210 : C FACTOR= 120 :PIPE MATTSDR-21 R-2 Pump-8 = Ir--� Pu J-1 Pipe Diameter =:= 0.5 <=1.25 O <=1.5 — 2 2.5 <= 3 =:= 4 6 O <= a <= 10 <= 12 >12 CANIERON WOODS PpW25 J- .b37 s J•21 �;�urnp-19 J-11 J�499� Pump-4 J-15 l 3 1w J-Purnp-2/4mp-22 GRAN E. -1UPAPS & SYSTEMS RODE HALIES O-A1J+B A=.525 : B= 25 : H= 384 : a= 226.6 GPf.1 GPD= 210 : C FACTOR= 120 :PIPE C1AT'L=SDR-21 * * * * * * * * * * CRANE PUMPS & SYSTEMS HYDRAULIC ANALYSIS FOR CAMERON WOODS PHASE 3B BRUNSWICK COUNTY, NC * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * Date & Time: Tue May 08 07:06:30 2018 ************************************************ S U M M A R Y O F O R I G I N A L D A T A U N I T S S P E C I F I E D FLOWRATE ............ = gallons/minute HEAD (HGL) .......... = feet PRESSURE ............ = psig P I P E L I N E D A T A STATUS CODE: XX -CLOSED PIPE CV -CHECK VALVE P I P E NODE NAMES LENGTH DIAMETER ROUGHNESS MINOR N A M E #1 #2 (ft) (in) COEFF. LOSS COEFF. ------------------------------------------------------------------------------- P-1 J-13 J-32 426.13 4.05 120.0000 0.00 P-2 J-2 J-4 330.83 4.05 120.0000 0.00 P-3 J-3 J-33 22.01 2.14 120.0000 0.00 P-4 J-4 J-6 659.10 4.05 120.0000 0.00 P-5 J-5 J-19 21.35 2.14 120.0000 0.00 P-6 J-6 J-9 574.84 4.05 120.0000 0.00 P-7 J-7 J-6 649.66 2.14 120.0000 0.00 P-8 J-8 J-25 1224.58 2.14 120.0000 0.00 P-9 J-9 J-18 60.69 5.96 120.0000 0.00 P-10 J-10 J-35 18.46 2.14 120.0000 0.00 P-11 J-11 J-9 364.10 3.15 120.0000 0.00 P-12 J-12 J-34 20.91 2.14 120.0000 0.00 P-13 J-14 J-48 39.36 2.14 120.0000 0.00 P-14 J-15 J-13 1048.23 3.15 120.0000 0.00 P-15 J-1 J-46 22.02 2.14 120.0000 0.00 P-16 J-16 J-49 19.73 2.14 120.0000 0.00 P-17 J-17 J-13 399.90 3.15 120.0000 0.00 P-18 J-19 J-4 1603.04 2.14 120.0000 0.00 P-19 J-18 J-21 297.73 5.96 120.0000 0.00 P-20 J-20 J-36 35.58 2.14 120.0000 0.00 P-21 J-21 R-2 1768.04 5.96 120.0000 0.00 P-22 J-23 J-22 289.51 2.14 120.0000 0.00 P-23 J-22 J-21 189.17 2.14 120.0000 0.00 P-24 J-24 J-51 18.79 2.14 120.0000 0.00 P-25 J-25 J-6 228.13 2.14 120.0000 0.00 P-26 J-26 J-25 427.99 2.14 120.0000 0.00 P-27 J-27 J-2 831.55 4.05 120.0000 0.00 P-28 J-28 J-27 192.62 2.14 120.0000 0.00 P-29 J-30 J-17 1030.14 2.14 120.0000 0.00 P-30 J-29 J-17 655.24 3.15 120.0000 0.00 P-31 J-31 J-29 1354.69 2.14 120.0000 0.00 P-32 J-32 J-27 138.41 4.05 120.0000 0.00 P-33 J-44 J-32 182.67 2.14 120.0000 0.00 P-34 J-46 J-29 64.91 2.14 120.0000 0.00 P-35 O-Pump-1 J-46 83.01 1.71 120.0000 0.00 P-36 O-Pump-2 J-31 76.23 1.71 120.0000 0.00 P-37 O-Pump-5 J-19 104.07 1.71 120.0000 0.00 P-38 J-33 J-2 1076.81 2.14 120.0000 0.00 P-39 O-Pump-6 J-33 96.33 1.71 120.0000 0.00 P-40 J-34 J-11 1187.21 2.14 120.0000 0.00 P-41 O-Pump-7 J-34 94.62 1.71 120.0000 0.00 P-42 J-35 J-11 1140.13 2.14 120.0000 0.00 P-43 O-Pump-8 J-35 94.40 1.71 120.0000 0.00 P-44 J-36 J-18 597.36 2.14 120.0000 0.00 P-45 O-Pump-9 J-36 69.20 1.71 120.0000 0.00 P-46 J-37 J-22 250.17 2.14 120.0000 0.00 P-58 J-41 J-55 17.26 2.14 120.0000 0.00 P-70 J-48 J-15 85.89 2.14 120.0000 0.00 P-71 O-Pump-3 J-48 79.95 1.71 120.0000 0.00 P-72 J-49 J-15 602.00 2.14 120.0000 0.00 P-73 O-Pump-4 J-49 86.07 1.71 120.0000 0.00 P-74 J-51 J-37 369.53 2.14 120.0000 0.00 P-75 O-Pump-18 J-51 78.74 1.71 120.0000 0.00 P-76 J-55 J-37 410.91 2.14 120.0000 0.00 P-77 O-Pump-19 J-55 91.24 1.71 120.0000 0.00 P-78 O-Pump-20 J-28 143.62 1.71 120.0000 0.00 P-79 O-Pump-21 J-44 91.44 1.71 120.0000 0.00 P-80 O-Pump-22 J-30 53.68 1.71 120.0000 0.00 P-81 O-Pump-23 J-26 73.58 1.71 120.0000 0.00 P-82 O-Pump-24 J-7 93.37 1.71 120.0000 0.00 P-83 O-Pump-25 J-23 69.12 1.71 120.0000 0.00 P-84 O-Pump-26 J-8 103.17 1.71 120.0000 0.00 P U M P/ L O S S E L E M E N T D A T A THERE IS A DEVICE AT NODE Pump-1 DESCRIBED BY THE FOLLOWING DATA: (ID= 1) HEAD FLOWRATE EFFICIENCY (£t) (4Pm) M 200.00 0.00 75.00 (Default) 175.00 12.00 75.00 (Default) 150.00 24.00 75.00 (Default) 125.00 29.00 75.00 (Default) 100.00 29.25 75.00 (Default) 75.00 29.50 75.00 (Default) 50.00 29.75 75.00 (Default) 25.00 30.00 75.00 (Default) 1.00 30.10 75.00 (Default) N O D E D A T A NODE NODE EXTERNAL JUNCTION EXTERNAL NAME TITLE DEMAND ELEVATION GRADE (gpm) (ft) (ft) -------------------------------------------------------------- J-1 0.00 47.00 J-2 0.00 46.00 J-3 0.00 46.00 J-4 0.00 44.00 J-5 0.00 45.00 J-6 0.00 44.00 J-7 0.00 44.00 J-8 0.00 46.00 J-9 0.00 47.00 J-10 0.00 49.00 J-11 0.00 49.00 J-12 0.00 49.00 J-13 0.00 34.00 J-14 0.00 29.00 J-15 0.00 26.50 J-16 0.00 27.00 J-17 0.00 43.50 J-18 0.00 47.00 J-19 0.00 45.00 J-20 0.00 44.00 J-21 0.00 48.00 J-22 0.00 48.50 J-23 0.00 48.00 J-24 0.00 48.50 J-25 0.00 50.00 J-26 0.00 46.00 J-27 0.00 48.00 J-28 0.00 38.00 J-29 0.00 47.00 J-30 0.00 28.00 J-31 0.00 30.00 J-32 0.00 48.00 J-33 0.00 46.00 J-34 0.00 49.00 J-35 0.00 49.00 J-36 0.00 44.00 J-37 0.00 48.50 J-41 0.00 48.00 J-44 0.00 38.00 J-46 0.00 47.00 J-48 0.00 29.00 J-49 0.00 27.00 J-51 0.00 48.00 J-55 0.00 48.00 O-Pump-1 ---- 40.00 40.00 O-Pump-4 ---- 20.00 20.00 O-Pump-5 ---- 45.00 38.00 O-Pump-7 ---- 49.00 42.00 O-Pump-8 ---- 49.00 42.00 O-Pump-23 ---- 39.00 39.00 O-PUMP-24 ---- 37.00 37.00 O-Pump-25 ---- 41.00 41.00 O-Pump-26 ---- 39.00 39.00 00'0 00.0 00.0 00.0 00'0 00.0 TT-£ VE-r oV-d 00.0 00'0 00'0 00.0 00.0 00'0 SE-r 9-dmnd-o 6E-d 00.0 00'0 00'0 00.0 00.0 00'0 Z-r EC-r 8E-d 99'99 95'99 LO'V 00'0 8L'S LO'6Z 61-£ S-did-o LE-d 00,9E 00,9E ZZ'£ 00'0 VL'Z 00'EZ TE-r Z-d—d-O 9E-d SUSS 8E'SS 90'V 00'0 09'11 ZO'6Z 9V-r T-dmnd-O SE-d £L'8T £L'8T 09'Z 00'0 ZZ'T ZO'6Z 6Z-r 9V-r VIE-d 00'0 00'0 00'0 00.0 00'0 00.0 ZE-r VV-r EE-d 06'£T 06'Ei TE'E 00'0 Z6'T 89'ZET LZ-r ZE-£ ZE-d LT'ZT LT'ZT 90'Z 00'0 6V'9T 00'£Z 6Z-r i£-r TE-d 9E'8 9£'8 ST'Z 00'0 8V'S ZO'ZS LT-r 6Z-r OE-d SUET S U ET OZ'Z 00'0 LT'VT 99'VZ LT-r OE-r 6Z-d 00'0 00'0 00"0 00'0 00'0 00'0 LZ-r BZ-r 8Z-d WET 06'Ei TE'E 00'0 95'11 89'ZET Z-r LZ-r LZ-d 00'0 00'0 00'0 00'0 00'0 00'0 SZ-r 9Z-r 9Z-d L6'8T L6'8T Z9'Z 00'0 E£'V ZZ'6Z 9-r SZ-r SZ-d 00'0 00'0 00'0 00'0 00'0 00'0 TS-r VIZ-r VZ-d 9E'61 9E'61 S9'Z 00'0 99'E 99'6Z TZ-r ZZ-r EZ-d 00.0 00.0 00'0 00'0 00.0 00'0 ZZ-r EZ-r ZZ-a £V'S EV's VS'Z 00'0 69'6 ZS'OZZ Z-x TZ-r TZ-d 00'0 00.0 00.0 00.0 00'0 00'0 9E-r OZ-r oZ-a 91'V 9T'V OZ'Z 00'0 VZ'T L6'06T TZ-r 8T-r 6T-d 6L'81 6L'81 09'Z 00'0 ZT'OE LO'6Z V-r 61-£ 8T-d ZT'LT ZT'LT 9T'E 00'0 98'9 89'9L ET-r LT-r LT-d 00'0 00'0 00'0 00'0 00'0 00'0 6V-r 91-r 9T-d 00'0 00'0 00'0 00'0 00'0 00'0 9V-r T-r ST-d Z9'6 Z9'6 iE'Z 00'0 80'01 60'99 ET-r ST-r VT-d 00'0 00'0 00'0 00'0 00'0 00'0 8V-r VT-r ET-d 00'0 00'0 00'0 00'0 00'0 00'0 V£-r ZT-r ZT-d 00'0 00'0 00'0 00'0 00'0 00'0 6-r TT-£ TT-d 00'0 00'0 00'0 00'0 00'0 00'0 S£-r OT-r OT-d 9T'V 9T'V OZ'Z 00'0 SZ'O L6'06T 8T-r 6-r 6-d L6'BT L6'8T Z9'Z 00'0 £Z'EZ ZZ'6Z SZ-r 8-£ B-d 00'0 00'0 00'0 00'0 00'0 00'0 9-£ L-r L-d OE'LZ OE'LZ 9L'V 00'0 69'ST L6'061 6-r 9-r 9-d 00'0 00'0 00'0 00'0 00'0 00'0 61-r S-£ S-d LO'OZ LO'OZ VO'V 00'0 EZ'ET SL'191 9-r V-r V-d 00'0 00'0 00'0 00.0 00'0 00.0 £E-r E-r E-d WET 06'£T TE'E 00'0 09'V 89'ZET V-r Z-£ Z-d 06'£T 06'ET iE'E 00'0 E6'S 89'ZET ZE-r ET-r T-d ----------------------------------------------------------------------------------------- 3/4.; 3/43 s/-43 4-; '9 mdb OOOT OOOT 'OZHA ss0'I SSOZ Z# T# a H v N /IIH /-M+I$ HxII WHIR aVaH IIV"073 saze3t x xaON a d I d HAMIA XDZHO- AO aaia aasoz0- XX : HQOO snivSS S Z Z n s a u H x I z a a I a f 9Z' ZZ' BT' S' V' £' Z' T-JxISYuHao saran) H azakm OI'InvuaaH v i v a x O I s a 0 S n a I a 0 00'TZ 00'TZ ---- ZZ-d ma-O 00'TE 00'T£ ---- TZ-dmka-o 00'TE 00'TE ---- OZ-dbma-0 00'TV 00'TV ---- 6T-drama-o 00'TV 00'TV ---- 8T-d+ur►a-O 00'ZZ 00'ZZ ---- E-duma-o 00' LE 00,111, ---- 6-cbuna-o 00'6E 00'91P ---- 9-duna-o 00'EZ 00'EZ ---- Z-dm-a-o OV'T8 00'99 ---- Z-g P-41 O-Pump-7 J-34 0.00 0.00 0.00 0.00 0.00 0.00 P-42 J-35 J-11 0.00 0.00 0.00 0.00 0.00 0.00 P-43 0-Pump-8 J-35 0.00 0.00 0.00 0.00 0.00 0.00 P-44 J-36 J-18 0.00 0.00 0.00 0.00 0.00 0.00 2-45 0-Pump-9 J-36 0.00 0.00 0.00 0.00 0.00 0.00 P-46 J-37 J-22 29.55 4.84 0.00 2.65 19.36 19.36 P-58 J-41 J-55 0.00 0.00 0.00 0.00 0.00 0.00 P-70 J-48 J-15 28.71 1.58 0.00 2.57 18.35 18.35 P-71 0-Pump-3 J-48 28.71 4.34 0.00 4.01 54.27 54.27 P-72 J-49 J-15 27.39 10.13 0.00 2.45 16.82 16.82 P-73 O-Pump-4 J-49 27.39 4.28 0.00 3.83 49.74 49.74 P-74 J-51 J-37 29.55 7.15 0.00 2.65 19.36 19.36 P-75 O-Pump-18 J-51 29.55 4.51 0.00 4.13 57.25 57.25 P-76 J-55 J-37 0.00 0.00 0.00 0.00 0.00 0.00 P-77 0-Pump-19 J-55 0.00 0.00 0.00 0.00 0.00 0.00 P-78 O-Pump-20 J-28 0.00 0.00 0.00 0.00 0.00 0.00 P-79 O-Pump-21 J-44 0.00 0.00 0.00 0.00 0.00 0.00 P-80 O-Pump-22 J-30 24.56 2.18 0.00 3.43 40.67 40.67 P-81 O-Pump-23 J-26 0.00 0.00 0.00 0.00 0.00 0.00 P-82 O-Pump-24 J-7 0.00 0.00 0.00 0.00 0.00 0.00 P-83 O-Pump-25 J-23 0.00 0.00 0.00 0.00 0.00 0.00 P-84 O-Pump-26 J-8 29.22 5.79 0.00 4.09 56.10 56.10 N O D E R E S U L T S NODE NODE EXTERNAL HYDRAULIC NODE PRESSURE NODE NAME TITLE DEMAND GRADE ELEVATION HEAD PRESSURE gpm ft ft ft psi ------------------------------------------------------------------------------ J-1 0.00 158.95 47.00 111.95 48.51 J-2 0.00 126.00 46.00 80.00 34.67 J-3 0.00 126.00 46.00 80.00 34.67 J-4 0.00 121.40 44.00 77.40 33.54 J-5 0.00 151.52 45.00 106.52 46.16 J-6 0.00 108.17 44.00 64.17 27.81 J-7 0.00 108.17 44.00 64.17 27.81 J-8 0.00 135.74 46.00 89.74 38.89 J-9 0.00 92.48 47.00 45.48 19.71 J-10 0.00 92.48 49.00 43.48 18.84 J-11 0.00 92.48 49.00 43.48 18.84 J-12 0.00 92.48 49.00 43.48 18.84 J-13 0.00 145.41 34.00 111.41 48.28 J-14 0.00 157.07 29.00 128.07 55.50 J-15 0.00 155.49 26.50 128.99 55.90 J-16 0.00 165.62 27.00 138.62 60.07 J-17 0.00 152.26 43.50 108.76 47.13 J-18 0.00 92.23 47.00 45.23 19.60 J-19 0.00 151.52 45.00 106.52 46.16 J-20 0.00 92.23 44.00 48.23 20.90 J-21 0.00 90.99 48.00 42.99 18.63 J-22 0.00 94.66 48.50 46.16 20.00 J-23 0.00 94.66 48.00 46.66 20.22 J-24 0.00 106.65 48.50 58.15 25.20 J-25 0.00 112.50 50.00 62.50 27.08 J-26 0.00 112.50 46.00 66.50 28.82 J-27 0.00 137.56 48.00 89.56 38.81 J-28 0.00 137.56 38.00 99.56 43.14 J-29 0.00 157.74 47.00 110.74 47.99 J-30 0.00 166.43 28.00 138.43 59.98 J-31 0.00 174.23 30.00 144.23 62.50 J-32 0.00 139.49 48.00 91.49 39.65 J-33 0.00 126.00 46.00 80.00 34.67 J-34 0.00 92.48 49.00 43.48 18.84 J-35 0.00 92.48 49.00 43.48 18.84 J-36 0.00 92.23 44.00 48.23 20.90 J-37 0.00 99.50 48.50 51.00 22.10 J-41 0.00 99.50 48.00 51.50 22.32 J-44 0.00 139.49 38.00 101.49 43.98 J-46 0.00 158.95 47.00 111.95 48.51 J-48 0.00 157.07 29.00 128.07 55.50 J-49 0.00 165.62 27.00 138.62 60.07 J-51 0.00 106.65 48.00 58.65 25.42 J-55 0.00 99.50 48.00 51.50 22.32 O-Pump-1 ---- 163.55 40.00 123.55 53.54 O-Pump-4 ---- 169.90 20.00 149.90 64.96 O-Pump-5 ---- 157.31 45.00 112.31 48.67 O-PuTap-7 ---- 92.48 49.00 43.48 18.84 O-Pump-8 ---- 92.48 49.00 43.48 18.84 O-Pump-23 ---- 112.50 39.00 73.50 31.85 O-Pump-24 ---- 108.17 37.00 71.17 30.84 O-Pump-25 ---- 94.66 41.00 53.66 23.25 O-Pump-26 ---- 141.52 39.00 102.52 44.43 R-2 ---- 81.40 56.00 25.40 11.01 O-pip-2 ---- 176.98 23.00 153.98 66.72 O-Pump-6 ---- 126.00 46.00 80.00 34.67 O-Pump-9 ---- 92.23 44.00 48.23 20.90 O-Pump-3 ---- 161.41 22.00 139.41 60.41 O-Pump-18 ---- 111.16 41.00 70.16 30.40 O-PUMP-19 ---- 99.50 41.00 58.50 25.35 O-Pump-20 ---- 137.56 31.00 106.56 46.18 O-Pump-21 ---- 139.49 31.00 108.49 47.01 O-Pump-22 ---- 168.61 21.00 147.61 63.96 MAXIMUM AND MINIMUM VALUES V E L O C I T I E S PIPE MAXIMUM NUMBER VELOCITY (ft/s) --------------------- P-6 4.76 P-75 4.13 P-84 4.09 P-37 4.07 P-35 4.06 P-4 4.04 P-71 4.01 P-73 3.83 P-80 3.43 P-2 3.31 P-1 3.31 P-32 3.31 P-27 3.31 P-36 3.22 P-17 3.16 P-74 2.65 PIPE MINIMUM NUMBER VELOCITY (ft/s) --------------------- P-31 2.06 P-30 2.15 P-9 2.20 P-19 2.20 P-29 2.20 P-14 2.31 P-72 2.45 P-21 2.54 P-70 2.57 P-34 2.60 P-18 2.60 P-8 2.62 P-25 2.62 P-23 2.65 P-46 2.65 P-74 2.65 S U M M A R Y O F I N F L O W S A N D O U T F L O W S (+) INFLOWS INTO THE SYSTEM FROM SUPPLY NODES (-) OUTFLOWS FROM THE SYSTEM INTO SUPPLY NODES NODE FLOWRATE NODE NAME -------------------------------------------- gpm TITLE Pump-1 29.02 Pump-2 23.00 Pump-3 28.71 P4=mp-4 27.39 Pump-5 29.07 Pump-18 29.55 Pump-22 24.56 Pump-26 29.22 R-2 -220.52 NET SYSTEM INFLOW = 220.52 NET SYSTEM OUTFLOW =-220.52 NET SYSTEM DEMAND = 0.00 ***** HYDRAULIC SAMPLE A ANALYSIS COMPLETED ***** Case: HYDRAULIC SAMPLE B (PUMPS OPERATING - 1,2,3,4,6,20,24,25) P I P E L I N E R E S U L T S STATUS CODE: XX -CLOSED PIPE CV -CHECK VALVE P I P E NODE NUMBERS FLOWRATE HEAD MINOR LINE HL+ML/ HL/ N A M E #1 #2 LOSS LOSS VELD. 1000 1000 ---------------------------------------------------------------------------------------- gpm ft ft ft/s ft/f ft/f P-1 J-13 J-32 105.85 3.90 0.00 2.64 9.15 9.15 P-2 J-2 J-4 164.00 6.81 0.00 4.09 20.59 20.59 P-3 J-3 J-33 0.00 0.00 0.00 0.00 0.00 0.00 P-4 J-4 J-6 164.00 13.57 0.00 4.09 20.59 20.59 P-5 J-5 J-19 0.00 0.00 0.00 0.00 0.00 0.00 P-6 J-6 J-9 193.36 16.06 0.00 4.82 27.93 27.93 P-7 J-7 J-6 29.36 12.43 0.00 2.63 19.13 19.13 P-8 J-8 J-25 0.00 0.00 0.00 0.00 0.00 0.00 P-9 J-9 J-18 193.36 0.26 0.00 2.23 4.25 4.25 P-10 J-10 J-35 0.00 0.00 0.00 0.00 0.00 0.00 P-11 J-11 J-9 0.00 0.00 0.00 0.00 0.00 0.00 P-12 J-12 J-34 0.00 0.00 0.00 0.00 0.00 0.00 P-13 J-14 J-48 0.00 0.00 0.00 0.00 0.00 0.00 P-14 J-15 J-13 53.33 9.18 0.00 2.20 8.76 8.76 P-15 J-1 J-46 0.00 0.00 0.00 0.00 0.00 0.00 P-16 J-16 J-49 0.00 0.00 0.00 0.00 0.00 0.00 P-17 J-17 J-13 52.51 3.40 0.00 2.17 8.51 8.51 P-18 J-19 J-4 0.00 0.00 0.00 0.00 0.00 0.00 P-19 J-18 J-21 193.36 1.27 0.00 2.23 4.25 4.25 P-20 J-20 J-36 0.00 0.00 0.00 0.00 0.00 0.00 P-21 J-21 R-2 222.97 9.79 0.00 2.57 5.54 5.54 P-22 J-23 J-22 29.62 5.63 0.00 2.65 19.45 19.45 P-23 J-22 J-21 29.62 3.68 0.00 2.65 19.45 19.45 P-24 J-24 J-51 0.00 0.00 0.00 0.00 0.00 0.00 P-25 J-25 J-6 0.00 0.00 0.00 0.00 0.00 0.00 P-26 J-26 J-25 0.00 0.00 0.00 0.00 0.00 0.00 P-27 J-27 J-2 134.89 11.92 0.00 3.37 14.34 14.34 P-28 J-28 J-27 29.04 3.61 0.00 2.60 18.76 18.76 P-29 J-30 J-17 0.00 0.00 0.00 0.00 0.00 0.00 P-30 J-29 J-17 52.51 5.58 0.00 2.17 8.51 8.51 P-31 J-31 J-29 23.46 17.11 0.00 2.10 12.63 12.63 P-32 J-32 J-27 105.85 1.27 0.00 2.64 9.15 9.15 P-33 J-44 J-32 0.00 0.00 0.00 0.00 0.00 0.00 P-34 J-46 J-29 29.05 1.22 0.00 2.60 18.77 18.77 P-35 O-Pump-1 J-46 29.05 4.61 0.00 4.06 55.49 55.49 P-36 O-Pump-2 J-31 23.46 2.85 0.00 3.28 37.35 37.35 P-37 O-Pump-5 J-19 0.00 0.00 0.00 0.00 0.00 0.00 P-38 J-33 J-2 29.11 20.28 0.00 2.61 18.84 18.84 P-39 O-Pump-6 J-33 29.11 5.37 0.00 4.07 55.70 55.70 P-40 J-34 J-11 0.00 0.00 0.00 0.00 0.00 0.00 P-41 O-Pump-7 J-34 0.00 0.00 0.00 0.00 0.00 0.00 P-42 J-35 J-11 0.00 0.00 0.00 0.00 0.00 0.00 P-43 O-Pump-8 J-35 0.00 0.00 0.00 0.00 0.00 0.00 P-44 J-36 J-18 0.00 0.00 0.00 0.00 0.00 0.00 P-45 O-Pump-9 J-36 0.00 0.00 0.00 0.00 0.00 0.00 P-46 J-37 J-22 0.00 0.00 0.00 0.00 0.00 0.00 P-58 J-41 J-55 0.00 0.00 0.00 0.00 0.00 0.00 P-70 J-48 J-15 28.69 1.58 0.00 2.57 18.34 18.34 P-71 O-Pump-3 J-48 28.69 4.83 0.00 4.01 54.23 54.23 P-72 J-49 J-15 24.64 8.33 0.00 2.21 13.83 13.83 P-73 O-Pump-4 J-49 24.64 3.52 0.00 3.45 40.90 40.90 P-74 J-51 J-37 0.00 0.00 0.00 0.00 0.00 0.00 P-75 O-Pump-18 J-51 0.00 0.00 0.00 0.00 0.00 0.00 P-76 J-55 J-37 0.00 0.00 0.00 0.00 0.00 0.00 P-77 O-Pump-19 J-55 0.00 0.00 0.00 0.00 0.00 0.00 P-78 O-Pump-20 J-28 29.04 7.97 0.00 4.06 55.46 55.46 P-79 O-Pump-21 J-44 0.00 0.00 0.00 0.00 0.00 0.00 P-80 O-Pump-22 J-30 0.00 0.00 0.00 0.00 0.00 0.00 P-81 O-Pump-23 J-26 0.00 0.00 0.00 0.00 0.00 0.00 P-82 O-Pump-24 J-7 29.36 5.28 0.00 4.10 56.57 56.57 P-83 O-Pump-25 J-23 29.62 3.97 0.00 4.14 57.51 57.51 P-84 O-Pump-26 J-8 0.00 0.00 0.00 0.00 0.00 0.00 N O D E R E S U L T S NODE NODE EXTERNAL HYDRAULIC NODE PRESSURE NODE NAME TITLE DEMAND GRADE ELEVATION HEAD PRESSURE gpm ft ft ft psi ------------------------------------------------------------------------------ J-1 0.00 156.44 47.00 109.44 47.42 J-2 0.00 129.15 46.00 83.15 36.03 J-3 0.00 149.44 46.00 103.44 44.82 J-4 0.00 122.34 44.00 78.34 33.95 J-5 0.00 122.34 45.00 77.34 33.52 J-6 0.00 108.77 44.00 64.77 28.07 J-7 0.00 121.20 44.00 77.20 33.45 J-8 0.00 108.77 46.00 62.77 27.20 J-9 0.00 92.72 47.00 45.72 19.81 J-10 0.00 92.72 49.00 43.72 18.94 J-11 0.00 92.72 49.00 43.72 18.94 J-12 0.00 92.72 49.00 43.72 18.94 J-13 0.00 146.24 34.00 112.24 48.64 J-14 0.00 157.00 29.00 128.00 55.47 J-15 0.00 155.42 26.50 128.92 55.87 J-16 0.00 163.75 27.00 136.75 59.26 J-17 0.00 149.65 43.50 106.15 46.00 J-18 0.00 92.46 47.00 45.46 19.70 J-19 0.00 122.34 45.00 77.34 33.52 J-20 0.00 92.46 44.00 48.46 21.00 J-21 0.00 91.19 48.00 43.19 18.72 J-22 0.00 94.87 48.50 46.37 20.09 J-23 0.00 100.50 48.00 52.50 22.75 J-24 0.00 94.87 48.50 46.37 20.09 J-25 0.00 108.77 50.00 58.77 25.47 J-26 0.00 108.77 46.00 62.77 27.20 J-27 0.00 141.08 48.00 93.08 40.33 J-28 0.00 144.69 38.00 106.69 46.23 J-29 0.00 155.22 47.00 108.22 46.90 J-30 0.00 149.65 28.00 121.65 52.71 J-31 0.00 172.34 30.00 142.34 61.68 J-32 0.00 142.34 48.00 94.34 40.88 J-33 0.00 149.44 46.00 103.44 44.82 J-34 0.00 92.72 49.00 43.72 18.94 J-35 0.00 92.72 49.00 43.72 18.94 J-36 0.00 92.46 44.00 48.46 21.00 J-37 0.00 94.87 48.50 46.37 20.09 J-41 0.00 94.87 48.00 46.87 20.31 J-44 0.00 142.34 38.00 104.34 45.22 J-46 0.00 156.44 47.00 109.44 47.42 J-48 0.00 157.00 29.00 128.00 55.47 J-49 0.00 163.75 27.00 136.75 59.26 J-51 0.00 94.87 48.00 46.87 20.31 J-55 0.00 94.87 48.00 46.87 20.31 O-P12mp-1 ---- 161.05 40.00 121.05 52.45 O-puW-4 ---- 167.27 20.00 147.27 63.82 O-Pump-5 ---- 122.34 45.00 77.34 33.52 O-Pump-7 ---- 92.72 49.00 43.72 18.94 O-Pump-8 ---- 92.72 49.00 43.72 18.94 O-Pump-23 ---- 108.77 39.00 69.77 30.23 O-Pump-24 ---- 126.48 37.00 89.48 38.78 O-Pump-25 ---- 104.48 41.00 63.48 27.51 O-pump-26 ---- 108.77 39.00 69.77 30.23 R-2 ---- 81.40 56.00 25.40 11.01 O-pump-2 ---- 175.18 23.00 152.18 65.95 o-pump-6 ---- 154.80 46.00 108.80 47.15 O-Purnp-9 ---- 92.46 44.00 48.46 21.00 O-Pump-3 ---- 161.83 22.00 139.83 60.59 O-Pump-18 ---- 94.87 41.00 53.87 23.34 O-Pump-19 ---- 94.87 41.00 53.87 23.34 O-Pump-20 ---- 152.66 31.00 121.66 52.72 O-Pump-21 ---- 142.34 31.00 111.34 48.25 O-Pump-22 ---- 149.65 21.00 128.65 55.75 M A X I M U M A N D M I N I M U M V A L U E S V E L O C I T I E S PIPE MAXIMUM NUMBER VELOCITY (ft/s) --------------------- P-6 4.82 P-83 4.14 P-82 4.10 P-2 4.09 P-4 4.09 P-39 4.07 P-35 4.06 P-78 4.06 P-71 4.01 P-73 3.45 P-27 3.37 P-36 3.28 P-22 2.65 P-23 2.65 P-32 2.64 PIPE MINIMUM NUMBER VELOCITY (ft/s) --------------------- P-31 2.10 P-17 2.17 P-30 2.17 P-14 2.20 P-72 2.21 P-9 2.23 P-19 2.23 P-21 2.57 P-70 2.57 P-28 2.60 P-34 2.60 P-38 2.61 P-7 2.63 P-1 2.64 P-32 2.64 S U M M A R Y O F I N F L O W S A N D O U T F L O W S (+) INFLOWS INTO THE SYSTEM FROM SUPPLY NODES (-) OUTFLOWS FROM THE SYSTEM INTO SUPPLY NODES NODE FLOWRATE NODE NAME gpm TITLE -------------------------------------------- Pump-1 29.05 Pump-2 23.46 Pump-3 28.69 Pump-4 24.64 Pump-6 29.11 Pump-20 29.04 Pump-24 29.36 Pump-25 29.62 R-2 -222.97 NET SYSTEM INFLOW = 222.97 NET SYSTEM OUTFLOW =-222.97 NET SYSTEM DEMAND = 0.00 ***** HYDRAULIC SAMPLE B ANALYSIS COMPLETED ***** Case: HYDRAULIC SAMPLE C ( PUMPS OPERATING - 1,2,7,8,9,21,22) P I P E L I N E R E S U L T S STATUS CODE: XX -CLOSED PIPE CV -CHECK VALVE P I P E NODE NUMBERS FLOWRATE HEAD MINOR LINE HL+ML/ HL/ N A M E #1 #2 LOSS LOSS VELD. 1000 1000 ---------------------------------------------------------------------------------------- gpm ft ft ft/s ft/f ft/f P-1 J-13 J-32 86.71 2.70 0.00 2.16 6.33 6.33 P-2 J-2 J-4 116.00 3.59 0.00 2.89 10.84 10.84 P-3 J-3 J-33 0.00 0.00 0.00 0.00 0.00 0.00 P-4 J-4 J-6 116.00 7.15 0.00 2.89 10.84 10.84 P-5 J-5 J-19 0.00 0.00 0.00 0.00 0.00 0.00 P-6 J-6 J-9 116.00 6.23 0.00 2.89 10.84 10.84 P-7 J-7 J-6 0.00 0.00 0.00 0.00 0.00 0.00 P-8 J-8 J-25 0.00 0.00 0.00 0.00 0.00 0.00 P-9 J-9 J-18 174.88 0.21 0.00 2.01 3.53 3.53 P-10 J-10 J-35 0.00 0.00 0.00 0.00 0.00 0.00 P-11 J-11 J-9 58.88 3.83 0.00 2.43 10.52 10.52 P-12 J-12 J-34 0.00 0.00 0.00 0.00 0.00 0.00 P-13 J-14 J-48 0.00 0.00 0.00 0.00 0.00 0.00 P-14 J-15 J-13 0.00 0.00 0.00 0.00 0.00 0.00 P-15 J-1 J-46 0.00 0.00 0.00 0.00 0.00 0.00 P-16 J-16 J-49 0.00 0.00 0.00 0.00 0.00 0.00 P-17 J-17 J-13 86.71 8.62 0.00 3.58 21.55 21.55 P-18 J-19 J-4 0.00 0.00 0.00 0.00 0.00 0.00 P-19 J-18 J-21 204.43 1.40 0.00 2.35 4.72 4.72 P-20 J-20 J-36 0.00 0.00 0.00 0.00 0.00 0.00 P-21 J-21 R-2 204.43 8.34 0.00 2.35 4.72 4.72 P-22 J-23 J-22 0.00 0.00 0.00 0.00 0.00 0.00 P-23 J-22 J-21 0.00 0.00 0.00 0.00 0.00 0.00 P-24 J-24 J-51 0.00 0.00 0.00 0.00 0.00 0.00 P-25 J-25 J-6 0.00 0.00 0.00 0.00 0.00 0.00 P-26 J-26 J-25 0.00 0.00 0.00 0.00 0.00 0.00 P-27 J-27 J-2 116.00 9.02 0.00 2.89 10.84 10.84 P-28 J-28 J-27 0.00 0.00 0.00 0.00 0.00 0.00 P-29 J-30 J-17 28.90 19.14 0.00 2.59 18.58 18.58 P-30 J-29 J-17 57.81 6.66 0.00 2.39 10.17 10.17 P-31 J-31 J-29 28.59 24.68 0.00 2.56 18.22 18.22 P-32 J-32 J-27 116.00 1.50 0.00 2.89 10.84 10.84 P-33 J-44 J-32 29.29 3.48 0.00 2.62 19.05 19.05 P-34 J-46 J-29 29.22 1.23 0.00 2.62 18.97 18.97 P-35 O-Pump-1 J-46 29.22 4.66 0.00 4.09 56.10 56.10 P-36 O-Pump-2 J-31 28.59 4.11 0.00 4.00 53.87 53.87 P-37 O-Pump-5 J-19 0.00 0.00 0.00 0.00 0.00 0.00 P-38 J-33 J-2 0.00 0.00 0.00 0.00 0.00 0.00 P-39 O-Pump-6 J-33 0.00 0.00 0.00 0.00 0.00 0.00 P-40 J-34 J-11 29.44 22.83 0.00 2.64 19.23 19.23 P-41 O-Pump-7 J-34 29.44 5.38 0.00 4.12 56.86 56.86 P-42 J-35 J-11 29.45 21.93 0.00 2.64 19.24 19.24 P-43 O-Pump-8 J-35 29.45 5.37 0.00 4.12 56.89 56.89 P-44 J-36 J-18 29.55 11.57 0.00 2.65 19.37 19.37 P-45 O-Pump-9 J-36 29.55 3.96 0.00 4.13 57.28 57.28 P-46 J-37 J-22 0.00 0.00 0.00 0.00 0.00 0.00 P-58 J-41 J-55 0.00 0.00 0.00 0.00 0.00 0.00 P-70 J-48 J-15 0.00 0.00 0.00 0.00 0.00 0.00 P-71 O-Pump-3 J-48 0.00 0.00 0.00 0.00 0.00 0.00 P-72 J-49 J-15 0.00 0.00 0.00 0.00 0.00 0.00 P-73 O-Pump-4 J-49 0.00 0.00 0.00 0.00 0.00 0.00 P-74 J-51 J-37 0.00 0.00 0.00 0.00 0.00 0.00 P-75 O-Pump-18 J-51 0.00 0.00 0.00 0.00 0.00 0.00 P-76 J-55 J-37 0.00 0.00 0.00 0.00 0.00 0.00 P-77 O-Pump-19 J-55 0.00 0.00 0.00 0.00 0.00 0.00 P-78 O-Pump-20 J-28 0.00 0.00 0.00 0.00 0.00 0.00 P-79 O-Pump-21 J-44 29.29 5.15 0.00 4.09 56.32 56.32 P-80 O-Pump-22 J-30 28.90 2.95 0.00 4.04 54.96 54.96 P-81 O-Pump-23 J-26 0.00 0.00 0.00 0.00 0.00 0.00 P-82 O-Pump-24 J-7 0.00 0.00 0.00 0.00 0.00 0.00 P-83 O-Pump-25 J-23 0.00 0.00 0.00 0.00 0.00 0.00 P-84 O-Pump-26 J-8 0.00 0.00 0.00 0.00 0.00 0.00 N O D E R E S U L T S NODE NODE EXTERNAL HYDRAULIC NODE PRESSURE NODE NAME TITLE DEMAND GRADE ELEVATION HEAD PRESSURE gpm ft ft ft psi ------------------------------------------------------------------------------ J-1 0.00 138.04 47.00 91.04 39.45 J-2 0.00 108.32 46.00 62.32 27.01 J-3 0.00 108.32 46.00 62.32 27.01 J-4 0.00 104.73 44.00 60.73 26.32 J-5 0.00 104.73 45.00 59.73 25.88 J-6 0.00 97.59 44.00 53.59 23.22 J-7 0.00 97.59 44.00 53.59 23.22 J-8 0.00 97.59 46.00 51.59 22.36 J-9 0.00 91.36 47.00 44.36 19.22 J-10 0.00 117.12 49.00 68.12 29.52 J-11 0.00 95.19 49.00 46.19 20.01 J-12 0.00 118.01 49.00 69.01 29.91 J-13 0.00 121.53 34.00 87.53 37.93 J-14 0.00 121.53 29.00 92.53 40.10 J-15 0.00 121.53 26.50 95.03 41.18 J-16 0.00 121.53 27.00 94.53 40.96 J-17 0.00 130.15 43.50 86.65 37.55 J-18 0.00 91.14 47.00 44.14 19.13 J-19 0.00 104.73 45.00 59.73 25.88 J-20 0.00 102.71 44.00 58.71 25.44 J-21 0.00 89.74 48.00 41.74 18.09 J-22 0.00 89.74 48.50 41.24 17.87 J-23 0.00 89.74 48.00 41.74 18.09 J-24 0.00 89.74 48.50 41.24 17.87 J-25 0.00 97.59 50.00 47.59 20.62 J-26 0.00 97.59 46.00 51.59 22.36 J-27 0.00 117.34 48.00 69.34 30.05 J-28 0.00 117.34 38.00 79.34 34.38 J-29 0.00 136.81 47.00 89.81 38.92 J-30 0.00 149.29 28.00 121.29 52.56 J-31 0.00 161.49 30.00 131.49 56.98 J-32 0.00 118.84 48.00 70.84 30.70 J-33 0.00 108.32 46.00 62.32 27.01 J-34 0.00 118.01 49.00 69.01 29.91 J-35 0.00 117.12 49.00 68.12 29.52 J-36 0.00 102.71 44.00 58.71 25.44 J-37 0.00 89.74 48.50 41.24 17.87 J-41 0.00 89.74 48.00 41.74 18.09 J-44 0.00 122.32 38.00 84.32 36.54 J-46 0.00 138.04 47.00 91.04 39.45 J-48 0.00 121.53 29.00 92.53 40.10 J-49 0.00 121.53 27.00 94.53 40.96 J-51 0.00 89.74 48.00 41.74 18.09 J-55 0.00 89.74 48.00 41.74 18.09 O-Pump-1 ---- 142.70 40.00 102.70 44.50 O-Pump-4 ---- 121.53 20.00 101.53 44.00 O-Pump-5 ---- 104.73 45.00 59.73 25.88 O-Pump-7 ---- 123.39 49.00 74.39 32.24 O-Purnp-8 ---- 122.49 49.00 73.49 31.85 O-Pump-23 ---- 97.59 39.00 58.59 25.39 O-Pump-24 ---- 97.59 37.00 60.59 26.26 O-Pump-25 ---- 89.74 41.00 48.74 21.12 O-Pump-26 ---- 97.59 39.00 58.59 25.39 R-2 ---- 81.40 56.00 25.40 11.01 O-Pump-2 ---- 165.60 23.00 142.60 61.79 O-Pump-6 ---- 108.32 46.00 62.32 27.01 O-Pump-9 ---- 106.68 44.00 62.68 27.16 O-Pump-3 ---- 121.53 22.00 99.53 43.13 O-PUMP-18 ---- 89.74 41.00 48.74 21.12 O-PUMP-19 ---- 89.74 41.00 48.74 21.12 O-Pump-20 ---- 117.34 31.00 86.34 37.41 O-Pump-21 ---- 127.47 31.00 96.47 41.80 O-Pump-22 ---- 152.24 21.00 131.24 56.87 M A X I M U M A N D M I N I M U M V A L U E S V E L O C I T I E S PIPE MAXIMUM PIPE MINIMUM NUMBER VELOCITY NUMBER VELOCITY (ft/s) --------------------- (ft/s) --------------------- P-45 4.13 P-9 2.01 P-43 4.12 P-1 2.16 P-41 4.12 P-21 2.35 P-79 4.09 P-19 2.35 P-35 4.09 P-30 2.39 P-80 4.04 P-11 2.43 P-36 4.00 P-31 2.56 P-17 3.58 P-29 2.59 P-2 2.89 P-34 2.62 P-4 2.89 P-33 2.62 P-6 2.89 P-40 2.64 P-27 2.89 P-42 2.64 P-32 2.89 P-44 2.65 S U M M A R Y O F I N F L O W S A N D O U T F L O W S (+) INFLOWS INTO THE SYSTEM FROM SUPPLY NODES (-) OUTFLOWS FROM THE SYSTEM INTO SUPPLY NODES NODE FLOWRATE NODE NAME gpm TITLE -------------------------------------------- Pump-1 29.22 Pump-2 28.59 Pump-7 29.44 Pump-8 29.45 Pump-9 29.55 Pump-21 29.29 Pump-22 28.90 R-2 -204.43 NET SYSTEM INFLOW = 204.43 NET SYSTEM OUTFLOW =-204.43 NET SYSTEM DEMAND = 0.00 ***** HYDRAULIC SAMPLE C ANALYSIS COMPLETED ***** Case: HYDRAULIC SAMPLE D ( PUMPS OPERATING - 1,2,3,4,6,19,21,24 ) P I P E L I N E R E S U L T S STATUS CODE: XX -CLOSED PIPE CV -CHECK VALVE P I P E NODE NUMBERS FLOWRATE HEAD MINOR LINE HL+ML/ HL/ N A M E #1 #2 LOSS LOSS VELO. 1000 1000 ---------------------------------------------------------------------------------------- gpm ft ft ft/s ft/f ft/f P-1 J-13 J-32 105.63 3.88 0.00 2.64 9.12 9.12 P-2 J-2 J-4 163.80 6.80 0.00 4.09 20.54 20.54 P-3 J-3 J-33 0.00 0.00 0.00 0.00 0.00 0.00 P-4 J-4 J-6 163.80 13.54 0.00 4.09 20.54 20.54 P-5 J-5 J-19 0.00 0.00 0.00 0.00 0.00 0.00 P-6 J-6 J-9 193.16 16.03 0.00 4.82 27.88 27.88 P-7 J-7 J-6 29.36 12.43 0.00 2.63 19.13 19.13 P-8 J-8 J-25 0.00 0.00 0.00 0.00 0.00 0.00 P-9 J-9 J-18 193.16 0.26 0.00 2.22 4.25 4.25 P-10 J-10 J-35 0.00 0.00 0.00 0.00 0.00 0.00 P-11 J-11 J-9 0.00 0.00 0.00 0.00 0.00 0.00 P-12 J-12 J-34 0.00 0.00 0.00 0.00 0.00 0.00 P-13 J-14 J-48 0.00 0.00 0.00 0.00 0.00 0.00 P-14 J-15 J-13 53.22 9.14 0.00 2.20 8.72 8.72 P-15 J-1 J-46 0.00 0.00 0.00 0.00 0.00 0.00 P-16 J-16 J-49 0.00 0.00 0.00 0.00 0.00 0.00 P-17 J-17 J-13 52.41 3.39 0.00 2.16 8.48 8.48 P-18 J-19 J-4 0.00 0.00 0.00 0.00 0.00 0.00 P-19 J-18 J-21 193.16 1.26 0.00 2.22 4.25 4.25 P-20 J-20 J-36 0.00 0.00 0.00 0.00 0.00 0.00 P-21 J-21 R-2 222.69 9.77 0.00 2.56 5.53 5.53 P-22 J-23 J-22 0.00 0.00 0.00 0.00 0.00 0.00 P-23 J-22 J-21 29.53 3.66 0.00 2.65 19.34 19.34 P-24 J-24 J-51 0.00 0.00 0.00 0.00 0.00 0.00 P-25 J-25 J-6 0.00 0.00 0.00 0.00 0.00 0.00 P-26 J-26 J-25 0.00 0.00 0.00 0.00 0.00 0.00 P-27 J-27 J-2 134.69 11.89 0.00 3.36 14.30 14.30 P-28 J-28 J-27 0.00 0.00 0.00 0.00 0.00 0.00 P-29 J-30 J-17 0.00 0.00 0.00 0.00 0.00 0.00 P-30 J-29 J-17 52.41 5.56 0.00 2.16 8.48 8.48 P-31 J-31 J-29 23.37 16.98 0.00 2.09 12.54 12.54 P-32 J-32 J-27 134.69 1.98 0.00 3.36 14.30 14.30 P-33 J-44 J-32 29.06 3.43 0.00 2.60 18.77 18.77 P-34 J-46 J-29 29.05 1.22 0.00 2.60 18.76 18.76 P-35 0-Pump-1 J-46 29.05 4.60 0.00 4.06 55.47 55.47 P-36 O-Pump-2 J-31 23.37 2.83 0.00 3.27 37.07 37.07 P-37 0-Pump-5 J-19 0.00 0.00 0.00 0.00 0.00 0.00 P-38 J-33 J-2 29.11 20.29 0.00 2.61 18.84 18.84 P-39 O-Pump-6 J-33 29.11 5.37 0.00 4.07 55.71 55.71 P-40 J-34 J-11 0.00 0.00 0.00 0.00 0.00 0.00 P-41 O-Pump-7 J-34 0.00 0.00 0.00 0.00 0.00 0.00 P-42 J-35 J-11 0.00 0.00 0.00 0.00 0.00 0.00 P-43 0-Pump-8 J-35 0.00 0.00 0.00 0.00 0.00 0.00 P-44 J-36 J-18 0.00 0.00 0.00 0.00 0.00 0.00 P-45 0-Pump-9 J-36 0.00 0.00 0.00 0.00 0.00 0.00 P-46 J-37 J-22 29.53 4.84 0.00 2.65 19.34 19.34 P-58 J-41 J-55 0.00 0.00 0.00 0.00 0.00 0.00 P-70 J-48 J-15 28.68 1.57 0.00 2.57 18.32 18.32 P-71 O-Pump-3 J-48 28.68 4.83 0.00 4.01 54.17 54.17 P-72 J-49 J-15 24.54 8.26 0.00 2.20 13.73 13.73 P-73 0-Pump-4 J-49 24.54 3.49 0.00 3.43 40.60 40.60 P-74 J-51 J-37 0.00 0.00 0.00 0.00 0.00 0.00 P-75 O-Pump-18 J-51 0.00 0.00 0.00 0.00 0.00 0.00 P-76 J-55 J-37 29.53 7.95 0.00 2.65 19.34 19.34 P-77 O-Pump-19 J-55 29.53 5.22 0.00 4.13 57.19 57.19 P-78 O-Pump-20 J-28 0.00 0.00 0.00 0.00 0.00 0.00 P-79 O-Pump-21 J-44 29.06 5.08 0.00 4.06 55.52 55.52 P-80 O-Pump-22 J-30 0.00 0.00 0.00 0.00 0.00 0.00 P-81 O-Pump-23 J-26 0.00 0.00 0.00 0.00 0.00 0.00 P-82 O-Pump-24 J-7 29.36 5.28 0.00 4.10 56.57 56.57 P-83 O-Pump-25 J-23 0.00 0.00 0.00 0.00 0.00 0.00 P-84 O-Pump-26 J-8 0.00 0.00 0.00 0.00 0.00 0.00 N 0 D E R. E S U L T S NODE NODE EXTERNAL HYDRAULIC NODE PRESSURE NODE NAME TITLE DEMAND GRADE ELEVATION HEAD PRESSURE gpm ft ft ft psi ------------------------------------------------------------------------------ J-1 0.00 156.97 47.00 109.97 47.65 J-2 0.00 129.05 46.00 83.05 35.99 J-3 0.00 149.34 46.00 103.34 44.78 J-4 0.00 122.25 44.00 78.25 33.91 J-5 0.00 122.25 45.00 77.25 33.48 J-6 0.00 108.72 44.00 64.72 28.04 J-7 0.00 121.14 44.00 77.14 33.43 J-8 0.00 108.72 46.00 62.72 27.18 J-9 0.00 92.69 47.00 45.69 19.80 J-10 0.00 92.69 49.00 43.69 18.93 J-11 0.00 92.69 49.00 43.69 18.93 J-12 0.00 92.69 49.00 43.69 18.93 J-13 0.00 146.80 34.00 112.80 48.88 J-14 0.00 157.52 29.00 128.52 55.69 J-15 0.00 155.95 26.50 129.45 56.09 J-16 0.00 164.21 27.00 137.21 59.46 J-17 0.00 150.19 43.50 106.69 46.23 J-18 0.00 92.43 47.00 45.43 19.69 J-19 0.00 122.25 45.00 77.25 33.48 J-20 0.00 92.43 44.00 48.43 20.99 J-21 0.00 91.17 48.00 43.17 18.71 J-22 0.00 94.83 48.50 46.33 20.07 J-23 0.00 94.83 48.00 46.83 20.29 J-24 0.00 99.67 48.50 51.17 22.17 J-25 0.00 108.72 50.00 58.72 25.44 J-26 0.00 108.72 46.00 62.72 27.18 J-27 0.00 140.94 48.00 92.94 40.27 J-28 0.00 140.94 38.00 102.94 44.61 J-29 0.00 155.75 47.00 108.75 47.13 J-30 0.00 150.19 28.00 122.19 52.95 J-31 0.00 172.73 30.00 142.73 61.85 J-32 0.00 142.92 48.00 94.92 41.13 J-33 0.00 149.34 46.00 103.34 44.78 J-34 0.00 92.69 49.00 43.69 18.93 J-35 0.00 92.69 49.00 43.69 18.93 J-36 0.00 92.43 44.00 48.43 20.99 J-37 0.00 99.67 48.50 51.17 22.17 J-41 0.00 107.61 48.00 59.61 25.83 J-44 0.00 146.35 38.00 108.35 46.95 J-46 0.00 156.97 47.00 109.97 47.65 J-48 0.00 157.52 29.00 128.52 55.69 J-49 0.00 164.21 27.00 137.21 59.46 J-51 0.00 99.67 48.00 51.67 22.39 J-55 0.00 107.61 48.00 59.61 25.83 O-Pump-I ---- 161.57 40.00 121.57 52.68 O-Pump-4 ---- 167.71 20.00 147.71 64.01 O-Pump-5 ---- 122.25 45.00 77.25 33.48 O-Pump-7 ---- 92.69 49.00 43.69 18.93 O-Pump-8 ---- 92.69 49.00 43.69 18.93 O-Pump-23 ---- 108.72 39.00 69.72 30.21 O-Pump-24 ---- 126.43 37.00 89.43 38.75 O-Pump-25 ---- 94.83 41.00 53.83 23.32 O-Pump-26 ---- 108.72 39.00 69.72 30.21 R-2 ---- 81.40 56.00 25.40 11.01 O-Pump-2 ---- 175.56 23.00 152.56 66.11 O-Pump-6 ---- 154.70 46.00 108.70 47.10 O-Pump-9 ---- 92.43 44.00 48.43 20.99 O-Pump-3 ---- 162.35 22.00 140.35 60.82 O-Pump-18 ---- 99.67 41.00 58.67 25.42 O-PUMP-19 ---- 112.83 41.00 71.83 31.13 O-Pump-20 ---- 140.94 31.00 109.94 47.64 O-Pump-21 ---- 151.42 31.00 120.42 52.18 O-Pump-22 ---- 150.19 21.00 129.19 55.98 M A X I M U M A N D M I N I M U M V A L U E S V E L O C I T I E S PIPE MAXIMUM PIPE MINIMUM NUMBER VELOCITY NUMBER VELOCITY (ft/s) --------------------- (ft/s) --------------------- P-6 4.82 P-31 2.09 P-77 4.13 P-17 2.16 P-82 4.10 P-30 2.16 P-2 4.09 P-14 2.20 P-4 4.09 P-72 2.20 P-39 4.07 P-9 2.22 P-79 4.06 P-19 2.22 P-35 4.06 P-21 2.56 P-71 4.01 P-70 2.57 P-73 3.43 P-34 2.60 P-27 3.36 P-33 2.60 P-32 3.36 P-38 2.61 P-36 3.27 P-7 2.63 P-23 2.65 P-1 2.64 P-46 2.65 P-46 2.65 P-76 2.65 P-76 2.65 S U M M A R Y O F I N F L O W S A N D O U T F L O W S (+) INFLOWS INTO THE SYSTEM FROM SUPPLY NODES (-) OUTFLOWS FROM THE SYSTEM INTO SUPPLY NODES NODE FLOWRATE NODE NAME gpm TITLE -------------------------------------------- Pump-1 29.05 Pump-2 23.37 Pump-3 28.68 Pump-4 24.54 Pump-6 29.11 Pump-19 29.53 Pump-21 29.06 Pump-24 29.36 R-2 -222.69 NET SYSTEM INFLOW = 222.69 NET SYSTEM OUTFLOW =-222.69 NET SYSTEM DEMAND = 0.00 ***** HYDRAULIC SAMPLE D ANALYSIS COMPLETED ***** Brunswick County Engineering Department Memorandum Date: August 24, 2017 To: Ann B. Hardy, MPA, CPA, County Manager VA-P,#L From: William L. Pinnix, P.E., Director of Engineering Amy Aycock, Engineering Project Manager Cc: John Nichols, P.E., Director of Public Utilities Subject: Annual Wastewater Facilities FTSE-04/16 Reps Ann, Please find enclosed the FTSE- 04/16 reports for your review: • Northeast Brunswick Regional WWTF - WQ0086819 • West Brunswick WWRF - WO0023693 • Shallotte WWTF - WO0000798 • Ocean Isle Beach WWTF - WQ0006085 • Sea Trail WWTF - WO0012748 • Carolina Shores WWTF - WQ006878 - W00044873 For each facility you will see listed: • The facility's permitted flow • The baseline 2008 Obligated but Not Tributary flow (from the initial county report to DWQ) • A reconciled flow figure that includes post-2008 permitted flow, commercial projects that transitioned from permitted to tributary post -2008, and residential connections that transitioned from permitted to tributary post-2008 • Calculated current Obligated but Not Tributary flow • The facility's average daily (wet) flow (for last year as supplied by PUD staff) • Calculated total actual and obligated flows to the facility • Percent of permitted flow used As you know on 7/18/2016 we received email correspondence from Dean Hunkele of NCDEQ/DWQ stating that it was no longer necessary to submit our annual report to DWQ. Per your direction, we will continue to produce the annual reports for your signature. Please let me know if you have any questions. I will need a fully executed copy back for the FTSE program files. Thank you, Bill FTSE UPDATE WORKSHEET 4/1/2016- 2017 OCEAN ISLE BEACH WQ 0006085 ALL FLOWS ARE REFLECTED IN MGD 1 WWTP FACILITY'S PERMITTED FLOW 1.05 2 OBLIGATED BUT NOT YET TRIBUTARY (2008 Baseline) 0.179 3 TOTAL FLOW FROM LINES A-C BELOW 0.442 A TOTAL FTSE FLOW ADDED SINCE 2008 0.534314 B COMMERCIAL PROJECTS MADE TRIBUTARY SINCE 2008 0.000000 C RESIDENTIAL CUSTOMER CONNECTIONS MADE SINCE 2008 (441 X 210 GPD) -0.092610 4 OBLIGATED BUT NOT YET TRIBUTARY (4/1/2016) 0.621 OBTAINED BY ADDING LINES 2 AND 3 ABOVE 5 WWTP FACILITY'S AVERAGE DAILY FLOW 0.335 6 TOTAL ACTUAL AND OBLIGATED FLOWS TO THE FACILITY 0.956 OBTAINED BY ADDING LINES 4 AND 5 ABOVE 7 PERCENT OF PERMITTED FLOW USED 91% OBTAINED BY DIVIDING LINE 5 BY LINE 1 ABOVE THE ABOVE INFORMATION WILL BE SEEN ON THE FTSE FORM AS FOLLOWS: I. Complete this section only if you are the owner of the wastewater treatment plant. a. WWTP Facility Name: OCEAN ISLE BEACH b. WWTP Facility Permit #: WQ 0006085 All flows are in MGD c. WWTP facility's permitted flow d. Estimated obligated flow not yet tributary to the WWTP e. WWTP facility's avg. flow f. Total flow for this specific request g. Total actual and obligated flows to the facility h. Percent of permitted flow used 1.05 0.621 0.335 0.956 91% State of North Carolina Department of Environmental Quality Division of Water Resources Flow Tracking/Acceptance for Sewer Extension Applications (FTSE 04-16) Entity Requesting Allocation: BRUNSWICK COUNTY Project Name for which flow is being requested: FTSE UPDATE 2017 More than one FTSE may be required for a single project if the owner of the WWTP is not responsible for all pump stations along the route of the proposed wastewater flow. I. Complete this section only if you are the owner of the wastewater treatment plant. a. WWTP Facility Name: OCEAN ISLE BEACH b. WWTP Facility Permit #: WQ 0006085 All flows are in MGD c. WWTP facility's permitted flow 1.05 d. Estimated obligated flow not yet tributary to the WWTP 0.621 e. WW7P facility's actual avg_ flow 0.335 f. Total flow for this specific request g. Total actual and obligated flows to the facility 0,956 h. Percent of permitted flow used 91 % II. Complete this section for each pump station you are responsible for along the route of this proposed wastewater flow. List pump stations located between the project connection point and the WWTP: (A) (B) (C) (D)=(B+C) (E)=(A-D) Design Obligated, Pump Average Daily Approx. Not Yet Total Current Station Finn Flow** Current Avg. Tributary Flow Plus (Name or Capacity, * (Finn / pfl, Daily Flow, Daily Flow, Obligated Available Number) MGD MGD MGD MGD Flow Capacity*** * The Firm Capacity of any pump station is defined as the maximum pumped flow that can be achieved with the largest pump taken out of service. ** Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor (pf) not less than 2.5. *** A Planning Assessment Addendum shall be attached for each pump station located between the project connection point and the WWTP where the Available Capacity is < 0. Downstream Facility Name (Sewer): Downstream Permit Number: Page I of 6 III. Certification Statement: I (1 r%r% � , "4& bM.— certify to the best of my knowledge that the addition of the volume of wastewater to Q permitted in this project has been evaluated along the route to the receiving wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden any downstream pump station en route to the receiving treatment plant under normal circumstances, given the implementation of the planned improvements identified in the planning assessment where applicable. This analysis has been performed in accordance with local established policies and procedures using the best available data. This certification applies to those items listed above in Sections I and II plus all attached planning assessment addendums for which I am the responsible party. Signature of this form indicates acceptance of this wastewater flow. Signing Official OP/Z '//� NAM Page 2 of 6 � •'rcry r• n � � r Jocelyn Painter From: Amy Aycock <amy.aycock@brunswickcountync.gov> Sent: Tuesday, May 08, 2018 4:10 PM To: Jennifer Williams Cc: Jocelyn Painter Subject: RE: Cameron Woods Phase 613 FTSE Attachments: FTSE 2017 Update for OIB WWTP.pdf Gotcha Jennifer, The numbers are different because we did an updated 2017 FTSE between Cameron Woods Phase 36 and Phase 613. 1 have included the information for the 2017 FTSE update that was completed, DEQ previously required this to be done every year, but they have stopped requiring it to be submitted to them. However, we wanted to keep it up as it helps keep our numbers at all of our plants in check. Hopefully, you can send this to Monti and this will explain the discrepancies. Thanks, Amy AyCOCL Engineering Project Manager Brunswick County Office: 910-253-2407 Cella 910-471-4049 From: Jennifer Williams[mailto:jennifer.williams@capefearengineering.com) Sent: Tuesday, May 08, 2018 4:00 PM To: Amy Aycock <amy.aycock@brunswickcountync.gov> Cc: Jocelyn Painter <jocelyn.painter@capefearengineering.com> Subject: RE: Cameron Woods Phase 66 FTSE CAUTION: This email originated from outside of Brunswick County Government. Do not click links or open attachments unless you recognize the sender and know the content is safe. Amy — Monti is pointing out that the FTSE we submitted for 313 does not match what we are submitting for 6B... the 36 one is attached for reference. Here is his exact comment "1. It appears that section I (d through h) of the submitted FTSE has not been updated since the recently submitted FTSE from Cameron Woods Phase 36 project. Please revise as necessary." Thanks, Jennifer Williams, PE