Loading...
HomeMy WebLinkAbout20090570 Ver 1_Application_20090519V/ 61 STATE OF NORTH CAROLINA BEVERLY EAVEsPERDUE GOVERNOR May 14, 2009 DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS EUGENE A. CoNT[, JR. SECRETARY North Carolina Division of Water Quality 401 Wetlands Certification Unit Attn: Mr. Brian Wrenn 2321 Crabtree Boulevard Raleigh, NC 27604-2260 ® 9 ® 5 r7 ® MAY i c 2009 9 OENR • WATER gUpL[Ty t MZ OS ANDSTOWyg"BR W Subject: Secondary Road Improvements to SR 1429 (Cameron Briley Road), Anson.County. WBS Element Number 10C.004043 (DWQ Minor Permit Fee $240.00). Dear Mr. Wrenn: The North Carolina Department of Transportation (NCDOT) proposes to upgrade SR 1429 (Cameron Briley Road) in Stanly County from an unpaved roadway to a paved roadway. The total project length is 1.0 miles. Transportation and highway laws of North Carolina (G.S. 136-44.6,136-44.7,136-44.7A, 136-44.8 and 136-44.9) require the NCDOT to develop annual work programs for construction and maintenance of secondary roads. These general statutes specifically set forth requirements for annual construction and paving of existing unpaved roads. Paving of these roads is performed in priority order as established by the NCDOT for each unpaved road within a given county. This number is based on characteristics of each road, including number of homes, schools, churches, businesses, industries, recreational facilities, traffic counts, presence of school bus routes, and value as a thoroughfare. Cameron Briley Road is scheduled for paving in the 2009-2010 Secondary Roads Construction Program. Protected Species NCDOT biologists have reviewed the project limits for the presence of federally listed threatened and endangered species. There will be no impact to listed species as a result of this project being constructed. Impacts to Waters of the United States This project cannot be completed without impacts to water; of the United States. This project is located within the Yadkin River Basin (Hydrologic Unit # 03040105) and 716 West Main Street, Albemarle, NC 28001 • (704) 982-0101 • Fax (704) 982-3146 I stream impacts to an unnamed tributary to an unnamed tributary of Cranes Branch will be incurred as a result of this project being constructed. Avoidance/Minimization The proposed impacts to the jurisdictional areas on this project have been minimized as much as practical. NCDOT's best management practices for the protection of wetlands and surface waters will be applied during all phases of project construction in an effort to eliminate any further impacts. Summary The purpose of this letter is to request authorization to construct the proposed project under Section 401 Water Quality Certificate (WQC) No. GC3704. If you have any questions or need any additional information concerning this project, please feel free to contact Mr. Larry Thompson, Division Environmental Supervisor, at (704) 982-0101. Sincerely, Barry S. Moose, PE Division Engineer BSM/LBT cc: Polly Lespinasse, NDWQ Troy Wilson, USFWS Marla Chambers, NCWRC John Andrews, District H Area. Field Operations Unit File 0AW ATF?9o6 o T Office Use Only: Corps action ID no. DWQ project no. Form Version 1.0 November 2008 Pre-Construction Notification (PCN) Form A. Applicant Information 1. Processing I a. Type(s) of approval sought from the Corps: ®Section 404 Permit El Section 10 Permit 1b. Specify Nationwide Permit (NWP) number: or General Permit (GP) number. 14 1c. Has the NWP or GP number been verified by the Corps? ® Yes ? No 1d. Type(s) of approval sought from the DWQ (check all that apply): ® 401 Water Quality Certification - Regular ® Non-404 Jurisdictional General Permit ? 401 Water Quality Certification - Express ? Riparian Buffer Authorization Is. Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 fication: Certi ? Yes ® No For the record only for Corps Permit: ? Yes ® No If. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in-lieu fee program. ? Yes ® No I g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1 In below. ? Yes ® No 1 h. Is the project located within a INC DCM Area of Environmental Concern (AEC)? ? Yes ® No 2. Project Information 2a. Name of project: SR 1429 (Cameron Briley Road) 2b. County: Anson 2c. Nearest municipality / town: Wadesboro 2d. Subdivision name: N/A 2e. NCDOT only, T.I.P. or state project no: 10C.004043 3. Owner Information 3a. Name on Recorded Deed: 3b. Deed Book and Page No. 3c. Responsible Party (for LLC if applicable): 3d. Street address: 3e. City, state, zip: 3f. Telephone no.: 3g. Fax no.: 3h. Email address: Page 1 of 12 PCN Form - Version 1.0 November 2008 Version Section A. Applicant Information, continued 4. Applicant Information (if different from owner) 4a. Applicant is: ® Agent ? Other, specify: 4b. Name: Barry S. Moose, PE 4c. Business name (if applicable): NC Department of Transportation 4d. Street address: 716 W. Main Street 4e. City, state, zip: Albemarle, NC 28001 4f. Telephone no.: 704-982-0101 4g. Fax no.: 704-982-3146 4h. Email address: bmoose@ncdot.gov 6. Agent/Consuttant Information (if applicable) 5a. Name: 5b. Business name (if applicable): 5c. Street address: 5d. City, state, zip: 5e. Telephone no.: 5f. Fax no.: 5g. Email address: Page 2 of 12 PCN Form - November 2008 Version B. Project Information and Prior Project History 1. Property Identification 1a. Property identification no. (tax PIN or parcel ID): 1b. Site coordinates (in decimal degrees): 35.032319'N -80.157761'W 1c. Property size: 7.27 (right-of-way width x project length) acres 2. Surface Waters 2a. Name of nearest body of water (stream, river, etc.) to Cranes Branch proposed project: 2b. Water Quality Classification of nearest receiving water. C 2c. River basin: Yadkin 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: SR 1429 (Cameron Briley Road) is an unpaved secondary road in Anson County (1.0 mile long). The majority of the project area is undeveloped and used for agricultural purposes. There are single family homes located along the south end of the project. 3b. List the total estimated acreage of all existing wetlands on the property: 0 3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: 60-feet (60-feet is used due to our ROW being 60-feet) 3d. Explain the purpose of the proposed project: , The purpose of this project is to improve the safety and service level of SR 1429 (Cameron Briley Road) by paving the existing gravel road. 3e. Describe the overall project in detail, including the type of equipment to be used: Prior to beginning road construction, sediment and erosion control measures will be installed according to an approved plan. Once the erosion control requirements have been met, an 18-inch x 24-foot RCP that is located on an intermittent stream will be replaced with a new 24-inch x 40-foot RCP. The work area around the pipe will be dewatered, as needed and the existing pipe will be removed and replaced. The roadway will then be graded, a new stone base will be added and the roadway will then be paved. Typical construction equipment will be used: Trackhoe, dump trucks, motor grader, vibratory roller and paving equipment. 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / ® Yes ? No ? Unknown project (including all prior phases) in the past? 4b. If the Corps made the jurisdictional determination, what type ? Preliminary ® Final of determination was made? 4c. If yes, who delineated the jurisdictional areas? Agency/Consultant Company: NCDWQ Name (if known): Polly Lespinasse Other. 4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. 4/30/2009 6. Project History Sa. Have permits or certifications been requested or obtained for ? Yes ® No ? Unknown this project (including all prior phases) in the past? 5b. If yes, explain in detail according to "help file' instructions. Page 3 of 12 PCN Form - Version 1.0 November 2008 Version B. Project information and Prior Project History 6. Future Project Plans 6a. Is this a phased project? ? Yes ® No 6b. If yes, explain. Page 4 of 12 PCN Form -November 2008 Version C. Proposed Impacts Inventory 1. Impacts Summary 1a. Which sections were completed below for your project (check all that apply): ? Wetlands ® Streams - tributaries ? Buffers ? Open Waters ? Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. 2b. 2c. 2d. 2e. 2f. Wetland impact Type of jurisdiction number - Type of Type of wetland Forested (Corps - 404, Area of impact (acres) Permanent (P) or impact (if known) DWQ - non-404, other) Temporary (T) W1 ? P ? T ? Yes ? No ? Corps ? DWQ W2 ? P ? T ? Yes ? No ? Corps ? DWQ W3 ? P ? T ? Yes ? No ? Corps ? DWQ W4 ? P-? T ? Yes ? No ? Corps ? DWQ W5 ? P ? T ? Yes ? No ? Corps ? DWQ W6 ? P ? T ? Yes ? No ? Corps ? DWQ 2g. Total wetland Impacts 2h. Comments: N/A 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. 3b. 3c. 3d. 3e. 3f. Stream impact Type of Stream name Perennial (PER) or Average stream width (feet) Impact number- impact intermittent(INT)? length Permanent (P) or (linear feet) Temporary (T) Replace existing (18-inch S1 ®P ? T x 24-foot) NA ? PER ® INT 2.5-Feet 16-Feet RCP with (24-inch x 40- foot)RCP S2 ?P?T ?PER ?INT S3 ? P ? T ? PER ? INT S4 ? P ? T ? PER ? INT S5 ? PEI T ? PER ? INT S6 ? P ? T ? PER ? INT 3g. Total stream and tributary Impacts 16-Feet 3h. Comments: This in an unnamed Intermittent stream Page 5 of 12 PCN Form - Version 1.0 November 2008 Version C. Proposed Impacts Inventory, continued 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then individual) list all open water impacts below. 4a. 4b. 4c. 4d. 4e. Open water Name of impact number waterbody Type of impact Waterbody type Area of impact (acres) - Permanent (if (P) or applicable) Temporary 01 ?P?T 02 ?P?T 03 ?P?T 04 ?P?T 4f. Total open water Impacts 4g. Comments: N/A Page 6 of 12 PCN Form - November 2008 Version D. Impact Justification and Mitigation 1. Avoidance and Minimization ta. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. The proposed impacts for this project have been limited to those necessary for the pipe replacement and establishing a stable shoulder slope. Measures will be taken to prevent additional impacts to the stream by adhereing to NCDOTs Best Management Practices for the Protection of Surface Waters. 1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. Elevations for the current installation have been recorded and recommendations for proper burial have been made in the attached pipe profile. The stream will be dewatered as needed and erosion control measures will be maintained through the fife of the project. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? ? Yes ®No 2b. If yes, mitigation is required by (check all that apply): ? DWQ ? Corps 2c. If yes, which mitigation option will be used for this project? ? Mitigation bank ? Payment to in-lieu fee program ? Permittee Responsible Mitigation 3. Complete If Using a Mitigation Bank 3a. Name of Mitigation Bank: 3b. Credits Purchased (attach receipt and letter) Type Quantity 3c. Comments: 4. Complete If Making a Payment to In4leu Fee Program 4a. Approval letter from in-lieu fee program is attached. ? Yes 4b. Stream mitigation requested: linear feet 4c. If using stream mitigation, stream temperature: warm, cool, cold 4d. Buffer mitigation requested (DWQ only): square feet 4e. Riparian wetland mitigation requested: acres 4f. Non-riparian wetland mitigation requested: acres 4g. Coastal (tidal) wetland mitigation requested: acres 4h.. Comments: 6. Complete If Using a Permittee Responsible Mitigation Plan 5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan. Page 8 of 12 PCN Form - Version 1.0 November 2008 Version D. Impact Justification and Mitigation, continued 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) - required by DWQ 6a. Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? ? Yes ® No 6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required. Zone Reason for impact Total impact (square feet) Multiplier Required mitigation (square feet) Zone 1 3 (2 for Catawba) Zone 2 1.5 Total buffer mitigation required: 6c. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in-lieu fee fund). 6d. Comments: WA Page 9 of 12 PCN Form - November 2008 Version F. Supplementary Information, continued 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or ? Yes ® No habitat? 5b. Have you checked with the USFWS concerning Endangered Species Act ? Yes ® No impacts?, Raleigh ? 5c. If yes, indicate the USFWS Field Office you have contacted. ? Asheville 5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? Natural Heritage Program GIS database and field review for suitable habitat. 8. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as essential fish habitat? ? Yes ® No 6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat? South Atlantic Fishery Management Council 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation ? Yes ® No status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)? 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? NCDOT GIS database/NCDOT Historic Architecture Group and National Register of Historic Places 8. Flood Zone Designation (Corps Requirement) Be. Will this project occur in a FEMA-designated 100-year floodplain? ? Yes ® No 8b. If yes, explain how project meets FEMA requirements: 8c. What source(s) did you use to make the floodplain determination? Anson County GIS data layer (Anson County Flood Zones) Barry S. Moose, PE rte ?- , 05/14/09 Applicant/Agent's Printed Name Applicant/Agent's Signature (Agent's signature is valid only x an author¢ation letter from the applicant Date is provided) Page 12 of 12 PCN Form - November 2008 Version u i'N d U fl? i 8* W Name:POLKTON Date: 5/6/2009 Scale: 1 inch equals 1143 feet J F 4 J r? 1 Location: 035'01'53.54" N 080'09'11.33" W Caption: SR 1429 (Cameron Briley Road), Anson County b rl. F W) b b b p O Z h z z ?® 44 A P9 0 ®® b pub 02% Fl% IF-4w <too R? ' ;<? FF 3 e Q m U o i 8 F F F F e e D ; y y G A F F " 9 e? in m y? ti y ° A '. ¢. E .ra yy e ?': 7 :LL Li'm m, 8 8oun67°0.1888y yy oyF F F .? 9 9 8 E ,. .. 0 9 B fi CFFFFtn"riFF'F+E^CCCyC 'I '1 ?I H '1 '1 ?I ?i N n.l H '1. H N ?I ?I ^I O O w k4 M ti R Wz a? m xz wo o N o a 0 3 N ? ? ?n L:=1 M C ggaa ? ?i444a0 iL- ?I I ^ 4 I?? `e iQl 09 ?x d ? 8 1'1`I , , 1 , , 1 v,lv ?G a§€€ 1 , ?d d n d d iI ?? I I I I ? nty I R o a? I I I ? I ?`1rODT I no?pov? o „Oa?pi * \ N? I S g P ----- ---------- i i 4 1 Eli i m i /I lei i / ? o 1 ??IrOD? nnuonv? g „`o G to, sI 2 P a ? a ??1roDt uunnuvt? G r' I I I I I II I I it I I I I I .I 1 I II I ? (I 9 30 s x 9