HomeMy WebLinkAbout20072164 Ver 2_Seabrooke JD 011018_20180425U.S. ARMY CORPS OF ENGINEERS
WILMINGTON DISTRICT
Action Id. SAW -2007-00944 County: Brunswick County U.S.G.S. Quad: Winnabow
NOTIFICATION OF JURISDICTIONAL DETERMINATION
Property Owner/Applicant: Mr. Kevin Hiniker
C T Corporation System 7 • r-_
REO Fundine Solutions III, LLC
Address: PO Box 56607 ;
Atlanta, Georda 30343
Telephone Number: 404-477-6806
Size (acres) 27 acres
Nearest Waterway Morgan Creek
USGS HUC 03030005
Nearest Town Leland
River Basin Cape Fear
Coordinates Latitude: 34.2076
Longitude: -78.0665
Location description: The site is located on apfti�oxhuately 27 acres of an overall —553 -acre parcel which is located on
13ucke e Rand NE., just north of US Highway 17 east of I-140 and west of the Railroad in Leland Brunswick County, North
Carolina. Parcel ID: 04600060
Indicate Which of the Following Apply:
A. Preliminary Determination
There are waters, including wetlands, on the above described project area, that may be subject to Section 404 of the Clean
Water Act (CWA)(33 USC § 1344) and/or Section 10 of the Rivers and Harbors Act (RHA) (33 USC § 403). The
waters, including wetlands, have been delineated, and the delineation has been verified by the Corps to be sufficiently accurate
and reliable. Therefore this preliminary jurisdiction determination may be used in the permit evaluation process, including
determining compensatory mitigation. For purposes of computation of impacts, compensatory mitigation requirements, and other
resource protection measures, a permit decision made on the basis of a preliminary JD will treat all waters and wetlands that
would be affected in anyway by the permitted activity on the site as if they are jurisdictional waters of the U.S. This preliminary
determination is not an appealable action under the Regulatory Program Administrative Appeal Process (Reference 33 CFR Part
331). However, you may request an approved JD, which is an appealable action, by contacting the Corps district for further
instruction.
_ There are wetlands on the above described property, that may be subject to Section 404 of the Clean Water Act (CWA)(33
USC § 1344) and/or Section 10 of the Rivers and Harbors Act (RHA) (33 USC § 403). However, since the
waters, including wetlands, have not been properly delineated, this preliminaryjurisdiction determination may not be used in the
permit evaluation process. Without a verified wetland delineation, this preliminary determination is merely an effective
presumption of CWA/RHA jurisdiction overall of the waters, including wetlands, at the project area, which is not sufficiently
accurate and reliable to support an enforceable permit decision. We recommend that you have the waters of the U.S. on your
property delineated. As the Corps may not be able to accomplish this wetland delineation in a timely manner, you may wish to
obtain a consultant to conduct a delineation that can be verified by the Corps.
B. Approved Determination
_ There are Navigable Waters of the United States within the above described property subject to the permit requirements of
Section 10 of the Rivers and Harbors Act (RHA) (33 USC § 403) and Section 404 of the Clean Water Act (CWA)(33 USC §
1344). Unless there is a change in law or our published regulations, this determination may be relied upon for a period not to
exceed five years from the date of this notification.
X There are waters of the U.S., including wetlands, on the above described project area subject to the permit
requirements of Section 404 of the Clean Water Act (CWA) (33 USC § 1344). Unless there is a change in the law or our
Page 1 of 2
SAW -2007-00944
published regulations, this determination may be relied upon for a period not to exceed five years from the date of this
notification.
_ We recommend you have the waters of the U.S. on your property delineated. As the Corps may not be able to accomplish
this wetland delineation in a timely manner, you may wish to obtain a consultant to conduct a delineation that can be verified by
the Corps.
X The waters of the U.S., including wetlands, on your project area have been delineated and the delineation has been
verified by the Corps. If you wish to have the delineation surveyed, the Corps can review and verify the survey upon
completion. Once verified, this survey will provide an accurate depiction of all areas subject to CWA and/or RHA
jurisdiction on your property which, provided there is no change in the law or our published regulations, may be relied
upon for a period not to exceed five years.
_ The waters of the U.S., including wetlands, have been delineated and surveyed and are accurately depicted on the plat signed
by the Corps Regulatory Official identified below on . Unless there is a change in the law or our published
regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification.
There are no waters of the U.S., to include wetlands, present on the above described project area which are subject to the permit
requirements of Section 404 of the Clean Water Act (33 USC 1344). Unless there is a change in the law or our published
regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification.
X The property is located in one of the 20 Coastal Counties subject to regulation under the Coastal Area Management Act
(CAMA). You should contact the Division of Coastal Management in Wilmington, NC, at (910) 796-7215 to determine
their requirements.
Placement of dredged or fill material within waters of the US, including wetlands, without a Department of the Army permit may
constitute a violation of Section 301 of the Clean Water Act (33 USC § 1311). Placement of dredged or fill material, construction or
placement of structures, or work within navigable waters of the United States without a Department of the Army permit may
constitute a violation of Sections 9 and/or 10 of the Rivers and Harbors Act (33 USC § 401 and/or 403). If you have any questions
regarding this determination and/or the Corps regulatory program, please contact Sarah Hair at (910) 251-4049 or
Sarah.E.HairAusace.army.mil.
C. Basis For Determination: The site contains wellands which exhibit criteria as described in the 1987 Corps of Engineers
Welland Dellnealion Manual and appropriate Regional Supplement. Additionally the site contains waters which exhibit an
Ordinaryb High Water Mark (OHWM, have relatively permanent flow (RPW), and flow from the site to Town Creek, a
Traditionally Navigable Water (TNH9 and to the Cape Fear River (TN99.
D. Remarks: A portion of the site was previously delineated and verified by the Corps on January 3, 2008.
E. Attention USDA Program Participants
This delineation/determination has been conducted to identify the limits of Corps' Clean Water Act jurisdiction for the particular site
identified in this request. The delineation/determination may not be valid for the wetland conservation provisions of the Food Security
Act of 1985. If you or your tenant are USDA Program participants, or anticipate participation in USDA programs, you should request
a certified wetland determination from the local office of the Natural Resources Conservation Service, prior to starting work.
F. Appeals Information (This information applies only to approved jurisdictional determinations as indicated in B.
above)
This correspondence constitutes an approved jurisdictional determination for the above described site. If you object to this
determination, you may request an administrative appeal under Corps regulations at 33 CFR Part 331. Enclosed you will find a
Notification of Appeal Process (NAP) fact sheet and request for appeal (RFA) form. If you request to appeal this determination you
must submit a completed RFA form to the following address:
US Army Corps of Engineers
South Atlantic Division
Attn: Jason Steele, Review Officer
60 Forsyth Street SW, Room l OM 15
Atlanta, Georgia 30303-8801
SANV-2007-00944
In order for an RFA to be accepted by the Corps, the Corps must determine that it is complete, that it meets the criteria for appeal
under 33 CFR part 331.5, and that it has been received by the Division Office within 60 days of the date of the NAP. Should you
decide to submit an RFA form, it must be received at the above address by March 8, 2018.
**It is not necessary to submit an RF form to the Division Office if you do not object to the determination in this correspondence.**
Corps Regulatory Official.• •
Date: January10,2018 Expiration Date: �hima► 70.2023
The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we
continue to do so, please complete our Customer Satisfaction Survey, located online at
hilp://cQrpsiiiapu.usace.ai7uy.niilfcin apcxJf?p=136:1:0.
Electronic Copy Furnished:
Mr. David Scibetta, Southern Environmental Group, Inc.
Mr. Chad Coburn, NC DWR
SAW -2007-00944
NOTIFICATION OF ADMINISTRATIVE APPEAL OPTIONS AND PROCESS AND
REQUEST FOR APPEAL
Applicant: REO Funding Solutions III, LLC File Number: SAW -2007-00944 Date: January 10, 2018
Attn: Mr. Kevin Hiniker
Attached is: See Section below
INITIAL PROFFERED PERMIT Standard Permit or Letter ofpermission) A
PROFFERED PERMIT (Standard Permit or Letter ofpermission) B
PERMIT DENIAL C
APPROVED JURISDICTIONAL DETERMINATION D
PRELIMINARY JURISDICTIONAL DETERMINATION E
SECTION I - The following identifies your rights and options regarding an administrative appeal of the above
decision. Additional information may be found at http://www.usace.a.miy.mil/inct/functions/cw/cecwo/1-C , or
Corps regulations at 33 CFR Part 331. _
A: INITIAL PROFFERED PERMIT: You may accept or object to the permit.
• ACCEPT: If you received a Standard Permit, you may sign the permit document and return it to the district engineer for final
authorization. If you received a Letter of Permission (LOP), you may accept the LOP and your work is authorized. Your signature
on the Standard Permit or acceptance of the LOP means that you accept the permit in its entirety, and waive all rights to appeal the
permit, including its terms and conditions, and approved jurisdictional determinations associated with the permit.
• OBJECT: If you object to the permit (Standard or LOP) because of certain terms and conditions therein, you may request that the
permit be modified accordingly. You must complete Section II of this form and return the form to the district engineer. Your
objections must be received by the district engineer within 60 days of the date of this notice, or you will forfeit your right to appeal
the permit in the future. Upon receipt of your letter, the district engineer will evaluate your objections and may: (a) modify the
permit to address all of your concerns, (b) modify the permit to address some of your objections, or (c) not modify the permit
having determined that the permit should be issued as previously written. After evaluating your objections, the district engineer
will send you a proffered permit for your reconsideration, as indicated in Section B below.
B: PROFFERED PERMIT: You may accept or appeal the permit
• ACCEPT: If you received a Standard Permit, you may sign the permit document and return it to the district engineer for final
authorization. If you received a Letter of Permission (LOP), you may accept the LOP and your work is authorized. Your signature
on the Standard Permit or acceptance of the LOP means that you accept the permit in its entirety, and waive all rights to appeal the
permit, including its terms and conditions, and approved jurisdictional determinations associated with the permit.
• APPEAL: if you choose to decline the proffered permit (Standard or LOP) because of certain terms and conditions therein, you
may appeal the declined permit under the Corps of Engineers Administrative Appeal Process by completing Section II of this form
and sending the form to the division engineer. This form must be received by the division engineer within 60 days of the date of
this notice.
C: PERMIT DENIAL: You may appeal the denial of a permit under the Corps of Engineers Administrative
Appeal Process by completing Section II of this form and sending the form to the division engineer. This form
must be received by the division engineer within 60 days of the date of this notice.
D: APPROVED JURISDICTIONAL DETERMINATION: You may acceptor appeal the approved JD or
provide new information.
• ACCEPT: You do not need to notify the Corps to accept an approved JD. Failure to notify the Corps within 60 days of the date of
this notice means that you accept the approved JD in its entirety, and waive all rights to appeal the approved JD.
• APPEAL: If you disagree with the approved JD, you may appeal the approved JD under the Corps of Engineers Administrative
Appeal Process by completing Section II of this form and sending the form to the division engineer. This form must be received by
the division engineer within 60 days of the date of this notice.
SAW -2007-00444
E: PRELIMINARY JURISDICTIONAL DETERMINATION: You do not need to respond to the Corps
regarding the preliminary JD. The Preliminary JD is not appealable. If you wish, you may request an approved
JD (which may be appealed), by contacting the Corps district for further instruction. Also you may provide new
information for further consideration by the Corps to reevaluate the JD.
SECTION II - REQUEST FOR APPEAL or OBJECTIONS TO AN INITIAL PROFFERED PERMIT
REASONS FOR APPEAL OR OBJECTIONS: (Describe your reasons for appealing the decision or your
objections to an initial proffered permit in clear concise statements. You may attach additional information to
this form to clarify where your reasons or objections are addressed in the administrative record.)
ADDITIONAL INFORMATION: The appeal is limited to a review of the administrative record, the Corps
memorandum for the record of the appeal conference or meeting, and any supplemental information that the
review officer has determined is needed to clarify the administrative record. Neither the appellant nor the Corps
may add new information or analyses to the record. However, you may provide additional information to clarify
the location of information that is already in the administrative record.
POINT OF CONTACT FOR QUTSTIQNS OX INFORMATION:
If you have questions regarding this decision and/or the If you only have questions regarding the appeal process you may
appeal process you may contact: also contact:
District Engineer, Wilmington Regulatory Division, Mr. Jason Steele, Administrative Appeal Review Officer
Attn: Sarah Hair CESAD-PDO
69 Darlington Avenue U.S. Army Corps of Engineers, South Atlantic Division
Wilmington, North Carolina 28403 60 Forsyth Street, Room 1OM1 5
Atlanta, Georgia 30303-8801
Phone: 404) 562-5137 _
RIGHT OF ENTRY: Your signature below grants the right of entry to Corps of Engineers personnel, and any government
consultants, to conduct investigations of the project site during the course of the appeal process. You will be provided a 15 day
notice of any site investigation, and will have the oppoitunity opportunityto participate in all site investigations.
Date: Telephone number:
Signature of appellant or agent.
For appeals on Initial Proffered Permits send this form to:
District Engineer, Wilmington Regulatory Division, Attn: Sarah Hair, 69 Darlington Avenue, Wilmington, North
Carolina 28403
For Permit denials, Proffered Permits and Approved Jnrisrlictional Determinations send this fo►m to:
Division Engineer, Commander, U.S. Army Engineer Division, South Atlantic, Attn: Mr. Jason Steele, Administrative
Appeal Officer, CESAD-PDO, 60 Forsyth Street, Room 1OM15, Atlanta, Georgia 30303-8801
Phone: (404) 562-5137