Loading...
HomeMy WebLinkAbout20180647 Ver 1_401 Application_20180511Action History (UTC -05:00) Eastern Time (US & Canada) Submit by Anonymous User 5/11/2018 10:15:57 AM (Start Event) Accept by Montalvo, Sheri A 5/11/2018 10:42:59 AM (Non DOT Initial Review) The task was assigned to Montalvo, Sheri A. The due date is: May 16, 2018 5:00 PM 5/11/2018 10:17 AM DWR Dfutston of Water Resources Pre -Construction Notification (PCN) Form For Nationwide Permits and Regional General Permits (along with corresponding Water Quality Certifications) January 31, 2018 Ver 2.3 Please note: fields marked with a red asterisk below are required. You will not be able to submit the form until all mandatory questions are answered. Also, if at any point you wish to print a copy of the E -PCN, all you need to do is right -click on the document and you can print a copy of the form. Below is a link to the online help file. https://edocs. deq. nc.gov/WaterResources/0/edoc/624704/PCN%20Help%20File%202018-1-30. pdf A. Processing Information County (or Counties) where the project is located:* New Hanover Is this project a public transportation project?* r Yes G No This is any publicly funded by rrunicipal,state or federal funds road, rail, airport transportation project. 1a. Type(s) of approval sought from the Corps:* PF Section 404 Permit (wetlands, streams and waters, Clean Water Act) r Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act) 1b. What type(s) of permit(s) do you wish to seek authorization?* r% Nationwide Permit (NWP) r Regional General Permit (RGP) r Standard (IP) This form may be Corps to initiate the standard/individual permit process. Please contact your Corps representative for submittal of standard permits. All required items that are not provided in the E -PCN and be added to the miscellaneous upload located at the bottom of this form. Nationwide Permit (NWP) Number: 39 - Commercial/Institutional Developments NWP Number Other: List all WV nun-bers you are applying for not on the drop dow n list. 1c. Type(s) of approval sought from the DWR:* check all that apply 401 Water Quality Certification - Regular r 401 Water Quality Certification - Express r Non -404 Jurisdictional General Permit r Riparian Buffer Authorization r Individual Permit * 1d. Is this notification solelyfor the record because written approval is not required? For the record only for DWR 401 Certification: For the record only for Corps Permit: f Yes r No r Yes r No 1e. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? It so, attach the acceptance letter from nitigation bank or in -lieu fee program r Yes r No Acceptance Letter Attachment Click the upload button or drag and drop files here to attach docunent NECFUMB_Credit Reservation—MM Castle Hayne_May 10 2018.pdf 149.01 KB RLE TYPE N& ST BE RDF 1f. Is the project located in any of NC's twenty coastal counties?* r Yes r No 1g. Is the project located within a NC DCM Area of Environmental Concern (AEC)?* r Yes r No r Unknown 1h. Is the project located in a designated trout watershed?* r Yes r No Link to trout information: http://wwvv.saw.usace.army.miI/Missions/Regulatory-Permit-Program/Agency-Coordination/Trout.aspx B. Applicant Information 1a. Who is the Primary Contact?* Thomas Brown 1b. Primary Contact Email:* Thomas.Brown@Martinmarietta.com 1c. Primary Contact Phone:* (xxx)xxx-xxxx (919)268-5297 1d. Who is applying for the permit? W Owner r Applicant (other than owner) r Agent/Consultant (Check all that apply) 2. Owner Information 2a. Name(s) on recorded deed: Martin Marietta Materials Inc 2b. Deed book and page no.: BKO05298 PG000703 2c. Responsible party: (for Corporations) Larry Roberts, Mid -Atlantic Division President 2d. Address Street Address 2700 Wycliff Rd Address Line 2 Suite 104 City Raleigh Postal / Zip Code 27607 2e. Telephone Number: (XXX)XXX-XXXX 2f. Fax Number: (XXX)XXX-XXXX Email Address:* Thomas. Brown@martinmarietta.com State / Rovince / Plegion NC Country USA C. Project Information and Prior Project History 1. Project Information 1a. Name of project:* Castle Hayne Rail Yard, Rail Extension 1b. Subdivision name: (if appropriate) 1c. Nearest municipality / town: * Castle Hayne 1d. Driving directions* If it is a new project and can not easily be found in a GPS mapping system Rease provide directions. From Wilmington, take 1-40 West to 6dt 414. Turn Right onto Folly Shelter Rd. Turn Left onto Diamond Shamrock Rd. The office is on the left before the road curves to the right. 2. Project Identification 2a. Property Identification Number: (tax RN or parcel ID) R00600-001-004-000 2b. Property size: (in acres) 513 2c. Project Address Street Address 5408 Holly Shelter Rd Address Line 2 City State / Rovince / Fbgion Castle Hayne NC Fbstal / Zip Code (buntry 28429 USA 2d. Site coordinates in decimal degrees Please collect site coordinates in decimal degrees. Use between 4-6 digits (unless you are using a survey -grade GPS device) after the decimal place as appropriate, based on how the location was determined. (For example, most mobile phones with GPS provide locational precision in decimal degrees to map coordinates to 5 or 6 digits after the decimal place.) Latitude:* Longitude:* 34.373 -77.845 ex: 34.208504 -77.796371 3. Surface Waters 3a. Name of the nearest body of water to proposed project:* Cape Fear River 3b. Water Resources Classification of nearest receiving water:* B;Sw Surface Water Lookup 3c. What river basin(s) is your project located in?* Cape Fear River Basin Lookup 4. Project Description 4a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application:* The project area is a mixed pine forest located at the end of an existing rail line, near an existing quarry and aggregate sock pile and sales yard. General land use around this area could be described as heavy industrial and forested 4b. Attach an 8 1/2 X 11 excerpt from the most recent version of the USGS topographic map indicating the location of the project site. (for DWR) Click the upload button or drag and drop files here to attach docurrent USGS Map.pdf File type rrust be pdf 1.96MB 4c. Attach an 8 1/2 X 11 excerpt from the most recent version of the published County NRCS Soil Survey map depicting the project site. (for DWR) Click the upload button or drag and drop files here to attach docurrent Soil Map.pdf 563.43KB File type rrust be pdf 4d. List the total estimated acreage of all existing wetlands on the property: total for property is unknown. total for project area is approximately 0.5 acre 4e. List the total estimated linear feet of all existing streams on the property: (interrrittent and perennial) unknown 4f. Explain the purpose of the proposed project:* Martin Marietta currently operates a rail yard associated Wth this project where hard rock is brought in by rail from our Lemon Springs Quarry near Sanford, NC. This yard supplies granite aggregate to the southeastern NC market where only softer limestone can be mined. Martin Marietta is contracted with CSX to move this aggregate. The length of the existing rail line allows for 78 rail cars to be unloaded at the facility. In order to more efficiently haul this aggregate, CSX has Martin Marietta to increase the number or cars that we can unload from 78 to 82. 4g. Describe the overall project in detail, including indirect impacts and the type of equipment to be used:* Changing from 78 to 82 cars will require an extra 225 feet of track to be added to the end of the rail line. Also, Martin Marietta currently maintains its own locomotive at the site to load and unload the rail cars. Maintenance of this locomotive and the rail cars requires that we build a road on one side of the tracks large enough for a service truck to travel. The rail and road together will result in a 50 ft wide disturbance area. 4h. Please upload project drawings for the proposed project. Click the upload button or drag and drop files here to attach docurrent Wetland Impact Map.pdf 1.13MB 18.5.4.Proposed. Castle. Hayne.Rail. Section. pdf 108.02KB Proposed Rail System Expansion to 82 Cars- MMM -Castle Hayne 4-23-18.pdf 707.08KB File type rrust be pdf 5. Jurisdictional Determinations 5a. Have the wetlands or streams been delineated on the property or proposed impact areas? * r Yes r No r Unknown Comments: Martin Marietta has delineated the wetlands within the project area. 5b. If the Corps made a jurisdictional determination, what type of determination was made? * r Preliminary Corps AID Number: Example: SAM2017-99999 r Approved 5c. If 5a is yes, who delineated the jurisdictional areas? Name (if known): Agency/Consultant Company: Other: r Unknown Thomas Brown Martin Marietta r WA 5d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. 5dl. Jurisdictional determination upload Click the upload button or drag and drop files here to attach docurrent Approximate Wetland Map.pdf 1.14MB File type rrust be FDF 6. Project History 6a. Have permits or certifications been requested or obtained for this project (including all prior phases) in the past?* r Yes r No r Unknown 6b. If yes, please give the DWR Certification number or the Corps Action ID (exp. SAW -0000-00000). 200200835 Project History Upload Click the upload button or drag and drop files here to attach docurrent Castle Hayne NWP39 October 2002.pdf 3.49MB File type rrust be FDF 7. Future Project Plans 7a. Is this a phased project?* r Yes F No Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the proposed project or related activity? This includes other separate and distant crossing for linear projects that require Department of the Army authorization but don't require pre -construction notification. D. Proposed Impacts Inventory 1. Impacts Summary 1a. Where are the impacts associated with your project? (check all that apply): Wetlands r Streams -tributaries r Buffers rJ Open Waters r Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. Site # - Reason for impact* 2b. Impact type * 2c. Type of wetland * 2d. Wetland name *2e. 2f. Type of 2g. Impact Forested* Jurisdicition* area* Fill for Rail Crossing P Small -Basin Wetland F Yes Both 0.010 Nbp label (e.g. Fbad Crossing 1 - CLlvert, Fbrrranent (P) or (404, 10) or DM2(401, (acres) dewatering, etc) Tenporary (T) other) Fill for Rail Crossing P Small -Basin Wetland E Yes Both 0.001 Ivbp label (e.g. Road Crossing 1 - CLlvert, Fbrnanent (P) or (404, 10) or D VR(401, (acres) dewatering, etc) Terrporary (T) other) Fill for Rail Crossing P Small -Basin Wetland D Yes Both 0.057 Nbp label (e.g. Fbad Crossing 1 - CLlvert, Fbrrrenent (F) or (404, 10) or DhR(401, (acres) dewatering, etc) Tenporary (T) other) 2g. Total Temporary Wetland Impact 0.000 2g. Total Permanent Wetland Impact 0.068 2g. Total Wetland Impact 0.068 2h. Comments: Total proposed impact is 0.07 acres. Martin Marietta is proposing to mitigate for 0.1 acre at a 2:1 ratio. 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then individually list all open water impacts below. 4a. Site # - Reason for 4b. Impact type * 4c. Name of waterbody* impact* Rail crossing P Open Water Ditch Ivbp label (e.g. Fbad Crossing 1) Fbrrrenent (P) or (if applicable) Tenporary(T) 4g. Total temporary open water Impacts: 0.00 4g. Total permanent open water impacts: 0.01 4g. Total open water impacts: 4d. Activity type * 4e. Waterbody type *4f. Impact area Culverts Tributary 0.01 (acres) 0.01 4h. Comments: Actual impact will be 75 linear ft of open water ditch and closer to 0.005 acre E. Impact Justification and Mitigation 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project:* Martin Marietta has attempted to align this rail extension to minimize impacts to wetlands. The alignment of the ebsting track avoided impacts to wetland C which has more hydrology than the other smaller wetlands which we are proposing to impact. 1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques:* Martin Marietta will use appropriate sediment and erosion controls during construction. All exposed soil will be stabilized quickly. To the extent possible, work will occur during times of dry or low flow. No wetland clearing will occur outside of the proposed construction limits. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? r Yes r No 2c. If yes, mitigation is required by (check all that apply): F- DWR V Corps 2d. If yes, which mitigation option(s) will be used for this project? rJ Mitigation bank r- Payment to in -lieu fee program r Permittee Responsible Mitigation 3. Complete if Using a Mitigation Bank 3a. Name of Mitigation Bank: Northeast Cape Fear Umbrella Mitigation Bank 3b. Credits Purchased/ Requested (attach receipt and letter) Type: Quantity: Non -riparian wetland 0.2 Attach Receipt and/or letter pick the upload button or drag and drop files here to attach docurrent NECFUMB_Credit Reservation -MM Castle Hayne_May 10 2018.pdf 149.01 KB RLE TYPE M -6T BE FDF 3c. Comments F. Stormwater Management and Diffuse Flow Plan (required by DWR) *** Recent changes to the stormwater rules have required updates to this section .*** 1. Diffuse Flow Plan 1a. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? r Yes t: No For a list of options to meet the diffuse flow requirements, click here If no, explain why: Not located in a buffered basin 2. Stormwater Management Plan 2a. Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250?* r Yes r No 2b. Does this project meet the requirements for low density projects as defined in 15A NCAC 02H .1003(2)?* r Yes r No To look up low density requirement click here 15A NCAC 02H .1003(2). 2c. Does this project have a stormwater management plan (SMP) reviewed and approved under a state stormwater program or state - approved local government stormwater program?* r Yes r No Fant: projects that have vested rights, exemptions, or grandfathering from state or locally implemented stormwater programs or projects that satisfy state or locally-inplerrented stormwater programs through use of community in -lieu programs should answer no to this question. 2d. Which of the following stormwater management program(s) apply (check all that apply):* r- Local Government rJ State State Stormwater Programs* r- Phase II F Coastal Counties F- HWQ or ORW rJ Other NPDES General Permit NCG020000 G. Supplementary Information 1. Environmental Documentation 1a. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land?* r Yes t: No 2. Violations (DWR Requirement) 2a. Is the site in violation of DWR Water Quality Certification Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), or DWR Surface Water or Wetland Standards or Riparian Buffer Rules (15A NCAC 2B .0200)? * r Yes F No 2b. Is this an after -the -fact permit application?* r Yes r No 3. Cumulative Impacts (DWR Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in additional development, which could impact nearby downstream water quality?* r Yes r No 3b. If you answered "no," provide a short narrative description. The project will not cause any additional development. The project will allow stone to be moved to our Castle Hayne Rail yard more efficiently. 4. Sewage Disposal (DWR Requirement) 4a. Is sewage disposal required by DWR for this project? r Yes r Nor N/A 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or habitat? r Yes G No 5b. Have you checked with the USFWS concerning Endangered Species Act impacts?* r Yes r No 5d. Is another Federal agency involved?* r Yes r No r Unknown 5e. Is this a DOT project located within Division's 1-8?* r Yes G No 5f. Will you cut any trees in order to conduct the work in waters of the U.S.? F Yes r No 5g. Does this project involve bridge maintenance or removal? r Yes G No Link to the NLEB SLOPES document: http://saw-reg.usace.army.mil/NLEB/1-30-17-signed_NLEB-SLOPES&apps.pdf 5h. Does this project involve the construction/installation of a wind turbine(s)?* r Yes F No 5i. Does this project involve (1) blasting, and/or (2) other percussive activities that will be conducted by machines, such as jackhammers, mechanized pile drivers, etc.? r Yes r No 5j. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? Natural Heritage Program. Letter attached 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as an Essential Fish Habitat?* r Yes r No 6b. What data sources did you use to determine whether your site would impact an Essential Fish Habitat?* Natural Heritage Program 7. Historic or Prehistoric Cultural Resources (Corps Requirement) Link to the State Historic Preservation Office Historic Properties Map (does not include archaeological data: http://gis.ncdcr.gov/hpoweb/ 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)?* r Yes r No 7b. What data sources did you use to determine whether your site would impact historic or archeological resources?* Site visit and State Historic Preservation Society Office Historic properties online map 7c. Historic or Prehistoric Information Upload Click the upload button or drag and drop files here to attach docurrent File rrust be FDF 8. Flood Zone Designation (Corps Requirement) Link to the FEMA Floodplain Maps: https://msc.fema.gov/portal/search 8a. Will this project occur in a FEMA -designated 100 -year floodplain?* r Yes G No 8c. What source(s) did you use to make the floodplain determination?* New Hanover County GIS Miscellaneous Miscellaneous attachments not previously requested. Click the upload button or drag and drop files here to attach docurrent Vicinity Map.pdf 379.63KB project _report _castle_hayne_rail_12302_12302.pdf 1.19MB File crust be FDF or WE Signature 17 By checking the box and signing below, I certify that: ■ I have given true, accurate, and complete information on this form; ■ I agree that submission of this PCN form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act'); ■ I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act'); ■ I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND ■ I intend to electronically sign and submit the PCN form. Full Name:* Thomas Brown Signature A" Piows, Initial Review Is this project a public transportation project?* (? f Yes r No Change only if needed. Has this project met the requirements for acceptance in to the review process?* r Yes r No BIMS # Assigned * 20180647 Version#* 1 Reviewing Office* Wilmington Regional Office - (910) 796-7215 Select Project Reviewer* Chad Coburn:eads\cccoburn Is a payment required for this project?* r No payment required r Fee received G Fee needed - send electronic notification What amout is owed? F $240.00 * $570.00