Loading...
HomeMy WebLinkAbout20090548 Ver 1_Application_200905141 A t? U 3 V Ih STATE OF NORTH CAROLINA ,, o Q<o0y D DEPARTMENT OF TRANSPORTATION y BEVERLY EAVES PERDUE GOVERNOR May 11, 2009 Mr. Bill Biddlecome U.S. Army Corps of Engineers Regulatory Field Office Post Office Box 1000 Washington, NC 27889-1000 Dear Sirs: EUGENE A. CONTI, JR. SECRETARY Mr. Jim Hoadley Division of Coastal Management N. C. Dept. of Env. & Natural Resources 1367 U. S. Highway 17 Elizabeth City, NC 27909 ® 9 0 5 41- 8 f l Subject: Nationwide 12 and 23 Permit Application, and CAMA Major Development Permit f Application for the replacement of Bridge No. 5 over Pembroke Creek on SR 1208 in Chowan County. State Project No. 8.2031101. Federal Aid Project Number BRZ- 1208(1). Debit $400.00 from WBS 33714.1.1.TIP No. B-4465. r Please find enclosed the North Carolina Division of Coastal Management Major Permit Forms 1 h and 5, Pre-Construction Notification (PCN) form, Ecosystem Enhancement Program (EEP) acceptance letter, N.C. State Stormwater Permit Exclusion letter, permit drawings, half-size plan sheets, utility narrative/drawings, and adjacent riparian landowner return receipts for the above U referenced project. A Categorical Exclusion (CE) was completed for this project on January 3, 2008, and distributed shortly thereafter. Additional copies are available upon request. The North Carolina Department of Transportation (NCDOT), Division of Highways, in consultation with the Federal Highway Administration (FHWA), proposes to replace Bridge No. 5 in Chowan County. The proposed let date for the project is January 19, 2010 with a review date of December 1, 2009. Regulatory Approvals CAMA: NCDOT requests that the proposed work be authorized under a Coastal Area Management Act Major Development Permit. The landowner receipts are provided with this permit application. Authorization to debit the $400 Permit Application Fee from WBS Element 33714. 1.1 is hereby given. Section 404 Permit: All aspects of this project are being processed by the Federal Highway Administration as a "Categorical Exclusion" in accordance with 23 CFR 771.115(b). The NCDOT requests that a Nationwide Permit 23 authorize these activities. We are also requesting the issuance of a Nationwide Permit 12 for utility work and 33 for the temporary fill due to the installation of erosion control measures. (72 CFR; 11092-11198, March 12, 2007). MAILING ADDRESS: TELEPHONE: 919431-2000 LOCATION: NC DEPARTNIENr OF TRANSPORTATION FAX 919431-2002 4701 ATLANTIC AVENUE PROJECT DEVELOPMENT AND ENVIRONIVEN AL ANALYSIS SUITE 116 1598 MAIL SERVICE CENTER WEBSITE: WWWNCDOTORG RALEIGH NC 27904 RALEIGH GH NC NC 2769 27699-1598 Section 401 Permit: We anticipate 401 General Certification numbers 3699 and 3701 will apply to this project. All general conditions of the Water Quality Certifications will be met, therefore we are not requesting written approval from NCDWQ. In accordance with 15A NCAC 2H, Section .0500(a), we are providing two copies of this application to the NCDWQ for their review. A copy of this permit application will be posted on the NCDOT website at: http://www.ncdot.ore/doh/preconstruct/ye/neu/permit.html If you have any questions or need additional information, please call or email Mrs. Veronica Barnes, at 919-431-6758 or vabames@ncdot.gov. Sincerely, ? /14? kme, Gregory J. Thorpe, Ph.D. Environmental Management Director Project Development and Environmental Analysis Branch cc List: W/attachment Mr. Brian Wrenn, NCDWQ (2 Copies) Ms. Cathy Brittingham, NCDCM W/o attachment (see website for attachments) Mr. Scott McLendon, USACE, Wilmington Mr. Travis Wilson, NCWRC Mr. Gary Jordan, USFWS Mr. Ron Sechler, NMFS Ms. Anne Denton, NCDMF Dr. David Chang, P.E., Hydraulics Mr. Greg Perfetti, P.E., Structure Design Mr. Mark Staley, Roadside Environmental Mr. Victor Barbour, P.E., Project Services Unit Mr. Anthony Roper, P.E., Division I Engineer Mr. Clay Willis, Division 1 Environmental Officer Mr. Jay Bennett, P.E., Roadway Design Mr. Majed Alghandour, P. E., Programming and TIP Mr. Art McMillan, P.E., Highway Design Ms. Beth Harmon, EEP Mr. Todd Jones, NCDOT External Audit Branch Ms. Christy M. Wright, P.E., PDEA 4' O?O? W ATEROG >? Office Use Only: Corps action ID no. DWQ project no. Form Version 1.3 Dec 10 2008 Pre-Construction Notification (PCN) Form A. Applicant Information 1. Processing 1 a. Type(s) of approval sought from the Corps: ® Section 404 Permit ? Section 10 Permit 1 b. Specify Nationwide Permit (NWP) number: 12 23 or General Permit (GP) number: 1c. Has the NWP or GP number been verified by the Corps? ® Yes ? No 1d. Type(s) of approval sought from the DWQ (check all that apply): ® 401 Water Quality Certification - Regular ? Non-404 Jurisdictional General Permit ? 401 Water Quality Certification - Express ? Riparian Buffer Authorization le. Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification: ® Yes ? No For the record only for Corps Permit: ? Yes ® No 1f. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in-lieu fee program. ® Yes ? No 1g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1 In below. ® Yes ? No th. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ® Yes ? No 2. Project Information 2a. Name of project: Replace Bridge No. 5 over Pembroke Creek on SR 1208. 2b. County: Chowan 2c. Nearest municipality / town: Edenton 2d. Subdivision name: not applicable 2e. NCDOT only, T.I.P. or state project no: 8-4465 3. Owner Information 3a. Name(s) on Recorded Deed: North Carolina Department of Transportation 3b. Deed Book and Page No. not applicable 3c. Responsible Party (for LLC if applicable): not applicable 3d. Street address: 4701 Atlantic Ave, Suite 116 3e. City, state, zip: Raleigh, NC 27604 3f. Telephone no.: (919) 431-6758 3g. Fax no.: (919) 431-2002 3h. Email address: vabames@ncdot.gov Page 1 of 10 {` 4. Applicant Information (if different from owner) 4a. Applicant is: ? Agent ? Other, specify: 4b. Name: not applicable 4c. Business name (if applicable): 4d. Street address: 4e. City, state, zip: 4f. Telephone no.: 4g. Fax no.: 4h. Email address: 5. Agent/Consultant Information (if applicable) 5a. Name: not applicable 5b. Business name (if applicable): 5c. Street address: 5d. City, state, zip: 5e. Telephone no.: 5f. Fax no.: 59. Email address: Page 2 of 10 B. Project Information and Prior Project History 1. Property Identification la. Property identification no. (tax PIN or parcel ID): N/A 1b. Site coordinates (in decimal degrees): Latitude: 36.88085 Longitude: - 76.641702 (DD.DDDDDD) (-DD.DDDDDD) 1c. Property size: N/A acres 2. Surface Waters 2a. Name of nearest body of water (stream, river, etc.) to Pembroke Creek proposed project: 2b. Water Quality Classification of nearest receiving water: C 2c. River basin: Chowan 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: Existing conditions on the site include Hardwood swamp forest and general land use is cropland and pasture. 3b. List the total estimated acreage of all existing wetlands on the property: 8.0 3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: 450 3d. Explain the purpose of the proposed project: To replace a structurally deficient and functionally obsolete bridge. 3e. Describe the overall project in detail, including the type of equipment to be used: The project involves replacing a structurally deficient bridge with a six-span 18 inch cored slab bridge on pile bents. The existing structure is a three span bridge with prestressed concrete channels on precast prestressed concrete caps and timber piles. Standard road building equipment will be used. Existing utilities will be relocated on-site via the directional bore method. 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / ®Yes ? No ? Unknown project (including all prior phases) in the past? Comments: 4b. If the Corps made the jurisdictional determination, what type ? Preliminary ® Final of determination was made? 4c. If yes, who delineated the jurisdictional areas? Agency/Consultant Company: EcoScience Corporation Name (if known): Other: 4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. March 7, 2006 5. Project History 5a. Have permits or certifications been requested or obtained for ? Yes ® No ? Unknown this project (including all prior phases) in the past? 5b. If yes, explain in detail according to "help file" instructions. N/A 6. Future Project Plans 6a. Is this a phased project? ? Yes ® No 6b. If yes, explain. N/A Page 3 of 10 PCN Form -Version 1.3 December 10, 2008 Version C. Proposed Impacts Inventory 1. Impacts Summary 1a. Which sections were completed below for your project (check all that apply): ® Wetlands ? Streams - tributaries ? Buffers ? Open Waters ? Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. 2b. 2c. 2d. 2e. 2f. Wetland impact Type of jurisdiction number- Type of impact Type of wetland Forested (Corps - 404, 10 Area of impact Permanent (P) or (if known) DWQ - non-404, other) (acres) Temporary T W1 ®P ? T Permanent fill Riparian ® Yes ? No ® Corps ? DWQ 0.30 W2 ? P ? T ? Yes ? Corps ? No ? DWQ W3 ? PEI T ? Yes ? Corps ? No ? DWQ W4 ? P ? T ? Yes ? Corps ? No ? DWQ W5 ? P ? T ? Yes ? Corps ? No ? DWQ W6 ? P ? T ? Yes ? Corps ? No ? DWQ 2g. Total wetland impacts 0.30 2h. Comments: 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. 3b. 3c. 3d. 3e. 3f. 3g. Stream impact Type of impact Stream name Perennial Type of jurisdiction Average Impact number - (PER) or (Corps - 404, 10 stream length Permanent (P) or intermittent DWQ - non-404, width (linear Temporary (T) (INT)? other) (feet) feet) S1 ? P ? T ? PER ? Corps ? INT ? DWQ S2 ? P ? T ? PER ? Corps ? INT ? DWQ S3 ? P ? T ? PER ? Corps ? INT ? DWQ S4 ? P ? T ? PER ? Corps ? INT ? DWO S5 ? P ? T ? PER ? Corps ? INT ? DWQ S6 ? P ? T ? PER ? Corps ? INT ? DWQ 3h. Total stream and tributary impacts 3i. Comments: Page 4 of 10 PCN Form - Version 1.3 December 10, 2008 Version O 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then individual) list all open water impacts below. 4a. 4b. 4c. 4d. 4e. Open water Name of waterbody impact number - (if applicable) Type of impact Waterbody type Area of impact (acres) Permanent(P)or Temporary T 01 ?P?T 02 ?P?T 03 ?P?T 04 ?P?T 4f. Total open water impacts 4g. Comments: N/A 5. Pond or Lake Construction If pond or lake construction proposed, then complete the chart below Sa. 5b. rFlood . Sd. 5e. Wetland Impacts (acres) Stream Impacts (feet) Upland Pond ID Proposed use or purpose (acres) number of pond edFilled Excavated Flooded Filled Excavated Flooded P1 P2 5f. Total 5g. Comments: N/A 5h. Is a dam high hazard permit required? ? Yes ®No If yes, permit ID no: 5i. Expected pond surface area (acres): 5j. Size of pond watershed (acres): 5k. Method of construction: 6. Buffer Impacts (for DWO) If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below. If an impacts require mitigation, then you MUST fill out Section D of this form. 6a. ? Neuse ?Tar-Pamlico ? Other: Project is in which protected basin? ? Catawba ? Randleman 6b. 6c. 6d. 6e. 6f. 6g. Buffer impact number - Reason Buffer Zone 1 impact Zone 2 impact Permanent (P) or for Stream name mitigation (square feet) (square feet) Temporary T impact required? 131 ?P?T ?Yes ? No B2 ?P?T ?Yes ? No B3 ?P?T ?Yes ? No 6h. Total buffer impacts 6i. Comments: N/A Page 5 of 10 D. Impact Justification and Mitigation 1. Avoidance and Minimization la. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. Measures taken during the design process to avoid or minimize impacts include the use of NCDOT Best Management Practices, increasing the length of the propsed bridge, and removal of the existing causeway. 1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. Construction techniques used to minimize impacts include the use of top-down construction and Stream Crossing Guidelines for Anadromous Fish Passage, including an in-water work moratorium from Feb. 15 to Jun. 15. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? ® Yes ? No 2b. If yes, mitigation is required by (check all that apply): ? DWQ ® Corps 2c. If yes, which mitigation option will be used for this project? ? Mitigation bank ® Payment to in-lieu fee program ? Pennittee Responsible Mitigation 3. Complete if Using a Mitigation Bank 3a. Name of Mitigation Bank: not applicable 3b. Credits Purchased (attach receipt and letter) Type Quantity 3c. Comments: 4. Complete if Making a Payment to In-lieu Fee Program 4a. Approval letter from in-lieu fee program is attached. ® Yes 4b. Stream mitigation requested: 0 linear feet 4c. If using stream mitigation, stream temperature: ? warm ? cool ?cold 4d. Buffer mitigation requested (DWQ only): N/A square feet 4e. Riparian wetland mitigation requested: 0.30 acres 4f. Non riparian wetland mitigation requested: N/A acres 4g. Coastal (tidal) wetland mitigation requested: N/A acres 4h. Comments: N/A 5. Complete if Using a Permittee Responsible Mitigation Plan 5a. If using a pennittee responsible mitigation plan, provide a description of the proposed mitigation plan. N/A Page 6 of 10 PCN Form - Version 1.3 December 10, 2008 Version 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) - required by DWQ 6a. Will the project result in an impact within a protected riparian buffer that requires ? Yes ®No buffer mitigation? 6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required. 6c. 6d. 6e. Zone Reason for impact Total impact Multiplier Required mitigation (square feet) (square feet) Zone 1 N/A 3 (2 for Catawba) Zone 2 N/A 1,5 6f. Total buffer mitigation required: 6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in-lieu fee fund). N/A 6h. Comments: N/A Page 7 of 10 E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan 1a . Does the project include or is it adjacent to protected riparian buffers identified ? Yes ®No within one of the NC Riparian Buffer Protection Rules? 1b . If yes, then is a diffuse flow plan included? If no, explain why. Yes No ? ? Comments: 2. Stormwater Management Plan 2a. What is the overall percent imperviousness of this project? N/A % 2b. Does this project require a Stormwater Management Plan? ® Yes ? No 2c. If this project DOES NOT require a Stormwater Management Plan, explain why: 2d. If this project DOES require a Stormwater Management Plan, then provide a brief, na rrative description of the plan: See attachments. ? Certified Local Government 2e. Who will be responsible for the review of the Stormwater Management Plan? ? DWQ Stormwater Program ? DWQ 401 Unit 3. Certified Local Government Stormwater Review 3a. In which local government's jurisdiction is this project? not applicable ? Phase II 3b. Which of the following locally-implemented stormwater management programs ? NSW ? USMP apply (check all that apply): ? Water Supply Watershed ? Other: 3c. Has the approved Stormwater Management Plan with proof of approval been ? Yes ? No attached? 4. DWQ Stormwater Program Review ® Coastal counties 4a. Which of the following state-implemented stormwater management programs apply ? HQW ? ORW (check all that apply): ? Session Law 2006-246 ? Other: 4b. Has the approved Stormwater Management Plan with proof of approval been attached? ® Yes ? No 5. DWQ 401 Unit Stormwater Review 5a. Does the Stormwater Management Plan meet the appropriate requirements? ® Yes ? No 5b. Have all of the 401 Unit submittal requirements been met? ® Yes ? No Page 8 of 10 PCN Form -Version 1.3 December 10, 2008 Version F. Supplementary Information 1. Environmental Documentation (DWQ Requirement) la. Does the project involve an expenditure of public (federal/state/local) funds or the ® Yes ? No use of public (federal/state) land? 1b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State ® Yes ? No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1c. If you answered "yes" to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval letter.) ® Yes ? No Comments: 2. Violations (DWQ Requirement) 2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated Welland Rules (15A NCAC 21-1.1300), DWQ Surface Water or Wetland Standards, ? Yes ® No or Riparian Buffer Rules (15A NCAC 2B.0200)? 2b. Is this an after-the-fact permit application? ? Yes ® No 2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s): 3. Cumulative Impacts (DWQ Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in ? Yes ® No additional development, which could impact nearby downstream water quality? 3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy. If you answered "no," provide a short narrative description. N/A 4. Sewage Disposal (DWQ Requirement) 4a. Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. not applicable Page 9 of 10 PCN Form - Version 1.3 December 10, 2008 Version 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or ? Yes ® No habitat? 5b. Have you checked with the USFWS concerning Endangered Species Act ? Yes ® No impacts? 5c. If yes, indicate the USFWS Field Office you have contacted. El Raleigh ? Asheville 5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? USFWS list of Threatened and Endangered Species for Chowan County (January 30, 2008) 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as essential fish habitat? ? Yes ® No 6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat? Index of Waterbodies with Essential Fish Habitat 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation ? Yes ® No status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)? 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA-designated 100-year floodplain? ® Yes ? No 8b. If yes, explain how project meets FEMA requirements: NCDOT Hydraulics Unit will coordinate with FEMA 8c. What source(s) did you use to make the floodplain determination? FEMA maps ?7Tkixee,Ok t S' X1, 6 Applicant/Agent's Printed Name ApplicenUAgent's Signature Date (Agent's signature is valid only if an authorization letter from the applicant is provided.) Page 10 of 10 DOE MP-1 APPLICATION for Major Development Permit (last revised 12127/06) r-;r,,%!12. North Carolina DIVISION OF COASTAL MANAGEMENT 1. Primary Applicant/ Landowner Information Business Name Project Name (if applicable) North Carolina Department Of Transportation B-4465 Applicant 1: First Name MI Last Name Gregory Thorpe, PhD. Applicant 2: First Name MI Last Name - If additional applicants, please attach an additional page(s) with names listed. Mailing Address PO Box City State 1598 Mail Service Center Raleigh NC ZIP Country Phone No. FAX No. 276991598 USA 919-431- 2000 ext. 919-431-2002 Street Address (rf different from above) City State ZIP 4701 Atlantic Ave, Suite 116 Raleigh NC 27604- Email gthorpe@ncdot.gov 2. Agent/Contractor Information Business Name Agent/ Contractor 1: First Name MI Last Name Agent/ Contractor 2: First Name MI Last Name Mailing Address PO Box City State ZIP 1 Phone No. 1 - - ext. Phone No. 2 - - ext. FAX No. Contractor # Street Address (d different from above) City state ZIP Email <Form continues on back> 252-808-2808 .. 1-888-4RCOAST .. www.nccoastaimanaagement.net Form DCM MP-1 (Page 2 of 4) APPLICATION for Major Development Permit 3. Project Location County (can be multiple) Street Address State Rd. # Chowan Wildcat Road SR 1208 Subdivision Name City State Zip N/A Edenton NC 27932- Phone No. Lot No.(s) (d many, attach additional page with list) N/A - ext. N/A, a. In which NC river basin is the project located? b. Name of body of water nearest to proposed project Chowan Pembroke Creek c. Is the water body identified in (b) above, natural or manmade? d. Name the closest major water body to the proposed project site. ®Natural []Manmade []Unknown Chowan River e. Is proposed work within city limits or planning jurisdiction? I. If applicable, list the planning jurisdiction or city limit the proposed []Yes ®No work falls within. N/A 4. Site Description a. Total length of shoreline on the tract (ft.) b. Size of entire tract (sq.ft.) 100 111,344 sq. ft. c. Size of individual lot(s) d. Approximate elevation of tract above NHW (normal high water) or NIA, NWL (normal water level) (If many lot sizes, please attach additional page with a list) 6.25 ft ®NHW or ?NWL e. Vegetation on tract Cypress-gum swamp and Maintained/Disturbed area (various grasses and weeds) f. Man-made features and uses now on tract Bridge and Roadway Approaches g. Identify and describe the existing land uses ad acent to the proposed project site. Agricultural and forested h. How does local government zone the tract? I. Is the proposed project consistent with the applicable zoning? A1-Agricultural (Attach zoning compliance certificate, if applicable) []Yes []No ®NA j. Is the proposed activity part of an urban waterfront redevelopment proposal? []Yes ®No k. Hasa professional archaeological assessment been done for the tract? If yes, attach a copy. []Yes ®No ?NA If yes, by whom? 1. Is the proposed project located in a National Registered Historic District or does it involve a []Yes ®No []NA National Register listed or eligible property? <Form continues on next page> 252-808-2808 .. 1-888-4RCOAST .. www.nccoastalmanagement.ne± Form DCM MP-1 (Page 3 of 4) APPLICATION for Major Development Permit m. (i) Are there wetlands on the site? ®Yes ?No (ii) Are there coastal wetlands on the site? ?Yes ®No (iii) If yes to either (i) or (ii) above, has a delineation been conducted? ®Yes ?No (Attach documentation, if available) n. Describe existing wastewater treatment facilities. None o. Describe existing drinking water supply source. None p. Describe existing storm water management or treatment systems. None 5. Activities and Impacts a. Will the project be for commerdal, public, or private use? []Commercial ®PublidGovemment ?Private/Community b. Give a brief description of purpose, use, and daily operations of the project when complete. This project involves the replacement of Bridge No. 5 (SR 1208) in Edenton. C. Describe the proposed construction methodology, types of construction equipment to be used during construction, the number of each type of equipment and where it is to be stored. The bridge will be replaced at the existing location, and traffic will be maintained with an off-site detour. The existing bridge will be removed without dropping any components into the water. Typical construction, earth moving, and road surface equipment will be used. d. List all development activities you propose. Roadway and bridge construction e. Are the proposed activities maintenance of an existing project, new work, or both? Both f. What is the approximate total disturbed land area resulting from the proposed project? 1 ?Sq.Ft or ISACres g. Will the proposed project encroach on any public easement, public accessway or other area ®Yes ?No ?NA that the public has established use ott h. Describe location and type of existing and proposed discharges to waters of the state. N/A I. Will wastewater or stonnwaler be discharged into a wetland? ®Yes ?No ?NA If yes, will this discharged water be of the same salinity as the receiving water? ®Yes ?No ?NA j. Is there any mitigation proposed? ®Yes ?No ?NA If yes, attach a mitigation proposal. <Form continues on back> 252-808.2803 :: 1-888-4RCOAST :: www.necoastaimanagement.net Form DCM MP-1 (Page 4 of 4) APPLICATION for Major Development Permit 6. Additional Information In addition to this completed application form, (MP-1) the following items below, if applicable, must be submitted in order for the application package to be complete. Items (a) - (f) are always applicable to any major development application. Please consult the application instruction booklet on how to property prepare the required items below. a. A project narrative. b. An accurate, dated work plat (including plan view and cross-sectional drawings) drawn to scale. Please give the present status of the proposed projecL Is any portion already complete? If previously authorized work, Beady indicate on maps, plats, drawings to distinguish between work completed and proposed. c. A site or location map that is sufficiently detailed to guide agency personnel unfamiliar with the area to the site. d. A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected properties. e. The appropriate application fee. Check or money order made payable to DENR. I. A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such owners have received a copy of the application and plats by certified mail. Such landowners must be advised that they have 30 days in which to submit comments on the proposed project to the Division of Coastal Management. Name See Attachmented permit drawing sheet 2 of 9 Phone No. Address Name Phone No. Address Name Phone No. Address g. A list of previous state or federal permits issued for work on the project tract. Include permit numbers, pernittee, and issuing dates. NCDENR State Stornwater Permit Exclusion, SW7090324; issued to NCDOT on April 9, 2009 h. Signed consultant or agent authorization forth, If applicable. i. Wetland delineation, if necessary. j. A signed AEC hazard notice for projects in oceanfront and inlet areas. (Must be signed by property owner) k. A statement of compliance with the N.C. Environmental Policy Act (N.C.G.S. 113A 1-10), if necessary. If the project involves expenditure of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act. mission to Enter on I understand that any permit issued in response to this application will allow only the development described in the application. The project will be subject to the conditions and restrictions contained in the permit. I certify that I am authorized to grant, and do in fact grant permission to representatives of state and federal review agencies to enter on the aforementioned lands in connection with evaluating information related to this permit application and follow-up monitoring of the project. I further certify that the information provided in this application is truthful to the best of my knowledge. Date YMV it ZUdj Print Name r7reb c / PO Signature AAA Please indicate application attachments pertaining to your proposed project. ?DCM MP-2 Excavation and Fill Information ®DCM MP-5 Bridges and Culverts ?DCM MP-3 Upland Development ?DCM MP-4 Structures Information 252-908-2808 .. 1-888-4RCOAST .. www.nccoastaimanagement.net Form DOM MP-5 BRIDGES and CULVERTS Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. 1. BRIDGES ?This section not applicable a. Is the proposed bridge: b. Water body to be crossed by bridge: []Commercial OPublictGovemment []Private/Community Pembroke Creek c. Type of bridge (construction material): 21" Cored Slab e. (i) Will proposed bridge replace an existing bridge? ®Yes ?No If yes, (ii) Length of existing bridge: 90' (iii) Width of existing bridge: 24' (iv) Navigation clearance underneath existing bridge: 2_5' (v) Will all, or a part of, the existing bridge be removed? (Explain) Yes, All of the existing bridge will be removed 9 Length of proposed bridge: 240 ft) L Will the proposed bridge affect existing water flow? ®Yes ONO If yes, explain: The new bridge and roadway grade will cause a slight increase in the 100 year water surface elevation k. Navigation clearance underneath proposed bridge: 5' m. Will the proposed bridge cross wetlands containing no navigable waters? ?Yes ONO If yes, explain: d. Water depth at the proposed crossing at NLW or NWL: 7- I. (i) Will proposed bridge replace an existing culvert? []Yes ONO If yes, (ii) Length of existing culvert: (iii) Width of existing culvert: _ (iv) Height of the top of the existing culvert above the NHW or NWL: _ (v) Will all, or a part of, the existing culvert be removed? (Explain) h. Width of proposed bridge: 33' j. Will the proposed bridge affect navigation by reducing or increasing the existing navigable opening? ®Yes ?No If yes, explain: Increase opening 1. Have you contacted the U.S. Coast Guard concerning their approval? ?Yes ONO If yes, explain: n. Height of proposed bridge above wetlands: 5' 2. CULVERTS ®This section not applicable a. Number of culverts proposed: N/A b. Water body in which the culvert is to be placed: 1.888-,IRCOA`Z3T www.nccoa_staimana rtment.net revised: 1017510E _: _ - _ Garth DCM MP-5 (Bridges and Culverts, Page 2 of 4) < Form continues on back> c. Type of culvert (construction material): N/A d. (i) Will proposed culvert replace an existing bridge? ?Yes ?No If yes, (ii) Length of existing bridge: (iii) Width of existing bridge: (iv) Navigation clearance underneath existing bridge: (v) Will all, or a part of, the existing bridge be removed? (Explain) f. Length of proposed culvert: h. Height of the top of the proposed culvert above the NHW or NWL. j. Will the proposed culvert affect navigation by reducing or increasing the existing navigable opening? ?Yes ?No If yes, explain: e. (i) Will proposed culvert replace an existing culvert? ?Yes ?No. If yes, (it) Length of existing culvert(s): (iii) Width of existing culvert(s): (iv) Height of the top of the existing culvert above the NH W or NWL: _ (v) Will all, or a part of, the existing culvert be removed? (Explain) 9. Width of proposed culvert: I. Depth of culvert to be buried below existing bottom contour. k. Will the proposed culvert affect existing water flow? ?Yes ?No If yes, explain: 3. EXCAVATION and FILL ?This section not applicable a. (i) Will the placement of the proposed bridge or culvert require any excavation below the NHW or NWL? ?Yes NNo If yes, (ii) Avg. length of area to be excavated: (iii) Avg. width of area to be excavated: (iv) Avg. depth of area to be excavated: (v) Amount of material to be excavated in cubic yards: b. (i) Will the placement of the proposed bridge or culvert require any excavation within coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ?CW ?SAV ?SB ?WL ®None (ii) Describe the purpose of the excavation in these areas: WA c. (i) Will the placement of the proposed bddge or culvert require any high-ground excavation? ®Yes ?No If yes, (it) Avg. length of area to be excavated: 150' (iii) Avg. width of area to be excavated: M. (iv) Avg. depth of area to be excavated: 3' (v) Amount of material to be excavated in cubic yards: 500 252-308-2898 :: 1-388.4RCOAST :: www.nccoastalmanagement_net revised: 1W26iQ6 FOr'.11 DGM MP-5 (Bridges and Culverts, Page 3 of 4) d. If the placement of the bridge or culvert involves any excavation, please complete the following: (i) Location of the spoil disposal area: Approved NCDOT site (ii) Dimensions of the spoil disposal area: To be determined by contractor (iii) Do you claim title to the disposal area? ?Yes ?No (If no, attach a letter granting permission from Me owner.) (iv) Will the disposal area be available for future maintenance? ?Yes ?No (v) Does the disposal area include any coastal wetandstmarsh (CW), submerged aquatic vegetation (SAVs), other wetlands (WL), or shell bottom (SB)? ?CW ?SAV ?WL ?SB ®None If any boxes are checked, give dimensions if different from (if) above. - (vi) Does the disposal area include any area below the NHW or NWL? ? ?Yes ®No If yes, give dimensions if different from (ii) above. e. (i) Will the placement of the proposed bridge or culvert result in any f. (1) Will the placement of the proposed bridge or culvert result in any fill (other than excavated material described in Item d above) to fill (other than excavated material described in Item d above) to be placed below NHW or NWL? ®Yes ?No be placed within coastal wetlands/marsh (CW), submerged If yes, aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square n filled: 2000' O Avg length of area to be feet affected. (iii) Avg. width of area to be filled: 10' ?CW ?SAV ?SS (iv) Purpose of fill: Widening roadway approaches ®WL 12939 ?None (ii) Describe the purpose of the excavation in these areas: Installation of interior bridge bent g. (i) Will the placement of the proposed bridge or culvert result in any fill (other than excavated material described in Item d above) to be placed on high-ground? ?Yes ®No If yes, (it) Avg. length of area to be filled: (iii) Avg. width of area to be filled: IN) Purpose of fill: a. Will the proposed project require the relocation of any existing b. Will the proposed project require the construction of any temporary utility lines? ®Yes ?No detour structures? ?Yes ®No If yes, explain: See attached utility plans. Existing utilities If yes, explain: will be relocated on-site via the directional bore method. If this portion of the proposed project has already received approval from local authorities, please attach a copy of the approval or certification. < Form continues on back> .52-tiU3-280a :: 1.888.4RCOAST :: vvww.nccoastalmanagemen t. net revised: 10.7EIf6 FnrM DCM MP-5 (Bridges and Culverts, Page 4 of 4) C. Will the proposed project require any work channels? ?Yes ONO d. How will excavated or fill material be kept on site and erosion controlled? If yes, complete Form DCM-MP-2. e. What type of construction equipment will be used (for example, dragline, backhoe, or hydraulic dredge)? Standard NCDOT road construction equipment will be used including but not limited to a crane, pile driver, and backhoe Use of Standard NCDOT BMP's Will wetlands be crossed in transporting equipment to project site? ?Yes ONO If yes, explain steps that will be taken to avoid or minimize environmental impacts. g. Will the placement of the proposed bridge or culvert require any shoreline stabilization? ?Yes ONO If yes, complete form MP-2, Section 3 for Shoreline Stabilization only. Date B-4465 Project Name 16 2 h Applicant Name - Applicant Signature 252.306-2808 :: 1.888.4RCOAST :: wv -nccoastalmanagement.net revised: 1101;26.06 r~ PROGRAM April 30, 2009 Mr. Bill Biddlecome U. S. Army Corps of Engineers Washington Regulatory Field Office Post Office Box 1000 Washington, North Carolina 27889-1000 Dear Mr. Biddlecome: Subject: EEP Mitigation Acceptance Letter: B-4465, Replace Bridge Number 5 over Pollock Swamp on SR 1208, Chowan County; Pasquotank River Basin (Cataloging Unit 03010205); Northern Outer Coastal Plain (NOCP) Eco-Region The purpose of this letter is to notify you that the Ecosystem Enhancement Program (EEP) will provide the compensatory riparian wetland mitigation for the unavoidable impact associated with the above referenced project. As indicated in the NCDOT's mitigation request dated March 2, 2009, riparian wetland mitigation from EEP is required for 0.30 acre of riparian wetland impact. This mitigation acceptance letter replaces the mitigation acceptance letter issued on March 16, 2009. Mitigation associated with this project will be provided in accordance with Section X of Amendment No. 2 to the Memorandum of Agreement between the N. C. Department of Environment and Natural Resources, the N. C. Department of Transportation, and the U. S. Army Corps of Engineers fully executed on March 8, 2007 (Tri-Parry MOA). EEP commits to implement sufficient riparian wetland mitigation up to 0.60 riparian wetland credits to offset the impacts associated with this project by the end of the MOA year in which this project is permitted. If the above referenced impact amounts are revised, then this mitigation acceptance letter will no longer be valid and a new mitigation acceptance letter will be required from EEP. if you have any questions or need additional information, please contact Ms. Beth Harmon at 919-715-1929. Sincerely, l? day V ?(y? WilliVh D. Gilmore, P.E. V EEP Director cc: Mr. Gregory J. Thorpe, Ph.D., NCDOT-PDEA Mr. Brian Wrenn, Division of Water Quality, Wetlands/401 Unit File: B4465 Revised X"tOi`14l9... F`tA"tCGKg... Prig" owfta& yr r y'. North Carolina Ecosystem Enhancement Program, 1652 Mail Service Center, Raleigh, NC 27699-1652 / 919-715-0476 / www.noeep.not rll? April 30,2009 Mr. Gregory J. Thorpe, Ph.D. Environmental Management Director Project Development and Environmental Analysis Branch North Carolina Department of Transportation 1548 Mail Service Center Raleigh, North Carolina 27699-1548 Dear Dr. Thorpe: Subject: . EEP Mitigation Acceptance Letter: B-4465, Replace Bridge Number 5 over Pollock Swamp on SR 1208, Chowan County The purpose of this letter is to notify you that the Ecosystem Enhancement Program (EEP) will provide the riparian wetland mitigation for the subjectproject. Based on the information supplied by you dated March 2, 2009, the impacts are located in CU 03010205 of the Pasquotank River Basin in the Northern Outer Coastal Plain (NOCP) Eco-Region, and are as follows: Riparian Wetland: 0.30 acre This mitigation acceptance letter replaces the mitigation acceptance letter issued on March 16, 2009. EEP commits to implementing sufficient compensatory riparian wetland mitigation credits to offset the impacts associated with this project by the end of the MOA Year in which this project is permitted, in accordance with Section X of the Amendment No. 2 to the Memorandum of Agreement between the North Carolina Department of Environment and Natural Resources, the North Carolina Department of Transportation, and the U. S. Army Corps of Engineers, fully executed on March 8, 2007. If the above referenced impact amounts are revised, then this mitigation acceptance letter will no longer be valid and a new mitigation acceptance letter will be required from EEP. If you have any questions or need additional information, please contact Ms. Beth Hannon at 919-715-1929. Sincerely, WiWain D. Gilmore P.E. , EEP Director cc: Mr. Bill Biddlecome, USACE - Washington Regulatory Field Office Mr. Brian Wrenn, Division of Water Quality, Wetlands/401 Unit File: BA465 Revised Restoring... Ei+ AWWi?... Pvoa ow Ita& 61Mh I^e.nYna enne.,clam Cnh?nromnnl O..v„er.. AR59 \A?J Can,iro rawly, gda:nh IJ/` 99R00_1RF9 / 010_) 6_/lA9C I w.m, nroan wa1 AP NCDEENR ;.? • (`o North Carolina Department of Environment and Natural Resources i Division of Water Quality Beverly Eaves Perdue Coleen H. Sullins Dee Freeman Governor Director B 5C10 Secretary April 9, 2009 APR 15 2oog Mr. D.R_ Henderson, PE DIW SIGN OF NCDOT - Hydraulics Unit RAOF HfGtyS 1590 Mail Service Center CS U Raleigh, NC 27699-1590 Subject: Stormwater Permit Exclusion - NC DOT Activity Replacement of Bridge No.5 over Pembroke Creek on SR1208 Stormwater Project No. SW7090324 Chowan County Dear Mr. Henderson: On March 30, 2009, the Washington Regional Office of the Division of Water Quality received a Coastal Stormwater Permit Application for project B-4465, the replacement of Bridge No. 5, located over Pembroke Creek on SR 1208 in Chowan County. Staff review of the plans and supporting documents has determined that the project proposes activities that are excluded from State Sturmwater permitting requirements as set forth in Section 2.(d)(1) of Session Law 2008-211, effective October 1, 2008, and the stormwater rules under Title 15A NCAC 2H 1000, as amended. Therefore, the Director of the Division of Water Quality is hereby providing confirmation that the subject project is excluded from State Stormwater permitting requirements, being an activity of the NC DOT that is regulated in accordance with the provisions of the NC DOT's National Pollutant Discharge Elimination System (NPDES) Stormwater Permit. Under Section 15A NCAC 2H .1003, any future development or changes to the proposed development, including but not limited to, the locations of the built-upon area and construction of additional built-upon area, may require approval or a Stormwater Management permit application and permit issuance from the Division of Water Quality prior to any construction. Any construction on the site prior to receipt of the required approval or permit will constitute a violation of Title 15A NCAC 2H.1000 and Session Law 2008-211, and may result in the initiation of appropriate enforcement action. Please keep in mind that this determination does not affect your legal obligation to obtain other permits and approvals, which may be required by Federal, State, or local government agencies, role or law. If you have any questions, or need additional information concerning this matter, please contact either Scott Vinson or me at (252) 946481. Sincerely, Regional Supervisor Surface Water Protection Section AH/sv: S:\WQS\STORMWATER\PERMIT\EXCLUSIONS\SW7090324 cc: Chown County Building Inspections Division of Coastal Management Garcy Ward, DWQ Washington Regional Office Central Files North Carohna DNWon of Water Q a ty Internet wuw.noN=KPaay.og e 943 WashirgW Square Mal Phone: 252-946-64811 FAX. 2524"15 NOrthCarolina Washl?n. NC 27689 FAX 252948-9215 Naturally U.S. ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT Action Id. 200511636 County: Chowan U.S.G.S. Quad: Edenhouse NOTIFICATION OF JURISDICTIONAL DETERDIINATI rNAR Property Ow ner/Agent: North Carolina Department of Transnortation VED Address: Gregory J. Thorpe. Ph.D. 1548 Mail Service Center Raleigh, North Carolina 27699-1548 20M Telephone No.: (919) 733-3141 Property (acdescription: I DM OF ? O Y$ Size acres 12.8 acres Nearest Town Edenton Nearest Waterway Pollock Swami) River Basin Albemarle Soun USGS HUC 03010205 Coordinates N 36.0880858 W 76.6417026 Location description The project is located on NCSR 1208 at bridge # 5, adiacent to and crossing Pollock Swami). TIP # B-4465 Indicate Which of the Following Apply: A. Preliminary Determination _ Based on preliminary information, there may be wetlands on the above described property. We strongly suggest you have this property inspected to determine the extent of Department of the Army (DA) jurisdiction. To be considered final, a jurisdictional determination must be verified by the Corps. This preliminary determination is not an appealable action under the Regulatory Program Administrative Appeal Process ( Reference 33 CFR Part 331). B. Approved Determination There are Navigable Waters of the United States within the above described property subject to the permit requirements of Section 10 of the Rivers and Harbors Act and Section 404 of the Clean Water Act Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. X There are waters of the U.S. including wetlands on the above described project area subject to the permit requirements of Section 404 of the Clean Water Act (CWA)(33 USC § 1344). Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. We strongly suggest you have the wetlands on your property delineated. Due to the size of your property and/or our present workload, the Corps may not be able to accomplish this wetland delineation in a timely manner. For a more timely delineation, you may wish to obtain a consultant. To be considered final, any delineation must be verified by the Corps. X The waters of the U.S. including wetland on your project area have been delineated and the delineation has been verified by the Corps. We strongly suggest you have this delineation surveyed. Upon completion, this survey should be reviewed and verified by the Corps. Once verified, this survey will provide an accurate depiction of all areas subject to CWA jurisdiction on your property which, provided there is no change in the law or our published regulations, may be relied upon for a period not to exceed five years. _ The wetlands have been delineated and surveyed and are accurately depicted on the plat signed by the Corps Regulatory Official identified below on _. Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. _ There are no waters of the U.S., to include wetlands, present on the above described property which are subject to the permit requirements of Section 404 of the Clean Water Act (33 USC 1344). Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. X The property is located in one of the 20 Coastal Counties subject to regulation under the Coastal Area Management Act (CAMA). You should contact the Division of Coastal Management in Elizabeth City, NC, at (252) 264-3901 to determine their requirements. Page 1 of 2 Action ID: 200511636 Placement of dredged or fill material within waters of the US and/or wetlands without a Department of the Army permit may constitute a violation of Section 301 of the Clean Water Act (33 USC § 1311). If you have any questions regarding this determination and/or the Corps regulatory program, please contact Bill Biddlecome at (252) 975-1616 ext. 26. C. Basis For Determination This site exhibits wetland criteria as described in the 1987 Corns Wetland Delineation Manual and is part of a broad continuum of wetlands connected to Pollock Swamp, a tributary to Pembroke Creek, a tributary to the Albemarle Sound. D. Remarks E. Appeals Information (This information applies only to approved jurisdictional determinations as indicated in B. above) This correspondence constitutes an approved jurisdictional determination for the above described site. If you object to this determination, you may request an administrative appeal under Corps regulations at 33 CFR part 331. Enclosed you will find a Notification of Appeal Process (NAP) fact sheet and request for appeal (RFA) form. If you request to appeal this determination you must submit a completed RFA form to the South Atlantic Division, Division Office at the Following address: Mr. Michael F. Bell, Administrative Appeal Review Officer CESAD-ET-CO-R U.S. Army Corps of Engineers, South Atlantic Division 60 Forsyth Street, Room 9M15 Atlanta, Georgia 30303-8801 In order for an RFA to be accepted by the Corps, the Corps must determine that it is complete, that it meets the criteria for appeal under 33 CFR part 331.5, and that it has been received by the Division Office within 60 days of the date of the NAP. Should you decide to submit an RFA form, it must be received at the above address by May 7, 2006. "It is not necessary to submit an RFA form to the Division Office if you do not object to the determination in this correspondence." Corps Regulatory Official: WtXtu j?. ?r Date 03/07/2006 Copy furnished: Eco Science Ms. Heather Jean Saunders 1101 Haynes Street, Suite 101 Raleigh, North Carolina 27604 Expiration Date 03/07/2011 Page 2 of 2 E ?mms zoo U N C C O Q « M m E O o N U N M E m y L E N c Q W U - a ¢ W c C C U Q C N 6 m? O ° m E ° W W U a U Q LL 7 N E N 'a) E d K m m O m O 7 € co E o N F a a ? c c 10 10 m - m 0 0 H U 3 K W a N m d ? ? m m m m o °o Z m m ? ~ U F W aQ p v > c W A o o o Z 3 0 5 W W N a E m E .. N o o E N C ? C m - m O p O F m C IL 0 O O IL 3 m m m @ U 2 m L N N ? q O LL' m m O O N 0 E °e m N N ? LL N J m O F fn Z U H 00 °I Property Owners Addresses 1 2 3 4 Jerry H. Small __L300 Wildcat Rd, Edenton, NC 27932 Mark W. Small Albemarle Beach Farms Inc Claude E Small III 251 Wildcat Road Edenton, NC 27932 PO Box 148 Edenton, NC 27932 3000 Kingston Circle, Apt. KS Greenville, NC 27858 NC DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS Chowan COUNTY WBS - 33714. (B-4465) 12/18/2008 Permit Drawing Sheet q- of S SS ass SYS TIMES$$$$ FSSSEISEFNAME*$$* NSSSSSSSSSSS6BS6S LI a a -09 C011lTRACT: TIP PROJECT: 1 N c O 0 0 T ? o o S o ? Z^ n y D o o O C 8 8 H .. gg < O o u li n n n x 0 ooo??y 00 a v 2 ? y ti 1 2 = c 'I c < 0 b 10 y O O m Go m' ~ H n Go Ln ?CD,A$ ?I L ?I II II A ? m A m D p 00 D ? J ? a> m ra y ? b p o . ? o O y R 1 o f'? A _ O 9 1/1 o m D Nan ? > Y ; 0 O m ° N mo m ] m ? s P R S m E n C N Sl NCti -? y Y N NT- I o^mV C-) I K -? z v cx Q 3> n 1> m z- vpnrn - n p^COr3J n mmr - 70 -mz V -0 m70 I n o Z7 p = x r mCDo m m m ? CD 0 0 ?m?? c <=x z- m - o n om n n mr -z . xmK o m m no-o n mp-Im m vm - ? x x- ? z n Z 0 °Z 10 n i°•n mN n= °oc as y mm ,"ate v3? 3 A y N 15100 ffi o 't4fttl' lkr m m D z v 0 n 1 Z v m v (/Z V N b G RIGHT-OF-WA - - - - - - - - - - - - - - - - - - - - - O 1`-? _--w'N" Y Ry_ ` ? II I1 Iill; O \ ?R w " » 9I 1 - -? T .. r r iI I? Y v \ \ w M w Y r ICI I; ,r R M v » r r III I'I w Y " » » Y I 1 ? M M I I Y " w » " II II Y y I II r r Y » I ?i (I r • OY ? I w M Iln II » » w M r I II y » Y I II» r w 1 1 " ! r » I I " " R I I ? f II I ? r ? O n @ I I w 3 " y 9 it li v s o " » » P ------------- w oil pipQ-, W » xldl ? ? » w » a » W Y ? w ? r I w:y W I ? \ W ? k r ?? I I? \\ W W I \ R I \\ / \4 \ .. .. .. \ \ Itst R r O?A. M w (P' r » 4a I I I I .r w r ' .. II M ?F? w I I » » M ep Y II II ?» » I w r ,I I; » r s M » II I M » r I Y N Y I II r ? v I v b " " I I r » a r - r II I » ?4 w " " II ?I " r .6 Y WP II ? » r S ??7pn r ? II Y 1t ??? " \ ? # r» ? » ? I ? 1 M r Y 20+00 25.00 ------------ --------- % » w II ?K w r r w • I I? \" \ ? r ? .. x r: I I r ? Y r y I w ` I y I w M I » w r » II I w x r r r M W » w I I I , w r • r I » II I .M » w r ? x » IN II r .Ow 1 II e w I I » r w ? r 1' I? » • » I I ' r w I I » r r I I » ?r r I I w r ? I I ? ? F O Y I I x » r I I ? r r I I tl r • I I a x ? » " I I L? r i M r ? I I ? » r » I I y w y » r I II 6 W n Y I I » y vw M Y M » r » `? x w Y w M °e(A » Y r e » r M x ??? ? » r r w rib r r x r r » r W w ?J r . VQ G I I V I w ? » » I r ? r r ? M • I I x . 1 » gg I ?` » I r 7 II I w r 1 w? I » -{ r II I w r ? w "P I k b I » a Y r I I w » k I I • u r I r » I r u » r I I r r u i r » ? r • » r ?4 r • I ? » ?.5 Y (^r1 ? I n?I » r 20+00 25+00 o 1 y~ O? DL?i Hy n? O p ---- h l0 IJc V Ip 15, CD IF W =iiii• ----=i----------- iii?Grl•o•uwnwou --------- -------------------- --- ---------------- EV01OMS -------- IA - u-?S`- III " 1 I 1 IN ? w r 1 1 1 r $ r p + LM 2 - Sa r p r • V " b M " • ` IA + Omm• 1 •y " y?my I(A " .?Z9 I " > 00 Ox +2y I> r+m • " D+o +p " ' I? • 2.. • 9 Nr 9y 9 I mm a A 1?t ? mmza F D z om rD221o r I W ?? ?rlr ++ AO.. + I m29 fumm -I r' Rr t yy 1 ? I > 000 +mal, .. .. z 9 O-IITm I m I rm p p ?z ig p, " O? om r 1 r m I 1 OA I r y• my " r oc ix.. I aw mwm I I `m 22 omm 9 I + ." ~.. iYl 1 I soo ?I r oi:+ M + i E I rz MV X I mm or >00 " ?r o m s r r r I I • t m A 956 il TE w mm^ mr I 8tC ?" I +?2 m C r r q? ow r 20+i " wmm I ? H N-+•M r V r "DO z " ? r I " 9 11 " +O t I ?l . • r I I 0mti r y m r r?q r r I l " mm " O r z I " ml ^ EXISTPOWER• r I • " r POLE T REMAIN + + STA 21+20131' L I + I • r r " I EXIST TELEPHONE: r zs mm " I REMOVE POLE + yma o ?jv >OO STA 2a+82132'R w Nz9 w • wil <m "^?___ • rm M " 3 m• 1 A m ° r • y r • r 1 O + ? I T z M ' a z j STA /34 R " w gg I EXTST TELEPHONE: r?i I I REMOVE POLE I • ? ~ I w r i 9 y yy I r • • g I R r 'Mm r .ri v imm • z I r • r oy • ? m " r • I 0 r • O + I • mmmb m w 25+0 I " •Ima:a r r Na: -1 " 2,0 I I I " A mzzmmr I -IV r r r P omom I r I I i + ?zxv r " M? °oi?i? I • y a r y I ?p "0 r I • ? " y L + ? I " ? I • • " r? 1 r I T 1 rl r I " r r EXI "POWE I I ' • wm POL TO IN " >y+ -"- TA +77/33'L w ?•i • " N _ t r r o • I l _ r . r ' i ? V is m A 00 w $ STA 0+00 r m 'm N M or sLsr ?m m er mz m a z ?0 mre = S OI N y3 g N C, u ? _m C m? v ~ ?i z 0 2 52 1.52 15 000 .-2.62 VPI 51 0+00.001 ELEV.0.56 VPI 52 0+60.000 ELEV.-1.06 i VPI N 1+00.000 ELEV.-1.60 VPI " 1+60.000 ELEV.-0.60 8 VPI 05 2+00.000 ELEV.-0.05 VPI Ie 2+80.000 ELEV.-2.17 PI h +20.000 ELEV.-11.17 OB ).000 v.-17.17 i i=d I? I , m m z 9 ne ).000 1.-0.12 177 0.000 V.2.00 m m z m x -20.17 ID i RM90Nf . ............... oop" STA 0+46 aa'a: ? - - ? O VPI N1 0 m 0+00.001 o ELEV -3 38 Z = g . . o to M ? W r 9 >? te a / r m STA 0+48 m VPI N2 ?r yy 0+18 408 w 8 . m.-. ma ELEV.-3.32 N m 0r r m v VPI 03 0, xy 0+88.000 80 ELEV -12 00 mm . . a a VPI 04 m r 1+28.000 T n ELEV.-18 00 m . r u .. r N GO H N VPI NB Z W 1+88.000 m cli m ELEV.-21 00 o . Z r r r -i VPI N8 Z 2+08.000 l ELEV.-21.00 VPI 07 . 2+48.000 ELEV.-18.00 i ? VPI NB 2+88.000 ELEV.-12.00 STA 3+23 VPI N8 ' 3+22.747 ELEV.-3.81 s , CA m i CtIg 0 r m 1y m f ? m 9 moo m m„ $ ?F K R M O? i yO x m xm 0 e M y v m0 M LEY.o..e .2 0.000 V-1.11 1.000 H .000 v.n .e1 01 000 I.-2.00 2.00 0 W ?AA V ' Z m 1.00 18.00 n wo .42.00 PI .12 0122.000 u v.-o.2o tlpprojects-b\b4465\roadwoy\pro)\b4465-rdy_tsh.dgn CONTRACT: Y p u t9 v n ti N N a C a u a u o 0 0 0 0 A_ k i (A ?o ?D O Un co Ln Ni I I II A II ? II O ? L4 rr cc 200 K ? 1? qq -mOr o ?Cy Y/I = P Y ui?AY N ye 33 ?m? W r g b` Y qri ? y ems 50 0-m on K1 xmomr-- cx o?nm z ?onra N o-wrx n mmr -? -mz V vx C 0 n )= x r m m-a0 m Z v O Z W l cm) O i ti0 =:=r x <2 Z Z - ? M- O N 0 N n m r xz mm-x (D xx3x m-1 C)O -- M N mo-+? f m vim v C) -r -I x x ? Z f n z K a p yY^,0 4 l S yoad?: 4 3Y? O lb* TIP PROJECT: J 04M YDg1 0*4 W Z ?V J a b N RIGHT-OF-WA a d 40j o?? a ? C ??? o a £ o- g 3 3 ? a a a £ 02 a ? O € pom ? '? $ 8 S 9 ? O C T a 1. l ?aQ?Oox.o?o o PV m am a- 3S O 3 o' y g Sf S os o S °s , 3 3 3 3 3?3 o° o 11 O _° a88 3$°°°33333?1$$ o' I 3 3 3 3 D I1, I I II I Q o oa ? i?i I I ? I I? I I D? { 0 0 ? ? i ? I I •? m ? ? { s0?° I I I I ° ?I OF Col. B$ 3 g $ s o° O a' W a 7° ° ?. n ?? s e is 39 C, ?23v S gym' a '? o ? ? v Q ? ? ? o '-? o o o_ s o o' - c fib lip O 3 0 30 o S °° ° asn P ?;sa; sac - a a in m FL [I^ S in in F `! C m? Zy rg C r £06 a: v N (M'? O z 1 5 +O + + MPP 88 °O O Z Z ? W N 8 >?TT ui mZ N mLV 8? rA N A N O m iP' FId m z ?C Z r 5 1 11 1>1 a? k _ m m + + N V N N V ^ ti 88 m Q } Z >> O p? O + O 8 9A N N f C N M F m m s9yy y° a 8 m zo>w z? y m e ?zm v y m my ;oa m z? x m mm m m m ms?ti Mm x ?zmr M% g yT Ir i r 2 y a o m+ ? m ° y m imi r y > -0 > wo m 1 m ' n mm 9a amm mm y ay mm m O m. m m v s 9<m m m m ?wc m X. c X. r a y m O MM C amm m m +y 9 :? a< L yam y < mm y ayM m xa m ° m o- o a m m 2 8 a L G AO v C z fZ1N G Z a_ IX Lam' ? II 0 Q Y j i l _ I Z . pev_ei nwe ?_'?"1? ? R __ r I k ? » cl m I » f16W Yr\ W } ZY I I I » » R ?° x?I.oDPB ?1° ati?oDSga I W ?» ? I I W "`? y??1 Q/O CS C ago y??1Z4 Cd a 1,1 I » ? f I I » n Y ?? U $? ar OYQ ? li• I W w O ?l Y M °?, I s fg w UI " III $ » Y » k I III ? " ?F w T T " 11 •Fi + w + II n } O p yyj tCe }gyp $ r . a ": I S mN w ? w 1 p 1 " w I Y a I I k ^i??' > I M J .I 0 y?i Y y Y- Lf I » ~ W 0 I w W W ??L$ ? ? i W ? W » 5 W k W W ?? 1WI4' W S $? W W ? » ? W f ) M W W W $ W _ rty?'1pRO W k i? •"R I ¢ I W W ?? s W " pf f fp ? i L T W W I I u I W ft ` ? r? M I .. T w W " S ti ? . » w » » ' ? Y I I m??mw Z ?y Y W ? u • » » I ? I I VO uJV » » w T v T o W » I I I y I » W Y W+ ? N + { $ W ? ? M y k + N ? ?? y » Gr $ I I » j pp m p a 1 W aq » " . O S ? W Y I I I I I ? :» w " 5 P w » " . I ? gw » M » .- ei w /1 5LL IS I I F w 20+00 25+00 Haugaard, Eric W From: Haugaard, Eric W Sent: Friday, December 19, 2008 12:01 PM To: Fontaine, Lance P. Ph.D. Cc: Haugaard, Eric W Subject: B-4465 Attachments: B-4465 plan view.pdf; B-4465 profile views.pdf 9W f,„, EW IJ B4165 plan B-4465 profile view.pdf (268 KB) views.pdf (134 ... Lance, According to utilities information we have available, there will not be an environmental impact on this project. Attached to this e-mail are "pdf" copies of plan and profile views of the required directional bores for water, telephone, and power lines. Below is contact information for all utilities inside project limits: Albemarle EMC Jerry Keeter 252-426-5735 Chowan County Water Ray Goodwin 252-482-7477 Embarq Telephone Hester Jones 252-335-2678 As this is a CAMA county, a separate hard copy plan sheet and profile sheets of the proposed utility relocations will follow via courier. Thank You, Eric Haugaard, PE NCDOT-Utilities 919-250-4128, ext. 253 Lktii'+q 1 Permit Drawing Sheet 5 Of