Loading...
HomeMy WebLinkAbout20090281 Ver 1_USACE Correspondence_20090515o9-0X31 DEPARTMENT OF THE ARMY WILMINGTON DISTRICT, CORPS OF ENGINEERS PO BOX 1890 WILMINGTON NC 28402-1890 May 29, 2009 Regulatory Division Action ID. SAW-2009-00632 @ 162 JUN 2009 DENR - WATER QUALITY WETLANDS AND STORMWATER BRANCH Mr. Doug Huggett Division of Coastal Management N.C. Department of Environment and Natural Resources 400 Commerce Avenue Morehead City, North Carolina 28557-3421 Dear Mr. Huggett: Reference the application of the North Carolina Wildlife Resources Commission (NCWRC) for a Department of for expansion of the existing parking lot, reconstruction of the existing boat ramps, addition of a new launch lane, four floating docks with a wave attenuator and excavation of the channel boat ramp area at the existing NCWRC boat ramp facility, adjacent to the AIWW, at 3400 Arendell Street in Morehead City, Carteret County, North Carolina The Federal agencies have completed review of the proposal as presented by the application and your field investigation report. We recommend that the following conditions be included in the State authorization: 1. All work authorized by this permit must be performed in strict compliance with the attached plans, which are a part of this permit. Any modification to these plans must be approved by the U.S. Army Corps of Engineers (USACE) prior to implementation. 2. The permittee understands and agrees that, if future operations by the United States require the removal, relocation, or other alteration, of the structure or work herein authorized, or if, in the opinion of the Secretary of the Army or his authorized representative, said structure or work shall cause unreasonable obstruction to the free navigation of the navigable waters, the permittee will be required, upon due notice from the U.S. Army Corps of Engineers, to remove, relocate, or alter the structural work or obstructions caused thereby, without expense to the United States. No claim shall be made against the United States on account of any such removal, -2- relocation, or alteration. The permittee shall notify NOAA/NATIONAL OCEAN SERVICE Chief Source Data Unit N CS261, 1315 E West HWY- RM 7316, Silver Spring, MD 20910- 3282 at least two weeks prior to beginning work and upon completion of work. 3. Except as specified in the plans attached to this permit, no excavation, fill or mechanized land-clearing activities shall take place at any time in the construction or maintenance of this project, in such a manner as to impair normal flows and circulation patterns within waters or wetlands or to reduce the reach of waters or wetlands. 4. The docks and piers extending over wetlands will be elevated sufficiently (a minimum of 3 feet) above the wetland substrate to prevent total shading of vegetation, substrate, or other elements of the aquatic environment. 5. Except as authorized by this permit or any USACE approved modification to this permit, no excavation, fill or mechanized land-clearing activities shall take place at any time in the construction or maintenance of this project, within waters or wetlands. This permit does not authorize temporary placement or double handling of excavated or fill material within waters or wetlands outside the permitted area. This prohibition applies to all borrow and fill activities connected with this project. 6. Unless otherwise authorized by this permit, all fill material placed in waters or wetlands shall be generated from an upland source and will be clean and free of any pollutants except in trace quantities. Metal products, organic materials (including debris from land clearing activities), or unsightly debris will not be used. 7. All mechanized equipment will be regularly inspected and maintained to prevent contamination of waters and wetlands from fuels, lubricants, hydraulic fluids, or other toxic materials. In the event of a spill of petroleum products or any other hazardous waste, the permittee shall immediately report it to the N.C. Division of Water Quality at (919) 733-5083, Ext. 526 or (800) 662-7956 and provisions of the North Carolina Oil Pollution and Hazardous Substances Control Act will be followed. 8. The authorized structure and associated activity must not interfere with the public's right to free navigation on all navigable waters of the United States. No attempt will be made by the permittee to prevent the full and free use by the public of all navigable waters at or adjacent to the authorized work for reason other than safety. 9. The permittee must install and maintain, at his expense, any signal lights and signals prescribed by the U.S. Coast Guard, through regulations or otherwise, on authorized facilities. For further information, the permittee should contact the U.S. Coast Guard Marine Safety Office at (910) 772-2191. -5- Mr. David Rackley NMFS, Habitat Conservation Division 219 Fort Johnson Road Charleston, South Carolina 29412-9110 Mr. Ronald J. Mikulak, Chief Wetlands Regulatory Section Water Management Division U.S. Environmental Protection Agency 61 Forsyth Street, SW Atlanta, Georgia 30303 Commanding Officer U.S. Coast Guard Marine Safety Office 721 Medical Center Drive, Suite 100 Wilmington, North Carolina 28401-4895 Ms. Tere Barrett, District Manager Morehead City Regional Office N.C. Division of Coastal Management 400 Commerce Avenue Morehead City, North Carolina 28557-3421