Loading...
HomeMy WebLinkAbout20180645 Ver 1_U03079-Section 1-Grimesland Bridge Rd Ext (5-8-18)_20180511© 2018 Microsoft Corporation © 2018 HERE Utility Owner: Conterra Ultra BroadbandUtilis Project Number: U03079Utilis Project Name: Section 1 - Grimesland Bridge Rd ExtAddress: 524 Cherry St, Greenville, NC 27834CONTACTSSHEET INDEXUtility Owner: Conterra Ultra Broadband2101 Rexford Rd, Suite 200E, Charlotte, NC 28211David Warden - VP Fiber Development(704) 936-1800dwarden@conterra.comPaul Jordan - Project Manager(704) 291-3636pjordan@conterra.comA - COVER SHEET/SITE LOCATIONB - LEGENDC - GENERAL NOTESD - RAKEOFF TABLEE-I - TYPICALS1-73 - PROJECT SHEETSPROJECT MANAGER:PROJECT ENGINEER:PROJECT NUMBER:DESCRIPTION:U03079-Section 1-Grimesland Bridge Rd Ext (5-8-18).dwgOWNER/DEVELOPER:ENGINEER:REVDESCRIPTIONDATESHEET TITLE:CONFIDENTIAL/PROPRIETARYSHEET:DRAWING NAME:PE SEAL:UTILIS ENGINEERING, INC.2033 CROSS BEAM DR.CHARLOTTE, NC 28217ofJUSTIN RICEJUSTIN RICEU03079GRIMESLAND BRIDGE RD EXT73PROJECT DESCRIPTION0ORIGINAL2-28-18ACOVER SHEETKnow what's belowCall before you dig.R12345678910111213141516171819202122232425262728293031323334353637383940414243444546474849505152535455565758596061626364656667686970717273Place 42,596 linear feet of (1) 72-count armored fiber optic cable inside of(1) 1.25" HDPE SDR 13.5 conduit along project route. MANUFACTURERNAMEVAULT-VAULTOWNERIDOWNER111111#F#F#FHH-HANDHOLEOWNERMH-MANHOLEOWNERPB-PULLBOXOWNERLEGENDENGINEER:CONFIDENTIAL/PROPRIETARYUTILIS ENGINEERING, INC.2033 CROSS BEAM DR.CHARLOTTE, NC 28217of73PROJECT MANAGER:PROJECT ENGINEER:PROJECT NUMBER:DESCRIPTION:U03079-Section 1-GrimeslandBridge Rd Ext (5-8-18).dwgSHEET TITLE:SHEET:DRAWING NAME:JUSTIN RICEJUSTIN RICEU03079GRIMESLAND BRIDGE RD EXT0-BLEGEND GENERAL NOTESCONTRACTOR MUST OBTAIN LOCATES PRIOR TO DISTURBING THE GROUND.CONTRACTOR MUST HAVE A COPY OF THE APPROVED PERMIT FROM THE APPROPRIATE AGENCY ON THE JOBSITE AT ALL TIMES.ALL CABLE WILL BE PLACED AT A MINIMUM DEPTH OF 36" DEEP UNLESS OTHERWISE DIRECTED BY A REPRESENTATIVE OF THEUTILITY OWNER.ANY LANDSCAPING WILL BE REPLACED TO EQUAL OR BETTER THAN THAT WHICH EXISTED PRIOR TO WORK.PROJECT SITE WILL BE PROPERLY SECURED PRIOR TO THE END OF EACH DAY.ALL WORK IS TO BE IN ACCORDANCE WITH ALL AUTHORITIES HAVING JURISDICTION IN THE WORK ZONE.CONTRACTORS ARE ADVISED TO CONTACT THE PROJECT MANAGER FOR ANY ADDITIONAL INFORMATION OR CLARIFICATIONCONCERNING SCOPE OF WORK OR THE REQUIREMENTS NECESSARY FOR PROJECT COMPLETION.CONTRACTOR IS RESPONSIBLE TO FIELD VERIFY ALL DIMENSIONS, QUANTITIES AND EXISTING CONDITIONS PRIOR TOCONSTRUCTION. IF A SIGNIFICANT CHANGE TO THE RUNNING LINE IS NEEDED, PLEASE CONTACT THE PROJECT MANAGERBEFORE PROCEEDING.BEFORE CONSTRUCTION BEGINS, CONTRACTOR SHALL TAKE APPROPRIATE PRECAUTIONS TO AVOID ANY POTENTIALOBSTRUCTIONS PRIOR TO PROCEEDING WITH WORK.NO CONSTRUCTION ON PRIVATE PROPERTY WILL COMMENCE UNTIL APPROVAL IS GIVEN BY A REPRESENTATIVE OF THE UTILITYOWNER.CONTRACTOR SHALL NOT PROCEED WITH WORK UNTIL THEY HAVE RECEIVED A PURCHASE ORDER AND HAVE BEEN DIRECTEDTO DO SO BY AN AUTHORIZED REPRESENTATIVE OF THE UTILITY OWNER.CONTRACTOR SHALL NOT EXCEED THE PURCHASE ORDER VALUE WITHOUT AUTHORIZATION IN WRITING FROM THEAPPROPRIATE REPRESENTATIVE OF THE UTILITY OWNER.AS-BUILTS WILL BE REQUIRED FOR EACH PROJECT INCLUDING CABLE FOOTAGE SEQUENTIALS AT EVERY ACCESS POINT, SLACKLOOP, SPLICE LOCATION, POLE AND TERMINATION POINT. CONTRACTOR SHOULD ALSO PROVIDE NOTES OF ALL CHANGES INDEPTHS, RUNNING LINES, MH/HH LOCATIONS, AND ANY OTHER APPLICABLE NOTES TO DEPICT THE WORK THAT TOOK PLACE.NOTE: ALL MAJOR CHANGES NEED TO BE PRE-APPROVED BY AN AUTHORIZED REPRESENTATIVE OF THE UTILITY COMPANYPRIOR TO STARTING THE WORK.SITE CONDITIONSTHE ACTUAL LOCATION OF EXISTING CONDUIT AND CABLES MAY VARY FROM THE LOCATION SHOWN. REPAIR OF ANYDAMAGED CONDUIT CONTAINING CABLE SHALL BE MADE BY USE OF PVC SPLIT DUCT. THE CONTRACTOR SHALL ENCLOSE THEEXISTING CABLES IN PVC.THE LOCATIONS OF EXISTING UTILITIES SHOWN IN THIS PLAN ARE APPROXIMATE. WHEN WORK IS TO BE CONDUCTED IN THEVICINITY OF KNOWN UTILITIES, THEIR ACTUAL LOCATION MUST BE FIELD VERIFIED TO AVOID CONFLICTS OR DAMAGE TO THOSEUTILITIES. VARIATION IN LOCATION BETWEEN "RECORDED POSITIONS" AND ACTUAL POSITIONS SHOULD BE ANTICIPATED.IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO VERIFY THE LOCATION OF ALL UNDERGROUND UTILITIES. BURIED UTILITIESMAY EXIST IN THE AREA IN ADDITION TO THOSE SHOWN ON THE PLAN. THE CONTRACTOR SHALL CONTACT PROPERTY OWNERSWHEN WORKING WITHIN PRIVATE EASEMENTS FOR LOCATION OF UNDERGROUND TANKS, PIPELINES, DRAIN TILES, OR OTHERBURIED IMPROVEMENTS. THE CONTRACTOR SHALL ALSO NOTIFY THE UTILITY NOTIFICATION CENTER PRIOR TO COMMENCINGANY CONSTRUCTION ACTIVITIES.THE CONTRACTOR MUST ASSUME ALL BURIED UTILITIES ENCOUNTERED ARE ALIVE AND ACTIVE UNLESS SPECIFICALLYINSTRUCTED OTHERWISE BY OWNERS OR OPERATORS OF SAID UTILITIES.DAMAGE TO SUB-SURFACE STRUCTURES IS THE SOLE RESPONSIBILITY OF THE PLACING CONTRACTOR.THE CONTRACTOR SHALL PROTECT THE EXISTING TRAFFIC CONTROL LOOPS. IF EXISTING TRAFFIC CONTROL LOOPS AREDAMAGED DURING CONSTRUCTION, THE ENTIRE LOOP WIRE FROM TERMINAL TO TERMINAL SHALL BE REPLACED INACCORDANCE WITH GOVERNING AGENCY STANDARDS AND REGULATIONS AT CONTRACTOR'S EXPENSE.REMOVAL OF EXISTING ASPHALT PAVEMENT, CONCRETE CURBS, AND CONCRETE SIDEWALKS WILL BE "NEAT LINE" WITH SAWOR PAVEMENT CUTTER, PER REQUIREMENTS AND SPECIFICATIONS OF THE AGENCY OR DEPARTMENT RESPONSIBLE FOR EACHLOCATION. IF CONCRETE PAVEMENT IS ENCOUNTERED WHILE EXCAVATING CONDUIT TRENCHES, THE CONCRETE REMOVALWILL BE "NEAT LINE" WITH A PAVEMENT SAW.IF CONCRETE CURB RETURNS AND/OR SIDEWALKS ARE REPLACED DUE TO CONDUIT OR MANHOLE INSTALLATION, THECONTRACTOR SHALL PLACE APPROVED HANDICAPPED SIDEWALK AND CURB ACCESS RAMPS IN CONFORMANCE WITH THEAPPROPRIATE STATE STATUTES.ALL MATERIALS NECESSARY FOR THE REPAIR OF STREETS, CURBS, SIDEWALKS, SANITARY SEWERS, STORM SEWERS, AND PUBLICSERVICE UTILITIES, AND THE INSTALLATION OF SUCH MATERIALS SHALL BE IN CONFORMANCE WITH THE REQUIREMENTS ANDSPECIFICATIONS OF THE AGENCY OR DEPARTMENT RESPONSIBLE FOR THE OPERATION AND MAINTENANCE OF THE REPAIREDFACILITY.ALL WORK SHALL CONFORM TO THE SPECIFICATIONS OF THE JURISDICTIONAL PERMIT AGENCY.ALL OPEN TRENCH WILL BE CLEARLY MARKED WITH BARRICADES OR CONES. STEEL PLATES OR OTHER TYPES OF BRIDGING SHALLBE PROVIDED TO COVER OPEN TRENCH IN THE TRAVEL PORTION OF THE STREETS. THESE PLATES OR BRIDGING SHALL BEADEQUATE TO SUPPORT THE NORMAL VEHICLE LOADS ANTICIPATED IN THIS AREA AND SHALL BE IN PLACE DURING ALLNON-WORKING AREAS.ALL SURFACES TO BE RESTORED TO ORIGINAL CONDITION, AND BACKFILL TO BE COMPACTED AS SPECIFIED. TRENCHEXCAVATION IN SURFACES WHICH INCLUDE CONCRETE TREATED BASE SHALL FOLLOW LOCAL AREA SPECIFICATIONS.HAZARDOUS MATERIALSTHE CONTRACTOR SHALL NOTIFY THE JURISDICTIONAL PERMIT AGENCY IMMEDIATELY IF ANY MATERIALS ARE ENCOUNTEREDTHAT ARE CONSIDERED HAZARDOUS BY THE EPA, DEQ, OR OSHA. IF POTENTIALLY HAZARDOUS MATERIALS ARE ENCOUNTEREDTHE CONTRACTOR SHALL SECURE THE SITE AND PREVENT THE ACCIDENTAL EXPOSURE BY THE PUBLIC OR THE CONTRACTOR'SPERSONNEL.THE CONTRACTOR MAY EXCAVATE UP TO, BUT SHALL NOT DISTURB KNOWN HAZARDOUS MATERIALS SUCH AS ASBESTOS, OILS,ACID, ETC. THE REMOVAL OF ALL HAZARDOUS MATERIALS MUST BE DONE BY AN APPROVED OR CERTIFIED HAZARDOUSMATERIALS CONTRACTOR LICENSED IN THE APPROPRIATE STATE.A COPY OF ALL CORRESPONDENCE PERTINENT TO THE REMOVAL OF HAZARDOUS MATERIALS SHALL BE TRANSMITTED TOOWNER AND A COPY SHALL BE AVAILABLE AT THE PROJECT OFFICE AND THE JOB SITE.AERIAL NOTES·AERIAL CONSTRUCTION TO BE PERFORMED TO INDUSTRY ACCEPTABLE STANDARDS.·ALL HEIGHTS OF CABLE PLACEMENT WILL BE RECORDED AT TIME OF CONSTRUCTION. DOCUMENT ALL POINTS OFATTACHMENT.·ALL EXTENSION ARMS TO BE PLACED WILL BE EPOXY ARMS UNLESS OTHERWISE NOTED OR APPROVED BY THE INSPECTOR.·BOND STRAND TO POWER MGN WHERE APPLICABLE. ANCHORS TO BE USED WILL BE 3/4 SCREW IN TYPE.·ALL STRAPS WILL BE PLACED 4" BEFORE AND AFTER EVERY SUPPORTING CLAMP AT A MINIMUM OF 21" APART.·P.O.A. = POINT OF ATTACHMENT.·ADD MISSING GROUNDS.·REPAIR/REPLACE EXISTING LASHING WIRE IF DAMAGED.CONSTRUCTION STAKINGIN AREAS WHERE THE CONDUIT ALIGNMENT IS NOT CLEARLY DEFINED BY CURB LINES, FENCE LINES, OR OTHER EVIDENCE OFTHE RIGHT-OF-WAY, THE ENGINEER WILL PROVIDE CENTERLINE STAKES OR PAINT MARKS WHERE REQUIRED TO MAKE THEPROPOSED CONDUIT ALIGNMENT EVIDENT.MANHOLE CENTERS WILL BE FIELD STAKED BY THE ENGINEER WHEN REQUESTED WITH OFFSET STAKES AT RIGHT ANGLES (90°)TO THE CONDUIT ALIGNMENT.CLOSURES IDENTIFIED IN THE PLANS SHALL BE LOCATED BY THE CONTRACTOR. DEVIATION FROM PLAN LAYOUT SHALL BEAPPROVED BY THE ENGINEER PRIOR TO CONDUIT AND/OR CLOSURE INSTALLATION.IF ADDITIONAL, FIELD STAKING OR LOCATION OF CONDUITS, MANHOLES, PROPERTY LINES, ETC., BECOMES NECESSARY, THECONTRACTOR IS TO NOTIFY THE INSPECTOR OR THE ENGINEER TWO WORKING DAYS PRIOR TO BEGINNING THE WORK.PERMITS - FRANCHISES - EASEMENTSPHYSICAL WORK SHALL NOT BE STARTED UNTIL THE GOVERNING AGENCY INSPECTOR AND THE CONTRACTOR ARE INPOSSESSION OF AND HAVE CAREFULLY REVIEWED AND FULLY UNDERSTAND ALL CONDITIONS AND SPECIFICATIONS SET FORTHIN THE REQUIRED PERMITS, FRANCHISES, AND/OR EASEMENTS.PLACING FOREMAN TO HAVE A COPY OF THE PERMITS/EASEMENTS ON SITE AT ALL TIMES.ANY CONFLICT BETWEEN WORK PRINT SPECIFICATIONS AND SPECIFICATIONS SET FORTH UNDER RELATED PERMITS,FRANCHISES, AND/OR EASEMENTS MUST BE CLEARED BY PROPER COMPANY AUTHORITY BEFORE PROGRESSING WITH WORKINVOLVEDTRAFFIC CONTROLTHIS PROJECT WILL INVOLVE WORKING ALONG A MAJOR ARTERIAL ROAD AND HEAVY TRAFFIC VOLUME SHOULD BEANTICIPATED.UNIFORM TRAFFIC FLOW SHALL BE MAINTAINED AT ALL TIMES. ONLY EQUIPMENT AND MATERIALS NECESSARY FORIMMEDIATELY SCHEDULED OR IN PROGRESS WORK WILL BE MAINTAINED IN THE WORK AREA. ALL OTHER EQUIPMENT ANDMATERIALS WILL BE "STORED OR STOCKPILED" IN SUCH A MANNER AS TO ELIMINATE HAZARDOUS CONDITIONS FOR TRAFFICOR PEDESTRIANS DURING NON-WORKING OR SHUT DOWN PERIODS.TRAFFIC WARNING DEVICES AND SIGNS SHALL CONFORM TO THE MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES FORSTREETS AND HIGHWAYS (U.S. GOVERNMENT PRINTING OFFICE) AND TO THE STATE STANDARD SPECIFICATIONS FOR HIGHWAYCONSTRUCTION. HIGH LEVEL WARNING TYPE DEVICES ARE TO BE USED AT ALL TIMES AND SPECIAL WARNING DEVICES MAY BESTIPULATED BY THE JURISDICTIONAL PERMIT AGENCY AT ANY TIME THE USE WILL ADD TO THE SAFETY AND PROTECTION OFTRAFFIC OR PEDESTRIANS IN THE CONSTRUCTION AREA.ALL CONDUIT TRENCHING IN PAVED AREAS SHALL BE BACKFILLED WITH CRUSHED GRAVEL OR COMPLETELY COVERED AT THECOMPLETION OF EACH WORKING DAY. ANY BACKFILLED TRENCH SHALL BE CAPPED WITH A MINIMUM LAYER OF ASPHALTICCONCRETE COLD PATCH AT THE END OF EACH WORKING DAY.THE CONTRACTOR SHALL MARK THE CONDUIT TRENCH AND DEFINE HIS CONSTRUCTION AREA CLEARLY WITH BARRICADES,CONES, AND/OR OTHER VISIBLE METHODS THAT ALERT THE PUBLIC OF THE CONSTRUCTION ACTIVITY.A TRAFFIC CONTROL PLAN SHALL BE PREPARED BY THE CONTRACTOR AS REQUIRED AND SUBMITTED TO EACH PERMITTINGAGENCY REQUESTING SUCH PLAN FOR REVIEW AND APPROVAL OR REVISION PRIOR TO COMMENCING ANY CONSTRUCTIONACTIVITY FOR THIS PROJECT. THE APPROVED PLAN SHALL BE SUBMITTED TO THE AGENCY AND A COPY OF THE PLAN SHALL BEKEPT AT THE CONSTRUCTION SITE AND MUST BE READILY AVAILABLE REVIEW BY THE AGENCY REPRESENTATIVES.SPECIAL UTILITY CLEARANCESALL WORK CONDUCTED ADJACENT TO WATER MAINS SHALL CONFORM TO THE FOLLOWING CONDITIONS:A.WHEREVER POSSIBLE CONDUIT SHALL MAINTAIN A HORIZONTAL SEPARATION OF 3.0 FEET, MEASURED SURFACE TOSURFACE (OUTSIDE EDGE TO OUTSIDE EDGE), FROM PARALLEL WATER MAINS.B.WHEREVER POSSIBLE, CONDUIT SHALL PASS UNDER EXISTING WATER MAINS AND MUST MAINTAIN 12" VERTICAL CLEARSEPARATION. CONDUITS PASSING OVER WATER MAINS MUST ALSO MAINTAIN THE 12" VERTICAL SEPARATION.C.THE CONTRACTOR SHALL BE RESPONSIBLE FOR ESTABLISHING AND MAINTAINING THIS REQUIRED VERTICAL SEPARATIONBY EITHER EXPOSING THE WATER MAIN EVERY 100 FEET IN THOSE AREAS WHERE HORIZONTAL SEPARATION IS LESS THAN3.0 FEET OR BY UTILIZING THE DEPTHS OF ADJACENT WATER VALVES. IF THE CONTRACTOR UTILIZES THE ADJACENT WATERTO DETERMINE WATER MAIN DEPTH, HE SHALL CONTACT THE AGENCY AT EACH SUCH LOCATION AND THE AGENCY WILLDETERMINE THE NECESSARY DEPTH OF THE TOP OF THE CONDUIT AT THAT POINT.D.THE VERTICAL AND HORIZONTAL SEPARATION SHALL BE MAINTAINED AT ALL TIMES UNLESS SPECIFICALLY REVISED BYAGREEMENT BETWEEN THE JURISDICTIONAL PERMIT AGENCY AND THE AGENCY ANY SPECIFIC DEVIATION IN VERTICAL ANDHORIZONTAL SEPARATION FROM THOSE DESCRIBED SHALL BE REPORTED TO THE OWNER BY THE CONTRACTOR. THECONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING VERTICAL AND HORIZONTAL SEPARATION AT ALL TIMES ANDSHALL BE RESPONSIBLE FOR ANY AND ALL ENCROACHMENTS.E.CLEARANCES TO STORM SEWERS AND SANITARY SEWERS SHALL BE EXACTLY THE SAME AS THOSE TO WATER MAINS.STRUCTURE PROTECTIONMANHOLES AND CONDUIT TO BE PLACED ADJACENT TO EXISTING STRUCTURES SUCH AS BRIDGE BRIDGE FOOTINGS/PIERS,BUILDING FOUNDATIONS, WALLS, POWER AND TELEPHONE POLES, AND OTHER UTILITIES SHALL MAINTAIN A MINIMUMCLEARANCE AS SHOWN. THE CONTRACTOR SHALL NOT UNDERMINE ANY ADJACENT STRUCTURE WITHOUT SPECIFIC WRITTENPERMISSION FROM THE OWNER/OPERATOR OF SUCH STRUCTURE.SHORING USED AS FOUNDATION SUPPORT SHALL BE DESIGNED SPECIFICALLY FOR BOTH THE LIVE AND DEAD LOADS OF THESTRUCTURE, OR IF ONLY THE DEAD LOAD IS USED FOR DESIGN, THE CONTRACTOR SHALL PROVIDE A DETAILED LAYOUT ANDPLAN OF THE METHOD OF ESTABLISHING AND MAINTAINING THE DESIGN LOAD CONDITIONS (I.E., ROAD DETOURS, TIEBACKS,ETC.).SEE UTILITY CLEARANCE SECTION NOTES FOR CLEARANCE CRITERIA TO PARALLEL OR CROSS UTILITIES.EXISTING UTILITIES EXPOSED DURING EXCAVATION SHALL BE 100% SUPPORTED BY EITHER TRENCH BRIDGING AND SUSPENSIONOR BY THE USE OF LONGITUDINAL TRAYS OR PLATFORMS VERTICALLY SUPPORTED BY ADJUSTABLE BUILDING JACKS.EXISTING SPLICE CASES AND CABLES SHALL BE SUPPORTED BY SUSPENSION FROM A CROSSING BEAM. SUPPORTS SHALL BEPLACED AT A MAXIMUM SPACING OF 4.0 FEET AND SHALL CONSIST OF A CANVAS SLING WITH NYLON BELTING OR ROPE. ALLCABLE SUPPORTS SHALL BE PLACED IN A MANNER THAN PREVENTS KINKS OR OTHER DAMAGE TO THE CABLE SHEATH.AN ACCEPTABLE ALTERNATIVE TO CABLE SLINGS WOULD BE THE UTILIZATION OF A WIDE FLANGE "I" BEAM OR CHANNEL AS A"CABLE TRAY" WITH THE CABLES/CASES BANDED IN PLACE.SHORINGTHE CONTRACTOR SHALL PROVIDE SHORING FOR CONDUIT TRENCH EXCAVATION 42" OR MORE IN DEPTH AS MEASURED FROMTHE HIGH SIDE OF THE TRENCH AND FOR ALL MANHOLE EXCAVATION.MANHOLE SHORING SHALL BE TIGHT-SHEETED.ALL SHORING SHALL CONFORM TO THE STANDARDS AND SPECIFICATIONS OF LOCAL COUNTY AND THE OCCUPATIONAL SAFETYAND HEALTH ADMINISTRATION (OSHA).SHORING SHALL BE DESIGNED TO MEET H-20 HIGHWAY LOADING.THE CONTRACTOR SHALL PROVIDE ALL SHORING AND DESIGN CALCULATIONS TO THE PERMIT ISSUING AGENCY PRIOR TOCOMMENCING ANY CONSTRUCTION ACTIVITY.CALL OUT STATE HIGHWAY SPECIFICATIONSGENERAL NOTESENGINEER:CONFIDENTIAL/PROPRIETARYUTILIS ENGINEERING, INC.2033 CROSS BEAM DR.CHARLOTTE, NC 28217of73PROJECT MANAGER:PROJECT ENGINEER:PROJECT NUMBER:DESCRIPTION:U03079-Section 1-GrimeslandBridge Rd Ext (5-8-18).dwgSHEET TITLE:SHEET:DRAWING NAME:JUSTIN RICEJUSTIN RICEU03079GRIMESLAND BRIDGE RD EXT0-CGENERAL NOTES ENGINEER:CONFIDENTIAL/PROPRIETARYUTILIS ENGINEERING, INC.2033 CROSS BEAM DR.CHARLOTTE, NC 28217of73PROJECT MANAGER:PROJECT ENGINEER:PROJECT NUMBER:DESCRIPTION:U03079-Section 1-GrimeslandBridge Rd Ext (5-8-18).dwgSHEET TITLE:SHEET:DRAWING NAME:JUSTIN RICEJUSTIN RICEU03079GRIMESLAND BRIDGE RD EXT0-DRAKE OFF TABLESTotal Underground Rake OffUnit Code & DescriptionUnitsEstimatedQuantityActualQuantityFIBER REEL BREAKDOWN**REEL INCLUDES AN ADDED 5% FOR UG** TIE-IN STATION·BORE FROM EACH DIRECTION IS RUN AT DESIGN DEPTH TO 2 FEET PAST THE INTENDEDTIE-IN. THEN TURNED UP TO DAYLIGHT.·THE TIE-IN POINT IS EXCAVATED. THE CONDUITS CUT OFF WHERE THEY CROSS EACHOTHER AT DESIGN DEPTH, AND A COUPLER IS INSTALLED TO CONNECT THE TWOCONDUITS AT THE DESIGN DEPTH.·ALL EXCAVATIONS OR TRENCHES 4 FEET OR GREATER IN DEPTH SHALL BEAPPROPRIATELY BENCHED, SHORED, OR SLOPED IN OSHA'S EXCAVATION STANDARD,29 CFR 1926.650, .651, AND .652DIRECTIONAL BORE TIE-IN DETAILNOT TO SCALEDBOREDBOREDBOREDBORE36"SETUP FOR NORTHSETUP FOR SOUTHEXISTING GRADEEXISTING GRADE3'W X 4'L X 3'DEXCAVATION PIT ON R/WBACKFILL IN 6" LAYERS WITH ROCKFREE MATERIAL AT 95%COMPACTION RATE4'ALL EXCAVATIONS OR TRENCHES 4FEET OR GREATER IN DEPTH SHALL BEAPPROPRIATELY BENCHED, SHORED, OR SLOPED ACCORDING TO THE PROCEDURESAND REQUIREMENTS SET FORTH IN OSHA'S EXCAVATION STANDARD, 29 CFR 1926.650,.651, AND .652.HANDHOLE CONSTRUCTION DETAILS, CONDUIT TOHANDHOLE PROFILE FOR R/W CONSTRUCTIONNOT TO SCALE18"18"36"HANDHOLE24"X36"X36"EXISTING GRADEEXISTING GRADEDBOREDBORE6" GRAVEL8' GROUND RODCULVERT CROSSING DETAILNOT TO SCALE36" MIN36" MINRCP/CULVERTCOVERDBOREDBOREDBOREGROUND LINE60' MINTYPICALSENGINEER:CONFIDENTIAL/PROPRIETARYUTILIS ENGINEERING, INC.2033 CROSS BEAM DR.CHARLOTTE, NC 28217of73PROJECT MANAGER:PROJECT ENGINEER:PROJECT NUMBER:DESCRIPTION:U03079-Section 1-GrimeslandBridge Rd Ext (5-8-18).dwgSHEET TITLE:SHEET:DRAWING NAME:JUSTIN RICEJUSTIN RICEU03079GRIMESLAND BRIDGE RD EXT0-ETYPICALS SILT FENCENOT TO SCALENOTE: THESE DETAILS ARE PROVIDED AS AN EXAMPLE AND ARE NOT INTENDED AS APPROVED DETAILS FOR A SEDIMENT AND EROSION CONTROL PLANFLOWFILTER FABRICSTEEL POSTANCHOR SKIRT 4"MINIMUMFILTER FABRIC STEEL POSTWOVEN FILTER FABRICVARIABLE AS DIRECTED BY THE ENGINEER (8' MAX)(SEE GENERAL NOTE 4)20"-24" 36" MIN. 24"GENERAL NOTESMAINTENANCE NOTES1.PREFABRICATED SILT FENCE IS NOT ACCEPTABLE ON THIS PROJECT.2.STEEL POSTS SHALL BE USED ON THIS PROJECT INSTEAD OF WOOD POSTS. STEELPOSTS SHALL BE 5'-0" IN HEIGHT AND BE OF THE SELF-FASTENER ANGLE STEEL TYPE.3.WOVEN FILTER FABRIC SHALL BE USED WHERE SILT FENCE IS TO REMAIN FOR A PERIODOF MORE THAN 30 DAYS, FILTER FABRIC FENCE SHALL BE A MINIMUM OF 32" WIDTH ANDSHALL HAVE A MINIMUM OF AT LEAST 6 LINE WIRES WITH 1'2" STAY SPACING.4.SILT FENCE SHALL BE STANDARD STRENGTH FILTER FABRIC WITH WIRE MESHREINFORCEMENT OR EXTRA STRENGTH FILTER FABRIC. WHEN FABRIC IS USED WITHWIRE MESH , 8' CENTERED POSTS MAY BE USED. OMISSION OF THE REINFORCING WIREIS A CONSTRUCTION CHANGE THAT NECESSITATES MORE POSTS FOR SUPPORT (IE. THESPACING DISTANCE NEEDS TO BE REDUCED TO NO GREATER THAN SIX (6) FEET APART).5.TURN SILT FENCE UP SLOPE AT ENDS.6.THE USE OF SILT FENCE IS AREAS OF CONCENTRATED FLOW IS INAPPROPRIATE.1.INSPECT SEDIMENT FENCES AT LEAST ONCE A WEEK AND AFTER EACHSIGNIFICANT (0.5") RAINFALL. MAKE ANY REQUIRED REPAIRS IMMEDIATELY.2.SHOULD THE FABRIC OF A SEDIMENT FENCE COLLAPSED, TEAR,DECOMPOSE OR BECOME INEFFECTIVE, REPLACE IT PROMPTLY.3.REMOVE SEDIMENT DEPOSITS AS NECESSARY TO PROVIDE ADEQUATESTORAGE VOLUME FOR THE NEXT RAIN AND TO REDUCE PRESSURE ONTHE FENCE . TAKE CARE TO AVOID UNDERMINING THE FENCE DURINGCLEANOUT.4.REMOVE ALL FENCING MATERIALS AND UNSTABLE SEDIMENT DEPOSITSAND BRING THE AREA TO GRADE AND STABILIZE IT AFTER THECONTRIBUTING DRAINAGE AREA HAS BEEN PROPERLY STABILIZED.REF: 6.62.7 NC Erosion and Sediment Control Planning and Design Manual, 2006TYPICALSENGINEER:CONFIDENTIAL/PROPRIETARYUTILIS ENGINEERING, INC.2033 CROSS BEAM DR.CHARLOTTE, NC 28217of73PROJECT MANAGER:PROJECT ENGINEER:PROJECT NUMBER:DESCRIPTION:U03079-Section 1-GrimeslandBridge Rd Ext (5-8-18).dwgSHEET TITLE:SHEET:DRAWING NAME:JUSTIN RICEJUSTIN RICEU03079GRIMESLAND BRIDGE RD EXT0-FTYPICALS CULVERT CUT AROUND THROUGH STREAMNOT TO SCALEFLOW18" WIDE DISTURBED AREATEMPORARY MATTING (SEE NOTES)TOP OF BANKTOP OF BANKSLOPE VARIESSLOPE VARIESDITCH/CHANNEL (TYPICALLY DRY)FLOW18" WIDE DISTURBED AREATEMPORARY MATTING (SEE NOTES)TOP OF BANKTOP OF BANKSLOPE VARIESSLOPE VARIESDITCH/CHANNEL (TYPICALLY DRY)UPGRADIENT END TO BE TOED INUPGRADIENT END TO BE TOED INNOTE: THESE DETAILS ARE PROVIDED AS AN EXAMPLE AND ARE NOT INTENDED AS APPROVED DETAILS FOR A SEDIMENT AND EROSION CONTROL PLANGENERAL NOTES1.APPLY SEED BEFORE LAYING THE NET OR MAT. IF OOPENWEAVE NETTING IS USED, LINE MAY BE INCORPORATED BEFOREINSTALLING THE THE NET AND FERTILIZER AND SEED MAY BESPRAYED ON AFTERWARD.2.START LAYING THE NET FROM THE TOP OF THE STREAM BANKSAND UNROLL IT DOWN THE GRADE. ALLOW NETTING TO LAYLOOSELY ON THE SOIL, BUT WITHOUT WRINKLES. DO NOTSTRETCH.3.TO SECURE THE NET, TOR IN THE UPGRADIENT END AND TOP OFBANK PORTIONS IN A SLOT OR TRENCH NO LESS THAN 6 INCHESDEEP, COVER WITH SOIL, AND TAMP FIRMLY. STAPLE THE NETEVERY 12 INCHES ACROSS THE TOP END AND EVERY 3 FEETAROUND THE EDGES AND BOTTOM. EACH STRIP OF MATTINGSHOULD ALSO BE STAPLED DOWN THE CENTER, EVERY 3 FEET.MAINTENANCE NOTES1.INSPECT EACH ROLLED EROSION CONTROL PRODUCTS (RECP)AT LEAST WEEKLY AND AFTER EACH SIGNIFICANT RAINFALLEVENT (0.5" OR GREATER)2.GOOD CONTACT WITH THE GROUND MUST BE MAINTAINED, ANDEROSION MUST NOT OCCUR BENEATH THE RECP.3.ANY AREAS OF THE RECP THAT ARE DAMAGED OR NOT INCLOSE CONTACT WITH THE GROUND SHALL BE REPAIRED ANDSTAPLED4.IF EROSION OCCURS DUE TO POORLY CONTROLLED DRAINAGE,THE PROBLEM SHALL BE FIXED AND THE ERODED AREAPROTECTED.5.MONITOR AND REPAIR THE RECP AS NECESSARY UNTIL THEGROUND COVER IS ESTABLISHED.TYPICALSENGINEER:CONFIDENTIAL/PROPRIETARYUTILIS ENGINEERING, INC.2033 CROSS BEAM DR.CHARLOTTE, NC 28217of73PROJECT MANAGER:PROJECT ENGINEER:PROJECT NUMBER:DESCRIPTION:U03079-Section 1-GrimeslandBridge Rd Ext (5-8-18).dwgSHEET TITLE:SHEET:DRAWING NAME:JUSTIN RICEJUSTIN RICEU03079GRIMESLAND BRIDGE RD EXT0-GTYPICALS DIRECTIONAL BORE DETAIL (PARALLEL)NOT TO SCALESILT FENCEBORE PITBORE RIGSPOIL PILESPOIL PILESTREAM, ROAD, OR ENVIRONMENTALLY SENSITIVE SEWER PIPELINEPIPELINE TRENCHGENERAL NOTES1.BORE PITS AND SPOILS PILES SHALL BE ENCLOSEDON THREE SIDES AS SHOWN WITH SILT FENCEDIRECTIONAL BORE DETAIL (TRAVERSE)NOT TO SCALESTREAM, ROAD, OR ENVIRONMENTALLY SENSITIVE SEWERGENERAL NOTES1.BORE PITS AND SPOILS PILES SHALL BE ENCLOSEDON THREE SIDES AS SHOWN WITH SILT FENCESILT FENCESPOIL PILEBORE RIGBORE PITPIPELINE TRENCHSPOIL PILEPIPELINESILT FENCECULVERT CUT OVER ON ROADSIDE SHOULDERNOT TO SCALEROADSPOILS18" DISTURBED AREASILT FENCEOPEN CUT TRENCHINLET OR OUTLET SIDECULVERTFLOWINLET OR OUTLET SIDECULVERTFLOWSILT FENCESLOPE VARIESROADDISTURBED AREA (18 INCHES)TOP OF SLOPEGENERAL NOTES1.INSTALL SILT FENCE TO PROTECT DOWNSTREAM AREAS FROMSEDIMENTATION PRIOR TO CONSTRUCTION.2.INSTALL SILT FENCE AS NEEDED TO PROTECT DRAINAGEFEATURES, BUT NO LESS THAN 10' ON EITHER SIDE OF CULVERT.MAINTENANCE NOTESINSPECT CULVERT CROSSING STRUCTURES WEEKLY ANDAFTER EACH SIGNIFICANT RAINFALL EVENT (0.5" OR GREATER)TO SEE IF ANY EROSION AROUND OR BELOW THE SILT FENCEHAS OCCURRED, IMMEDIATELY MAKE ALL NEEDED REPAIRS TOPREVENT FURTHER DAMAGE. *REF: 6.41.5 NC Erosion and Sediment Control Planning andDesign Manual, 2006TYPICALSENGINEER:CONFIDENTIAL/PROPRIETARYUTILIS ENGINEERING, INC.2033 CROSS BEAM DR.CHARLOTTE, NC 28217of73PROJECT MANAGER:PROJECT ENGINEER:PROJECT NUMBER:DESCRIPTION:U03079-Section 1-GrimeslandBridge Rd Ext (5-8-18).dwgSHEET TITLE:SHEET:DRAWING NAME:JUSTIN RICEJUSTIN RICEU03079GRIMESLAND BRIDGE RD EXT0-HTYPICALS PARALLEL CONDUIT DETAIL FOR NCDOT RIGHT-OF-WAYNOT TO SCALEEOPEOP R/WR/WUNDISTURBED ROAD BEDPROPOSED 2" CONDUIT PLACED BY DIRECTIONALBORE W/ 3.0" BACK REAMER OR OPEN TRENCH3' MINEXISTING GRADEASPHALT SURFACEVARIESVARIESVARIESVARIESTHEORETICAL 1:1SLOPEPROPOSED FIBEROPTIC CABLE36" MINDIRECTIONAL BORE UNDER SECONDARY ROADWAYNOT TO SCALECASING/CONDUIT AS SPECIFIED15" MINRADIUS15" MINRADIUS36" MIN36" MIN36" MIN10' MINEXISTING GROUNDDITCH LINEPAVEMENT36" MIN10' MINDITCH LINEVARIESVARIESCASING/CONDUIT AS SPECIFIEDCONDUIT TO BE PLACED A MINIMUM OF 5 FEETBELOW CREEK BEDDIRECTIONAL BORE UNDER CREEK BEDCREEK15" MINRADIUS15" MINRADIUS5' MIN36" MIN36" MINNOT TO SCALEEXISTING GROUNDBOXFEATURES*POLYMERCONCRETECONSTRUCTION*STACKABLE*APPROX.WEIGTH385LBS.49 58"24'36"38" X 3" HEX BOLT(2 PL EA SIDE)PULL PIN(2 PL )BOLT DOWN(2 PL )2" X 8" NAMEPLATERECESS(1 PL )COVER FEATURES:* STANDARD LOAD RATING: 45,136 POUND WHEEL LOAD ON 10 X 20 PLATE* POLYMER CONCRETE CONSTRUCTION* WEIGHT = 220 POUNDS* 2 BOLT DOWN LOCATIONS* COLOR = CONCRETE GREY* NON-SKID SURFACE2" GRAVEL ORCRUSHED ROCKTYPICALSENGINEER:CONFIDENTIAL/PROPRIETARYUTILIS ENGINEERING, INC.2033 CROSS BEAM DR.CHARLOTTE, NC 28217of73PROJECT MANAGER:PROJECT ENGINEER:PROJECT NUMBER:DESCRIPTION:U03079-Section 1-GrimeslandBridge Rd Ext (5-8-18).dwgSHEET TITLE:SHEET:DRAWING NAME:JUSTIN RICEJUSTIN RICEU03079GRIMESLAND BRIDGE RD EXT0-ITYPICALS US 264US 264US 264US 264CHERRY ST (SR 1597)··· · ·CONSTRUCTION NOTESMATCH TO SHEET2 PROJECT MANAGER:PROJECT ENGINEER:PROJECT NUMBER:DESCRIPTION:U03079-Section 1-Grimesland Bridge Rd Ext (5-8-18).dwgOWNER/DEVELOPER:ENGINEER:SHEET TITLE:CONFIDENTIAL/PROPRIETARYSHEET:DRAWING NAME:UTILIS ENGINEERING, INC.2033 CROSS BEAM DR.CHARLOTTE, NC 28217ofJUSTIN RICEJUSTIN RICEU03079GRIMESLAND BRIDGE RD EXT73REVDESCRIPTIONDATE#Know what's belowCall before you dig.R1PROJECT SHEET US 264US 264· · ·CONSTRUCTION NOTESMATCH TO SHEET1 MATCH TO SHEET3 PROJECT MANAGER:PROJECT ENGINEER:PROJECT NUMBER:DESCRIPTION:U03079-Section 1-Grimesland Bridge Rd Ext (5-8-18).dwgOWNER/DEVELOPER:ENGINEER:SHEET TITLE:CONFIDENTIAL/PROPRIETARYSHEET:DRAWING NAME:UTILIS ENGINEERING, INC.2033 CROSS BEAM DR.CHARLOTTE, NC 28217ofJUSTIN RICEJUSTIN RICEU03079GRIMESLAND BRIDGE RD EXT73REVDESCRIPTIONDATE#Know what's belowCall before you dig.R2PROJECT SHEET US 264US 264· · ·CONSTRUCTION NOTESMATCH TO SHEET4 PROJECT MANAGER:PROJECT ENGINEER:PROJECT NUMBER:DESCRIPTION:U03079-Section 1-Grimesland Bridge Rd Ext (5-8-18).dwgOWNER/DEVELOPER:ENGINEER:SHEET TITLE:CONFIDENTIAL/PROPRIETARYSHEET:DRAWING NAME:UTILIS ENGINEERING, INC.2033 CROSS BEAM DR.CHARLOTTE, NC 28217ofJUSTIN RICEJUSTIN RICEU03079GRIMESLAND BRIDGE RD EXT73REVDESCRIPTIONDATE#Know what's belowCall before you dig.R3PROJECT SHEETMATCH TO SHEET2 US 264US 264···· · ·CONSTRUCTION NOTESMATCH TO SHEET3 MATCH TO SHEET5 PROJECT MANAGER:PROJECT ENGINEER:PROJECT NUMBER:DESCRIPTION:U03079-Section 1-Grimesland Bridge Rd Ext (5-8-18).dwgOWNER/DEVELOPER:ENGINEER:SHEET TITLE:CONFIDENTIAL/PROPRIETARYSHEET:DRAWING NAME:UTILIS ENGINEERING, INC.2033 CROSS BEAM DR.CHARLOTTE, NC 28217ofJUSTIN RICEJUSTIN RICEU03079GRIMESLAND BRIDGE RD EXT73REVDESCRIPTIONDATE#Know what's belowCall before you dig.R4PROJECT SHEET US 264US 264· · ·CONSTRUCTION NOTESMATCH TO SHEET4 MATCH TO SHEET6 PROJECT MANAGER:PROJECT ENGINEER:PROJECT NUMBER:DESCRIPTION:U03079-Section 1-Grimesland Bridge Rd Ext (5-8-18).dwgOWNER/DEVELOPER:ENGINEER:SHEET TITLE:CONFIDENTIAL/PROPRIETARYSHEET:DRAWING NAME:UTILIS ENGINEERING, INC.2033 CROSS BEAM DR.CHARLOTTE, NC 28217ofJUSTIN RICEJUSTIN RICEU03079GRIMESLAND BRIDGE RD EXT73REVDESCRIPTIONDATE#Know what's belowCall before you dig.R5PROJECT SHEET US 264US 264· · ·CONSTRUCTION NOTESMATCH TO SHEET7 PROJECT MANAGER:PROJECT ENGINEER:PROJECT NUMBER:DESCRIPTION:U03079-Section 1-Grimesland Bridge Rd Ext (5-8-18).dwgOWNER/DEVELOPER:ENGINEER:SHEET TITLE:CONFIDENTIAL/PROPRIETARYSHEET:DRAWING NAME:UTILIS ENGINEERING, INC.2033 CROSS BEAM DR.CHARLOTTE, NC 28217ofJUSTIN RICEJUSTIN RICEU03079GRIMESLAND BRIDGE RD EXT73REVDESCRIPTIONDATE#Know what's belowCall before you dig.R6PROJECT SHEETMATCH TO SHEET5 US 264US 264NC 30· · ·CONSTRUCTION NOTESMATCH TO SHEET6 MATCH TO SHEET8 PROJECT MANAGER:PROJECT ENGINEER:PROJECT NUMBER:DESCRIPTION:U03079-Section 1-Grimesland Bridge Rd Ext (5-8-18).dwgOWNER/DEVELOPER:ENGINEER:SHEET TITLE:CONFIDENTIAL/PROPRIETARYSHEET:DRAWING NAME:UTILIS ENGINEERING, INC.2033 CROSS BEAM DR.CHARLOTTE, NC 28217ofJUSTIN RICEJUSTIN RICEU03079GRIMESLAND BRIDGE RD EXT73REVDESCRIPTIONDATE#Know what's belowCall before you dig.R7PROJECT SHEET US 264US 264···· · ·CONSTRUCTION NOTESMATCH TO SHEET7 MATCH TO SHEET9 PROJECT MANAGER:PROJECT ENGINEER:PROJECT NUMBER:DESCRIPTION:U03079-Section 1-Grimesland Bridge Rd Ext (5-8-18).dwgOWNER/DEVELOPER:ENGINEER:SHEET TITLE:CONFIDENTIAL/PROPRIETARYSHEET:DRAWING NAME:UTILIS ENGINEERING, INC.2033 CROSS BEAM DR.CHARLOTTE, NC 28217ofJUSTIN RICEJUSTIN RICEU03079GRIMESLAND BRIDGE RD EXT73REVDESCRIPTIONDATE#Know what's belowCall before you dig.R8PROJECT SHEET US 264US 264· · ·CONSTRUCTION NOTESMATCH TO SHEET10 PROJECT MANAGER:PROJECT ENGINEER:PROJECT NUMBER:DESCRIPTION:U03079-Section 1-Grimesland Bridge Rd Ext (5-8-18).dwgOWNER/DEVELOPER:ENGINEER:SHEET TITLE:CONFIDENTIAL/PROPRIETARYSHEET:DRAWING NAME:UTILIS ENGINEERING, INC.2033 CROSS BEAM DR.CHARLOTTE, NC 28217ofJUSTIN RICEJUSTIN RICEU03079GRIMESLAND BRIDGE RD EXT73REVDESCRIPTIONDATE#Know what's belowCall before you dig.R9PROJECT SHEETMATCH TO SHEET8 US 264US 264· · ·CONSTRUCTION NOTESMATCH TO SHEET9 MATCH TO SHEET11 PROJECT MANAGER:PROJECT ENGINEER:PROJECT NUMBER:DESCRIPTION:U03079-Section 1-Grimesland Bridge Rd Ext (5-8-18).dwgOWNER/DEVELOPER:ENGINEER:SHEET TITLE:CONFIDENTIAL/PROPRIETARYSHEET:DRAWING NAME:UTILIS ENGINEERING, INC.2033 CROSS BEAM DR.CHARLOTTE, NC 28217ofJUSTIN RICEJUSTIN RICEU03079GRIMESLAND BRIDGE RD EXT73REVDESCRIPTIONDATE#Know what's belowCall before you dig.R10PROJECT SHEET US 264US 264· · ·CONSTRUCTION NOTESMATCH TO SHEET10 MATCH TO SHEET12 PROJECT MANAGER:PROJECT ENGINEER:PROJECT NUMBER:DESCRIPTION:U03079-Section 1-Grimesland Bridge Rd Ext (5-8-18).dwgOWNER/DEVELOPER:ENGINEER:SHEET TITLE:CONFIDENTIAL/PROPRIETARYSHEET:DRAWING NAME:UTILIS ENGINEERING, INC.2033 CROSS BEAM DR.CHARLOTTE, NC 28217ofJUSTIN RICEJUSTIN RICEU03079GRIMESLAND BRIDGE RD EXT73REVDESCRIPTIONDATE#Know what's belowCall before you dig.R11PROJECT SHEET US 264US 264···· · ·CONSTRUCTION NOTESMATCH TO SHEET13 PROJECT MANAGER:PROJECT ENGINEER:PROJECT NUMBER:DESCRIPTION:U03079-Section 1-Grimesland Bridge Rd Ext (5-8-18).dwgOWNER/DEVELOPER:ENGINEER:SHEET TITLE:CONFIDENTIAL/PROPRIETARYSHEET:DRAWING NAME:UTILIS ENGINEERING, INC.2033 CROSS BEAM DR.CHARLOTTE, NC 28217ofJUSTIN RICEJUSTIN RICEU03079GRIMESLAND BRIDGE RD EXT73REVDESCRIPTIONDATE#Know what's belowCall before you dig.R12PROJECT SHEETMATCH TO SHEET11 US 264US 264· · ·CONSTRUCTION NOTESMATCH TO SHEET12 MATCH TO SHEET14 PROJECT MANAGER:PROJECT ENGINEER:PROJECT NUMBER:DESCRIPTION:U03079-Section 1-Grimesland Bridge Rd Ext (5-8-18).dwgOWNER/DEVELOPER:ENGINEER:SHEET TITLE:CONFIDENTIAL/PROPRIETARYSHEET:DRAWING NAME:UTILIS ENGINEERING, INC.2033 CROSS BEAM DR.CHARLOTTE, NC 28217ofJUSTIN RICEJUSTIN RICEU03079GRIMESLAND BRIDGE RD EXT73REVDESCRIPTIONDATE#Know what's belowCall before you dig.R13PROJECT SHEET US 264US 264· · ·CONSTRUCTION NOTESMATCH TO SHEET13 MATCH TO SHEET15 PROJECT MANAGER:PROJECT ENGINEER:PROJECT NUMBER:DESCRIPTION:U03079-Section 1-Grimesland Bridge Rd Ext (5-8-18).dwgOWNER/DEVELOPER:ENGINEER:SHEET TITLE:CONFIDENTIAL/PROPRIETARYSHEET:DRAWING NAME:UTILIS ENGINEERING, INC.2033 CROSS BEAM DR.CHARLOTTE, NC 28217ofJUSTIN RICEJUSTIN RICEU03079GRIMESLAND BRIDGE RD EXT73REVDESCRIPTIONDATE#Know what's belowCall before you dig.R14PROJECT SHEET US 264US 264· · ·CONSTRUCTION NOTESMATCH TO SHEET16 PROJECT MANAGER:PROJECT ENGINEER:PROJECT NUMBER:DESCRIPTION:U03079-Section 1-Grimesland Bridge Rd Ext (5-8-18).dwgOWNER/DEVELOPER:ENGINEER:SHEET TITLE:CONFIDENTIAL/PROPRIETARYSHEET:DRAWING NAME:UTILIS ENGINEERING, INC.2033 CROSS BEAM DR.CHARLOTTE, NC 28217ofJUSTIN RICEJUSTIN RICEU03079GRIMESLAND BRIDGE RD EXT73REVDESCRIPTIONDATE#Know what's belowCall before you dig.R15PROJECT SHEETMATCH TO SHEET14 US 264US 264· · ·CONSTRUCTION NOTESMATCH TO SHEET15 MATCH TO SHEET17 PROJECT MANAGER:PROJECT ENGINEER:PROJECT NUMBER:DESCRIPTION:U03079-Section 1-Grimesland Bridge Rd Ext (5-8-18).dwgOWNER/DEVELOPER:ENGINEER:SHEET TITLE:CONFIDENTIAL/PROPRIETARYSHEET:DRAWING NAME:UTILIS ENGINEERING, INC.2033 CROSS BEAM DR.CHARLOTTE, NC 28217ofJUSTIN RICEJUSTIN RICEU03079GRIMESLAND BRIDGE RD EXT73REVDESCRIPTIONDATE#Know what's belowCall before you dig.R16PROJECT SHEET US 264US 264···· · ·CONSTRUCTION NOTESMATCH TO SHEET16 MATCH TO SHEET18 PROJECT MANAGER:PROJECT ENGINEER:PROJECT NUMBER:DESCRIPTION:U03079-Section 1-Grimesland Bridge Rd Ext (5-8-18).dwgOWNER/DEVELOPER:ENGINEER:SHEET TITLE:CONFIDENTIAL/PROPRIETARYSHEET:DRAWING NAME:UTILIS ENGINEERING, INC.2033 CROSS BEAM DR.CHARLOTTE, NC 28217ofJUSTIN RICEJUSTIN RICEU03079GRIMESLAND BRIDGE RD EXT73REVDESCRIPTIONDATE#Know what's belowCall before you dig.R17PROJECT SHEET US 264US 264· · ·CONSTRUCTION NOTESMATCH TO SHEET19 PROJECT MANAGER:PROJECT ENGINEER:PROJECT NUMBER:DESCRIPTION:U03079-Section 1-Grimesland Bridge Rd Ext (5-8-18).dwgOWNER/DEVELOPER:ENGINEER:SHEET TITLE:CONFIDENTIAL/PROPRIETARYSHEET:DRAWING NAME:UTILIS ENGINEERING, INC.2033 CROSS BEAM DR.CHARLOTTE, NC 28217ofJUSTIN RICEJUSTIN RICEU03079GRIMESLAND BRIDGE RD EXT73REVDESCRIPTIONDATE#Know what's belowCall before you dig.R18PROJECT SHEETMATCH TO SHEET17 US 264US 264SHEPPARD MILL RD (SR 1607)· · ····CONSTRUCTION NOTESMATCH TO SHEET18 MATCH TO SHEET50 PROJECT MANAGER:PROJECT ENGINEER:PROJECT NUMBER:DESCRIPTION:U03079-Section 1-Grimesland Bridge Rd Ext (5-8-18).dwgOWNER/DEVELOPER:ENGINEER:SHEET TITLE:CONFIDENTIAL/PROPRIETARYSHEET:DRAWING NAME:UTILIS ENGINEERING, INC.2033 CROSS BEAM DR.CHARLOTTE, NC 28217ofJUSTIN RICEJUSTIN RICEU03079GRIMESLAND BRIDGE RD EXT73REVDESCRIPTIONDATE#Know what's belowCall before you dig.R19PROJECT SHEET US 264US 264· · ·CONSTRUCTION NOTESMATCH TO SHEET19 MATCH TO SHEET21PROJECT MANAGER:PROJECT ENGINEER:PROJECT NUMBER:DESCRIPTION:U03079-Section 1-Grimesland Bridge Rd Ext (5-8-18).dwgOWNER/DEVELOPER:ENGINEER:SHEET TITLE:CONFIDENTIAL/PROPRIETARYSHEET:DRAWING NAME:UTILIS ENGINEERING, INC.2033 CROSS BEAM DR.CHARLOTTE, NC 28217ofJUSTIN RICEJUSTIN RICEU03079GRIMESLAND BRIDGE RD EXT73REVDESCRIPTIONDATE#Know what's belowCall before you dig.R20PROJECT SHEET US 264US 264· · ·CONSTRUCTION NOTESMATCH TO SHEET22 PROJECT MANAGER:PROJECT ENGINEER:PROJECT NUMBER:DESCRIPTION:U03079-Section 1-Grimesland Bridge Rd Ext (5-8-18).dwgOWNER/DEVELOPER:ENGINEER:SHEET TITLE:CONFIDENTIAL/PROPRIETARYSHEET:DRAWING NAME:UTILIS ENGINEERING, INC.2033 CROSS BEAM DR.CHARLOTTE, NC 28217ofJUSTIN RICEJUSTIN RICEU03079GRIMESLAND BRIDGE RD EXT73REVDESCRIPTIONDATE#Know what's belowCall before you dig.R21PROJECT SHEETMATCH TO SHEET20 US 264US 264· · ·CONSTRUCTION NOTESMATCH TO SHEET21 MATCH TO SHEET23PROJECT MANAGER:PROJECT ENGINEER:PROJECT NUMBER:DESCRIPTION:U03079-Section 1-Grimesland Bridge Rd Ext (5-8-18).dwgOWNER/DEVELOPER:ENGINEER:SHEET TITLE:CONFIDENTIAL/PROPRIETARYSHEET:DRAWING NAME:UTILIS ENGINEERING, INC.2033 CROSS BEAM DR.CHARLOTTE, NC 28217ofJUSTIN RICEJUSTIN RICEU03079GRIMESLAND BRIDGE RD EXT73REVDESCRIPTIONDATE#Know what's belowCall before you dig.R22PROJECT SHEET US 264US 264US 264US 264STIC K S R D ( S R 1 5 6 3 )···· · ·CONSTRUCTION NOTESMATCH TO SHEET22MATCH TO SHEET24PROJECT MANAGER:PROJECT ENGINEER:PROJECT NUMBER:DESCRIPTION:U03079-Section 1-Grimesland Bridge Rd Ext (5-8-18).dwgOWNER/DEVELOPER:ENGINEER:SHEET TITLE:CONFIDENTIAL/PROPRIETARYSHEET:DRAWING NAME:UTILIS ENGINEERING, INC.2033 CROSS BEAM DR.CHARLOTTE, NC 28217ofJUSTIN RICEJUSTIN RICEU03079GRIMESLAND BRIDGE RD EXT73REVDESCRIPTIONDATE#Know what's belowCall before you dig.R23PROJECT SHEET STIC K S R D ( S R 1 5 6 3 )· · ·CONSTRUCTION NOTESMATCH TO SHEET25PROJECT MANAGER:PROJECT ENGINEER:PROJECT NUMBER:DESCRIPTION:U03079-Section 1-Grimesland Bridge Rd Ext (5-8-18).dwgOWNER/DEVELOPER:ENGINEER:SHEET TITLE:CONFIDENTIAL/PROPRIETARYSHEET:DRAWING NAME:UTILIS ENGINEERING, INC.2033 CROSS BEAM DR.CHARLOTTE, NC 28217ofJUSTIN RICEJUSTIN RICEU03079GRIMESLAND BRIDGE RD EXT73REVDESCRIPTIONDATE#Know what's belowCall before you dig.R24PROJECT SHEETMATCH TO SHEET23 STIC K S R D ( S R 1 5 6 3 )· · ·CONSTRUCTION NOTESMATCH TO SHEET24MATCH TO SHEET26PROJECT MANAGER:PROJECT ENGINEER:PROJECT NUMBER:DESCRIPTION:U03079-Section 1-Grimesland Bridge Rd Ext (5-8-18).dwgOWNER/DEVELOPER:ENGINEER:SHEET TITLE:CONFIDENTIAL/PROPRIETARYSHEET:DRAWING NAME:UTILIS ENGINEERING, INC.2033 CROSS BEAM DR.CHARLOTTE, NC 28217ofJUSTIN RICEJUSTIN RICEU03079GRIMESLAND BRIDGE RD EXT73REVDESCRIPTIONDATE#Know what's belowCall before you dig.R25PROJECT SHEET STICKS RD (SR 1563)· · ·CONSTRUCTION NOTESMATCH TO SHEET25MATCH TO SHEET27PROJECT MANAGER:PROJECT ENGINEER:PROJECT NUMBER:DESCRIPTION:U03079-Section 1-Grimesland Bridge Rd Ext (5-8-18).dwgOWNER/DEVELOPER:ENGINEER:SHEET TITLE:CONFIDENTIAL/PROPRIETARYSHEET:DRAWING NAME:UTILIS ENGINEERING, INC.2033 CROSS BEAM DR.CHARLOTTE, NC 28217ofJUSTIN RICEJUSTIN RICEU03079GRIMESLAND BRIDGE RD EXT73REVDESCRIPTIONDATE#Know what's belowCall before you dig.R26PROJECT SHEET STICKS RD (SR 1563)···· · ·CONSTRUCTION NOTESMATCH TO SHEET28PROJECT MANAGER:PROJECT ENGINEER:PROJECT NUMBER:DESCRIPTION:U03079-Section 1-Grimesland Bridge Rd Ext (5-8-18).dwgOWNER/DEVELOPER:ENGINEER:SHEET TITLE:CONFIDENTIAL/PROPRIETARYSHEET:DRAWING NAME:UTILIS ENGINEERING, INC.2033 CROSS BEAM DR.CHARLOTTE, NC 28217ofJUSTIN RICEJUSTIN RICEU03079GRIMESLAND BRIDGE RD EXT73REVDESCRIPTIONDATE#Know what's belowCall before you dig.R27PROJECT SHEETMATCH TO SHEET26 STICKS RD (SR 156 3 )· · ·CONSTRUCTION NOTESMATCH TO SHEET27MATCH TO SHEET29PROJECT MANAGER:PROJECT ENGINEER:PROJECT NUMBER:DESCRIPTION:U03079-Section 1-Grimesland Bridge Rd Ext (5-8-18).dwgOWNER/DEVELOPER:ENGINEER:SHEET TITLE:CONFIDENTIAL/PROPRIETARYSHEET:DRAWING NAME:UTILIS ENGINEERING, INC.2033 CROSS BEAM DR.CHARLOTTE, NC 28217ofJUSTIN RICEJUSTIN RICEU03079GRIMESLAND BRIDGE RD EXT73REVDESCRIPTIONDATE#Know what's belowCall before you dig.R28PROJECT SHEET STICKS RD ( S R 1 5 6 3 )· · ·CONSTRUCTION NOTESMATCH TO SHEET28MATCH TO SHEET30PROJECT MANAGER:PROJECT ENGINEER:PROJECT NUMBER:DESCRIPTION:U03079-Section 1-Grimesland Bridge Rd Ext (5-8-18).dwgOWNER/DEVELOPER:ENGINEER:SHEET TITLE:CONFIDENTIAL/PROPRIETARYSHEET:DRAWING NAME:UTILIS ENGINEERING, INC.2033 CROSS BEAM DR.CHARLOTTE, NC 28217ofJUSTIN RICEJUSTIN RICEU03079GRIMESLAND BRIDGE RD EXT73REVDESCRIPTIONDATE#Know what's belowCall before you dig.R29PROJECT SHEET STICKS RD ( S R 1 5 6 3 )· · ·CONSTRUCTION NOTESMATCH TO SHEET31PROJECT MANAGER:PROJECT ENGINEER:PROJECT NUMBER:DESCRIPTION:U03079-Section 1-Grimesland Bridge Rd Ext (5-8-18).dwgOWNER/DEVELOPER:ENGINEER:SHEET TITLE:CONFIDENTIAL/PROPRIETARYSHEET:DRAWING NAME:UTILIS ENGINEERING, INC.2033 CROSS BEAM DR.CHARLOTTE, NC 28217ofJUSTIN RICEJUSTIN RICEU03079GRIMESLAND BRIDGE RD EXT73REVDESCRIPTIONDATE#Know what's belowCall before you dig.R30PROJECT SHEETMATCH TO SHEET29 STICKS RD (SR 1563)· · ·CONSTRUCTION NOTESMATCH TO SHEET30MATCH TO SHEET32PROJECT MANAGER:PROJECT ENGINEER:PROJECT NUMBER:DESCRIPTION:U03079-Section 1-Grimesland Bridge Rd Ext (5-8-18).dwgOWNER/DEVELOPER:ENGINEER:SHEET TITLE:CONFIDENTIAL/PROPRIETARYSHEET:DRAWING NAME:UTILIS ENGINEERING, INC.2033 CROSS BEAM DR.CHARLOTTE, NC 28217ofJUSTIN RICEJUSTIN RICEU03079GRIMESLAND BRIDGE RD EXT73REVDESCRIPTIONDATE#Know what's belowCall before you dig.R31PROJECT SHEET STICKS RD (SR 1563)· · ·CONSTRUCTION NOTESMATCH TO SHEET31MATCH TO SHEET33PROJECT MANAGER:PROJECT ENGINEER:PROJECT NUMBER:DESCRIPTION:U03079-Section 1-Grimesland Bridge Rd Ext (5-8-18).dwgOWNER/DEVELOPER:ENGINEER:SHEET TITLE:CONFIDENTIAL/PROPRIETARYSHEET:DRAWING NAME:UTILIS ENGINEERING, INC.2033 CROSS BEAM DR.CHARLOTTE, NC 28217ofJUSTIN RICEJUSTIN RICEU03079GRIMESLAND BRIDGE RD EXT73REVDESCRIPTIONDATE#Know what's belowCall before you dig.R32PROJECT SHEET STICKS RD (SR 1563)···· · ·CONSTRUCTION NOTESMATCH TO SHEET34PROJECT MANAGER:PROJECT ENGINEER:PROJECT NUMBER:DESCRIPTION:U03079-Section 1-Grimesland Bridge Rd Ext (5-8-18).dwgOWNER/DEVELOPER:ENGINEER:SHEET TITLE:CONFIDENTIAL/PROPRIETARYSHEET:DRAWING NAME:UTILIS ENGINEERING, INC.2033 CROSS BEAM DR.CHARLOTTE, NC 28217ofJUSTIN RICEJUSTIN RICEU03079GRIMESLAND BRIDGE RD EXT73REVDESCRIPTIONDATE#Know what's belowCall before you dig.R33PROJECT SHEETMATCH TO SHEET32 STICKS RD (SR 1563)· · ·CONSTRUCTION NOTESMATCH TO SHEET33MATCH TO SHEET35PROJECT MANAGER:PROJECT ENGINEER:PROJECT NUMBER:DESCRIPTION:U03079-Section 1-Grimesland Bridge Rd Ext (5-8-18).dwgOWNER/DEVELOPER:ENGINEER:SHEET TITLE:CONFIDENTIAL/PROPRIETARYSHEET:DRAWING NAME:UTILIS ENGINEERING, INC.2033 CROSS BEAM DR.CHARLOTTE, NC 28217ofJUSTIN RICEJUSTIN RICEU03079GRIMESLAND BRIDGE RD EXT73REVDESCRIPTIONDATE#Know what's belowCall before you dig.R34PROJECT SHEET STICKS RD (SR 1563)· · ·CONSTRUCTION NOTESMATCH TO SHEET34MATCH TO SHEET36PROJECT MANAGER:PROJECT ENGINEER:PROJECT NUMBER:DESCRIPTION:U03079-Section 1-Grimesland Bridge Rd Ext (5-8-18).dwgOWNER/DEVELOPER:ENGINEER:SHEET TITLE:CONFIDENTIAL/PROPRIETARYSHEET:DRAWING NAME:UTILIS ENGINEERING, INC.2033 CROSS BEAM DR.CHARLOTTE, NC 28217ofJUSTIN RICEJUSTIN RICEU03079GRIMESLAND BRIDGE RD EXT73REVDESCRIPTIONDATE#Know what's belowCall before you dig.R35PROJECT SHEET STICKS RD (SR 1563)· · ·CONSTRUCTION NOTESMATCH TO SHEET35MATCH TO SHEET37PROJECT MANAGER:PROJECT ENGINEER:PROJECT NUMBER:DESCRIPTION:U03079-Section 1-Grimesland Bridge Rd Ext (5-8-18).dwgOWNER/DEVELOPER:ENGINEER:SHEET TITLE:CONFIDENTIAL/PROPRIETARYSHEET:DRAWING NAME:UTILIS ENGINEERING, INC.2033 CROSS BEAM DR.CHARLOTTE, NC 28217ofJUSTIN RICEJUSTIN RICEU03079GRIMESLAND BRIDGE RD EXT73REVDESCRIPTIONDATE#Know what's belowCall before you dig.R36PROJECT SHEET STICKS RD (SR 1563)· · ·CONSTRUCTION NOTESMATCH TO SHEET38PROJECT MANAGER:PROJECT ENGINEER:PROJECT NUMBER:DESCRIPTION:U03079-Section 1-Grimesland Bridge Rd Ext (5-8-18).dwgOWNER/DEVELOPER:ENGINEER:SHEET TITLE:CONFIDENTIAL/PROPRIETARYSHEET:DRAWING NAME:UTILIS ENGINEERING, INC.2033 CROSS BEAM DR.CHARLOTTE, NC 28217ofJUSTIN RICEJUSTIN RICEU03079GRIMESLAND BRIDGE RD EXT73REVDESCRIPTIONDATE#Know what's belowCall before you dig.R37PROJECT SHEETMATCH TO SHEET36 STICKS RD (SR 1563)· · ·CONSTRUCTION NOTESMATCH TO SHEET37MATCH TO SHEET39PROJECT MANAGER:PROJECT ENGINEER:PROJECT NUMBER:DESCRIPTION:U03079-Section 1-Grimesland Bridge Rd Ext (5-8-18).dwgOWNER/DEVELOPER:ENGINEER:SHEET TITLE:CONFIDENTIAL/PROPRIETARYSHEET:DRAWING NAME:UTILIS ENGINEERING, INC.2033 CROSS BEAM DR.CHARLOTTE, NC 28217ofJUSTIN RICEJUSTIN RICEU03079GRIMESLAND BRIDGE RD EXT73REVDESCRIPTIONDATE#Know what's belowCall before you dig.R38PROJECT SHEET STICKS RD (SR 1563)···· · ·CONSTRUCTION NOTESMATCH TO SHEET38MATCH TO SHEET40PROJECT MANAGER:PROJECT ENGINEER:PROJECT NUMBER:DESCRIPTION:U03079-Section 1-Grimesland Bridge Rd Ext (5-8-18).dwgOWNER/DEVELOPER:ENGINEER:SHEET TITLE:CONFIDENTIAL/PROPRIETARYSHEET:DRAWING NAME:UTILIS ENGINEERING, INC.2033 CROSS BEAM DR.CHARLOTTE, NC 28217ofJUSTIN RICEJUSTIN RICEU03079GRIMESLAND BRIDGE RD EXT73REVDESCRIPTIONDATE#Know what's belowCall before you dig.R39PROJECT SHEET STICKS RD (SR 1563)· · ·CONSTRUCTION NOTESMATCH TO SHEET41PROJECT MANAGER:PROJECT ENGINEER:PROJECT NUMBER:DESCRIPTION:U03079-Section 1-Grimesland Bridge Rd Ext (5-8-18).dwgOWNER/DEVELOPER:ENGINEER:SHEET TITLE:CONFIDENTIAL/PROPRIETARYSHEET:DRAWING NAME:UTILIS ENGINEERING, INC.2033 CROSS BEAM DR.CHARLOTTE, NC 28217ofJUSTIN RICEJUSTIN RICEU03079GRIMESLAND BRIDGE RD EXT73REVDESCRIPTIONDATE#Know what's belowCall before you dig.R40PROJECT SHEETMATCH TO SHEET39 STICKS RD (SR 1563)· · ·CONSTRUCTION NOTESMATCH TO SHEET40MATCH TO SHEET42PROJECT MANAGER:PROJECT ENGINEER:PROJECT NUMBER:DESCRIPTION:U03079-Section 1-Grimesland Bridge Rd Ext (5-8-18).dwgOWNER/DEVELOPER:ENGINEER:SHEET TITLE:CONFIDENTIAL/PROPRIETARYSHEET:DRAWING NAME:UTILIS ENGINEERING, INC.2033 CROSS BEAM DR.CHARLOTTE, NC 28217ofJUSTIN RICEJUSTIN RICEU03079GRIMESLAND BRIDGE RD EXT73REVDESCRIPTIONDATE#Know what's belowCall before you dig.R41PROJECT SHEET STICKS RD (SR 1563)· · ·CONSTRUCTION NOTESMATCH TO SHEET41MATCH TO SHEET43 PROJECT MANAGER:PROJECT ENGINEER:PROJECT NUMBER:DESCRIPTION:U03079-Section 1-Grimesland Bridge Rd Ext (5-8-18).dwgOWNER/DEVELOPER:ENGINEER:SHEET TITLE:CONFIDENTIAL/PROPRIETARYSHEET:DRAWING NAME:UTILIS ENGINEERING, INC.2033 CROSS BEAM DR.CHARLOTTE, NC 28217ofJUSTIN RICEJUSTIN RICEU03079GRIMESLAND BRIDGE RD EXT73REVDESCRIPTIONDATE#Know what's belowCall before you dig.R42PROJECT SHEET STICKS RD (SR 1563)· · ·CONSTRUCTION NOTESMATCH TO SHEET42 MATCH TO SHEET44 PROJECT MANAGER:PROJECT ENGINEER:PROJECT NUMBER:DESCRIPTION:U03079-Section 1-Grimesland Bridge Rd Ext (5-8-18).dwgOWNER/DEVELOPER:ENGINEER:SHEET TITLE:CONFIDENTIAL/PROPRIETARYSHEET:DRAWING NAME:UTILIS ENGINEERING, INC.2033 CROSS BEAM DR.CHARLOTTE, NC 28217ofJUSTIN RICEJUSTIN RICEU03079GRIMESLAND BRIDGE RD EXT73REVDESCRIPTIONDATE#Know what's belowCall before you dig.R43PROJECT SHEET STICKS RD (SR 1563)· · ·CONSTRUCTION NOTESMATCH TO SHEET45 PROJECT MANAGER:PROJECT ENGINEER:PROJECT NUMBER:DESCRIPTION:U03079-Section 1-Grimesland Bridge Rd Ext (5-8-18).dwgOWNER/DEVELOPER:ENGINEER:SHEET TITLE:CONFIDENTIAL/PROPRIETARYSHEET:DRAWING NAME:UTILIS ENGINEERING, INC.2033 CROSS BEAM DR.CHARLOTTE, NC 28217ofJUSTIN RICEJUSTIN RICEU03079GRIMESLAND BRIDGE RD EXT73REVDESCRIPTIONDATE#Know what's belowCall before you dig.R44PROJECT SHEETMATCH TO SHEET43 STICKS RD (SR 1563)···· · ·CONSTRUCTION NOTESMATCH TO SHEET44 MATCH TO SHEET46 PROJECT MANAGER:PROJECT ENGINEER:PROJECT NUMBER:DESCRIPTION:U03079-Section 1-Grimesland Bridge Rd Ext (5-8-18).dwgOWNER/DEVELOPER:ENGINEER:SHEET TITLE:CONFIDENTIAL/PROPRIETARYSHEET:DRAWING NAME:UTILIS ENGINEERING, INC.2033 CROSS BEAM DR.CHARLOTTE, NC 28217ofJUSTIN RICEJUSTIN RICEU03079GRIMESLAND BRIDGE RD EXT73REVDESCRIPTIONDATE#Know what's belowCall before you dig.R45PROJECT SHEET STICKS RD (SR 1563)N GRIMESLANDBRIDGE RD (SR 1565)···· · ·CONSTRUCTION NOTESMATCH TO SHEET45 MATCH TO SHEET47PROJECT MANAGER:PROJECT ENGINEER:PROJECT NUMBER:DESCRIPTION:U03079-Section 1-Grimesland Bridge Rd Ext (5-8-18).dwgOWNER/DEVELOPER:ENGINEER:SHEET TITLE:CONFIDENTIAL/PROPRIETARYSHEET:DRAWING NAME:UTILIS ENGINEERING, INC.2033 CROSS BEAM DR.CHARLOTTE, NC 28217ofJUSTIN RICEJUSTIN RICEU03079GRIMESLAND BRIDGE RD EXT73REVDESCRIPTIONDATE#Know what's belowCall before you dig.R46PROJECT SHEET N G R I M E S L A N D BR I D G E R D ( S R 1 5 6 5 )· · ·CONSTRUCTION NOTESMATCH TO SHEET46MATCH TO SHEET48PROJECT MANAGER:PROJECT ENGINEER:PROJECT NUMBER:DESCRIPTION:U03079-Section 1-Grimesland Bridge Rd Ext (5-8-18).dwgOWNER/DEVELOPER:ENGINEER:SHEET TITLE:CONFIDENTIAL/PROPRIETARYSHEET:DRAWING NAME:UTILIS ENGINEERING, INC.2033 CROSS BEAM DR.CHARLOTTE, NC 28217ofJUSTIN RICEJUSTIN RICEU03079GRIMESLAND BRIDGE RD EXT73REVDESCRIPTIONDATE#Know what's belowCall before you dig.R47PROJECT SHEET N G R IM E S L A N D B R I D G E R D ( S R 1 5 6 5 )· · ·CONSTRUCTION NOTESMATCH TO SHEET49PROJECT MANAGER:PROJECT ENGINEER:PROJECT NUMBER:DESCRIPTION:U03079-Section 1-Grimesland Bridge Rd Ext (5-8-18).dwgOWNER/DEVELOPER:ENGINEER:SHEET TITLE:CONFIDENTIAL/PROPRIETARYSHEET:DRAWING NAME:UTILIS ENGINEERING, INC.2033 CROSS BEAM DR.CHARLOTTE, NC 28217ofJUSTIN RICEJUSTIN RICEU03079GRIMESLAND BRIDGE RD EXT73REVDESCRIPTIONDATE#Know what's belowCall before you dig.R48PROJECT SHEETMATCH TO SHEET47 N G R IM E S L A N D B R I DG E R D ( S R 1 5 6 5 )· · ·CONSTRUCTION NOTESMATCH TO SHEET48MATCH TO SHEET50PROJECT MANAGER:PROJECT ENGINEER:PROJECT NUMBER:DESCRIPTION:U03079-Section 1-Grimesland Bridge Rd Ext (5-8-18).dwgOWNER/DEVELOPER:ENGINEER:SHEET TITLE:CONFIDENTIAL/PROPRIETARYSHEET:DRAWING NAME:UTILIS ENGINEERING, INC.2033 CROSS BEAM DR.CHARLOTTE, NC 28217ofJUSTIN RICEJUSTIN RICEU03079GRIMESLAND BRIDGE RD EXT73REVDESCRIPTIONDATE#Know what's belowCall before you dig.R49PROJECT SHEET N G R I M E S L A N D BRI D G E R D ( S R 1 5 6 5 )···· · ·CONSTRUCTION NOTESMATCH TO SHEET49MATCH TO SHEET51PROJECT MANAGER:PROJECT ENGINEER:PROJECT NUMBER:DESCRIPTION:U03079-Section 1-Grimesland Bridge Rd Ext (5-8-18).dwgOWNER/DEVELOPER:ENGINEER:SHEET TITLE:CONFIDENTIAL/PROPRIETARYSHEET:DRAWING NAME:UTILIS ENGINEERING, INC.2033 CROSS BEAM DR.CHARLOTTE, NC 28217ofJUSTIN RICEJUSTIN RICEU03079GRIMESLAND BRIDGE RD EXT73REVDESCRIPTIONDATE#Know what's belowCall before you dig.R50PROJECT SHEET N GRIM E S L A N D BRIDGE R D ( S R 1 5 6 5 )· · ·CONSTRUCTION NOTESMATCH TO SHEET52PROJECT MANAGER:PROJECT ENGINEER:PROJECT NUMBER:DESCRIPTION:U03079-Section 1-Grimesland Bridge Rd Ext (5-8-18).dwgOWNER/DEVELOPER:ENGINEER:SHEET TITLE:CONFIDENTIAL/PROPRIETARYSHEET:DRAWING NAME:UTILIS ENGINEERING, INC.2033 CROSS BEAM DR.CHARLOTTE, NC 28217ofJUSTIN RICEJUSTIN RICEU03079GRIMESLAND BRIDGE RD EXT73REVDESCRIPTIONDATE#Know what's belowCall before you dig.R51PROJECT SHEETMATCH TO SHEET50 N G R I M E S L A N D BRI D G E R D ( S R 1 5 6 5 )···· · ·CONSTRUCTION NOTESMATCH TO SHEET51MATCH TO SHEET53PROJECT MANAGER:PROJECT ENGINEER:PROJECT NUMBER:DESCRIPTION:U03079-Section 1-Grimesland Bridge Rd Ext (5-8-18).dwgOWNER/DEVELOPER:ENGINEER:SHEET TITLE:CONFIDENTIAL/PROPRIETARYSHEET:DRAWING NAME:UTILIS ENGINEERING, INC.2033 CROSS BEAM DR.CHARLOTTE, NC 28217ofJUSTIN RICEJUSTIN RICEU03079GRIMESLAND BRIDGE RD EXT73REVDESCRIPTIONDATE#Know what's belowCall before you dig.R52PROJECT SHEET N G R I M E S L A N D BR I D G E R D ( S R 1 5 6 5 )· · ·CONSTRUCTION NOTESMATCH TO SHEET52MATCH TO SHEET54PROJECT MANAGER:PROJECT ENGINEER:PROJECT NUMBER:DESCRIPTION:U03079-Section 1-Grimesland Bridge Rd Ext (5-8-18).dwgOWNER/DEVELOPER:ENGINEER:SHEET TITLE:CONFIDENTIAL/PROPRIETARYSHEET:DRAWING NAME:UTILIS ENGINEERING, INC.2033 CROSS BEAM DR.CHARLOTTE, NC 28217ofJUSTIN RICEJUSTIN RICEU03079GRIMESLAND BRIDGE RD EXT73REVDESCRIPTIONDATE#Know what's belowCall before you dig.R53PROJECT SHEET N G R I M E S L A N D B R I D G E R D ( S R 1 5 6 5 )· · ·CONSTRUCTION NOTESMATCH TO SHEET55PROJECT MANAGER:PROJECT ENGINEER:PROJECT NUMBER:DESCRIPTION:U03079-Section 1-Grimesland Bridge Rd Ext (5-8-18).dwgOWNER/DEVELOPER:ENGINEER:SHEET TITLE:CONFIDENTIAL/PROPRIETARYSHEET:DRAWING NAME:UTILIS ENGINEERING, INC.2033 CROSS BEAM DR.CHARLOTTE, NC 28217ofJUSTIN RICEJUSTIN RICEU03079GRIMESLAND BRIDGE RD EXT73REVDESCRIPTIONDATE#Know what's belowCall before you dig.R54PROJECT SHEETMATCH TO SHEET53 N G R I M E S L A N D B R I D G E R D ( S R 1 5 6 5 )· · ·CONSTRUCTION NOTESMATCH TO SHEET54MATCH TO SHEET56PROJECT MANAGER:PROJECT ENGINEER:PROJECT NUMBER:DESCRIPTION:U03079-Section 1-Grimesland Bridge Rd Ext (5-8-18).dwgOWNER/DEVELOPER:ENGINEER:SHEET TITLE:CONFIDENTIAL/PROPRIETARYSHEET:DRAWING NAME:UTILIS ENGINEERING, INC.2033 CROSS BEAM DR.CHARLOTTE, NC 28217ofJUSTIN RICEJUSTIN RICEU03079GRIMESLAND BRIDGE RD EXT73REVDESCRIPTIONDATE#Know what's belowCall before you dig.R55PROJECT SHEET N G R I M E S L A N D B R I D G E R D ( S R 1 5 6 5 )· · ·CONSTRUCTION NOTESMATCH TO SHEET55MATCH TO SHEET57PROJECT MANAGER:PROJECT ENGINEER:PROJECT NUMBER:DESCRIPTION:U03079-Section 1-Grimesland Bridge Rd Ext (5-8-18).dwgOWNER/DEVELOPER:ENGINEER:SHEET TITLE:CONFIDENTIAL/PROPRIETARYSHEET:DRAWING NAME:UTILIS ENGINEERING, INC.2033 CROSS BEAM DR.CHARLOTTE, NC 28217ofJUSTIN RICEJUSTIN RICEU03079GRIMESLAND BRIDGE RD EXT73REVDESCRIPTIONDATE#Know what's belowCall before you dig.R56PROJECT SHEET N G R I M E S L A N D B R I D G E R D ( S R 1 5 6 5 )· · ·CONSTRUCTION NOTESMATCH TO SHEET58PROJECT MANAGER:PROJECT ENGINEER:PROJECT NUMBER:DESCRIPTION:U03079-Section 1-Grimesland Bridge Rd Ext (5-8-18).dwgOWNER/DEVELOPER:ENGINEER:SHEET TITLE:CONFIDENTIAL/PROPRIETARYSHEET:DRAWING NAME:UTILIS ENGINEERING, INC.2033 CROSS BEAM DR.CHARLOTTE, NC 28217ofJUSTIN RICEJUSTIN RICEU03079GRIMESLAND BRIDGE RD EXT73REVDESCRIPTIONDATE#Know what's belowCall before you dig.R57PROJECT SHEETMATCH TO SHEET56 N G R I M E S L A N D B R I D G E R D ( S R 1 5 6 5 )···· · ·CONSTRUCTION NOTESMATCH TO SHEET57MATCH TO SHEET59PROJECT MANAGER:PROJECT ENGINEER:PROJECT NUMBER:DESCRIPTION:U03079-Section 1-Grimesland Bridge Rd Ext (5-8-18).dwgOWNER/DEVELOPER:ENGINEER:SHEET TITLE:CONFIDENTIAL/PROPRIETARYSHEET:DRAWING NAME:UTILIS ENGINEERING, INC.2033 CROSS BEAM DR.CHARLOTTE, NC 28217ofJUSTIN RICEJUSTIN RICEU03079GRIMESLAND BRIDGE RD EXT73REVDESCRIPTIONDATE#Know what's belowCall before you dig.R58PROJECT SHEET N G R I M E S L A N D B R I D G E R D ( S R 1 5 6 5 )· · CONSTRUCTION NOTESMATCH TO SHEET58MATCH TO SHEET60PROJECT MANAGER:PROJECT ENGINEER:PROJECT NUMBER:DESCRIPTION:U03079-Section 1-Grimesland Bridge Rd Ext (5-8-18).dwgOWNER/DEVELOPER:ENGINEER:SHEET TITLE:CONFIDENTIAL/PROPRIETARYSHEET:DRAWING NAME:UTILIS ENGINEERING, INC.2033 CROSS BEAM DR.CHARLOTTE, NC 28217ofJUSTIN RICEJUSTIN RICEU03079GRIMESLAND BRIDGE RD EXT73REVDESCRIPTIONDATE#Know what's belowCall before you dig.R59PROJECT SHEET N G R I M E S L A N D B R I D G E R D ( S R 1 5 6 5 )· · CONSTRUCTION NOTESMATCH TO SHEET59MATCH TO SHEET61PROJECT MANAGER:PROJECT ENGINEER:PROJECT NUMBER:DESCRIPTION:U03079-Section 1-Grimesland Bridge Rd Ext (5-8-18).dwgOWNER/DEVELOPER:ENGINEER:SHEET TITLE:CONFIDENTIAL/PROPRIETARYSHEET:DRAWING NAME:UTILIS ENGINEERING, INC.2033 CROSS BEAM DR.CHARLOTTE, NC 28217ofJUSTIN RICEJUSTIN RICEU03079GRIMESLAND BRIDGE RD EXT73REVDESCRIPTIONDATE#Know what's belowCall before you dig.R60PROJECT SHEET N G R I M E S L A N D B R I D G E R D ( S R 1 5 6 5 )TAR RIVER· · CONSTRUCTION NOTESMATCH TO SHEET62PROJECT MANAGER:PROJECT ENGINEER:PROJECT NUMBER:DESCRIPTION:U03079-Section 1-Grimesland Bridge Rd Ext (5-8-18).dwgOWNER/DEVELOPER:ENGINEER:SHEET TITLE:CONFIDENTIAL/PROPRIETARYSHEET:DRAWING NAME:UTILIS ENGINEERING, INC.2033 CROSS BEAM DR.CHARLOTTE, NC 28217ofJUSTIN RICEJUSTIN RICEU03079GRIMESLAND BRIDGE RD EXT73REVDESCRIPTIONDATE#Know what's belowCall before you dig.R61PROJECT SHEETMATCH TO SHEET60 S G R I M E S L A N D B R I D G E R D ( S R 1 5 6 5 )TAR RIVERTAR RIVER· · CONSTRUCTION NOTESMATCH TO SHEET61MATCH TO SHEET63PROJECT MANAGER:PROJECT ENGINEER:PROJECT NUMBER:DESCRIPTION:U03079-Section 1-Grimesland Bridge Rd Ext (5-8-18).dwgOWNER/DEVELOPER:ENGINEER:SHEET TITLE:CONFIDENTIAL/PROPRIETARYSHEET:DRAWING NAME:UTILIS ENGINEERING, INC.2033 CROSS BEAM DR.CHARLOTTE, NC 28217ofJUSTIN RICEJUSTIN RICEU03079GRIMESLAND BRIDGE RD EXT73REVDESCRIPTIONDATE#Know what's belowCall before you dig.R62PROJECT SHEET S GRIMESLANDBRIDGE RD (SR 156 5 )···· · ·CONSTRUCTION NOTESMATCH TO SHEET62MATCH TO SHEET64 PROJECT MANAGER:PROJECT ENGINEER:PROJECT NUMBER:DESCRIPTION:U03079-Section 1-Grimesland Bridge Rd Ext (5-8-18).dwgOWNER/DEVELOPER:ENGINEER:SHEET TITLE:CONFIDENTIAL/PROPRIETARYSHEET:DRAWING NAME:UTILIS ENGINEERING, INC.2033 CROSS BEAM DR.CHARLOTTE, NC 28217ofJUSTIN RICEJUSTIN RICEU03079GRIMESLAND BRIDGE RD EXT73REVDESCRIPTIONDATE#Know what's belowCall before you dig.R63PROJECT SHEET S GRIMESLANDBRIDGE RD (SR 1565)· · ·CONSTRUCTION NOTESMATCH TO SHEET65 MATCH TO SHEET63 PROJECT MANAGER:PROJECT ENGINEER:PROJECT NUMBER:DESCRIPTION:U03079-Section 1-Grimesland Bridge Rd Ext (5-8-18).dwgOWNER/DEVELOPER:ENGINEER:SHEET TITLE:CONFIDENTIAL/PROPRIETARYSHEET:DRAWING NAME:UTILIS ENGINEERING, INC.2033 CROSS BEAM DR.CHARLOTTE, NC 28217ofJUSTIN RICEJUSTIN RICEU03079GRIMESLAND BRIDGE RD EXT73REVDESCRIPTIONDATE#Know what's belowCall before you dig.R64PROJECT SHEET S GRIMESLANDBRIDGE RD (SR 1565)· · ·CONSTRUCTION NOTESMATCH TO SHEET64 PROJECT MANAGER:PROJECT ENGINEER:PROJECT NUMBER:DESCRIPTION:U03079-Section 1-Grimesland Bridge Rd Ext (5-8-18).dwgOWNER/DEVELOPER:ENGINEER:SHEET TITLE:CONFIDENTIAL/PROPRIETARYSHEET:DRAWING NAME:UTILIS ENGINEERING, INC.2033 CROSS BEAM DR.CHARLOTTE, NC 28217ofJUSTIN RICEJUSTIN RICEU03079GRIMESLAND BRIDGE RD EXT73REVDESCRIPTIONDATE#Know what's belowCall before you dig.R65PROJECT SHEETMATCH TO SHEET66 S GR IMESLANDBRIDGE RD (SR 1565 ) POKER HOUSE R D ( S R 1 5 8 9 )· · ·CONSTRUCTION NOTESMATCH TO SHEET65MATCH TO SHEET67PROJECT MANAGER:PROJECT ENGINEER:PROJECT NUMBER:DESCRIPTION:U03079-Section 1-Grimesland Bridge Rd Ext (5-8-18).dwgOWNER/DEVELOPER:ENGINEER:SHEET TITLE:CONFIDENTIAL/PROPRIETARYSHEET:DRAWING NAME:UTILIS ENGINEERING, INC.2033 CROSS BEAM DR.CHARLOTTE, NC 28217ofJUSTIN RICEJUSTIN RICEU03079GRIMESLAND BRIDGE RD EXT73REVDESCRIPTIONDATE#Know what's belowCall before you dig.R66PROJECT SHEET S G R I M E S L A N D B R I D G E R D ( S R 1 5 6 5 )···· · ·CONSTRUCTION NOTESMATCH TO SHEET66MATCH TO SHEET68PROJECT MANAGER:PROJECT ENGINEER:PROJECT NUMBER:DESCRIPTION:U03079-Section 1-Grimesland Bridge Rd Ext (5-8-18).dwgOWNER/DEVELOPER:ENGINEER:SHEET TITLE:CONFIDENTIAL/PROPRIETARYSHEET:DRAWING NAME:UTILIS ENGINEERING, INC.2033 CROSS BEAM DR.CHARLOTTE, NC 28217ofJUSTIN RICEJUSTIN RICEU03079GRIMESLAND BRIDGE RD EXT73REVDESCRIPTIONDATE#Know what's belowCall before you dig.R67PROJECT SHEET S G R I M E S L A N D BRI D G E R D ( S R 1 5 6 5 )· · ·CONSTRUCTION NOTESMATCH TO SHEET69PROJECT MANAGER:PROJECT ENGINEER:PROJECT NUMBER:DESCRIPTION:U03079-Section 1-Grimesland Bridge Rd Ext (5-8-18).dwgOWNER/DEVELOPER:ENGINEER:SHEET TITLE:CONFIDENTIAL/PROPRIETARYSHEET:DRAWING NAME:UTILIS ENGINEERING, INC.2033 CROSS BEAM DR.CHARLOTTE, NC 28217ofJUSTIN RICEJUSTIN RICEU03079GRIMESLAND BRIDGE RD EXT73REVDESCRIPTIONDATE#Know what's belowCall before you dig.R68PROJECT SHEETMATCH TO SHEET67 N B E A U F O R T S T ( S R 1 5 6 5 ) MAINTAINED)(GRIMESLANDRIVER ST· · ·CONSTRUCTION NOTESMATCH TO SHEET68MATCH TO SHEET70PROJECT MANAGER:PROJECT ENGINEER:PROJECT NUMBER:DESCRIPTION:U03079-Section 1-Grimesland Bridge Rd Ext (5-8-18).dwgOWNER/DEVELOPER:ENGINEER:SHEET TITLE:CONFIDENTIAL/PROPRIETARYSHEET:DRAWING NAME:UTILIS ENGINEERING, INC.2033 CROSS BEAM DR.CHARLOTTE, NC 28217ofJUSTIN RICEJUSTIN RICEU03079GRIMESLAND BRIDGE RD EXT73REVDESCRIPTIONDATE#Know what's belowCall before you dig.R69PROJECT SHEET N BEAUFORT ST (SR 1565)BRYANT ST (SR 1568)···· · ·CONSTRUCTION NOTESMATCH TO SHEET69MATCH TO SHEET71 PROJECT MANAGER:PROJECT ENGINEER:PROJECT NUMBER:DESCRIPTION:U03079-Section 1-Grimesland Bridge Rd Ext (5-8-18).dwgOWNER/DEVELOPER:ENGINEER:SHEET TITLE:CONFIDENTIAL/PROPRIETARYSHEET:DRAWING NAME:UTILIS ENGINEERING, INC.2033 CROSS BEAM DR.CHARLOTTE, NC 28217ofJUSTIN RICEJUSTIN RICEU03079GRIMESLAND BRIDGE RD EXT73REVDESCRIPTIONDATE#Know what's belowCall before you dig.R70PROJECT SHEET SCHOOL ST (SR 1568)BRYANT ST (SR 1568)· · ·CONSTRUCTION NOTESMATCH TO SHEET70 MATCH TO SHEET72 PROJECT MANAGER:PROJECT ENGINEER:PROJECT NUMBER:DESCRIPTION:U03079-Section 1-Grimesland Bridge Rd Ext (5-8-18).dwgOWNER/DEVELOPER:ENGINEER:SHEET TITLE:CONFIDENTIAL/PROPRIETARYSHEET:DRAWING NAME:UTILIS ENGINEERING, INC.2033 CROSS BEAM DR.CHARLOTTE, NC 28217ofJUSTIN RICEJUSTIN RICEU03079GRIMESLAND BRIDGE RD EXT73REVDESCRIPTIONDATE#Know what's belowCall before you dig.R71PROJECT SHEET SCHOOL ST (SR 1568)SC H O O L S T ( S R 1 5 6 8 )· · ····CONSTRUCTION NOTESMATCH TO SHEET73PROJECT MANAGER:PROJECT ENGINEER:PROJECT NUMBER:DESCRIPTION:U03079-Section 1-Grimesland Bridge Rd Ext (5-8-18).dwgOWNER/DEVELOPER:ENGINEER:SHEET TITLE:CONFIDENTIAL/PROPRIETARYSHEET:DRAWING NAME:UTILIS ENGINEERING, INC.2033 CROSS BEAM DR.CHARLOTTE, NC 28217ofJUSTIN RICEJUSTIN RICEU03079GRIMESLAND BRIDGE RD EXT73REVDESCRIPTIONDATE#Know what's belowCall before you dig.R72PROJECT SHEETMATCH TO SHEET71 SC H O O L S T ( S R 1 5 6 8 )· · ···CONSTRUCTION NOTESMATCH TO SHEET72PROJECT MANAGER:PROJECT ENGINEER:PROJECT NUMBER:DESCRIPTION:U03079-Section 1-Grimesland Bridge Rd Ext (5-8-18).dwgOWNER/DEVELOPER:ENGINEER:SHEET TITLE:CONFIDENTIAL/PROPRIETARYSHEET:DRAWING NAME:UTILIS ENGINEERING, INC.2033 CROSS BEAM DR.CHARLOTTE, NC 28217ofJUSTIN RICEJUSTIN RICEU03079GRIMESLAND BRIDGE RD EXT73REVDESCRIPTIONDATE#Know what's belowCall before you dig.R73PROJECT SHEET