HomeMy WebLinkAbout20090104 Ver 6_Modification_20180509Action History (UTC-05:00) Eastern Time (US & Canada)
�brrrit by Anonymous User 5/9/2018 5:42:53 PM (Message Start Event)
Accept by Carpenter,Kristi 5/9/2018 5:44:00 PM (DOT project)
. The task was assigned to Carpenter,Kristi. The due date is: May 14, 2018 5:00 PM 5/9/2018 5:43 PM
Water Resources
ENVIRONMENTAL �UPLITV
Staff Review
ID#* Version* 6
20090104
Is this project a public transportation project? * �' Yes
�' No
Reviewer List:* Rob Ridings:eads\rgridings
Select Reviewing Office:* Central Office -(919) 707-9000
Submittal Type:*
Modifications
Does this project require a request for payment to be sent? *
l'
Yes
r•
No
Project Submittal Dated 5/9/2018
*
Please note: fields marked with a red asterisk beloware required. You will not be able to submit the form until all
mandatory questions are ans�red.
Project Type:* �' New Project
C' Pre-Application Submittal
C' More Information Response
r Other Agency Comments
l' For the Record Only (Courtesy Copy)
New Project - Please check the new project type if you are trying to submit a new project that needs an official approval
decision.
Pre-Application Submittal - Please check the pre-application submittal if you just want feedback on your submittal and
do not have the e�ectation that your submittal will be considered a complete application requiring a formal decision.
More Information Response - Please check this type if you are responding to a request for information from staff and
you have and ID# and version for this response.
Other Agency Comments - Please check this if you are submitting comments on an ebsting project.
Project Contact Information
Name:
Email Address:*
Project Information
Project Name:*
Kristi Lynn Carpenter for Chris Rivenbark
Who is subrritting the irrforrration?
crivenbark@ncdot.gov
Rolesville Bypass on US 401(R-2814 A, B& C)
Is this a public transportation project? *
C•' Yes
C' No
Is the project located within a NC DCM Area of Environmental Concern (AEC)?*
C' Ye�" No �' Unknown
TI P#:
R-2814C
County (ies) *
Wake
WBS#:
34506.1.1
(Applies to DOT projects only)
Please upload all files that need to be submited.
C7ick the upload button or drag and drop files here to attach docurrent
R-2814C Individual Modification Wake Franklin May
9 2018.pdf
20090104v.6 Email.pdf
Only pdf or Ime files are accepted.
Describe the attachments:
Originally submitted via email by Chris Rivenbark.
7.22MB
85.2KB
* rJ By checking the box and signing box below, I certify that:
o I have given true, accurate, and complete information on this form;
o I agree that submission of this form is a"transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the
"Uniform Electronic Transactions AcY')
o I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes
(the "Uniform Electronic Transactions AcY');
o I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written
signature; AND
o I intend to electronically sign and submit the online form."
Signature:
::�jr'�ltr'�j+rrr ['��r�t�.r�frt
Submittal Date:
STATE OF NORTH CAROLINA
DEPARTMENT OF TRANSPORTATION
ROY COOPER
GOVERNOR
May 9, 2018
US Army Corps of Engineers
Raleigh Regulatory Field Office
3331 Heritage Trade Dr., Suite 105
Wake Forest, NC 27587
Attention: Eric Alsmeyer
NCDOT Coordinator, Division 5
JAMES H. TROGDON, III
SECRETARY
Subject: Modification Request for Section 404 Individual Permit, Individual Section 401
Water Quality Certification, Neuse Buffer Authorization, and Issuance of Tar-
Pamlico Buffer Authorization for the Rolesville Bypass from NC 96 (Zebulon Road) to
SR 1103 (Flat Rock Church Road/Clifton Pond Road), Wake/Franklin Counties, Federal
Aid No. STP-401(249), State Project No. 81403001, Division 5, TIP R-2814 C.
Debit $570.00 from WBS Element 34506.1.1.
Reference: Section 404 Individual Permit, issued July 14, 2009, USACE Action ID 2008-01316
Section 404 Individual Permit modification, issued December 6, 2016
Section 401 Individual Water Quality Certification, Isolated Wetlands Permit and Neuse Riparian
Buffer Authorization issued June 16, 2009, NCDENR-DWQ Water Quality Certification Project
No. 20090104 ver.l
Modification to the 401 Water Quality Certification, Isolated Wetlands Permit and Neuse & Tar-
Pamlico Buffer Rules issued November 18, 2016, NCDWR Project No. 20090104 ver. 5.
Dear Sir:
Please see the enclosed revised permit drawings and impact summary sheets for the above referenced
project.
Due to the installation of a new driveway access along US 401 (Sta. —L- 311+74 RT), there will be an
additiona10.02 acre of inechanized clearing in jurisdictional wetlands (Permit Drawings Site 13B). An
additional impact to Tar-Pamlico riparian buffers will occur due to this work totaling impacts of 1,013
square feet in zone 1 and 1,991 square feet in zone 2(Buffer Permit Drawings Site 9D).
Also, the design has been revised at Site 14 (Sta. —L- 314+63 RT<). The raised grade at this site will
result in an additiona10.01 acre of inechanized clearing in jurisdictional wetlands (Pernut Drawing Site
14). Additionally, the raised grade will cause the proposed culvert to be lengthened by 5 linear feet.
Bank stabilization at this site is adjusted for this increased culvert resulting in no net change in permanent
stream impact.
MailingAddress: Telephone: (919)707-6000 Location:
NC DEPARTMENT OF TRANSPORTATION FCIx: �919� 212-5%$S 1 OZO BIRCH RIDGE DffiVE
ENVIRONMENT ANALYSIS UNIT CuStO»t2Y' SC7'ViC¢: 1-H%%-36H-496H RALEIGH NC 2%61O
IS9g MAIL SERVICE CENTER Website: www.ncdot.gov
R.ai,EiGx NC 27699-1598
During review of the buffer drawings for the permit modification request it was noticed that the buffer
impacts for Site 9C were incorrect. Values for Zone 1 and Zone 2 had been reversed. This modification
corrects these values on the buffer impact summary sheet. Total impacts to Tar-Pamlico riparian buffers
(03020101) are 71,894 sq ft for Zone 1 and 51,226 sq ft for Zone 2. Mitigable impacts to Tar-Pamlico
buffers, minus buffers in wetlands is 60,150 sq ft for Zone 1 and 37,584 sq ft for Zone 2. There are no
change in impacts to buffers in the Neuse River basin as a result of these revisions.
Miti ag tion
Compensatory mitigation for the additional, unavoidable impacts to jurisdictional features is reflected in
the attached revised DMS acceptance letter. These changes include an additiona10.03 acre of
mechanized clearing in wetland mitigated at a 1:1 ratio, 5 linear feet of permanent stream impact
mitigated at 2:1.
A copy of this modification request will be posted on the NCDO�' website at
htt�s://connect.ncdot.�ov/resources/Environmental/. If you have any questions or need additional
information, please contact Jason Dilday at 919-707-6111 or jldilday@ncdot.gov.
Sincerely,
e.
� �
Philip S. Harris III, P.E., C.P.M.
Environment Analysis Unit
cc: NCDOT Permit Application Standard Distribution List
Environmentdl
Quality
ROY COOPER
Cc��ernor
Mr. Philip S. Harris, III, P.E., CPM
Environmental Analysis Unit
North Carolina Department of Transportation
1598 Mail Service Center
Raleigh, North Carolina 27699-1598
Dear Mr. Harris:
Subj ect:
Reference:
November 18, 2016
Mitigation Acceptance Letter:
TIP Number R-2814C, US 401 Improvements from NC 96 to SR 1103, Wake and
Franklin Counties
USACE 404 Individual Permit issued December 6, 2016 (USACE Action ID 2008-
01316)
NCDWR 401 Water Quality Certiiication {WQC) issued November 18, 2016 (NCDWR
ID 2009-0104)
The purpose of this letter is to notify you that the Division of Mitigation Services (DMS) will provide
the additional stream, riparian wetland and Uuffer mitigation for the subject project. Based on the information
supplied by you on March 28, 2018, the additional impacts are located in CU 03020101 of the Tar-Pamlico
River Basin in the Central Piedmont (CP) Eco-Region, and are as follows:
Table 1— Additional
Tar-Pamlico
03020101
I CP
Impacts (feedacres)
�cts (feet / acres / sr�uare
Stream
Cold Cool Warm
0 0 5.0
Wetlands
�p�� , Non-
Ri 7arian
0.03 0
Buffer (Sq. Ft.)
Coastal Zone 1 Zone 2
Marsh (3:1) (1.5:11
461.0 j 1,784.0
*NOTE: Some of the stream impacts may be pmposed to be mitigated at a 1:1 mirigation ratio. See permit application for details.
These impacts and associated mitigation needs were not projected by the NCDOT in the 2018 impact data.
DMS is currently providing stream, riparian wetland, and buffer mitigation for the impacts associated with this
project located in cataloging unit 03020201 of the Neuse River basin and cataloging unit 03020101 of the Tar-
Pamlico River basin as required by the 404 and 401 pernuts issued in December and November 2016, as shown
in the below table (in mitigation credits}:
�Nothing Compares�,�
State of North Carolina I Environmental Quality
217 West Jones Street I 160] Mail Service Center I Raleigh, North Carolina 27699 7601
919 707 8600
Mr. Harris
TIP R-2814C
March 28, 2018
Page Two
Table 2— Current Permitted Impacts and Associated Mitigation Requirements provided by DMS (based
on 2016 permits) and Revised Anticipated Impacts (based on mitigation request)
Tar-Pamlico 03020101
Total Permitted Mitigation Provided by Additional Revised Total
Impact Type Impacts DMS per Issued Impact (for Impacts*
(feet / acre / sq ft) Permits (Credits) approval)
Stream 1,021.0 1,710.0 5.0 1,026.0
Ri arian Wetland 0.33 0.59 0.03 0.36
Riparian Buffer —
Zone 1 59,689.0 179,067.0 461.0 60,150.0
Riparian Buffer —
Zone 2 35,800.0 53,700.0 1,784.0 56,376.0
�5ome ot tne addrtional wetland unpacts may be proposed to be mitigated at a 1:1 mitigation ratio. See permit application for details.
DMS will provide the amount of mirigation as determined by the regulatory agencies.
All buffer mitigation requests and approvals are administrated through the Riparian Restoration Buffer
Fund. The NCDOT will be responsible to ensure that appropriate compensation for the buffer mitigation will be
provided in the agreed upon method of fund transfer. Upon receipt of the NCDWR's Buffer Authorization
Certification, DMS will transfer funds from the NCDOT 2984 Fund into the Riparian Restoration Buffer Fund.
Upon completion of transfer payment, NCDOT will have completed its riparian buffer mitigation responsibility
for TIP Number R-2814C. Subsequently, DMS will conduct a review of current NCDOT ILF Program
mitigation projects in the river basin to determine if available buffer mitigation credits exist. If there are buffer
mitigation credits available, then the Riparian Restoration Buffer Fund will purchase the appropriate amount of
buffer mitigation credits from NCDOT ILF Program.
This impact and associated mitigation need were under projected by the NCDOT in the 2018 impact
data. DMS will commit to implement sufficient compensatory mitigation credits to offset the additional impacts
associated with this project as determined by the regulatory agencies using the delivery tixneline listed in Section
F3.c.iii of the In-Lieu Fee Instrument dated July 28, 2010. If you have any questions or need additional
information, please contact Ms. Beth Harmon at 919-707-8420.
Sincerely,
' ,-'�,'�`.''`� ��' , -�
�
James B � Stanfill
Asset �anagement Supervisor
Cc: Mr. Eric Alsmeyer, USACE — Raleigh Regulatory Field Office
Ms. Amy Chapman, NCDWR
File: R-2814C Additional
�Nothing Compares�.,�._
State of North Carolina I Environmenta! Quatity
217 West Jones Street � 1601 Mail Service Center � Raleigh, North Carolina 27699-1601
919 707 8600
� �j����� ���, Norch Carolina Department of Transportation
Sti)1't73tiVrd1PF Highway Stormwater Program
��
STORMWATER MANAGEMENT PLAN �'-�---•
(Version 2.07; Released October 2016) FOR NCDOT PROJECTS
WBS Element: 34506.1.1 TIP No.: R-2814C County�ies): Wake Franklin Page 1 of 2
General Project Information
WBS Element: 34506.1.1 TIP Number: R-2814C Project T pe: Roadwa Widenin Date: 3/8/2018
NCDOT Contact: Linda Johns Contractor I Desi ner: NCDOT H draulics Unit
Address: 1590 Mail Service Center Address: 1590 Mail Service Center
Raleigh, NC 27699-1590 Raleigh, NC 27699-1590
Phone: 919-707-6728 Phone:
Email: Im'ohns ncdot. ov Email:
Cit ITown: Rolesville Count ies : Wake Franklin
River Basin s: Neuse Tar-Pamlico CAMA Count ? No No
Wetlands within Project Limits? Yes
Pro'ect Description
Pro'ect Len th lin. miles or feet : 6.6 miles Surroundin Land Use: Rolling topography, agriculture, forests, rural residential, changing to urban
Proposed Pro�ect Existin Site
Pro'ect Buiit-Upon Area ac. 61.0 ac. 28.0 ac.
Typical Cross Section Description: The proposed cross-section for most of the project is four-lane, 46 ft. median divided Existing US 401 is a two to three-lane roadway, with variable width grass shoulders.
section, utilizing 4 ft paved shoulders. North of -Y8-, Beaver Dam Dr. to the end of this The existing roadway has 10 ft lane widths, with 2 ft paved shoulders.
portion of the project, a four-lane 20 ft median divided section utilizing curb and gutter is
proposed . Lanes along the -L- line are typically 12 ft, and 10 ft on the -Y- lines.
Annual Avg Daily Tra�c (veh/hr/day): Desi n/Future: 15,848 Year: 2036 Existin : 10,892 Year: 2016
General Project Narrative: Design Rev 3-8-18 includes new driveway at -L- Sta 311+74 RT. Design rev 6-30-17 includes raising the grade at Site 14, left turn bulb widening throughout and
(Description of Minimization of Water revision to spread criteria due to increased design speed within curb and gutter portion of the project. R-2814C is the third part of four on R-2814, widening of US 401
Quality Impacts) in Wake and Franklin Counties from SR 2044 (Ligon Mill Rd) to SR 1700 (Fox Park Rd) in Louisburg, to a four-lane, median divided, superstreet design facility. Widening will be
to the east or to the west of the existing two lanes of US 401. The proposed project is needed to alleviate the existing and future capacity deficiencies along US 401.
Best Management Practices include utilization of an open shoulder typical section, as well as steepening fill slopes (and providing guardrail) to minimize impacts to jurisdictional
features.
Grass swales are proposed primarily as stormwater control measures where possible throughout the Neuse River basin, WS II (HQW) NSW areas, and in areas adjacent to
jurisdictional features in the Tar-Pam River basin Class C, NSW areas. In open shoulder areas, shoulder berm gutter are proposed to capture roadway runoff into storm drain
systems and route to outlets located far enough away from jurisdictional features so grass swale treatment could be obtained prior to reaching wetland, jurisdictional stream
and/or buffer zone. Design revision created adjustments to the grass swales, noted in red on the Grass Swale Tab.
Rip Rap bank stabilization is included in the design upstream and downstream of all major stream crossings, and downstream of all minorjurisdictional stream crossings. Rip
rap at embankment is also added at the ends of ditches that outlet to jurisdictional streams. Rip rap toe protection is proposed at the bottom of all fill slopes that are adjacent to
wetlands. Flat rip rap pads were used at the ends of ditches to slow velocities and diffuse concentrated flow.
Environmental Site Design is proposed as a stormwater control device for roadway drainage entering Crooked Creek Trib 3.
Waterbody Information
Surface Water Body (1): Little River NCDWR Stream Index No.: 27-57-(1)a
NCDWR Surface Water Classification for Water Body Primary Classification: Water Supply II (WS-II)
Supplemental Classification: High Quality Waters (HQW (NSW)
Other Stream Classification:
Impairments: biological impairment
Aquatic T&E Species? Yes Comments: Biological conclusions for Michaux's sumac, dwarf-wedge mussel, and Tar River spiny mussel are unresolved
NRTR Stream ID: Buffer Rules in Effect: Neuse
Project Includes Bridge Spanning Water Body? No Deck Drains Discharge Over Buffer? N/A Dissipator Pads Provided in Buffer? N/A
Deck Drains Discharge Over Water Body? N/A (If yes, provide justification in the General Project Narrative) (If yes, describe in the General Project Narrative; if no, justify in the
(If yes, provide justifcation in the General Project Narrative) General Project Narrative)
[ Ii�hw� �lti' North Carolina Department of Transportation
�tunia�•vat�r
— Highway Stormwater Program �'t
STORMWATER MANAGEMENT PLAN `' �'=�"�
(Version 2.07; Released October 2016) FOR NCDOT PROJECTS
WBS Element: 34506.1.1 TIP No.: R-2814C County(ies): Wake Franklin Page 2 of 2
Additional Waterbod Information
Surface Water Bod (2 : Little River Trib 3 NCDWR Stream Index No.: 27-57-(1
NCDWR Surface Water Classification for Water Body Prima Classification: Water Su I II WS-II
Supplemental Classification: Hi h Qualit Waters HQW NSW
Other Stream Classification:
Impairments:
Aquatic T8E Species? Yes Comments: Biolo ical conclusions for Michaux's sumac, dwarf-wed e mussel, and Tar River s in mussel are unresolved
NRTR Stream ID: Buffer Rules in Effect: Neuse
Pro'ect Inciudes Brid e Spanning Water Bod ? No Deck Drains Dischar e Over Buffer? N/A Dissipator Pads Provided in Buffer? N!A
Deck Drains Discharge Over Water Body? N/A (If yes, provide justification in the General Project Narrative) (If yes, describe in the General Project Narrative; if no, justify in the
(If yes, provide justification in the General Project Narrative) General Project Narrative)
Surtace Water Bod 3: UT to Little River Trib 3b NCDWR Stream Index No.: 27-57-(1
NCDWR Surface Water Classification for Water Body Primar Classification: Water Su I II WS-II
Supplemental Classification: Hi h Qualit Waters HQW NSW
Other Stream Classification:
Im airments:
Aquatic TB,E Species? Yes Comments: Biolo ical conclusions for Michaux's sumac, dwarf-wed e mussel, and Tar River s in mussel are unresolved
NRTR Stream ID: Buffer Rules in Effect: Neuse
Pro'ect Inciudes Brid e Spannin Water Bod 7 No Deck Drains Dischar e Over Buffer? N/A Dissipator Pads Provided in Buffer? N/A
Deck Drains Dischar e Over Water Bod ? N/A (If yes, provide justification in the General Project Narrative) (If yes, describe in the General Project Narrative; if no, justify in the
(If yes, provide justification in the General Project Narrative) General Project Narrative)
Surface Water Bod (4�: Crooked Creek Trib 3(Clifton's Pond) NCDWR Stream Index No.: 28-30-01
NCDWR Surface Water Classification for Water Body Primar Classification: Class C
Supplemental Classification: Nutrient Sensitive Waters (NSW
Other Stream Classification:
Im airments:
Aquatic T&E Species? Yes Comments: Biolo ical conclusions for Michaux's sumac, dwarf-wed e mussel, and Tar River spin mussel are unresolved
NRTR Stream ID: Buffer Rules in Effect: Tar-Pamlico
Project Includes Bridge Spanning Water Body? No Deck Drains Discharge Over Buffer? N/A Dissipator Pads Provided in Buffer? N/A
Deck Drains Discharge Over Water Bod ? N/A Qf yes, provide justification in the General Project Narrative) (If yes, describe in the General Project Narrative; if no, justify in the
(If yes, provide justification in the General Project Narrative) General Project Narrative)
Surface Water Body (5): Crooked Creek NCDWR Stream Index No.: 28-30
NCDWR Surface Water Classification for Water Body Prima Classification: Class C
Supplemental Classification: Nutrient Sensitive Waters NSW
Other Stream Classification:
Im airments: dissolved ox en DO
Aquatic T&E Species? Yes Comments: Biolo ical conclusions for Michaux's sumac, dwarf-wed e mussel, and Tar River s in mussel are unresolved
NRTR Stream ID: Buffer Rules in Effect: Tar-Pamlico
Pro'ect Includes Brid e Spannin Water Bod ? No Deck Drains Dischar e Over Buffer? N/A Dissipator Pads Provided in Buffer? N/A
Deck Drains Dischar e Over Water Bod ? N/A (If yes, provide justification in the General Project Narrative) (If yes, describe in the General Project Narrative; if no, justify in the
(If yes, provide justification i� the General Project Narrative) General Project Narrative)
�
i
c
rn
v
m
3
LI
�I
'O
.\
_
u�
v
ro
N
K
�
O
3
m
0
�
�
�
v
c
0
m
3
c
a
a
�
m
0
a
0
c
d
E
c
0
.�
c
w .+>
N I :i
� iR
K
W
1
N
�
�
�
x �
v
�o -
N '� i-
��.;,�
�':�;� �
�_
o^
^�iw
?�,�
M�
o �����
r_
��;�,;����
� x ���,�-�
���
O V +' .
� S ? �
O a
�
�
• �
�
V
�
�
O
V
_`.ee ;n�er r a r or 1 n 7e a,,t � nF:ers
= ��t 9-l� � �� i:u � ntic�nal V��tal�
_:. Ic�'i� I 1 fhni lr_ F: l�"�u�vr� � r>ntrc��l "�l>r��t�s
FLAT ROCK
CHURCH RD.
rqR �
e���R Fr�
1 PROJECT °
I
��
� ���
� ��
� END PROJECT
o ♦
�
�
5°I's�'�'1� ��IF�' �����1—� �'��I' c�Jlel��� �1 PERMIT DRAWING
��������� �j � ��������� SHEET 1 OF 61
WAI�E � FR .A1�lI�Ll1�l CO U1�1 T Y
LOCATIOIV: US 401 FROM NC 96 TO NORTH OF SR 1103 (FLAT ROCK
CHURCH RD/CLIFT011t P0111D RD)
TYPE OF WORK: GRADIIVG, DRAI11tAGE, PAVI11tG, CULVERTS, £� SIG11lALS
WETLAND AND STREAM IMPACTS REVISED: MARCH 9, 2o�s **
T C�TA '�n7 � A/1 �G' T.177"1 T77'1 7'177l1TT.l1T 77 �1A7Al1
sT�Te sT�� PRa�e�T R�N�u�e uo.
���� R-2814C
. VNOI. . .w.�ROl.vO.
34506.1.4 STP-401(249)
34506.2.FR7 STP-401(249)
34506.2.FRU7 STP-401(249)
34506.3.FR6 � STP-40112491
TI.L
HCC 5H¢CTS
�
ESCYUMION
PE
RNJ
UTILITIES
CONSTR
��
.115�'.
GRAPHIC SCALES
50 25 0 50 100
PLANS
50 25 0 50 100
PROFILE (HORIZONTAL)
0
DESIGN DATA
ADT 2016 = 10,892
ADT 2036 = 15,848
K = �0 %
D = 65 %
T = 6 % *
V = 60 MPH
TTST = 2% DUAL = 4%
FUNC CLASS =
MAJOR COLLECTOR
STATEWIDE TIER
PROJECT LENGTH Prepored In the Offlce o/:
DIVISI0IV OF HIGHWAYS
1000 Birch Ridge Dr., Ra[eigh NC, 27610
LEI�GTH OF ROADWAY TIP PROJECT R-2814C = 6.580 MILES
2012 STANDARD SPECIFIGATIONS
LEIVGTH STRUCTURES TIP PROJECT R-2814C = 0.015 MILES
TOTAL LENGTH OF TIP PROJECT R-2814C = 6.595 MILES �GHT OF WAY DATE: PHILLIP E. ROGERS, PE
JANUARY 28, ZO�S %ROjECT ENGINEER
LETTING DATE: CASEY E. HARRIS, PE
JANUARY 15, ZO�9 f'ROJECT DESIGN ENGINEER
HYDRA ULICS ENGINEER
ROADWAY DESIGN ENGIIYEER
P.E.
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALLSIGNATURES COMPLETED
� , r / �� / � �- � \ . . �i � PROJECT REFERENCE NO. SHEET NO.
. � /
Y / i / R-2814C 23
�' � �a /% I �� � —
� �`'� � \ /� � / 2W SHEET NO.
/ ' 1 -Y10- PC SiO.10+847 L, �
` � \ — ROADNGIN DRSIGN HEN�GINEERS
/
\ ✓ �_
/
� \ �
g� � � �, � -Y10- PC S�o.13+325�, � � _ /� � \�
�� � ��� `- � ,� � � / -- j � �'� � �� \
�j � �. � � --- � � ��
I ��4� � � � � � � � �'� � � � / � � �\ S 5 Z�\
II ��.� _,� � �\\\ \ ,` \ \ � / j ' N'��� ���
��
�,
II � � ��� � ;��\.�'`,A; �, �� _ � 3� O � REvisEo MaRCH s, 2oi8
�,� _. � � � �� � � ,� �
\ �� � �£ 7 I I� � I x J{ \ 3 0 5 _,�_ HDR Engineerinq, Inc. of the Carolinas
�� � 4 � � �� � � � � � � _ � ��� 555 Fzyetieville S�, Sulte 900 Raleigh, N.C. 27601
\ �� T � N.C.B.E.L.S. License Number: F-Oi 16
���� � �
�� �t r � .. � � � � � ' � , � � � �� � � � �� enHK 1nei��oN �. I �- � i � �
: _. ' w �,.� �
�} �
, y
� � ���
( SEE DET
�'�� , � fi � �,.rh,�- \ � � ��- `'' �' �� �� � ��\ � � � II ' V�`, ', ' "�r, �' PERMIfi ,DRAWING
� CF1� „ � _ � �,� ,,,- 'X ' � � � �r �.I � � � Y^��� � �' � �.. _wrCL I RIP RA DITCH �_-�� �5 � _. � '�, ��_ �� /.� [ ���. 7 1
\� �� 4 �'� . I \ � � . i . SEE DETAIL BK -� �� � � I. � ii� S� � � '.� � I 1 S H E-ET � / . O F � 1
, V, f \ �� r.,�r 0 ;� � .� ` � � �� � � � �' �\ l �� �.� � � 1� �, ; I T �r � � `��`. -
3 \ � �; i� i �
L _
,� ,
� � � �� ��
� J m �. � T�
� \� ,
� � ° �.
�� �- _� � r .� � � � � _ - __ ___ � l�_
� i ` \ �.� '�> �' � � r � � , � i i m 4 �� ,. � y�� .,, . , >
II m I T 4 _ - _ ;::� . .. �� ' �; -,, _ J i � I � ; �� � f� -�. - EMPORARY _ _ . .. 1 i �'_, " . � / i �T I � � / } \ \47 •,_rs�i-in4ir��`'�j''=``-` 4
r
� �
s. . .M1 ,y � - ` .
I � ,-. -� _ _ � f ��.a'�' `. ` 7 ��`. � � � � _ �,�. I 7 .- (� �\ SU ACE WATER IMPACTS . � `.; ,r� � r-... -, ,t� . � � . 1� \ � F-� _ .
i � �r . `�'j ` 4. . ' �( � '� � _ � �F _ � � --- ' � I I �I„.ti� � �BEROA DI7Cii _ \ 4:�i -__- -d
\
� � I �/
W �I:' - -� ��\ , ' i \ �1 � - . � � � .J� . . � \ �T � I� �F i-b01TH CL I RiP AP C �
�� �' � ' � �� � \ t � � �� � � � �� � l� � _ � V � 5 I�� � r� � '� '-ai - ; �`°���` `�� ° - �,,,r
� � r � � i� � � � �,
�- ' � '� � . GRqDE TO D�2R(N� � . - 1 '...i'
l � > � � "5 � � �'� � �' ' v FOX RIDGE RD. DITCH � f / � �" \ - M�P' � �
- �— J � 4_ `�,.,;, _ � // � 4 i 1 ` � � J � \ � � ' ; \ � - 5
(V � , J . \ � �. � � � ,.., \ , I �.., \ '� �.. - TO SPEC: LAT.�BASE �� �.: � I � r � . - / - / . � -z. � � _
� � I � 1�� � �'
N I � � i ��. � ' i \�Y1 �. X, � � PEc � \ ��' � GRASS-SWALE � �A I �. �. .
� I , } o ` \4 , : \ � �N�-'��xRcesoe �� � \ I� i +oo.00� � -_�~� �
� ' -
�"'Z, .-�\ �-� �\ - � � ` � �� � ~ . 57D 4 E- GH �-. � 6PECIAL L4TERAL � F� � � �' / /� J u1N EORRFC � �EMENT
. A , � � � 6A5€ GRA53 iw � \ � � � � L�
_ - \ � ti � � � ,... ... � \ \ \ \ � � DIT O
� ` `V �+ I ��-c + I �., � ' E STAKES NOi 3HO�WpN � �/�
W f .,T ' `-' t ��c�:.: �.:. �- V� . \\ . � � �: � � � \ �il �,' � � L RI \ . ^ A r.. ID�ER ARirACIH - � � ��'� . CATIONL l 1
u' . F ] �
W �' � 4 �� Fdk d� � � v
1 � � �; I � A
Z cB �. PUE PUE -'�c`- �`�r,�P �._� f'VE PUE � ` _ q�� PUE � PU •�:' see e�i�e��� cf-ee�,aflaN-� � �I � STo seaM dircN� - . ,� �
_' L E pEfAIL BG
4 � � � �� \
�
�. i �� � � � �— � E . ._ 1CU' ,...� - D E��- PUE � . . f[�)E ��'U��_.�, ��� -RLJE � PUE PUE P� �:.- � - �
' �, '
i �I
�.. � � _� 0 i �`'i �\� � � I �i �j
N .. � � � -
W N � , � �, , � � 7 ,. � � � � l � • � � a s eiP P ,.� r�s t, � I, � � _ T
C � -. _, �j
� �fl . .,_,,; ,, . <, -'' .. � v �ti -. .:_ �� ,-�, � r,_, , ,� � ^_._✓ / i �,.:r�. ,ti :��.�;.n,:_.�'�,'EO Ex�T �� ',§, _ _ _ - -i I � I � V. � � � - , r`..�,;c-,�.,^ ..l .� - _ . � _ . -
.
W � 1 . -`� w �d , ��. _ I I - - � / � �. ���""' � ��' '� FX' ' � ` ��, ; _�� j '� �" ` edo � - '� - � -'' _ � � - � ���� �
_ _ � .-' � R :n , � .,� _
H N � _ i '. „ _ _� _ ,F � �L ..—i � � 1 � Ze � �_��..,���C _ y _ � E�aows I
a /
o$ � ��7—' m r:; -' �j�T \� _ �� �_ - _ -�7 - - - _ �
N O � �1 �- — — — — � _i Izl _ Remove F, ��, � — —' Re�novE � Z zg ` �Qovi�k�A� �,2TONs- � s ��L _ - _ d'_ _ � r'
� u
� � �r � � .
/ .� � . � . ' . � �� �— fM0 E ��a 1s=CSP__
- , . _ � �"` _ � -
w�i � -T ' " .' _ - - r.L� � - - a`, _ - . , _ - i - _ - _ — _ - - -- - _
� � C6 . . ,i� �.� ' � � . - i . R _ ' �--, '� - -- _ � . .. N
� �� --_--_ _ '_—�-- : _-_� ��.: ".•.y \ �a
�,_ �A _, � _ _ _ _
`- __. . r . j _
+ _—'— — — � '—_— —_'—_ '- C . ��._ _ _ _ _
B
�
`$� � � us-r�i :resr � \� — � —� — `� � �� � -�r2__� =�� � — — — _ - — �
o� O� — _ =L— —�-� ---� — --�---- - -- - — - -- — _ - - ---- _---- -
,
N �-
c _ ___ _. __ _ — Z GJ
� �� - - � _ �
o I . - ,.. - ._�_ � - - . ., - � � _ i _ _ __ HZ i _- _ _ .. ..\ - _- �
� W � " . "�,._..,. .,..�� � : -' `.- , '...us._., . . ,�,� . ..�. - _,-,�,...,-,�• ...�--•.�-� �. ��;.... ' ' _ _ . -. - ' . - - . ' - ' _�- - - �d �o_,�. _� ___ -.�' NEW CB 24" RCPJII
� r, � __._,_ ..;.. h � � i. �'tir`�r...� �"-;.,J._.-cfn..J - `� � ♦
h -.. y � , ,� SFRYYJG � Tr '�r~ - „ - - r'.,� . / ._ ,._,. 1� Chi
' ' L.. :- � �� $ � � ,y��.
� h � . ��, � � u � .;
jU Q � ;, f�� ( � � � � `_.r'�-,1, -v"-�",7 15' RCP-V . . TO�BE FIEL� L CAT6tf / � ti . ` � „-..� S; - _- _ - "ir"
`
O j F \ � � . %t-. C' .� , �-,— �r ` `-�\._ � - -- . . _ _ � u_ - f _ _ _
m � ' ' C�� / � ! ��, � � - � � --� ��-� � � � �
i
g� � � w�p ��� 4�z�•� t� � � � / ,- - -- - - � +
i �i :F^ ���1 . � �.:�.� .S r'�,. ."'�' / '. F ��� T=RAL BASE SEE DETAIL 61 � / ' w.52 ELUOWS / i , ^ ts'2, ELHO SP �-� , � l� ..-� � f `�....\,. �. - L4TERAL GRA55 SWrSLE . � 2d„ _ �`- O
x � _ _ �'-e' �'�:;:�' i �_ / .. _ y�s . ' � �� — �\ �• �\ 1�8. �'x�ERr�G[M �. .�z , ;~
N g I � _ I �5 c � �
d� I.q - �s� c5P 2� eL6ows / � C
c' � . ' `y'�' — � P � — -�, � b� - � � - - - ��aows 1 �r _ �
,
,� . � /� �
'�W � � �` ,�io`baaiN �� `LJ �,- � � l � � � F ` -_ ' \_��� _ �� i� iP aoi , �` �� I'T7
_
o W ��� � , � � E,$ ' % � '- " _ � ��ro ' T
w h .. � � . _ � / � . .. �. . , -. �.. � - , . . , :. . ,.� .,� : . TILE 15 � � �
�� � ' � �,mc ' �I � � �� � � PDE � � � e/ �. � � . < � / eZ ,� I/ ; � N
Q v _
o _ �� t� � _
� � I � p O l CE e RIP aaa �RDE PD � PDE i PDE \� �13€i,—� _ ,\ m �;\ y'. ;�t r_�
2 � I � . .. . _
c U � `�< � GF � � g \ o o i �a , i-�- ' o J z j= - ,_y r RI
U - - - - \ s roN�
� Q Ii - � , .. � �`,. \ EOTEXTILE _ ...J SY �,.� � � m � �..� . ' ` .
U ° � � ' -
� m ,' _ - _ - � � . � �� � _ A� UE� l.� a�`� �7a�ano � �- � � T
-� � ; r ti: � _ �+
�c N� �
� o � � ,� _ � � � � �,� � � � � /`_ � _ �- � �
� � `° � r � � � J _ _ so, `" � q �V �� � � . � � � ° % a A S ! , . . � 4i3- .7 �� � �
U �N� � �_ � �`_'_ -- ,�� -•.�"t, � r� �� -L- T SIO.�J9 PBA9= � �� ��� ,. . � TEMPORARY ��EE �A7 BM � `� � �� - �,.�- �- N
\
_ , �
pq�q� ; �� 'i� �� - �
Q 2 E E� ' m � I I . � � , y - . f _�_._ . . . f - - . -YIO� S%O.IS'F \ � �\ \ .�\\\ � \ \ �., . - \ � SURFACE WATE�IMPAC S �� \ � _ { `� � _ . �' p �
p� / � �\ - � LnTERA BASE DITC � �,(j��
� � g ct2 � - . � / � C� u� '� �� . , �� � � ��� � � SEE �I B � � � � � �� � � � � � � �� � � .��,1 � �� � i`� �..
� - ,� _ �_-__=�_-�-_� r �t� , � E � � z ; ; ��:����- _�� ��f��
� � � � � � + � � � ' � ; � �� RIP P = 2 TO,NS � � � � � i r- �
' I�T � 3� �
u�1 r�o- Pc sro n a3.se \ �
i� �c� 1� Y � � �. ' 4.."� \ . CL B P.
N p�. 4�' �� .�.� _�t_ _ _ ,� � �\\ 1 � � TEXTILEI = 7 SY :� � �, ; .,�_O EXTILE $7: �Y /�� J - ,. - // �.�I ; , .
' � LU � �. ,� �:��r -,c``�rntil.ti , �,- � �� ' ` ..��_\ ` \ } _� ' PERMANENT� �J Q J � �,1��/ i � � F�� � < . \„_� � ,-__�g _ __�. � �� LJ'��\
ti � ... o � � 1 � ' � � �=-f-t �-�" �� p ���x
� ��,
, � ,\ � / _
� � - . � .�5� < _ i.
l� .�_ I � . �/ .'.-- � �� . f'y'JJ SURFACE-W ER IMPAQS 1 AT�RA ASE DIT G 5��.3'-BASE T�H 7� ,
O o� . � `� . . �, "�. P _ � _ \
� N �� I I . �_: �. .__ . I�`-� � I // �� T � � "�� � 1 LATERdl BASE GRA55 �ALE �'� /' ` / � �� � \ _ .�� .ir' � ,� "\ [� � .. ' . \\. .
�
����� �`�z I I,�" j�_. s,�u"/ � �,� � / � �� �`�`- l��\ �- ,seE-6ETAILBI /.. / l� �ai \�` \ \ '--- -> �� cr'"' `N ri �� l,\
Yt� , � `
�NF�� /IL� I. .� ��_ � ..; �"'\� - .=_ J;' �'J/ � / .� . I � ' l r �-�.J � -! i� � .-,��� , ,�_ �� ,' C �/ .c—_.::. $ RFAOCE WATER IMPACTS ~ - __ �t:��M , \��l ��,y`
� i � � 1�
3 � i i �ri � r'� � w„' �,, - _ � / � � � �� � � r� I � � �;� J � � � �' �� >- ' � � � �RiP gnr nr -�r � _ -`� � � ��
� I �
� ��. � � . �'.� 1 . ` � ,.7 . . / I ' I I �' . / � J EM6ANKMENT � �. . �. Y BASE DITChL�.""' „ .. l �
S'
L' � � �� ��- ' � � � �� � �� . ' . � � � , � � - SEE OETAIL BA � � KL I RIP Rit�" � � , �
� � � - r SEE DETAIL BK
,l � � `_. / .
�
` I ``�- �-�oN,: � �� �� � ��- � � / ��
�
���✓r�_���-- -- _- �. SITE 13B
_
;.
� ;%` �. � � - --' - %�� -��� S ITE 13
� f � , , __ � �,n� � / . �
� - , i
� � � ,-- /
� _ � � �- � � - -- �- = '' �
-�^ � (��� _�:•� ' / - DENOTES MECHANRED
. � J I I _, . � � � ' '�' ' CLEARING
�
� DENOTES IMPACTS �N MARCH 9, 2018 REVISION INCLUDES
IOO' � O' IOO' `� / SURFACE WATER
GLI DENOTES TEMPORARY NEW SITE 13B ADDED FOR NEW DRIVEWAY
1 � IMPACTS IN SURFACE WATER
CRAPHIC SCALE j� f r
� l
N
Z
0
N
W
3
E
g
x
u
�
3
�
� � u ':.
rZ»
s°a«,
M
N
H
W
W
_
N
W
W
N
O
O
+
M
r
M
Q
H
N
I
J
I
w
Z
J
_
V
�
\
\ ,��ti
� � p�
`��z �,���15
- ^"�' (✓ ///��� 2' LATERAL 8.
i'" � ((( WIT
/ $EE
I—BERM �ITCo 0 ono /
L��
' j BI ��r� ti ��5��_�
�Y � -` �`cti� 4� �- �,,S
���,� -�i
�
/
/
� �
/ ,
� � � � ,5= ��
' 320
�s�� �
i '�
� ��"'� � / cr — "� H
,s � �:�
�� �
i� ��
ti� f
i �'.
!
' '�' ' DENOTES MECHANIZED
GLEARING
DENOTES TEMPORARY � DENOTES IMPACTS IN
FILL IN WETLAN� SURFACE WATER
�oo- o� �oo� GLI
� DENOTES FILL IN � DENOTES TEMPORARY
wETLAND IMPACTS W SURFACE WATER
GRAPHIC SCAl.E
PROJECT REFERENCE NO.
PERMIT DRAWING R-2814C
RN✓ SHEET NO.
S H E ET 48 O F 61 ROADNGIN DRSIGN
8� S�S ,Lop�
N�
SHEET NO.
HVORAUUCS
ENGINEER
�♦� HDR Engineering, Inc. of the Carolinas
J 555 Fayetteville St, Suite 900 Raleigh, N C 27601
N.C.B.E.L.S. License Number: F-0116
REVISED 1-10-18
�
�
n
_
r
Z
rn
I
r
I
N
�
D
W
N
V
+
O
O
N
rn
rn
N
_
rn
rn
�
NIw
VI
N
Z
0
N
W
3
E
g
x
u
�
3
�
� � u ':.
rZ»
s°a«,
M
N
H
W
W
_
N
W
W
N
O
O
+
M
r
M
Q
H
t/')
I
J
I
w
Z
J
_
V
�
\
\ ,��ti
0
J YL� �`� �����'
z ' �i�,
- / -� � � ,/
�,��"�- /." �' IAT[RAL B,
/ wfr
/ /`SEE
- '-BnRM DITC�Ho oeo /�/ . /, . ./ ��/
�'
����>
, �: �-,
�oo- o� �oo� � GLI
GRAPHIC SCAl.E
' '�' ' DENOTES MECHANIZED
GLEARING
DENOTES TEMPORARY
FILL IN WE7LAN�
� DENOTES FILL IN
W ETLAN D
PROJECT REFERENCE NO. � SHEET NO.
PERMIT DRAWING R-2814C 24
RN✓ SHEET NO.
SH E ET 49 O F 61 ROADNGIN DRSIGN ENGI^NEERS
8� S�S ,Lop�
N�
HDR
555 F�
' ,J .. /. --,y5: �' ., . � --�.�..� C � - - � N�ynber:,E;0316
. � - 32 0 ; __ =-� __�- �= � � � �vrSE� ���r�,��� 4
, �
� � _ _
i� �� �� � '� � � � � � ����
i �, J ' � �_ �a� � ii: - = / _ � �
/ � _ -�� �,` — � �� — —" — ' / ' , i
�j�j� - � � -., -J �' /i!� / �--- _' �'���i J
/ J � � // / � � ��� � '. �- - -� �°r. .
� �— � — /� / / - � � `� �
�j � � � _
; / //// / J / -/ / / , j� � `— -_
Z
% ; �"� !� � �� �- � -; = � %/" / i -�j�i %; f % j�' � �— —��: —� �- �
" ,
� ;� � - ;
�� �� � � � � r �/� � � ;
/ / / i�� % -'- - \� �- � ' l �/ � l' l i� �' i ! i � / � � ' "
. V _
�DENOTES IMPACTS IN
SURFACE WATER
�DENOTES TEMPORARY
IMPACTS W SURFACE WATER
�
�
n
_
r
Z
rn
I
r
I
N
�
D
W
N
V
-�
O
O
N
rn
rn
N
_
rn
rn
�
NIw
VI
WETLAND PERMIT IMPACT SUMMARY
WETLAND IMPACTS SURFACE WATER IMPACTS
Hand Existing Existing
Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural
Site Station Structure Fillln Fillln in Clearing in SW SW Impacts Impacts Stream
No. (From/To) Size / Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp. Design
(ac) (ac) (ac) (ac) (ac) (ac) (ac) (ft) (ft) (ft)
1 -L- 55+75 RT 36" RCP 0.04 < 0.01
1A -L- 55+75 LT 36" RCP 0.03
2 -L- 58+80 RT 24" RCP 0.04 0.01
3 -L- 67+45 LT Pond 0.28
3 -L- 67+45 RT Bank Stabilization < 0.01 < 0.01 < 0.01 10 10
4 -L- 107+88 RT< 3@12'X11' RCBC 0.37 0.09 0.10
5 -L- 137+22 LT 1@12'X7' RCBC 0.42 0.06 0.02 0.07 0.02 123
5 -L- 137+22 LT Bank Stabilization < 0.01 < 0.01 64 39
5A -L- 137+22 RT 1@12'X7' RCBC 0.06 0.02 < 0.01 0.07 < 0.01 12
5A -L- 137+22 RT Bank Stabilization 0.01 < 0.01 60 31
6 -Y6- 21 +86 RT 1@12'X7' RCBC 0.04 0.03 0.01 0.03 < 0.01 49
6 -Y6- 21+86 RT Bank Stabilization < 0.01 < 0.01 59 33
7 -Y6- 31 +75 RT Road/Toe Protection 0.04 0.03
8** -L- 168+21 LT 2@7'X7' RCBC 0.19 < 0.01 0.04 0.10 0.02 161
8 -L- 168+21 LT Bank Stabilization 0.01 < 0.01 75 31
8A -L- 168+21 RT 2@7'X7' RCBC < 0.01 0.01 0.05 < 0.01 10
8A -L- 168+21 RT Bank Stabilization 0.01 < 0.01 42 28
9 -L- 175+00 LT Roadway Fill 0.17
10 -L- 180+25 RT "False cut" Ditch fill 0.01 0.05
11 -L- 229+60 LT 54" RCP < 0.01 11
11 *** -L- 229+60 LT Bank Stabilization < 0.01 < 0.01 21 6
11A -L- 229+60 RT 54" RCP 0.20 < 0.01 0.03 0.02 100
11A -L- 229+60 RT Bank Stabilization < 0.01 < 0.01 19 6
SHEET SUBTOTALS*: 1.58 0.20 0.11 0.56 0.40 0.02 816 184
*Rounded totals are sum of actual impacts
NOTES:
** Rev 11-2-16 Site 8: Fill slope adjusted. Permanent Fill in Wetlands was 0.20 ac and is now 0.19ac. Mech. Clearing in Wetlands
was 0.11 ac and is now 0.10 ac.
*** Rev 11-4-16 Site 11 Ditch alignment adjustment. Increased Permanent Surface Water Impacts (Bank Stabilization) by 3', reduced
Temporary Surface Water Impacts by 3'.
***" Site 14: Design Revision raised grade at -L- 314+63, culvert extended.
***"* Site 136: Design Revision added Driveway at -L- 311+74 Rt. New Mechanized clearing in Wetland.
ised 2013 10 24
WETLAND PERMIT IMPACT SUMMARY
WETLAND IMPA T URFA E WATER IMPA T
Hand Existing Existing
Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural
Site Station Structure Fillln Fillln in Clearing in SW SW Impacts Impacts Stream
No. (From/To) Size / Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp. Design
(ac) (ac) (ac) (ac) (ac) (ac) (ac) (ft) (ft) (ft)
12 -L- 283+77 RT< 1 10'X8' RCBC 0.03 113
12 -L- 283+77 RT< Bank Stabilization 0.02 < 0.01 99 31
13 -L- 307+70 RT< 66" RCP 0.02 217
13 -L- 307+70 RT< Bank Stabilization < 0.01 < 0.01 30 21
13A -L- 306+29-307+60 RT Roadwa Fill 0.02 153
13B""' -L- 311+74 RT Drivewa Fill 0.02
14 -L- 314+63 RT< 3 11'X11' RCBC 0.06 0.04 0.05 0.08 100
14 -L- 314+63 RT< Bank Stabilization 0.07 < 0.01 158 32
15 -L- 344+35 LT Pond Bank Stabilization < 0.01 < 0.01 8 10
SHEET SUBTOTALS': 0.06 0.04 0.06 0.26 0.02 877 94
TOTAL*: 1.64 0.24 0.11 0.63 0.66 0.04 1693 278
*Rounded totals are sum of actual impacts
NOTES:
was 0.11 ac and is now 0.10 ac.
`*` Rev 11-4-16 Site 11 Ditch alignment adjustment. Increased Permanent Surface Water Impacts (Bank Stabilization) by 3', reduced
Temporary Surface Water Impacts by 3'.
`*`* Site 14: Design Revision raised grade at -L- 314+63, culvert extended.
"�`� Site 13B: Design Revision added new Driveway at -L- 311+74 Rt. New Mechanized clearing in Wetland.
Revised 2013 10 24
�
� _
�
� �
�
� �
�
�
� s
�
� ��
� �
�
� _�
� �
� �
N
I �
/
�� �
�
�
I �
N
I �
�
� �
/
I N
�
I �3
a
I L
� �
/
�
I �
�
I �
I =
�
� �i
�
I w � Fr
NI �
H �''�
I � �
� �
w �
I a �
� ' �'
I � �
� � �
� �
� Z ���
� �
V �+
� —�
I � ��
I ����
I �i���
I N ���
o �� ���,
� W�W
� � r,F� �
I ����Q
O r'itr*L
��
� in � w
I � _ ���,,
� � �� �
O �V�� ;
Z ���
II � it+rtfF++�
_����
• �
GRAPHIC SCAL�S DESIG11t DATA PROJECT LEI�GTH Prepored in the office of: HYDRAULICS E1VGIIVEER
ADT 2016 = 10,s92 DIVISI011t OF HIGHWAYS
50 25 0 50 100 1000 Birch Rid e Dr., Ralei h 111C, 27610 �'��10 �/� `
� ADT 2036 = 15 848 �� ��� ����.
� �
� LE11tGTH OF ROADWAY TIP PROJECT R-28I4C = 6.580 MILES ���° � ���o,��,
K — � O % 2012 STANDARD SPECIFICATI011iS ----------------------- ;;;, �:' � �r�����,,
PLANS — LE11lGTH STRUCTURES TIP PROJECT R-2814C = 0.015 MILES '�� ��"
D = 65 % %E. /� � ���� �
�� �
TOTAL LEIVGTH OF TIP PROJECT R-2814C = 6.595 MILES SIGNATURE: n ��--- �
50 25 0 50 l00 T— 6 ��o * RIGHT OF WAY DATE: PHILLIP E. ROGERS, PE � �
V= 60 MPH JANUARY 28, 2015 I'ROJECT ENGINEER ROADWAY DESIG11t E11tGI11tEER ��-��� �
\ �� �,��„
PROFILE HORIZONTAL * � o �'� ��v�%'
( ) TTST = 2 /o D UAL = 4 /o , - � � �
5 0 5 10 FUNC CLASS = LETTI11lG DATE: CASEY E. HARRIS, PE ������ ��'��������
,� � �
MAJ O R C O L L E C T O R J A N U A RY 15 � 2 O � 9 I'ROJECT DESIGN ENGINEER -----------------------
P.E. DOCUMENT NOT CONSIDERED FINAL
PROFILE (VERTICAL) STATEWIDE TIER SIGNATURE: UNLESS ALL SIGNATURES COMPLETED
BUFFER IMPACTS SUMMARY
IMPACT BUFFER
TYPE ALLOWABLE MITIGABLE REPLACEMENT
SITE NO. STRUCTURE SIZE / STATION
TYPE (FROM/TO) ROAD PARALLEL ZONE 1 ZONE 2 TOTAL ZONE 1 ZONE 2 TOTAL ZONE 1 ZONE 2
CROSSING BRIDGE IMPACT (ft2) (ft2) (ft2) (ft2) (ft2) (ft2) (ft2) (ft2)
1 30" RCP -L- 64+50 RT< X 20346 12410 32756
2 3@ 12'X11' RCBC -L- 107+gg RT< X 9087 5422 14509
3 1@ 12'X7' RCBC -L- 137+22 RT< X 15170 9506 24676
4 1@ 12'X7' RCBC -Y- 21 +86 RT< X 7518 3300 10818
5 TOE PROTECTION -Y- 31+25 RT X 2001 876 2877
6' 2@ 7'X7' RCBC -L- 168+21 RT< X 17507 9823 27330
7 54" RCP -L- 229+60 RT< X 9750 8540 18290
8 1@ 10'x8' RCBC -L- 283+77 RT< X 11339 7396 18735
9 66" RCP -L- 307+67 RT< X 18942 8927 27869
9A ROAD FILL -L- 306+50 RT X 10615 6758 17372
9B 15" RCP -L- 309+50 RT X 1438 2231 3669
9C 24" CSP -L- 312+57 RT X 79 1181 1260
9D Driveway -L- 311+74 RT X 1013 1991 3004
10 3@ 11'x11' RCBC -L- 314+63 RT< X 15391 8982 24373
10A STILLING BASIN -L- 314+g0 RT X 1038 1038
11 36" RCP -L- 343+79 RT< X 3327 4182 7509
TOTAL: 14363 12808 27170 129160 79755 208915
* Site 6: Revision 11-4-16: Fill slope adjustment: Reduced BZ 2 Impacts by 127 sf.
* Site 9D: Revision 3-8-18. New site added for new driveway.
Rev.Jan 2009
Carpenter,Kristi
From: Rivenbark, Chris
Sent: Wednesday, May 09, 2018 8:05 AM
To: Eric Alsmeyer (eric.c.alsmeyer@usace.army.mil); Ridings, Rob
Cc: AI-Dhalimy, Nadia A; AI-Ghandour, Majed N; Barclay, Carl A;
Chapman, Amy; gary�jordan@fws.gov; Hanks, Brian; Hopkins, Joey;
Carpenter,Kristi; Lauffer, Matthew S; Mellor, Colin; Murray,
Christopher A; NCDOT Service Account - Roadway Design; Staley,
Mark K; Wilson, Travis W.; Harmon, Beth; Dilday, Jason L
Subject: Permit modification request, R-2814C Wake/Franklin Counties
Follow Up Flag: Follow up
Flag Status: Flagged
A permit modification request has been prepared for R-2814C. The electronic copy can
be viewed/downloaded at
https://connect.ncdot.�ov/resources/Environmental/
Chris Rivenbark
Environmental Analysis Unit
North Carolina Department of Transportation
919 707 6152 office
crivenbark(a�ncdot.qov
1598 Mail Service Center
Raleigh, NC 27699-1598
1020 Birch Ridge Drive
Raleigh, NC 27610
Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third
parties.