Loading...
HomeMy WebLinkAbout20081674 Ver 3_CAMA Major Permit_20180511'la's Permit Number 'ICATION/MAJOR 84-11 STATE OF NORTH CAROLINA Department of Environmental Quality and Coastal Resources Commission Vermit for X Major Development in an Area of Environmental Concern pursuant to NCGS 113A-118 X Excavation and/or filling pursuant to NCGS 113-229 development in Beaufort County adjacent to Pamlico River. at 1 BU Drive as requested in the permittee's application dated 1/17/18, including issued on May 11, 2018 is subject to compliance with the application (where consistent twit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may o fines, imprisonment or civil action; or may cause the permit to be null and void. Unless specifically altered herein, this permit authorizes the grading and other land disturbing activities associated with the development of the above referenced property, including the fill of 498W of 404 fill and the removal and relocation of a 12in culvert, all as expressly and specifically set forth in the attached major modification application and workplan drawing. The permittee and/or his or her contractor shall meet with a representative of the Division prior to project initiation. (See attached sheet for additional conditions) lit action may be appealed by the permittee or other Signed by the authority of the Secretary of DEQ and the persons within twenty (20) days of the issuing date. Chairman of the Coastal Resources Commission. must be accessible on-site to Department a the project is inspected for compliance. work or project modification not covered further Division approval. ist cease when the permit expires on 31, 2021 permit, the State of North Carolina agrees that is consistent with the North Carolina Coastal " Y LO'At- roQBraxton C. Davis, Director Division of Coastal Management This permit and its conditions are hereby accepted. Signature of Permittee G Hardee Permit No. 84-11 Page 2 of 2 ADDITIONAL CONDITIONS This Major Modification shall be attached to the original Permit No. 84-11, which was issued on 6/30/11, as well as all subsequent renewals, refinements, and modifications, and copies of all documents must be readily available on site when Division personnel inspect the project for compliance. 11 conditions and stipulations of the active permit remain in force, under this Major Modification, iless specifically altered herein. The U.S. Army Corps of Engineers assigned the proposed project COE Action Id. No. SAW - 2018 -00597 issued 4/27/18. The Division of Water Resources assigned the proposed project DWR Project No. 08-1674 V3. An application processing fee of $400 was received by DCM for this project. This fee also satisfied the Section 401 application processing fee requirements of the Division of Water Resources.