Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
20120900 Ver 1_ External Falls Flow Monitoring_20180509
Strickland, Bev From: Jody Smet <jsmet@cubecarolinas.com> Sent: Wednesday, May 09, 2018 7:46 PM To: Tarver, Fred; Mcdaniel, Chonticha; Jerald Robinson; Styer, Tami; Neal Simmons; Brandon Beres; Eli Hopson Subject: [External] RE: Yadkin Project (FERC No. 2197) - Falls Flow Monitoring Attachments: Flow Monitoring Proposal_5-9-2018.docx; flow out of narrows_5-9-2018.docx All, I apologize for the delay. When we last spoke on March 20, Cube Yadkin committed to drafting a flow monitoring proposal that addressed the concerns you expressed during our call. I have attached a proposal for your review and comment. Additionally, both NCDEQ and Duke have asked for information to support the claim that the flow out of Narrows = the flow out of Falls. I have also attached a short discussion and some supporting data that address this question. Please review both documents and send us your feedback. I'm also happy to schedule a call to discuss further, if necessary. Thanks, Jody J. Smet, AICP Cube Hydro Carolinas (0) 804-739-0654 (C) 804-382-1764 CUBEHYDRO CAROLINAS CONFIDENTIALITY NOTICE: This e-mail and any files transmitted with it are confidential and intended solely for the use of the individual or entity to which they are addressed. If you are not the intended recipient, you may not review, copy, or distribute this message. If you have received this email in error, please notify the sender immediately and delete the original message. Neither the sender nor the company for which he or she works accepts any liability for damage caused by any virus transmitted by this email -----Original Appointment ----- From: Jody Smet Sent: Tuesday, March 20, 2018 1:18 PM To: Jody Smet; Tarver, Fred; Mcdaniel, Chonticha; Jerald Robinson; Styer, Tami; Neal Simmons; Brandon Beres; Eli Hopson Subject: Yadkin Project (FERC No. 2197) - Falls Flow Monitoring When: Thursday, March 22, 2018 3:30 PM -4:30 PM (UTC -05:00) Eastern Time (US & Canada). Where: Dial 1-515-604-9768 Enter 989008# To discuss permanent flow monitoring device below Falls Dam. High Rock Cube plans to install a side looking doppler current meter (SLDCM) on the upstream side of the Denton Water Intake structure below the High Rock Dam (Figure 1). The river at this point, is approximately 650ft wide and ranges in depth from approximately 12ft on the Denton side, to 6ft on the opposite bank (see Figure 2 and Figure 3). The SLDCM instrument selected for flow measurement is a SonTek-SL500 which a vertical beam width of 3.8°, a resolution of 0.001m/s and an accuracy of ±1% measured velocity. The Denton structure was chosen for two reasons; first, approx. 60% of the water flow is seen in the first third of the transect on the Denton side of the river. Measuring in this higher flow area will allow the SLDCM to accurately measure the stream flow. Second, installing the system on the upstream side of the structure will provide some protection from debris that get sent downstream during discharge events while still being able to give reliable live data during these events. The SLDCM will be mounted on a rail system that will allow the sensor to be easily removed from the water for maintenance and placed back at the same elevation prior to the maintenance. This will ensure that the SL -500 is always placed at the same elevation. Additionally, a staff gauge will also be installed next to the SL -500 To further ensure that the sensor is placed back at the same elevation and to also verify that the depth readings are accurate. River discharge, bathymetry, velocity, and elevation will be characterized by measurements taken with a SonTek M9 Doppler River Surveyor unit [1] [2]. The characterized measurements will be used with to the SL -500 measurements to develop a discharge curve. This curve will be characterized over a variety of flows and its accuracy is expected to grow with time. The SL -500s will report the measured velocity data to a solar powered telemetry system on shore that will transmit the data via cell signal to a Cube Hydro server for display on the website. Cube plans on having these devices installed, operational, and transmitting data no later than 9/28/2018. Both, the SonTek SL meter and the M9 Doppler Surveyor are used by USGS to determine real time Water Velocities [3] [4] [2]. Narrows Cube plans to discontinue flow monitoring below the Falls dam in favor of the more accurate monitoring of flow through the Narrows penstocks. The flow through the Narrows Dam is equal to the flow out of the Falls Dam. Cube plans to install Ultrasonic Time Transit (Figure 4) RISONIC Type C transducers in a multipath (Figure 5) configuration at the base of each of the Narrows penstocks. These flow meters will be mounted near the base of the penstocks outside of the scroll case and provide continuous accurate flow monitoring measurements. The diameter of the penstock at this point is 15ft and the RISONIC Type C Transducer has a measuring distance of 4.6-32.8ft with an estimated flow accuracy of 1-2%. The transducers use the Ultrasonic Transit Time method (Figure 4) to measure the water velocity. The Transit Time method measures the difference between the transit time upstream to downstream to calculate the mean path velocity. In some cases, USGS also uses this method to determine water velocity [4]. The RISON IC Transducers will report the measured data back to a RISON IC Ultrasonic Transit Time Module, which will in turn feed data back to our operations sever for display on the website. Cube plans on having these devices installed, operational, and transmitting data no later than 9/28/2018. Any water that does not go through the penstock, such as during a bypass, will be characterized by the existing weir tables and automatically added to measured turbine discharge so the flow that is recorded and displayed on the site webpage is reflective of the total discharge. Figure 1: SLDCM Flow Monitoring Proposed Location Figure 2: High Rock Transect Location 9'Win0lrxr Q-Teleb7ne RG]nmumenss-9Pay KVpmlabe Hydmwh[PJfdacJsi O�MighP«IS0006_18-0]-2zL034L4.P00AL File [',,figure View Acquire Playback Window Help AM NIM k N NNtIE4$'-v©l-Cf i®I. 4 f{1 '+MeasuremeWCW -.00� +e lnrenziry profile l -TRO[ �'�{ +Stick$M1ip Tmck l-IRpI + Field [onlig'rad'n �eaml �aam2 �eam7 �6eam4 —SM1O TranAvere� 4 Nrybark COMIBUMbn - © Tram 933 ® High9 l,.g m3 TB-gT-2z 10a Hi9hRxk-o 003_1&01-Yzm: � Fleltl Cgnllg'ra"n 4 NaybnOr [aMiguratinn Q Rignnock_'_o0o_1a-'I-zz_l0� -B Rignnock.g oda_Ta-m-zzrd3'. Fieltl C'nfigurati'n b N^Y�[nmlgurntinn r: D Tramett005 6 D Trame M -© rra reecr007 + Gischarge5ummary A . QAIQC J + CoI—Gars m A + citycomaprI--t,t �'rv�oa�� iep' oe � �6am�� a oaph 1% 1% 2S5 Irroe vry[co m] .31 OC® �Cpmppsire Tabularl TRO] u� Ens. Nmb_Nmb. d E. Lost Ens_ Calc. oeplh 110212017 0 169.21 [mj Ens_ %Batl Bins Delta Timm u 1% 0.29 eeBatl Janunry22,201910:49:02.30 - PRch Rdl Headi.g -6.50° 6.27° 764.37° Temp. P—Se- 3.64'C 0.57 m '- --------------- 04ch9rye (Rot: BT) flight to LA Goctl Bins fi Top 0 46.780 [.%] Measnretl Q 61.507 [WN -- Bp0'm0 20789 [mN LOG5.413 [m'/s] Right 0.993 TWa10 139.893 -r0.0 25.r 933 95] r383 M9T Comecletl 0 138.893 [iii'/e] Gistarim East (Fiat_ BT) [ml N9V1988Gn (Rot: BT) Bpat $peetl D -M [misl UL� = B'Bt c-,— 110 60 [°] E—bla Numb. Figure 3: High Rock Transect Data Water Speed 0.766 [misl Water Di, 149A11 ['] _ Calc. oeplh 2,764 [ml Length 169.21 [mj D shilce MG 16809 [m] me MG 49.52 [°] 'Gou Oumfion 567.68 [s] G -Rei Ldd'de G Rei Longitotle WiiNde 35° 36.972009' N Lmgllude 80° 13.917889' W E—bla Numb. Figure 3: High Rock Transect Data Ultrasonic Transit Time Method • Difference between transit time Upstream and downstream This transit time difference is directly proport€onaE to the mean path velocity velocity muitiplied with cross sectional area of pipe or channel results in [1I9,y& 1 -- Figure 4: Ultrasonic Time Transit Time Method Info on multiple paths and multiple planes... E _ # planes (1 or 2) P = TOTAL # paths in all planes With respect to a horizontal place in the middle of the cross-section, the transducers are placed at the following angles 1E1P / 1E2P zero (i.e. on the horizontal plane) 1E2P / 2E4P +/- 30 degrees 1E4P / 2E8P +/- 18 deg. and +/- 54 deg. Figure 5: Flow Meter Configuration Information Bibliography [1] U.S. Geological Survey, Discharge Measurements at Gaging Stations, Reston Virginia: U.S. Department of the Interior, 2010. [2] J. A. B. K. A. O. (USGS), "Validation of Streamflow Measurements Made with M9 and," [Online]. Available: https://hydroacoustics.usgs.gov/publications/Validation-RRay-M9-Boldt0berg-sm.pdf. [3] USGS, "Velocity Meter Deployments," [Online]. Available: https://hydroacoustics.usgs.gov/indexvelocity/deployments.shtml. [4] USGS, "Index -velocity and Other Fixed -deployment Instruments," [Online]. Available: https://hydroacoustics.usgs.gov/indexvelocity/instruments.shtml#advm. On January 191h 2018, Normandeau Associates was contracted to measure the discharge flow below the Falls dam. Normandeau used a SonTek Doppler River Surveyor Sensor in conjunction with a NAVD88 GPS to take the measurements. Over the course of 30 minutes (12:30pm-1pm), Normandeau took a total of 4 transect measurements. These 4 measurements, were then averaged to get an estimated discharge of 5,041cfs below the Falls Dam. Our calculated estimates of the discharge flow out of the Narrows Dam at that time was 5109cfs. The difference between the two flows is %1.35, which is well within the tolerance of error for both the calculated estimates and the Normandeau discharge measurements. There are no significant stream inflows, discharges or withdraws between the dams and the water that exits Narrows must exit Falls shortly after. The measurements described above support this equivalence in flow out of the Narrows and Falls. River bank convention is that "Right" bank is to the person's right Average 5040.64 when looking downstream from on the transect. Mean River Total Transect River Width Transect Velocity Discharge Transect Start Banki (ft) Area (ftz) (ft/s) (ft3/s) 1 R 856.30 6585.90 0.75 4958.53 2 L 807.74 6320.78 0.82 5084.96 3 R 797.57 6220.25 0.82 5164.06 4 L 828.41 6340.59 0.79 4955.00 River bank convention is that "Right" bank is to the person's right Average 5040.64 when looking downstream from on the transect.