Loading...
HomeMy WebLinkAbout20080525 Ver 1_Stormwater Approval_20090507A NCDENR North Carolina Department of Environment and Division of Water Quality Beverly Eaves Perdue Coleen H. Sullins Governor Director May 7, 2009 Jaganathan Gnanasekaran, Owner 561 Ambergate Place NW Concord, NC 28027 OP Natural Resources Dee Freeman Secretary Subject: State Stormwater Management Permit No. SW8 090106 Jaganathan Gnanasekaran Property High Density Commercial Wet Detention Pond Project Pender County Dear Mr. Gnanasekaran: The Wilmington Regional Office received a complete Stormwater Management Permit Application for the Jaganathan Gnanasekaran Property on May 1, 2009. Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Title 15A NCAC 2H.1000 and Session Law 2008-211. We are forwarding Permit No. SW8 090106 dated May 7, 2009 for the construction of the subject project. This permit shall be effective from the date of issuance until May 7, 2019, and shall be subject to the conditions and limitations as specified therein. Please pay special attention to the Operation and Maintenance requirements in this permit. Failure to establish an adequate system for operation and maintenance of the stormwater management system will result in future compliance problems. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within thirty (30) days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 150B of the North Carolina General Statutes, and filed with the Office of Administrative Hearings, P.O. Drawer 27447, Raleigh, NC 27611- 7447. Unless such demands are made this permit shall be final and binding. If you have any questions, or need additional information concerning this matter, please contact Steve Pusey or me at (910) 796-7215. Sinc rely, eorgette Scott Stormwater Supervisor Division of Water Quality GDS/ sgp: S:\WQS\STORMWATER\PERMIT\090106.may09 cc: Brad Sedgwick, PE - JBS Consulting, PA Pender County Building Inspections Steve Pusey Wilmington Regional Office Central Files Wilmington Regional Office 127 Cardinal Drive Extension, Wilmington, North Carolina 28405 ODe Phone: 910-796-72151 FAX: 910-350-20041 Customer Service: 1-877.623-6748 NorthCarolina Internet: www.ncwaterquality.org ?atuNn??? An Equal Opportunity 1 Affirmative Action Employer `N State Stormwater Management Systems Permit No. SW8 090106 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY COMMERCIAL DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Jaganathan Gnanasekaran Jaganathan Gnanasekaran Property Hwy 17, Hampstead, Pender County FOR THE construction, operation and maintenance of one wet detention pond in compliance with the provisions of 15A NCAC 2H .1000 and Session Law 2008-211 (hereafter collectively referred to as the "stormwater rules') the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Water Quality and considered a part of this permit. This permit shall be effective from the date of issuance until May 7, 2019, and shall be subject to the following specified conditions and limitations: 1. DESIGN STANDARDS 1. This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. This stormwater system has been approved for the management of stormwater runoff as described in Section 1.8 on page 3 of this permit. The stormwater control has been designed to handle the runoff from 31,913 square feet of impervious area. 3. A 50' wide vegetative buffer must be provided adjacent impounded structures, streams, rivers and tidal waters. 4. This wet detention pond must be operated with a 30' vegetated filter strip designed to pass the 10 year storm in a diffuse, non-erosive manner. 5. The tract will be limited to the amount of built-upon area indicated on page 3 of this permit, and per approved plans. 6. All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements. The final plats for the project will be recorded showing all such required easements, in accordance with the approved plans. Page 2 of 7 State Stormwater Management Systems Permit No. SW8 090106 5. Decorative spray fountains will not be allowed in the stormwater treatment system. 6. The facilities shall be constructed as shown on the approved plans. This permit shall become void unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. 7. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. A modification may be required for those deviations. 8. If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. 9. Access to the stormwater facilities for inspection and maintenance shall be maintained via appropriate recorded easements at all times. 10. The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans, including, but not limited to, those listed below: a. Any revision to any item shown on the approved plans, including the stormwater management measures, built-upon area, details, etc. b. Project name change. C. Transfer of ownership. d. Redesign or addition to the approved amount of built-upon area or to the drainage area. e. Further development, subdivision, acquisition, lease or sale of any, all or part of the project area. The project area is defined as all property owned by the permittee, for which Sedimentation and Erosion Control Plan approval or a CAMA Major permit was. sought. f. Filling in, altering, or piping of any vegetative conveyance shown on the approved plan. 11. Prior to the construction of any permitted future areas shown on the approved plans, the permittee shall submit final site layout and grading plans to the Division for approval. 12. A copy of the approved plans and specifications shall be maintained on file by the Permittee at all times. 13. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. Page 4 of 7 State Stormwater Management Systems Permit No. SW8 090106 Jaganathan Gnanasekaran Property Stormwater Permit No. SW8 090106 Pender County Designer's Certification I, , as a duly registered in the State of North Carolina, having been authorized to observe (periodically/ weekly/ full time) the construction of the project, (Project) for (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form is included in the Certification. Noted deviations from approved plans and specifications: SEAL Signature Registration Number Date Page 6 of 7 STORMWATER MANAGEMENT PERMIT APPLICATION FORM This form may be photocopied for use as an original I. GENERAL INFORMATION 1. Applicants name (specify the name of the corporation, individual, etc. who owns the project): laganathan Gnanasekaran 2. Print Owner/Signing official's name and title (person legally responsible for facility and compliance): TaUnathan Gnanasekaran / Owner 3. Mailing Address for person listed in item 2 above: 561 Ambergate Place NW City:Concord State:NC Zip:28027 Phone: (7'14-) Y-yd - Y-11 9 Fax: ) Email:.shekarLrn@vahoo.com 4. Project Name (subdivision, facility, or establishment name -should be consistent with project name on plans, specifications, letters, operation and maintenance agreements, etc.): Jaganathan Gnanasekaran Property 5. Location of Project (street address): 17 Hwy City:Ham sp tead County:Pender Zip:28443 6. Directions to project (from nearest major intersection): From the intersection of SR 210 and US 17, o north on US 17 site is on the left approximently 1 2 miles 7. Latitude:0340 22' 41.55" N Longitude:077141' 58.63" W of project 8. Contact person who can answer questions about the project: Name:Brad Sedgwick, PE Telephone Number: (910 ) 619-9330 Email: bradsedgwick@hotmail.com II. PERMIT INFORMATION: 1. Specify whether project is (check one): [DNew [JRenewal []Modification Form SWU-101 Version 09.25.08 Page 1 of 4 L L ?. eJ t ,' State of North Carolina Department of Environment and Natural Resources Division of Water Quality 9. How was the off-site impervious area listed above derived?N/A Projects in Union County: Contact the DWQ Central Office staff to check to see ifyou project is located within a Threatened & Endangered Species watershed that may be subject to more stringent stormwater requirements. IV. DEED RESTRICTIONS AND PROTECTIVE COVENANTS One of the following property restrictions and protective covenants are required to be recorded for all subdivisions, outparcels and future development prior to the sale of any lot. If lot sizes vary significantly, a table listing each lot number, size and the allowable built-upon area for each lot must be provided as an attachment. Forms can be downloaded from httl2:Hh2o.enr.state.nc.us/su/bmp forms.htm - deed restrictions. Form DRPC-1 High Density Commercial Subdivisions Form DRPC-2 High Density Developments with Outparcels Form DRPC-3 High Density Residential Subdivisions Form DRPC4 Low Density Commercial Subdivisions Form DRPC-5 Low Density Residential Subdivisions Form DRPC-6 Low Density Residential Subdivisions with Curb Outlets By your signature below, you certify that the recorded property restrictions and protective covenants for this project shall include all the applicable items required in the above form, that the covenants will be binding on all parties and persons claiming under them, that they will run with the land, that the required covenants cannot be changed or deleted without concurrence from the NC DWQ, and that they will be recorded prior to the sale of any lot. V. SUPPLEMENT FORMS The applicable state stormwater management permit supplement form(s) listed below must be submitted for each BMP specified for this project. Contact the Stormwater Permitting Unit at (919) 807-6300 for the status and availability of these forms. Forms can be downloaded from http://b2o.enr.state.nc.us/su/bmj2 forms.htm. Form SW401-Low Density Low Density Supplement Form SW401-Curb Outlet System Curb Outlet System Supplement Form SW401-Off-Site System Off-Site System Supplement Form SW401-Wet Detention Basin Wet Detention Basin Supplement Form SW401-Infiltration Basin Infiltration Basin Supplement Form SW401-Infiltration Trench Underground Infiltration Trench Supplement Form SW401-Bioretention Cell Bioretention Cell Supplement Form SW401-Level Spreader Level Spreader/Filter Strip/Restored Riparian Buffer Supplement Form SW401-Wetland Constructed Wetland Supplement Form SW401-Grassed Swale Grassed Swale Supplement Form SW401-Sand Filter Sand Filter Supplement Form SW401-Permeable Pavement Permeable Pavement Supplement Form SW401-Cistern Cistern Supplement Form SWU-101 Version 09.25.08 Page 3 of 4 Permit Number: 5'/;)S-s (to be provided by DWQ) Drainage Area Number: Wet Detention Basin Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the vegetated filter if one is provided. This system (check one): ? does ® does not incorporate a vegetated filter at the outlet. This system (check one): ? does ® does not incorporate pretreatment other than a forebay. Important maintenance procedures: Immediately after the wet detention basin is established, the plants on the vegetated shelf and perimeter of the basin should be watered twice weekly if needed, until the plants become established (commonly six weeks). No portion of the wet detention pond should be fertilized after the first initial fertilization that is required to establish the plants on the vegetated shelf. Stable groundcover should be maintained in the drainage area to reduce the sediment load to the wet detention basin. If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain should be minimized to the maximum extent practical. Once a year, a dam safety expert should inspect the embankment. After the wet detention pond is established, it should be inspected once a month and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance should be kept in a known set location and must be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potential problem: How I will remediate the problem: The entire BMP Trash debris is resent. Remove the trash/ debris. The perimeter of the wet Areas of bare soil and/or Regrade the soil if necessary to detention basin erosive gullies have formed. remove the gully, and then plant a ground cover and water until it is established. Provide lime and a one-time fertilizer application rVegetation is too short or too Maintain vegetation at a height of approximately six inches. Form SW401-Wet Detention Basin O&M-Rev.4 Y Page 1 of 4 Permit N umber: SW g 6161"10 (to be provided by DWQ) Drainage Area Number: BMP element: Potential problem: How I will remediate the problem: The embankment Shrubs have started to grow Remove shrubs immediately. on the embankment. Evidence of muskrat or Use traps to remove muskrats and beaver activity is present. consult a professional to remove beavers. A tree has started to grow on Consult a dam safety specialist to the embankment. remove the tree. An annual inspection by an Make all needed repairs. appropriate professional shows that the embankment needs repair. if applicable) The outlet device Clogging has occurred. Clean out the outlet device. Dispose of the sediment off-site. The outlet device is damaged Repair or replace the outlet device. The receiving water Erosion or other signs of Contact the local NC Division of damage have occurred at the Water Quality Regional Office, or outlet. the 401 Oversight Unit at 919-733- 1786. The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the permanent pool depth reads 6 feet in the main pond, the sediment shall be removed. When the permanent pool depth reads 6 feet in the forebay, the sediment shall be removed. BASIN DIAGRAM (fill in the blanks) Permanent Pool Elevation 46.5 Sediment Removal Bottom 40-5 ] ---------- -/Volume -ft Min. Sediment Storage Pool - - - -Sediment Removal Elevation 40.5 Volume -- - ------? FOREBAY Bottom Elevation MAIN POND 1-ft Storage Form SW401-Wet Detention Basin O&M-Rev.4 Page 3 of 4 & Permit No.?? it (to be provided by DWQ) OF W A T?9 ?®'A ^A O? 9G r NCDENR o STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part Ill) must be printed, filled out and submitted along with all of the required information, 1 R TION Project name Jaganathan Gnanasekaran. Property Contact person Brad Sedgwick, PE Phone number (910) 619-9990 Date 12/1912008 (revised 5/1/09) Drainage area number 1 11, DESfG.. TION Site Characteristics Drainage area Impervious area, post-development %impervious Design rainfall depth Storage Volume: Non•SA Waters Minimum volume required Volume provided Storage Volume: SA Waters 1.5' runoff volume Pre-development 1-yr, 24-hr runoff Post-development 1-yr, 24-hr runoff Minimum volume required Volume provided Peak Flow Calculations Is the prelpost control of the lyr 24hr storm peak flow required? 1-yr, 24-hr rainfall depth Rational C, pre-development Rational C, post-development Rainfall intensity: 1-yr, 24-hr storm Pre-development 1-yr, 24-hr peak flow Post-development 1-yr, 24-hr peak flow Pre/Post 1-yr, 24-hr peak flow control Elevations Temporary pool elevation Permanent pool elevation SHWT elevation (approx. at the perm. pool elevation) Top of 10ft vegetated shelf elevation Bottom of 1 Oft vegetated shelf elevation Sediment cleanout, top elevation (bottom of pond) Sediment cleanout, bottom elevation Sediment storage provided Is there additional volume stored above the state-required temp. pool? Elevation of the top of the additional volume 55,837 ft 31,913 ft 57.15 % 1.5 in 3,939 ft3 6,192 ft3 _ ft3 _ ft3 _ ft3 0 ft3 ft3 OK OK, volume provided is equal to or in excess of volume required. Y (Y or N) 3.4 in 0.30 (unidess) 0.75 (unitless) 0.72 in/hr OK 0.71 ft3/sec 3.62 ft3/sec 2.91 ft'/sec 48.00 fmsl 46.50 fmsl 46.00 fmsl 47.00 fmsl 46.00 fmsl 40.50 fmsl 39.50 fmsl 1.00 ft y (Y or N) 48.0 tmsl OK 41f E qq,???j MAY 0 ? 2009 EtF $ Form SW401-Wet Detention Basin-Rev.5 Parts I. S II. Design Summary, Page 1 of 2 Permit No. SW ?. 0"Z6166 (to be provided by DWQ) III. REQUIRED ITEMS CHECKLIST Please indicate the page or plan sheet numbers where the supporting documentation can be found. M incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. It a requirement has not been met, attach justification. d. 9- Pagel Plan (itl_ C. ? C. 9. A copy of the deed restrictions (if required). ( 1 7 Plans (1" - 50' or larger) of the entire site showing. - Design at ultimate build-out, - Off-site drainage (if applicable), - Delineated drainage basins (include Rational C coefficient per basin), - Basin dimensions, - Pretreatment system, - High flow bypass system, - Maintenance access, - Proposed drainage easement and public right of way (ROW), - Overflow device, and - Boundaries of drainage easement. 2. Partial plan (1" = 30' or larger) and details for the wet detention basin showing: - Outlet structure with trash rack or similar, - Maintenance access, - Permanent pool dimensions, - Forebay and main pond with hardened emergency spillway, - Basin cross-section, - Vegetation specification for planting shelf, and - Filter strip. 3. Section view of the wet detention basin (1" = 20' or larger) showing: - Side slopes, 3:1 or lower, - Pretreatment and treatment areas, and - Inlet and outlet structures. 4. If the basin is used for sediment and erosion control during construction, clean out of the basin is specified on the plans prior to use as a wet detention basin. 5. A table of elevations, areas, incremental volumes & accumulated volumes for overall pond and for forebay, to verify volume provided. 6. A construction sequence that shows how the wet detention basin will be protected from sediment until the entire drainage area is stabilized. The supporting calculations. A copy of the signed and notarized operation and maintenance (0&M) agreement. 10. A soils report that is based upon an actual field investigation, soil borings, and infiltration tests. County soil maps are not an acceptable source of soils information. Form SW401-Wet Detention Basin-Rev.5 Part 111. Required Items Checklist, Page 1 of 1