HomeMy WebLinkAbout19890127 Ver 2_CAMA Major Permit_20180511Permit Number
90-09
STATE OF NORTH CAROLINA
Department of Environmental Quality
and
Coastal Resources Commission
rmtt
for
X Major Development in an Area of Environmental Concern
pursuant to NCGS 113A-118
Excavation and/or filling pursuant to NCGS 113-229
r City of Washington
102 East 2nd
Street Washington
NC 27889
ing development in
Beaufort
County
adi. Runyan Creek. at NC 32 bridge
to ttavens tiaraen Park in Washington , as requested in the permittee's application dated 12/13/17,
t, issued on May 11, 2018 is subject to compliance with the application (where consistent
xmit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may
to fines, imprisonment or civil action; or may cause the permit to be null and void.
Pier
This permit modification authorizes only the existing pier removal and new pier and uses located in
or over the water that are expressly and specifically set forth in the permit application. No other
structure, whether floating or stationary, shall become a permanent part of this pier without permit
modification. No non -water dependent uses of structures shall be conducted on, in or over Public
Trust waters without permit modification.
The permittee shall install and maintain at his expense any signal lights or signals prescribed by the
U.S. Coast Guard, through regulation or otherwise, on the authorized facilities. At minimum,
permanent reflectors shall be attached to the structure in order to make it more visible during hours of
darkness or inclement weather.
(See attached sheet for additional conditions)
action may be appealed by the permittee or other
-sons within twenty (20) days of the issuing date.
milt must be accessible on-site to Department
.1 when the project is inspected for compliance.
intenance work or project modification not covered
,r requires further Division approval.
must cease when the permit expires on
December 31, 2021
g this permit, the State of North Carolina agrees that
iject is consistent with the North Carolina Coastal
nent Program.
Signed by the authority of the Secretary of DEQ and the
Chairman of the Coastal Resources Commission.
Co
V "
rpr, Braxton C. Davis, Director
Division of Coastal Management
This permit and its conditions are hereby accepted.
Signature of Permittee
""'""'stUH Permit No. 90-09
Page 2 of 2
ADDITIONAL CONDITIONS
'his permit does not authorize any formalized boat slips.
attempt shall be made by the permittee to prevent the full and free use by the public of all navigable
ers at or adjacent to the authorized work.
excavated or fill material shall be placed at any time in any vegetated wetlands or surrounding
;r to ensure compliance with the conditions of this Permit, the permittee and his contractor shall
1e a pre -construction conference with the Division of Coastal Management prior to the initiation
dredging or mobilization activities.
Major Modification shall be attached to the original Permit No. 90-09, which was issued on 7/6/09,
,ell as all subsequent renewals, refinements, and modifications, and copies of all documents must be
ily available on site when Division personnel inspect the project for compliance.
-onditions and stipulations of the active permit remain in force, under this Major Modification,
ss specifically altered herein.
The U.S. Army Corps of Engineers assigned the proposed project COE Action Id. No. SAW -
2018 -00599, issued 5/7/18.
The N.C. Division of Water Resources has authorized the proposed project under General Water
Quality Certification No. 4144 (DWR Project No. 1989-0127 V2), which was issued on 4/27/18.
An application processing fee of $400 was received by DCM for this project.