HomeMy WebLinkAboutNC0007323_Compliance Evaluation Inspection_20180507 w
ROY COOPER
1`.-A, Governor
_MICHAEL S.REGAN
Secretary
Water Resources a LINDA CULPEPPER
Environmental Quality Interim Director
May 7,2018
Mr.Brian Collie
Town of Yanceyville
P.O.Box 727
Yanceyville,NC 27379
SUBJECT: Compliance Evaluation Inspection RECEIVED/DENF�IDWR
Yanceyville WTP—Town of Yanceyville
NPDES Permit#NC0007323 MAY 15 2016
Caswell County
Water Resources
Dear Mr. Collie: Permitting Section
On May 2, 2018, Jenny Graznak of this office met with Greg Purcell to perform a Compliance Evaluation
Inspection on the filter backwash wastewater at the Yanceyville Water Treatment Plant. The inspection
findings are detailed below and an inspection checklist is attached.
1.Permit
The current permit became effective October 1, 2017 and will expire September 30, 2022. A copy of the
permit monitoring requirements was available during the inspection. The operator should have a complete•
copy of the permit.
2.Self-Monitoring Program
The monthly Discharge Monitoring Reports (DMRs) were reviewed for the period January 2017 through
February 2018 for this inspection. The facility was found to be compliant with permit limits during this
time. It was also noted that sampling seems to have been performed per the frequencies specified in the
permit. A comparison of the January 2018 DMR with the laboratory data revealed that the data from the
samples collected on January 10 was incorrectly transcribed into the January 5 row.Mr.Purcell stated that
he would fix the eDMR and send in a new copy.
Meritech picks up the samples for TSS, Turbidity, metals, and toxicity, and chain of custody forms were
available for review. Mr. Purcell measures TRC, pH, and temperature under Field Parameter Certification
#5700 at the facility.
3.Flow Measurement
Effluent flow is estimated based on filter backwash volumes. Mr. Purcell stated that a flow meter will be
installed for the filter backwash discharge within the next year.
4. Sludge Handling and Disposal
The Town of Yanceyville has a land application permit for the removal of sludge from the plant's two
lagoons. Sludge records were not available during the inspection. Mr. Purcell believes that the lagoons
were dredged in 2017.
-`.'`Nothin C mpares�--,�
State of North Carolina I Environmental Quality
450 W.Hanes Mill Road,Suite 300,Winston-Salem,North Carolina 27105
Phone.336-776-98001 FAX:336-776-9797
5. Operations and Maintenance
Inframark Water Infrastructure Operations took over operations for this facility in January 2018.Mr.Purcell
is the Operator in Responsible Charge and holds Physical/Chemical Grade 1, #1005540. The Town of
Yanceyville performs maintenance on the lagoons.Lagoon 001 appeared to have a high solids level.Lagoon
002 had significant floating sludge. Mr. Purcell said that they plan to have the lagoons cleaned at the end
of the summer.
6.Facility Site Review
The facility operates a conventional water treatment system with a discharge of filter backwash wastewater
through a dual settlement lagoon system. This facility currently has a design flowrate of 1.0 MGD and a
maximum,monthly average wastewater discharge of 0.0284 MGD.
7.Effluent/Receiving Waters
The system discharges into Fullers Creek, a waterbody currently classified WS-III; CA waters in the
Roanoke River Basin. The effluent was clear on the day of inspection.
Should-you have any questions concerning this letter and attached inspection report, please contact Jenny
Graznak or me at(336)776-9800.
Sincerely,
Sherri V. Knight,P.E.
Regional Supervisor
Water Quality Regional Operations Section
Division of Water Resources
cc: Greg Purcell,Inframark(greg.purcell@inframark.com)
Central Files
WSRO
NPDES Unit
•
Attachments: Inspection Report
Monitoring Violations Report
United States Environmental Protection Agency Form Approved.
EPA Washington,D C 20460 OMB No 2040-0057
Water Compliance Inspection Report Approval expires 8-31-98
Section A.National Data System Coding(i.e,PCS)
Transaction Code NPDES yr/mo/day Inspection Type Inspector Fac Type
1 �N, 2 Li 3 I NC0007323 111 12 I 18/05/02 117 18 I,.( 19 [ j
201
21111111 1111111111111111111111111 11111111111 r6
Inspection Work Days Facility Self-Monitoring Evaluation Rating B1 QA Reserved
671 1 701 I 71 Ii 72 LJ 1 , 1 731 1 174 75i 1 1 1 1 1 1 180
Section B Facility Data
Name and Location of Facility Inspected(For Industrial Users discharging to POTW,also include Entry Time/Date Permit Effective Date
POTW name and NPDES permit Number) 09 OOAM 18/05/02 17/10/01
Yanceyville VVTP
Exit Time/Date Permit Expiration Date
1282 W Main St
10 30AM 18/05/02 22/09/30
Yanceyville NC 27379
Name(s)of Onsite Representative(s)/Titles(s)/Phone and Fax Number(s) Other Facility Data
///
Gregory Dean Purcell/ORC/336-349-1021/
Name,Address of Responsible Official/Title/Phone and Fax Number
Contacted
Brian Collie,PO Box 727 Yanceyville NC 2737911336-694-5431/
No
Section C Areas Evaluated During Inspection(Check only those areas evaluated)
Permit I. Flow Measurement • Operations&Maintenance II Records/Reports
• Self-Monitoring Program • Sludge Handling Disposal • Facility Site Review II Effluent/Receiving Waters
Section D Summary of Finding/Comments(Attach additional sheets of narrative and checklists as necessary)
(See attachment summary)
Name(s)and Signature(s)of Inspector(s) Agency/Office/Phone and Fax Numbers Date
Jennifer F Grazne WSRO WQ//336-771-5000/ 1-7/0
rty_ drAGrat--
Signature of Management Q A Reviewer Agency/Office/Phone and Fax Numbers Date
)". -4-G-j(ve/11 1//ff
EPA Form 3560-3(Rev 9-94)Previous editions are obsolete
Page# 1
NPDES yr/mo/day Inspection Type (Cont.) 1
31 NC0007323 I11 121 18/05/02 117 18 1 I
Section D:Summary of Finding/Comments(Attach additional sheets of narrative and checklists as necessary)
1. Permit
The current permit became effective October 1, 2017 and will expire September 30, 2022.A copy of
the permit monitoring requirements was available during the inspection.The operator should have a
complete copy of the permit.
2. Self-Monitoring Program
The monthly Discharge Monitoring Reports (DMRs)were reviewed for the period January 2017 through
February 2018 for this inspection.The facility was found to be compliant with permit limits during this
time. It was also noted that sampling seems to have been performed per the frequencies specified in
the permit. A comparison of the January 2018 DMR with the laboratory data revealed that the data
from the samples collected on January 10 was incorrectly transcribed into the January 5 row. Mr.
Purcell stated that he would fix the eDMR and send in a new copy.
Meritech picks up the samples for TSS,Turbidity, metals, and toxicity, and chain of custody forms
were available for review. Mr. Purcell measures TRC, pH, and temperature under Field Parameter
Certification#5700 at the facility.
3. Flow Measurement
Effluent flow is estimated based on filter backwash volumes. Mr. Purcell stated that a flow meter will
be installed for the filter backwash discharge within the next year.
4. Sludge Handling and Disposal
The Town of Yanceyville has a land application permit for the removal of sludge from the plant's two
lagoons. Sludge.records were not available during the inspection. Mr. Purcell believes that the lagoons
were dredged in 2017.
5 Operations and Maintenance
Inframark Water Infrastructure Operations took over operations for this facility in January 2018 Mr.
Purcell is the Operator in Responsible Charge and holds Physical/Chemical Grade 1,#1005540.The
Town of Yanceyville performs maintenance on the lagoons. Lagoon 001 appeared to have a high solids
level. Lagoon 002 had significant floating sludge. Mr Purcell-said that they plan to have the lagoons
cleaned at the end of the summer.
6. Facility Site Review
The facility operates a conventional water treatment system with a discharge of filter backwash
wastewater through a dual settlement lagoon system.This facility currently has a design flowrate of 1.0
MGD and a maximum, monthly average wastewater discharge of 0.0284 MGD.
7. Effluent/Receiving Waters
The system discharges into Fullers Creek, a waterbody currently classified WS-III; CA waters in the
Roanoke River Basin. The effluent was clear on the day of inspection.
Page# 2
S
Permit: NC0007323 Owner-Facility: Yanceyville WTP
Inspection Date: 05/02/2018 Inspection Type: Compliance Evaluation
Operations &Maintenance, Yes No NA NE
Is the plant generally clean with acceptable housekeeping'? • 000
Does the facility analyze process control parameters,for ex MLSS, MCRT,Settleable ❑ ❑ E ❑
Solids, pH, DO, Sludge Judge, and other that are applicable'?
Comment: Inframark Water Infrastructure Operations took over operations for this facility in January
2018. Mr. Purcell is the Operator in Responsible Charge and holds Physical/Chemical
Grade 1,#1005540.
Permit Yes No NA NE
(If the present permit expires in 6 months or less). Has the permittee submitted a new 00 • 0
application'?
Is the facility as described in the permit? • 000
#Are there any special conditions for the permit? 0 • 00
Is access to the plant site restricted to the general public'? • 000
Is the inspector granted access to all areas for inspection'? • 000
Comment: The current permit became effective October 1, 2017 and will expire September 30, 2022.A ,
copy of the permit monitonnq requirements was available during the inspection.The
operator should have a copy of the complete permit.
Record Keeping Yes No NA NE
Are records kept and maintained as required by the permit'? • 000
Is all required information readily available,complete and current? • 000
Are all records maintained for 3 years(lab. reg required 5 years)' • 000
Are analytical results consistent with data reported on DMRs'7 ❑ E ❑ ❑
Is the chain-of-custody complete'? • 000
Dates,times and location of sampling • E
Name of individual performing the sampling •
Results of analysis and calibration •
Dates of analysis
Name of person performing analyses •
Transported COCs E
Are DMRs complete do they include all permit parameters'? • 000
Has the facility submitted its annual compliance report to users and DWQ? 00110
(If the facility is=or>5 MGD permitted flow)Do they operate 24/7 with a certified operator 00 • 0
on each shift'?
Is the ORC visitation log available and current'? • 000
Is the ORC certified at grade equal to or higher than the facility classification'? E ❑ ❑ ❑
Page# 3
,
Permit: NC0007323 Owner-Facility: Yanceyville WTP
Inspection Date: 05/02/2018 Inspection Type: Compliance Evaluation
Record Keeping Yes No NA NE
Is the backup operator certified at one grade less or greater than the facility classification'? • ❑ 0 0
Is a copy of the current NPDES permit available on site'? 0 • 0 0
Facility has copy of previous year's Annual Report on file for review'? 0 0 • 0
Comment: A comparison of the January 2018 DMR with the laboratory data revealed that the data from
the samples collected on January 10 was incorrectly transcribed into the January 5 row.
Effluent Pipe Yes No NA NE
Is right of way to the outfall properly maintained? • 0 0 0
Are the receiving water free of foam other than trace amounts and other debris'? • 0 0 0
If effluent (diffuser pipes are required) are they operating properly'? 0 0 • 0
Comment: The system discharges into Fullers Creek, a waterbody currently classified WS-III; CA
waters in the Roanoke River Basin.The effluent was clear on the day of inspection. '
Flow Measurement-Effluent Yes No NA NE
#Is flow meter used for reporting'? 0 • 0 0
Is flow meter calibrated annually'? 0 0 • 0
Is the flow meter operational'? 0 0 U 0
(If units are separated) Does the chart recorder match the flow meter'? 0 0 IN 0
Comment: Effluent flow is estimated based on filter backwash volumes. Mr. Purcell stated that a flow
meter will be installed for the filter backwash discharge within the next year.
De-chlorination Yes No NA NE
Type of system? Tablet
Is the feed ratio proportional to chlorine amount(1 to 1)? 0 0 U 0
Is storage appropriate for cylinders'? 0 0 U 0
#Is de-chlorination substance stored away from chlorine containers'? • 0 0 0
Comment:
Are the tablets the proper size and type'? • 0 0 0
Are tablet de-chlorinators operational'? • 0 ❑ 0
Number of tubes in use'? 4
Comment:
Lagoons Yes No NA NE
Type of lagoons'?
Page# 4
Permit: NC0007323 Owner-Facility: Yanceyville WTP
Inspection Date: 05/02/2018 Inspection Type: Compliance Evaluation
Lagoons Yes No NA NE
#Number of lagoons in operation at time of visit? 2
Are lagoons operated in? Series
#Is a re-circulation line present'? 00110
Is lagoon free of excessive floating materials'? 01100
#Are baffles between ponds or effluent baffles adjustable'? 00 • O
Are dike slopes clear of woody vegetation'? • ❑ ❑ ❑
Are weeds controlled around the edge of the lagoon? • 000
Are dikes free of seepage'? • 000
Are dikes free of erosion'? • 000
Are dikes free of burrowing animals'? • ❑ ❑ ❑
#Has the sludge blanket in the lagoon(s)been measured periodically in multiple 0 • 00
locations'?
#If excessive algae is present, has barley straw been used to help control the growth'? 01100
Is the lagoon surface free of weeds'? • 000
Is the lagoon free of short circuiting'? • ❑ 1: 1=1
Comment: Lagoon 001 appeared to have a high solids level. Lagoon 002 had significant floating sludge.
Mr. Purcell said that they plan to have the lagoons cleaned at the end of the summer.
Page# 5