Loading...
HomeMy WebLinkAboutEmail RE NCG140420 Rescission StatusGeorgoulias, Bethany From: Johnson Jr, Tony <johnsonto@vmcmail.com> Sent: Tuesday, May 15, 2018 5:52 PM To: Wehner, Judy Cc: Khan, Zahid; Georgoulias, Bethany; David Chaparro; Miller, David Subject: [External] Fwd: NCG140420_Lane Construction_Inspection report 1-23-2017 Attachments: Cabarrus Quarry Mine Permit Map.pdf Hey Judy, Per our conversion today, NCDEQ DWR has requested verification that Vulcan's former tenant Lane Construction Concrete Plant (Lane) was located within Vulcan's Cabarrus Quarry Mine Permitted Boundaries. Once verification is received, DWR can process Lane's request to rescind NCG140420 Permit. Once Lane's permit is rescinded, this area can be covered under Vulcan's current NPDES, Permit No. NCG020172. Vulcan request a reply confirming that Lane's Plant was within Vulcan's Mine Permitted Area. I have attached a copy of Vulcan's Mine Permit Map showing Lane's former location. If you should need any other information, please let me know. ---------- Forwarded message ---------- From: Johnson Jr, Tony <iohnsonto@vmcmail.com> Date: Mon, May 14, 2018 at 1:55 PM Subject: Re: NCG140420_Lane Construction inspection report 1-23-2017 To: "Keen, Holliday V" <holliday.keen@ncdenr.gov> Cc: "Khan, Zahid" <zahid.khan@ncdenr.gov>, Wes Webb <wwebb@awck.com> Hey Holliday, I wanted to followup on the previous email sent 8/8/17, regarding the pond re -inspection. As you may be aware, Lane Construction has moved off our site a few years ago and they would like to be released from their NPDES Permit. Vulcan will assume responsibility. Please advise. On Tue, Aug 8, 2017 at 3:41 PM, Johnson Jr, Tony <iohnsonto@vmcmail.com> wrote: Hey Holliday, 1 We have completed all the improvements to the Pond, we would like to invite you back out to view, please let me know your availability for a site visit. Vulcan wishes to merger this BMP into our current NPDES permit for our mine site. Please advise on how to proceed. I look forward to hearing from you soon. Thank you, On Thu, Feb 9, 2017 at 4:04 PM, Keen, Holliday V <holliday.keen@ncdenr.gov> wrote: Thanks for the response Mr. Webb, We understand that this basin is required to stay in place because the impermeable area is not going to be removed then re -vegetated. Prior to rescinding this permit, please repair the gulley/eroded area on the inside of the basin wall, ensure all areas of the basin and the stockpile are well stabilized, then request the permit rescission. We will conduct another inspection when the repairs are completed and vegetation has been established to assess viability of permit rescission. Let me know if you have any other questions! Thank you, Holliday Keen Environmental Senior Specialist Land Quality Section, Mooresville Regional Office Division of Energy, Mineral and Land Resources North Carolina Department of Environmental Quality Phone: 704-235-2148 Email: Holliday. Keen@NCDENR.gov From: Wes Webb [mailto:wwebb@awck.com] Sent: Thursday, February 09, 2017 2:21 PM To: Keen, Holliday V <holliday.keen@ncdenr.gov> Cc: iohnsonto@vmcmail.com; Khan, Zahid <zahid.khan@ncdenr.gov> Subject: RE: NCG140420_Lane Construction_Inspection report 1-23-2017 Holly PEI The pond on the back of the site is a Phase II Stormwater BMP that was installed to comply with the City of Concords development standards. The pond is in place to treat the gravel surface area where the plant was located. The Quarry intends to keep the plant area as an impervious surface and utilize the area for other mine activities. Per the stormwater agreement with Concord, this pond is design to remain in place in perpetuity. The discharge from this BMP flows into a drainage basin that has downstream sampling point for the Quarry's NPDES stormwater permit. At this time, there are no activities associated with the operation of a concrete plant. Wes Webb, PE Alley, Williams, Carmen & King, Inc. 120 South Main St. PO Box 1248 Kannapolis, NC 28082-1248 Tel. - (704)938-1515 Fax - (704)938-6810 wwebb awck.com www.awck.com From: Keen, Holliday V[mailto:holliday.keen@ncdenr.gov] Sent: Thursday, February 09, 2017 9:37 AM To: Wes Webb <wwebb@awck.com> Cc: iohnsonto@vmcmail.com; Khan, Zahid <zahid.khan@ncdenr.gov> Subject: NCG140420_Lane Construction inspection report 1-23-2017 Attached is the inspection report from our site visit on January 23, 2017. Please let me know if you have any questions. Thank you, Holliday Keen Environmental Specialist Land Quality Section, Mooresville Regional Office Division of Energy, Mineral and Land Resources North Carolina Department of Environmental Quality Phone: 704-235-2148 Email: Holliday. Keena-NCDENR.gov Tony Johnson Environmental Engineer Vulcan Materials Company 11020 David Taylor Drive, Suite 105 Charlotte, NC 28262 Office 704-547-7076 Cell 571-422-6401 Fax 704-549-4137 Thank you, Tony Johnson Environmental Engineer Vulcan Materials Company 11020 David Taylor Drive, Suite 400 Charlotte, NC 28262 Office 704-547-7076 Cell 571-422-6401 Fax 704-549-4137 Thank you, Tony Johnson Environmental Engineer Vulcan Materials Company 11020 David Taylor Drive, Suite 400 Charlotte, NC 28262 Office 704-547-7076 Cell 571-422-6401 Fax 704-549-4137