Pre -Construction Notification (PCN) Form
For Nationwide Permits and Regional General Permits
(along with corresponding Water Quality Certifications)
January 31, 2018 Ver 2.3
Please note: fields marked with a red asterisk below are required. You will not be able to submit the form until all mandatory questions are answered.
Also, if at any point you wish to print a copy of the E -PCN, all you need to do is right -click on the document and you can print a copy of the form.
Below is a link to the online help file.
https://edocs. deq. nc.gov/WaterResources/0/edoc/624704/PCN%20Help%20File%202018-1-30. pdf
A. Processing Information
County (or Counties) where the project is located:*
New Hanover
Is this project a public transportation project?*
r Yes G No
This is any publicly funded by rrunicipal,state or federal funds road, rail, airport transportation project.
1a. Type(s) of approval sought from the Corps:*
PF Section 404 Permit (wetlands, streams and waters, Clean Water Act)
r Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act)
1b. What type(s) of permit(s) do you wish to seek authorization?*
r% Nationwide Permit (NWP)
r Regional General Permit (RGP)
r Standard (IP)
This form may be Corps to initiate the standard/individual permit process. Please contact your Corps representative for submittal of standard permits.
All required items that are not provided in the E -PCN and be added to the miscellaneous upload located at the bottom of this form.
Nationwide Permit (NWP) Number: 39 - Commercial/Institutional Developments
NWP Number Other:
List all WV nun-bers you are applying for not on the drop dow n list.
1c. Type(s) of approval sought from the DWR:*
check all that apply
401 Water Quality Certification - Regular r 401 Water Quality Certification - Express
r Non -404 Jurisdictional General Permit r Riparian Buffer Authorization
r Individual Permit
*
1d. Is this notification solelyfor the record because written approval is not required?
For the record only for DWR 401 Certification:
For the record only for Corps Permit:
f Yes r No
r Yes r No
1e. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts?
It so, attach the acceptance letter from nitigation bank or in -lieu fee program
r Yes r No
Acceptance Letter Attachment
Click the upload button or drag and drop files here to attach docunent
NECFUMB_Credit Reservation—MM Castle Hayne_May 10 2018.pdf 149.01 KB
RLE TYPE N& ST BE RDF
1f. Is the project located in any of NC's twenty coastal counties?*
r Yes r No
1g. Is the project located within a NC DCM Area of Environmental Concern (AEC)?*
r Yes r No r Unknown
1h. Is the project located in a designated trout watershed?*
r Yes r No
Link to trout information: http://wwvv.saw.usace.army.miI/Missions/Regulatory-Permit-Program/Agency-Coordination/Trout.aspx
B. Applicant Information
1a. Who is the Primary Contact?*
Thomas Brown
1b. Primary Contact Email:*
Thomas.Brown@Martinmarietta.com
1c. Primary Contact Phone:*
(xxx)xxx-xxxx
(919)268-5297
1d. Who is applying for the permit?
W Owner r Applicant (other than owner) r Agent/Consultant
(Check all that apply)
2. Owner Information
2a. Name(s) on recorded deed:
Martin Marietta Materials Inc
2b. Deed book and page no.:
BKO05298 PG000703
2c. Responsible party:
(for Corporations)
Larry Roberts, Mid -Atlantic Division President
2d. Address
Street Address
2700 Wycliff Rd
Address Line 2
Suite 104
City
Raleigh
Postal / Zip Code
27607
2e. Telephone Number:
(XXX)XXX-XXXX
2f. Fax Number:
(XXX)XXX-XXXX
Email Address:*
Thomas. Brown@martinmarietta.com
State / Rovince / Plegion
NC
Country
USA
C. Project Information and Prior Project History
1. Project Information
1a. Name of project:*
Castle Hayne Rail Yard, Rail Extension
1b. Subdivision name:
(if appropriate)
1c. Nearest municipality / town:
*
Castle Hayne
1d. Driving directions*
If it is a new project and can not easily be found in a GPS mapping system Rease provide directions.
From Wilmington, take 1-40 West to 6dt 414. Turn Right onto Folly Shelter Rd. Turn Left onto Diamond Shamrock Rd. The office is on the
left before the road curves to the right.
2. Project Identification
2a. Property Identification Number:
(tax RN or parcel ID)
R00600-001-004-000
2b. Property size:
(in acres)
513
2c. Project Address
Street Address
5408 Holly Shelter Rd
Address Line 2
City
State / Rovince / Fbgion
Castle Hayne
NC
Fbstal / Zip Code
(buntry
28429
USA
2d. Site coordinates in decimal degrees
Please collect site coordinates in decimal degrees. Use between 4-6 digits (unless you are using a survey -grade GPS device) after the decimal place as
appropriate, based on how the location was determined. (For example, most mobile phones with GPS provide locational precision in decimal degrees to
map coordinates to 5 or 6 digits after the decimal place.)
Latitude:* Longitude:*
34.373 -77.845
ex: 34.208504 -77.796371
3. Surface Waters
3a. Name of the nearest body of water to proposed project:*
Cape Fear River
3b. Water Resources Classification of nearest receiving water:*
B;Sw
Surface Water Lookup
3c. What river basin(s) is your project located in?*
Cape Fear
River Basin Lookup
4. Project Description
4a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application:*
The project area is a mixed pine forest located at the end of an existing rail line, near an existing quarry and
aggregate sock pile and sales yard. General land use around this area could be described as heavy industrial and
forested
4b. Attach an 8 1/2 X 11 excerpt from the most recent version of the USGS topographic map indicating the location of the project site. (for
DWR)
Click the upload button or drag and drop files here to attach docurrent
USGS Map.pdf
File type rrust be pdf
1.96MB
4c. Attach an 8 1/2 X 11 excerpt from the most recent version of the published County NRCS Soil Survey map depicting the project site.
(for DWR)
Click the upload button or drag and drop files here to attach docurrent
Soil Map.pdf 563.43KB
File type rrust be pdf
4d. List the total estimated acreage of all existing wetlands on the property:
total for property is unknown. total for project area is approximately 0.5 acre
4e. List the total estimated linear feet of all existing streams on the property:
(interrrittent and perennial)
unknown
4f. Explain the purpose of the proposed project:*
Martin Marietta currently operates a rail yard associated Wth this project where hard rock is brought in by rail from
our Lemon Springs Quarry near Sanford, NC. This yard supplies granite aggregate to the southeastern NC market
where only softer limestone can be mined. Martin Marietta is contracted with CSX to move this aggregate. The
length of the existing rail line allows for 78 rail cars to be unloaded at the facility. In order to more efficiently haul
this aggregate, CSX has Martin Marietta to increase the number or cars that we can unload from 78 to 82.
4g. Describe the overall project in detail, including indirect impacts and the type of equipment to be used:*
Changing from 78 to 82 cars will require an extra 225 feet of track to be added to the end of the rail line. Also,
Martin Marietta currently maintains its own locomotive at the site to load and unload the rail cars. Maintenance of
this locomotive and the rail cars requires that we build a road on one side of the tracks large enough for a service
truck to travel. The rail and road together will result in a 50 ft wide disturbance area.
4h. Please upload project drawings for the proposed project.
Click the upload button or drag and drop files here to attach docurrent
Wetland Impact Map.pdf 1.13MB
18.5.4.Proposed. Castle. Hayne.Rail. Section. pdf 108.02KB
Proposed Rail System Expansion to 82 Cars- MMM -Castle Hayne 4-23-18.pdf 707.08KB
File type rrust be pdf
5. Jurisdictional Determinations
5a. Have the wetlands or streams been delineated on the property or proposed impact areas? *
r Yes r No r Unknown
Comments:
Martin Marietta has delineated the wetlands within the project area.
5b. If the Corps made a jurisdictional determination, what type of determination was made? *
r Preliminary
Corps AID Number:
Example: SAM2017-99999
r Approved
5c. If 5a is yes, who delineated the jurisdictional areas?
Name (if known):
Agency/Consultant Company:
Other:
r Unknown
Thomas Brown
Martin Marietta
r WA
5d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation.
5dl. Jurisdictional determination upload
Click the upload button or drag and drop files here to attach docurrent
Approximate Wetland Map.pdf 1.14MB
File type rrust be FDF
6. Project History
6a. Have permits or certifications been requested or obtained for this project (including all prior phases) in the past?*
r Yes r No r Unknown
6b. If yes, please give the DWR Certification number or the Corps Action ID (exp. SAW -0000-00000).
200200835
Project History Upload
Click the upload button or drag and drop files here to attach docurrent
Castle Hayne NWP39 October 2002.pdf 3.49MB
File type rrust be FDF
7. Future Project Plans
7a. Is this a phased project?*
r Yes F No
Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the
proposed project or related activity? This includes other separate and distant crossing for linear projects that require Department of the
Army authorization but don't require pre -construction notification.
D. Proposed Impacts Inventory
1. Impacts Summary
1a. Where are the impacts associated with your project? (check all that apply):
Wetlands r Streams -tributaries r Buffers
rJ Open Waters r Pond Construction
2. Wetland Impacts
If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted.
2a. Site # - Reason for impact*
2b. Impact type *
2c. Type of wetland *
2d. Wetland name
*2e.
2f. Type of
2g. Impact
Forested*
Jurisdicition*
area*
Fill for Rail Crossing
P
Small -Basin Wetland
F
Yes
Both
0.010
Nbp label (e.g. Fbad Crossing 1 - CLlvert,
Fbrrranent (P) or
(404, 10) or DM2(401,
(acres)
dewatering, etc)
Tenporary (T)
other)
Fill for Rail Crossing
P
Small -Basin Wetland
E
Yes
Both
0.001
Ivbp label (e.g. Road Crossing 1 - CLlvert,
Fbrnanent (P) or
(404, 10) or D VR(401,
(acres)
dewatering, etc)
Terrporary (T)
other)
Fill for Rail Crossing
P
Small -Basin Wetland
D
Yes
Both
0.057
Nbp label (e.g. Fbad Crossing 1 - CLlvert,
Fbrrrenent (F) or
(404, 10) or DhR(401,
(acres)
dewatering, etc)
Tenporary (T)
other)
2g. Total Temporary Wetland Impact
0.000
2g. Total Permanent Wetland Impact
0.068
2g. Total Wetland Impact
0.068
2h. Comments:
Total proposed impact is 0.07 acres. Martin Marietta is proposing to mitigate for 0.1 acre at a 2:1 ratio.
4. Open Water Impacts
If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then individually list
all open water impacts below.
4a. Site # - Reason for 4b. Impact type * 4c. Name of waterbody*
impact*
Rail crossing P Open Water Ditch
Ivbp label (e.g. Fbad Crossing 1) Fbrrrenent (P) or (if applicable)
Tenporary(T)
4g. Total temporary open water Impacts:
0.00
4g. Total permanent open water impacts:
0.01
4g. Total open water impacts:
4d. Activity type * 4e. Waterbody type *4f. Impact
area
Culverts Tributary 0.01
(acres)
0.01
4h. Comments:
Actual impact will be 75 linear ft of open water ditch and closer to 0.005 acre
E. Impact Justification and Mitigation
1. Avoidance and Minimization
1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project:*
Martin Marietta has attempted to align this rail extension to minimize impacts to wetlands. The alignment of the
ebsting track avoided impacts to wetland C which has more hydrology than the other smaller wetlands which we
are proposing to impact.
1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques:*
Martin Marietta will use appropriate sediment and erosion controls during construction. All exposed soil will be
stabilized quickly. To the extent possible, work will occur during times of dry or low flow. No wetland clearing will
occur outside of the proposed construction limits.
2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State
2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State?
r Yes r No
2c. If yes, mitigation is required by (check all that apply):
F- DWR V Corps
2d. If yes, which mitigation option(s) will be used for this project?
rJ Mitigation bank r- Payment to in -lieu fee program r Permittee Responsible Mitigation
3. Complete if Using a Mitigation Bank
3a. Name of Mitigation Bank:
Northeast Cape Fear Umbrella Mitigation Bank
3b. Credits Purchased/ Requested (attach receipt and letter)
Type: Quantity:
Non -riparian wetland 0.2
Attach Receipt and/or letter
pick the upload button or drag and drop files here to attach docurrent
NECFUMB_Credit Reservation -MM Castle Hayne_May 10 2018.pdf 149.01 KB
RLE TYPE M -6T BE FDF
3c. Comments
F. Stormwater Management and Diffuse Flow Plan (required by DWR)
*** Recent changes to the stormwater rules have required updates to this section .***
1. Diffuse Flow Plan
1a. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection
Rules?
r Yes t: No
For a list of options to meet the diffuse flow requirements, click here
If no, explain why:
Not located in a buffered basin
2. Stormwater Management Plan
2a. Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250?*
r Yes r No
2b. Does this project meet the requirements for low density projects as defined in 15A NCAC 02H .1003(2)?*
r Yes
r No
To look up low density requirement click here 15A NCAC 02H .1003(2).
2c. Does this project have a stormwater management plan (SMP) reviewed and approved under a state stormwater program or state -
approved local government stormwater program?*
r Yes
r No
Fant: projects that have vested rights, exemptions, or grandfathering from state or locally implemented stormwater programs or projects that satisfy state or locally-inplerrented stormwater programs
through use of community in -lieu programs should answer no to this question.
2d. Which of the following stormwater management program(s) apply (check all that apply):*
r- Local Government
rJ State
State Stormwater Programs*
r- Phase II
F Coastal Counties
F- HWQ or ORW
rJ Other NPDES General Permit NCG020000
G. Supplementary Information
1. Environmental Documentation
1a. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land?*
r Yes t: No
2. Violations (DWR Requirement)
2a. Is the site in violation of DWR Water Quality Certification Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), or
DWR Surface Water or Wetland Standards or Riparian Buffer Rules (15A NCAC 2B .0200)? *
r Yes F No
2b. Is this an after -the -fact permit application?*
r Yes r No
3. Cumulative Impacts (DWR Requirement)
3a. Will this project (based on past and reasonably anticipated future impacts) result in additional development, which could impact
nearby downstream water quality?*
r Yes r No
3b. If you answered "no," provide a short narrative description.
The project will not cause any additional development. The project will allow stone to be moved to our Castle
Hayne Rail yard more efficiently.
4. Sewage Disposal (DWR Requirement)
4a. Is sewage disposal required by DWR for this project?
r Yes r Nor N/A
5. Endangered Species and Designated Critical Habitat (Corps Requirement)
5a. Will this project occur in or near an area with federally protected species or habitat?
r Yes G No
5b. Have you checked with the USFWS concerning Endangered Species Act impacts?*
r Yes r No
5d. Is another Federal agency involved?*
r Yes r No r Unknown
5e. Is this a DOT project located within Division's 1-8?*
r Yes G No
5f. Will you cut any trees in order to conduct the work in waters of the U.S.?
F Yes r No
5g. Does this project involve bridge maintenance or removal?
r Yes G No
Link to the NLEB SLOPES document: http://saw-reg.usace.army.mil/NLEB/1-30-17-signed_NLEB-SLOPES&apps.pdf
5h. Does this project involve the construction/installation of a wind turbine(s)?*
r Yes F No
5i. Does this project involve (1) blasting, and/or (2) other percussive activities that will be conducted by machines, such as jackhammers,
mechanized pile drivers, etc.?
r Yes r No
5j. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat?
Natural Heritage Program. Letter attached
6. Essential Fish Habitat (Corps Requirement)
6a. Will this project occur in or near an area designated as an Essential Fish Habitat?*
r Yes r No
6b. What data sources did you use to determine whether your site would impact an Essential Fish Habitat?*
Natural Heritage Program
7. Historic or Prehistoric Cultural Resources (Corps Requirement)
Link to the State Historic Preservation Office Historic Properties Map (does not include archaeological data: http://gis.ncdcr.gov/hpoweb/
7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural
preservation status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)?*
r Yes r No
7b. What data sources did you use to determine whether your site would impact historic or archeological resources?*
Site visit and State Historic Preservation Society Office Historic properties online map
7c. Historic or Prehistoric Information Upload
Click the upload button or drag and drop files here to attach docurrent
File rrust be FDF
8. Flood Zone Designation (Corps Requirement)
Link to the FEMA Floodplain Maps: https://msc.fema.gov/portal/search
8a. Will this project occur in a FEMA -designated 100 -year floodplain?*
r Yes G No
8c. What source(s) did you use to make the floodplain determination?*
New Hanover County GIS
Miscellaneous
Miscellaneous attachments not previously requested.
Click the upload button or drag and drop files here to attach docurrent
Vicinity Map.pdf 379.63KB
project _report _castle_hayne_rail_12302_12302.pdf 1.19MB
File crust be FDF or WE
Signature
17 By checking the box and signing below, I certify that:
■ I have given true, accurate, and complete information on this form;
■ I agree that submission of this PCN form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic
Transactions Act');
■ I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic
Transactions Act');
■ I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND
■ I intend to electronically sign and submit the PCN form.
Full Name:*
Thomas Brown
Signature
A" Piows,
Initial Review
Is this project a public transportation project?* (?
f Yes r No
Change only if needed.
Has this project met the requirements for acceptance in to the review process?*
r Yes
r No
BIMS # Assigned *
20180647
Version#*
1
Reviewing Office*
Wilmington Regional Office - (910) 796-7215
Select Project Reviewer*
Chad Coburn:eads\cccoburn
Is a payment required for this project?*
r No payment required
r Fee received
G Fee needed - send electronic notification
What amout is owed?
F $240.00
* $570.00