Loading...
HomeMy WebLinkAbout20181597 Ver 1_final signed B 4438 PJD_20180504U.S. ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT Action Id. SAW-2015-00954 County: Brunswick Countv U.S.G.S. Quad: Honev Island NOTIFICATION OF JURISDICTIONAL DETERMINATION Property Owner/Applicant: Address: Size (linear feet) Nearest Waterway USGS HUC NCDOT-Division 3 Attn: Mr. Mason Herndon 5501 Barbados Blvd Castle Havne, NC 28429 +/-1200 Juniuer Creek 03040206 Nearest Town Bolivia River Basin Lower Pee Dee Coordinates Latitude:34.1408874027632 Longitude: -78.325021395591 Location description: The qroiect area is located alonE Hwv 211 south of Bolton and north of Bolivia, Brunswick Coun . Indicate Which of the Followin� Auulv: A. Preliminary Determination X There are waters, including wetlands, on the above described project area, that may be subject to Section 404 of the Clean Water Act (CWA)(33 USC § 1344) and/or Section 10 of the Rivers and Harbors Act (RHA) (33 USC § 403). The waters, including wetlands, have been delineated, and the delineation has been verified by the Corps to be sufficiently accurate and reliable. Therefore this preliminary jurisdiction determination may be used in the permit evaluation process, including determining compensatory mitigation. For purposes of computation of impacts, compensatory mitigation requirements, and other resource protection measures, a permit decision made on the basis of a preliminary JD will treat all waters and wetlands that would be affected in any way by the permitted activity on the site as if they are jurisdictional waters of the U.S. This preliminary determination is not an appealable action under the Regulatory Program Administrative Appeal Process (Reference 33 CFR Part 331). However, you may request an approved JD, which is an appealable action, by contacting the Corps district for further instruction. _ There are wetlands on the above described property, that may be subject to Section 404 of the Clean Water Act (CWA)(33 USC § 1344) and/or Section 10 of the Rivers and Harbors Act (RHA) (33 USC § 403). However, since the waters, including wetlands, have not been properly delineated, this preliminary jurisdiction determination may not be used in the permit evaluation process. Without a verified wetland delineation, this preliminary determination is merely an effective presumption of CWA/RHA jurisdiction over all of the waters, including wetlands, at the project area, which is not sufficiently accurate and reliable to support an enforceable permit decision. We recommend that you have the waters of the U.S. on your property delineated. As the Corps may not be able to accomplish this wetland delineation in a timely manner, you may wish to obtain a consultant to conduct a delineation that can be verified by the Corps. B. Approved Determination _ There are Navigable Waters of the United States within the above described property subject to the permit requirements of Section 10 of the Rivers and Harbors Act (RHA) (33 USC § 403) and Section 404 of the Clean Water Act (CWA)(33 USC § 1344). Unless there is a change in law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. _ There are waters of the U.S., including wetlands, on the above described project area subject to the permit requirements of Section 404 of the Clean Water Act (CWA) (33 USC § 1344). Unless there is a change in the 1aw or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. _ We recommend you have the waters of the U.S. on your property delineated. As the Corps may not be able to accomplish this wetland delineation in a timely manner, you may wish to obtain a consultant to conduct a delineation that can be verified by the Corps. Page 1 of 4 SAW-2015-00954 _ The waters of the U.S., including wetlands, on your project area have been delineated and the delineation has been verified by the Corps. We strongly suggest you have this delineation surveyed. Upon completion, this survey should be reviewed and verified by the Corps. Once verified, this survey will provide an accurate depiction of all areas subject to CWA jurisdiction on your property which, provided there is no change in the law or our published regulations, may be relied upon for a period not to exceed five years. The waters of the U.S., including wetlands, have been delineated and surveyed and are accurately depicted on the plat signed by the Corps Regulatory Official identified below on . Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. _ There are no waters of the U.S., to include wetlands, present on the above described project area which are subject to the permit requirements of Section 404 of the Clean Water Act (33 USC 1344). Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. _ The property is located in one of the 20 Coastal Counties subject to regulation under the Coastal Area Management Act (CAMA). You should contact the Division of Coastal Management in Morehead City, NC, at (252) 808-2808 to determine their requirements. Placement of dredged or fill material within waters of the US, including wetlands, without a Department of the Army permit may constitute a violation of Section 301 of the Clean Water Act (33 USC § 1311). Placement of dredged or fill material, construction or placement of structures, or work within navigable waters of the United States without a Department of the Army permit may constitute a violation of Sections 9 and/or 10 of the Rivers and Harbors Act (33 USC § 401 and/or 403). If you have any questions regarding this determination and/or the Corps regulatory program, please contact Brad Shaver at (910) 251-4611 or Brad.E.Shaver(a�usace.armv.mil. C. Basis For Determination: N/A. An Approved JD has not been completed. D. Remarks: The field visit was completed on 4/27/2015. E. Attention USDA Program Participants This delineation/deternunation has been conducted to identify the limits of Corps' Clean Water Act jurisdiction for the particular site identified in this request. The delineation/determination may not be valid for the wetland conservation provisions of the Food Security Act of 1985. If you or your tenant are USDA Program participants, or anticipate participation in USDA programs, you should request a certified wetland determination from the local office of the Natural Resources Conservation Service, prior to starting work. S H AV E R. 6 RA D. DHAVEIR.BRA E7276601756 DN: c=US, o=U.S. Government, ou=DoD, E.1276601756 °°-`K�,°°-�SA, cn=SHAVER.BRAD.E.1276601756 Corps Regulatory Official: �ate:zo,$.os.o4o9:sss, -04�00� Date: Mav 4, 2018 Expiration Date: None PJD The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so, please complete our Customer Satisfaction Survey, located online at http://corpsmapu.usace.army.mil/cm_apex/f?p=136:4:0. Copy Furnished: NCDEO-DWR attn: Ms. Joanne Steenhuis Page 2 of 4 NOTIFICATION Or ADMINISTRATiVE APPEAL OPTIONS AND PROCESS AND REQUEST FOR APPEAL Applicant: NCDOT-Division 3 Attached is: E File Number: SAW-2015-00954 � Date: Mav 4, 2018 INITIAL PROFFERED PERMIT (Standard Pennit or Letter of p PROFFERED PERMIT (Standard Pennit or Letter of pernlission PERMIT DENIAL APPROVED JURISDICTIONAL DETERMINATION PRELIMINARY JURISDICTIONAL DLTERMINATION See Section below ion) A B C D E SECTION I- The following identifies your rights and options regarding an administrative appeal of the above decision. Additional information may be found at http:i/�vww.usace.armv.mil/Missions/CivilWorksiRe�ulato�yProgramandPermits.aspx or Coms resulations at 33 CFR Part 33l . � A: INITIAL PROFFERED PERMIT: You may accept or object to the pennit. • ACCEPT: If you received a Standard Pern�it, you may sign the pennit document and ret�inl it to the district engi��eer for final authorization. lf you received a Letter of Pei7nission (LOP), yott may accept the LOP and your wark is audlarized. Your signature on the Standard Perniit or acceptance of the LOP means that you accept the permit in its entirety, and waive all rights to appeal the pei7nit, including its ternis and co��ditions, and approved jurisdictioilal detern7inations associated with the pei7nit. OB7ECT: If you object to the pennit (St�ndard or LOP) because of certain terms and conditions therein, you may request th�t fl7e }�enmit be modified accordingly. You �nust complete Section II of this fornl and return the form to the district engineer. Your objections must be received by the dish�ict engineer within 60 days of the date of this notice, or you will forfeit your rigl�t to appeal the permit in tl�e fut�u•e. Upon receipt of your letter, the disri•ict engineer will evaluate yo«r objections and may: (a) modify the permit to address all of your concerns, (b) modify the permit to address some of your objections, or (c) not modify the permit having dete�rmined that Yhe permit should be issued as previously written. After evaluating your objections, the district engineer will send you a proffered permit for your reconsideration, as indicated in Section B Uelow. B: PROFFERED PERMIT: You may accept or appeal the permit • ACCEPT: If you received a Standard Pei-�nit, you may sign the permit document and rehtrn it to the district engineer for final authorization. If yoLi received a Letter of Pem7ission (LOP), you niay accept the LOP and your work is authorized. Your signahue on the Standard Permit or acceptance of the LOP means that you accept the perinit in its entirety, and waive all rights to appeal the pennit, includin� its tenns and conditions, and approved jurisdictional detei177inations associated with tl�e pern�it. • APPEAL: If you choose to decline the proffered permit (Standard or LOP) because of certain terms and conditions therein, you may appeal tl�e declined permit under the Coips of Engineers Adminish•aYive Appeal Process by completing Sectiou II of this form and sending the form to the division engineer. This forni must be received by the division engineer within 60 days of the date of this notice. C: PERMIT DENIAL: You may appeal the denial of a permit under the Corps of Engineers Administrative Appeal Process by completing Section II of this foi-�n and sending the form to the division engineei-. This fonn must be received by the division engineer within 60 days of the date of this notice. D: APPROVED JURISDICTIONAL DETERMINATION: You may accept or appeal the approved JD or provide new information. • ACCEPT: You do not need to notify the Cor�s to accept an approved JD. Failure to notify the Corps within 60 days of the date of this notice means that you acce�t the approved JD ii7 its entirety, and waive all ri�hts to appeal the approvecl JD. APPEAL: lf you disagree witl� the approved JD, you may appeal the approved JD under the Coips of Engineers Administrative Appeal Process by con�pleting Section II of this form and sending the fonn to the division engineer. This farm must be received by the division engineer within 60 days of the date of this notice. Page 3 of 4 SA W-2015-00954 E: PRELIMINARY JLJRISDICTIONAL DETERMINATION: You do not need to respond to the Corps regarding the preliminaiy JD. The Preliminaiy JD is not appealable. If you wish, you may request an approved JD (which may be appealed), by contacting the Corps district for further instruction. Also you may provide new information for further consideration by the Corps to reevaluate the JD. SECTION II - REQUEST FOR APPEAL or OBJECTIONS TO AN INITIAL PROFFERED PERMIT REASONS FOR APPEAL OR OBJECTIONS: (Describe yoLu- reasons for appealing the decision or your objections to an initial proffered permit in clear concise statements. You may attach additional information to this form to clarify where your reasons or objections are addressed in the administrative record.) ADDITIONAL INFORMATION: The appeal is limited to a review of the admiiustrative record, the Corps meinorandum for the record of the appeal conference or ineeting, and any supplemental information that the review officer has determined is needed to clarify the administrative record. Neither the appellant nor the Corps may add new itlformatioi� or analyses to tl�e record. However, you n7ay provide additional infoi-mation to clarify the location of information that is already in the administrative i�ecord. POINT OF CONTACT FOR QUESTIONS OR INFORMATION: If you havc questions regarding this dccision and/or the If you only have questions regarding tll� appe�l process you may appeal process you inay contact: also contact: District Engineer, Wilmington Regulatory Division, Mr. Jason Steele, Administrative Appeal Review Officer Attn: Brad Shaver CESAD-PDO 69 Darlington Ave U.S. Army Corps of Engineers, South Atlantic Division Wilmington, NC 28403 60 Forsyth St�-eet, Room l OM 15 Atlanta, Georgia 30303-8801 Phone: (404) 562-5137 RIGHT OF ENTRY: Your signature below grants the right of entry to Coips of Engineers personnel, and any government cousultants, to conduct investigations of the project site during the course of the appeal process. You will be provided a 15 day notice oF an site investigation, and will have the o artunity to artici ate in all site investigations. Date: Telephone number: Signature of appellant or agent. For appeals on Initial Proffered Permits send this form to: District Engineer, Wilmington Regulatory Division, Attn: Brad Shaver, 69 Darlington Avenue, Wilmington, North Carolina 28403 For Permit denials, Proffered Permits and approved Jurisdictional Determinations send this form to: Division Engineer, Commander, U.S. Army Engineer Division, South Atlantic, Attn: Mr. Jason Steele, Administrative Appeal Officer, CESAD-PDO, 60 Forsyth Street, Room 1OM15, Atlanta, Georgia 30303-8801 Phone: (404) 562-5137 Page 4 of 4