HomeMy WebLinkAboutWQ0039968_Application_20180503CES Group Engineers, LLP
274 N. Hwy. 16, Suite 300
Denver, NC 28037
Phone: (704) 489-1500
TO: NCDEQ
610 E. Center Avenue
Mooresville, NC 28301
WE ARE SENDING YOU:
LETTER OF TRANSMITTAL
Date: May 2, 2018
Attention: Ori Tuvia
RE: 6854: Melwood Subdivision
FTA Sewer Submittal
RECEIVED/NCDENR/OWR
MAY ®,,3 nm
wQROS
MOORESVILLE REGIONAL OFFICE
AS REQUESTED x DRAWINGS BY UNITED PARCEL SERVICE
x FOR YOUR REVIEW x PRINTS BY US MAIL
FOR YOUR INFORMATION CHANGE ORDER x Hand Delivered
THE FOLLOWING ITEMS:
COPIES
DATED
DESCRIPTION
1
4/19/18
FTA Package and accompanied documents
1
4/19/18
LCPW Approved Plan Set — Melwood Subdivision
1
4/19/18
Engineer's Report — Sewer Pump Station
1
5/2/18
Check ($480)
REMARKS:
Thank you.
SENDER:
CES Group Engineers, LLP
WOSB / NC HUB / DBE / WBE
May 2, 2018
Mr. Ori Tuvia
North Carolina Department of Environmental Quality
Water Quality Section
610 E. Center Avenue
Mooresville, NC 28301-5094
Re: Melwood Subdivision
Gravity Sewer Line, Force Main and Pump Station
Lincoln County, NC
Project Number 6854.0217
Dear Mr. Tuvia
Included are design plans for 6,553 linear feet of eight (8) inch gravity sewer line, 39 linear
feet of fifteen (15) inch gravity sewer line, 1,794 linear feet of six (6) inch force main and a
duplex submersible pump station to serve 162 new single-family homes for the Melwood
Subdivision located at approximately 2391 North Highway 16 Denver, North Carolina. CES
Group Engineers, LLP (CES) is pleased to present these plans for review and permitting
through the Fast Tract Sewer System Extension Application. These plans are for the entire
subdivision and will include 162 lots with a peak design flow of 67.5 gallons per minute
(gpm).
These plans are submitted on behalf of the Owner Lennar Carolinas, LLC.
Once complete the sewer infrastructure will be deeded to Lincoln County for ownership,
operation, and maintenance.
The property consists of one land parcel recognized by Lincoln County GIS as Parcel
ID number 4604-25-0975. The parcel consists of approximately 82 acres.
These plans are for your review and comment. Should you have any questions please
feel free to contact me at (704)-489-1500.
Respectfully,
CES GROUP ENGINEERS, L
sh Peeler, E.I.
Civil Engineering Project Manager
1ECEIVED/NCDENR/1)WR
MAY 0 3 2018
MOORESVILLE RE�IONAL OFFICE
State of North Carolina
Department of Environmental Quality
n -w R Division of Water Resources
15A NCAC 02T.0300 — FAST TRACK SEWER SYSTEM EXTENSION APPLICATION
Division of Water Resources FTA 04-16 & SUPPORTING DOCUMENTATION
Application Number: hIC?cv3�G6� (tobecompletedbyDWR)
All items must be completed or the application will be returned
I. APPLICANT INFORMATION:
1. Applicant's name: Lennar Carolinas. LLC (company, municipality, HOA, utility, etc.)
2. Applicant type: ❑ Individual
® Corporation ❑ General Partnership
❑ Federal
❑ State/County ❑ Municipal
3. Signature authority's name: Michael Ncff per 15A NCAC 02T .0106(b)
Title: Land Development Manager
4. Applicant's mailing address: 11230 Carmel Commons Blvd
City: Charlotte State: NC
Zip: 28226-_
5. Applicant's contact information:
Phone number: (704) 542-8300
Email Address: Michael.Ncf[@Lennar.com
II. PROJECT INFORMATION:
❑ Privately -Owned Public Utility
❑ Other
RECEIVED/NCDENRIDWR
MAY 0 3 2018
WOROS
MOORESVILLE REGIONAL OFFICE
I. Project name: Melwood Subdivision
2. Application/Project status: ® Proposed (New Permit) ❑ Existing Permit/Project
If a modification, provide the existing permit number: W000_ and issued date:
If new construction but part of a master plan, provide the existing permit number: WQ00_
3. County where project is located: Lincoln
4. Approximate Coordinates (Decimal Degrees): Latitude: 35.5069° Longitude: -88.0034°
5. Parcel ID (if applicable): 4604-25-0975
(or Parcel ID to closest downstream sewer)
III. CONSULTANT INFORMATION:
1. Professional Engineer: Dave Lutz License Number: 032866
Firm: CES- Group Engineers, LLP
Mailing address: 274 N Hwy 16 Suite 300
City: Denver State: NC Zip: 28037
Phone number: (704) 489-1500 Email Address: dlutznccs-group.nct
IV. WASTEWATER TREATMENT FACILITY (WWTF) INFORMATION:
1. Facility Name: Killian Creek W WTP Permit Number: WOCS0088722
Owner Name: Lincoln County
V. RECEIVING DOWNSTREAM SEWER INFORMATION (if different than WWTF):
1. Permit Number(s): WQCS00149 Downstream (Receiving) Sewer Size: -%inch
System Wide Collection System Permit Number(s) (if applicable): WQCS_
OwnerName(s): Lincoln County
FORM: FTA 04-16 Page 1 of 5
VI. GENERAL REQUIREMENTS
1. If the Applicant is a Privately -Owned Public Utility, has a Certificate of Public Convenience and Necessity been attached?
❑ Yes ❑No MN/A
2. If the Applicant is a Developer of lots to be sold, has a Developer's Operational Agreement (FORM: DEV) been attached?
M Yes ❑No ❑N/A
3. If the Applicant is a HomeTroKny Owners' Association, has an Operational Agreement (FORM: HOA) been attached?
[—]Yes ❑No MN/A
4. Origin of wastewater: (check all that apply):
M Residential Owned ❑ Retail (stores, centers, malls) ❑ Car Wash
❑ Residential Leased ❑ Retail with food preparation/service ❑ Hotel and/or Motels
❑ School / preschool / day care ❑ Medical / dental / veterinary facilities ❑ Swimming Pool /Clubhouse
❑ Food and drink facilities ❑ Church ❑ Swimming Pool/Filter Backwash
❑ Businesses / offices / factories ❑ Nursing Hone ❑ Other (Explain in Attachment)
5. Nature of wastewater: 100 % Domestic/Commercial % Commercial
_ % Industrial (See 15A NCAC 02T.0 103(20)
L---* Is there a Pretreatment Program in effect? ❑ Yes ❑ No
6. Hasa flow reduction been approved under 15A NCAC 02T .0114(f)? ❑ Yes ❑ No
➢ If yes, provide a copy of flow reduction approval letter
7. Summarize wastewater generated by project:
Establishment Type (see 02T.0114(f)
Daily Design Flow a,b
No. of Units
Flow
Single Family Dwelling 3 bed
240 gal/GPD
162
38,880 GPD
gal/
GPD
gal/
GPD
gal/
GPD
gall
GPD
gal/
GPD
Total
38,880 GPD
a See 15A NCAC 02T.01 14(b). (d). (e)(D and (e)(2) for caveats to wastewater design flow rates (i.e., minimum flow per
dwelling; proposed unknown non-residential development uses; public access facilities located near high public use areas;
and residential property located south or east of the Atlantic Intracoastal Waterway to be used as vacation rentals as defined
in G.S. 42A4).
b Per 15A NCAC 02T.01 14(c), design flow rates for establishments not identified [in table 15A NCAC 02T.01141 shall be
determined using available flow data, water using fixtures, occupancy or operation patterns, and other measured data.
8. Wastewater generated by project: 38 880 GPD (per 15ANCAC 02T.0114)
➢ Do not include future flows or previously permitted allocations
If permitted flow is zero, indicate why:
❑ Pump Station or Gravity Sewer where flow will be permitted in subsequent permits that connect to this line
❑ Flow has already been allocated in Permit Number:
❑ Rehabilitation or replacement of existing sewer with no new flow expected
❑ Other (Explain):
FORM: FTA 04-16 Page 2 of 5
VII. GRAVITY SEWER DESIGN CRITERIA (If Applicable) - 02T.0305 & MDC (Gravity Sewers):
1. Summarize gravity sewer to be permitted:
Size (inches)
Length (feet)
Material
8
5,987
PVC
8
566
DIP
15
39
PVC
➢ Section II & III of the MDC for Permitting of Gravity Sewers contains information related to design criteria
➢ Section III contains information related to minimum slopes for gravity sewer(s)
➢ Oversizing lines to meet minimum slope requirement is not allowed and a violation of the MDC
VIII. PUMP STATION DESIGN CRITERIA (If Applicable) —02T.0305 & MDC (Pump Stations/Force Mains):
COMPLETE FOR EACH PUMP STATION INCLUDED IN THIS PROJECT
1. Pump station number or name: Melwood Subdivision
2. Approximate Coordinates (Decimal Degrees): Latitude: 35.50630 Longitude: -81.0074°
3. Design flow of the pump station: .038880 millions gallons per day (firm capacity)
4. Operational point(s) of the pump(s): 200 gallons per minute at 72.5 feet total dynamic head (TDH)
5. Summarize the force main to be permitted (for this Pump Station):
Size (inches)
Length (feet)
Material
6
1,663
PVC
6
131
DIP
6. Power reliability in accordance with 15A NCAC 02T.0305(h)(1):
® Standby power source or pump with automatic activation and telemetry - 15A NCAC 02T .0305(h)(1)(B).'
➢ Required for all pump stations with an average daily flow greater than or equal to 15,000 gallons per day
➢ Must be permanent to facility
Or if the pump station has an average daily flow less than 15,000 gallons per day:
❑ Portable power source with manual activation, quick -connection receptacle and telemetry - 15A NCAC 02T
.0305(h)(1)(C)
or
❑ Potable pumping unit with plugged emergency pump connection and telemetry - 15A NCAC 02T .0305(h)(1)(C):
➢ It shall be demonstrated to the Division that the portable source is owned or contracted by the applicant (draft agreement)
and is compatible with the station.
➢ If the portable power source or pump is dedicated to multiple pump stations, an evaluation of all the pump stations' storage
capacities and the rotation schedule of the portable power source or pump, including travel timeframes, shall be provided
in the case of a multiple station power outage.
FORM: FTA 04-16 Page 3 of 5
IX. SETBACKS & SEPARATIONS — (02B.0200 & 15A NCAC 02T.0305(f)):
1. Does the project comply with all separations found in 15A NCAC 02T .0305(f) & (g)
D 15A NCAC 02T.0305(f) contains minimum separations that shall be provided for sewer systems:
® Yes ❑ No
Setback Parameter*
Separation Required
Storm sewers and other utilities not listed below vertical
24 inches
Water mains vertical -water over sewer including in benched trenches
18 inches
Water mains horizontal
10 feet
Reclaimed water lines vertical - reclaimed over sewer
18 inches
Reclaimed water lines horizontal - reclaimed over sewer
2 feet
**Any private or public water supply source, including any wells, WS -I waters of Class I or
Class II impounded reservoirs used as a source of drinking water
100 feet
**Waters classified WS (except WS -1 or WS -V), B, SA, ORW, HOW, or SB from normal
high water or tide elevation and wetlands see item IX.2
50 feet
**Any other stream, lake, impoundment, or ground water lowering and surface drainage
ditches
10 feet
Any building foundation
5 feet
Any basement
10 feet
Top slope of embankment or cuts of 2 feet or more vertical height
10 feet
Drainage systems and interceptor drains
5 feet
Any swimming pools
10 feet
Final earth grade vertical
36 inches
➢ 15A NCAC 02T.0305(g) contains alternatives where separations in 02T.0305(f) cannot be achieved.
➢ **Stream classifications can be identified using the Division's NC Surface Water Classifications webpage
➢ If noncompliance with 02T.0305(f)or (g). see Section X of this application
2. Does the project comply with separation requirements for wetlands? (50 feet of separation) ❑ Yes []No ®N/A
➢ See the Division's draft separation requirements for situations where separation cannot be meet
➢ No variance is required if the alternative design criteria specified is utilized in design and construction
➢ As built documents should reference the location of areas effected
3. Does the project comply with setbacks found in the river basin rules per 15A NCAC 02B.0200? ®Yes ❑ No ❑ N/A
➢ This would include Trout Buffered Streams per 15A NCAC 28.0202
4. Does the project require coverage/authorization under a 404 Nationwide or ❑ Yes ® No
individual permits or 401 Water Quality Certifications?
➢ Information can be obtained fi•om the 401 & Buffer Permitting Branch
5. Does project comply with 15A NCAC 02T.0105(c)(6) (additional permits/certifications)? ® Yes [-]No
Per 15A NCAC 02T.0105(c)(6), directly related environmental permits or certification applications are being prepared, have
been applied for, or have been obtained. Issuance of this permit is contingent on issuance of dependent permits (erosion and
sedimentation control plans, stotmwater management plans, etc.).
6. Does this project include any sewer collection lines that are deemed "high-priority?"
Per 15A NCAC 02T.0402 "high-priority sewer" means "any aerial sewer, sewer contacting surface waters, siphon, or sewer
positioned parallel to streambanks that is subject to erosion that undermines or deteriorates the sewer.
❑ Yes ® No ❑ N/A
➢ If yes, include an attachment with details for each line, including type (aerial line, size, material, and location).
High priority lines shall be inspected by the permittee or its representative at least once every six -months and inspections
documented per 15A NCAC 02T.0403(a)(5) or the permitee's individual System -Wide Collection permit.
FORM: FTA 04-16 Page 4 of 5
X. 'CERTIFICATIONS:
1. Does the submitted system comply with 15A NCAC 02T, the Minimum Design Criteria for the Permitting of Pump Stations
and Force Mains (latest version), and the Gravity Sewer Minimum Design Criteria (latest version) as applicable?
® Yes ❑ No
If No, complete and submit the Variance/Alternative Design Request application (VADC 10-14) and supporting documents for
review. Approval of the request is required prior to submittal orthe Fast Track Application and supporting documents.
2. Professional Engineer's Certification:
that this application for
Engineer's name from Application Item 111.1.)
has been reviewed by me and is accurate, complete and consistent with the information supplied in the plans, specifications,
engineering calculations, and all other supporting documentation to the best of my knowledge. I further attest that to the best
of my knowledge the proposed design has been prepared in accordance with the applicable regulations, Gravity Sewer
Minimum Design Criteria for Gravity Sewers (latest version), and the Minimum Design Criteria for the Fast-Tdack Permitting
of Pump Stations and Force Mains (latest version). Although other professionals may have developed certain portions of this
submittal package, inclusion of these materials under my signature and seal signifies that I have reviewed this material and
have judged it to be consistent with the proposed design.
NOTE — In accordance with General Statutes 143-215.6A and 143-215.6E, any person who knowingly makes any false
statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may
include a fine not to exceed $10,000, as well as civil penalties up to $25,000 per violation.
North Carolina Professional Engineer's seal, signature, and date:
3. Applicant's Certification per 15A NCAC 02T .0106(b):
L
(Sigdiandre AuOdority's name & title from Application Item 1.3.)
that this application for
has been reviewed by me and is accurate and complete to the best of my knowledge. I understand that if all required parts of
this application are not completed and that if all required supporting documentation and attachments are not included, this
application package is subject to being returned as incomplete. I understand that any discharge of wastewater from this non -
discharge system to surface waters or the land will result in an immediate enforcement action that may include civil penalties,
injunctive relief, and/or criminal prosecution. I will make no claim against the Division of Water Resources should a condition
of this permit be violated. I also understand that if all required parts of this application package are not completed and that if
all required supporting infonnation and attachments are not included, this application package will be returned to me as
incomplete.
NOTE — In accordance with General Statutes 143-215.6A and 143-215.6E any person who knowingly makes any false
statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may
include a fine not to exceed $10,000 as well as civil penalties up to $25,000 per violation.
Signatuo
Date: 3 l0
FORM: FTA 04-16 Page 5 of 5
Tuvia, Ori A
From:
Sent:
To:
Cc:
Subject:
Ori,
Josh Peeler <jpeeler@ces-group.net>
Friday, May 04, 2018 3:28 PM
Tuvia, Ori A
David Lutz
[External] FW: Model Homes and bedroom counts per home (Melwood)
The developer has confirmed below that the 162 lots for Melwood will be for 3 bedroom homes.
Thanks.
Josh Peeler, E.I.
Civil Project Manager
GES GROUP ENGINEERS, LLP
engineers planners surveyors sdentists
DRE; WBE IPSP%NCHUB''NOSS SBE:'O/ NC
j p eeler@ c es -group. n et
www.ces-aroup.net
W -tip MEN -
.11]\i; OWNED
w .ces-arcuo.net
From: Michael Neff <Michael. Neff@ Len na r.com>
Sent: Friday, May 4, 2018 01:43 PM
To: Josh Peeler <ipeeler@ces-group.net>
Subject: RE: Model Homes and bedroom counts per home (Melwood)
Yes all 3 bedroom
Mike Neff, PE
Land Development Manager
Lennar Carolinas, LLC
From: Josh Peeler [mai Ito: ipeele.r@ces-group. net]
Sent: Friday, May 04, 2018 12:55 PM
To: Michael Neff <Michael.Neff@Lennar.com>
Subject: RE: Model Homes and bedroom counts per home (Melwood)
:DBE/ WSr 1; SPSF / NCHUB .1 WOS3 I SBE ; WBENI'
�00
www.ces-group.net
TNC OWNED
wWW.Ces-grouo.ne
STATE OF NOIZTH CAROLINA
COUNTY OF Lincoln Permit No.
DEVELOPER'S OPERATIONAL AGRREMENT
This AGREEMENT made pursuant to G.S. 143-215.1 (dl) and entered into this
clay of
March by and between the North Carolina Environmental Management
Commission, an agency of the State of North Carolina, hereinafter known as the COMMISSION; and
Lennar Carolinas, LLC , a corporation/general partnership registered/licensed to do
business in the State of North Carolina, hereinafter known as the DEVELOPER.
WITNESSETH:
The DEVELOPER is the owner of the certain lands lying in Lincoln County, upon
which it is erecting and will erect dwelling units and other improvements, said development to be known
as
Melwood Subdivision
(hereinafter the Development).
2, The DEVELOPER desires, to construct a wastewater collection system with pumps, wastewater treatment
works, and/or disposal facilities (hereinafter Disposal System) to provide sanitary sewage disposal to serve
the Development on said lands.
3. The DEVELOPER has applied to the COMMISSION for the issuance of a permit pursuant to G.S. 143-
215.1 to construct, maintain, and operate the Disposal System.
4. The DEVELOPER has created or shall create unit ownership in said dwellings units, other improvements
and lands through filing of a Declaration of Unit Ownership (hereinafter Declaration), pursuant to Chapter
47C or 47F of the North Carolina General Statutes.
5. '1'fie DEVELOPER has caused to be formed or will cause to be fortned at the time of filing of the
Declaration, the (Unit Owners' Association) (hereinafter
Association), a non-profit corporation organized and existing under and by the virtue of the laws of the
State of North Carolina, for the purpose, among others, of handling the property, affairs and business of
the Development; of operating, maintaining, re -constructing and repairing the common elements of the
lands and improvements subject to unit ownership, including the Disposal System; and of collecting dues
and assessments to provide funds for such operation, maintenance, re -construction and repair.
6. The COMMISSION desires to assure that the Disposal System of the Development is properly
constructed, maintained and operated in accordance with law and permit provisions in order to protect the
quality of the waters of the State and the public interest therein.
NOW, THEREFORE, in consideration of the promises and the benefits to be derived by each of the parties
hereto, the COMMISSION and DEVELOPER do hereby mutually agree as follows:
1. The DEVELOPER shall construct the Disposal System in accordance with the permit and plans and
specifications hereafter issued and approved by the COMMISSION, and shall thereafter properly operate
and maintain such systems and facilities in accordance with applicable permit provisions and law.
2. The DEVELOPER shall not transfer ownership and/or control of the Disposal System to the Association
until construction has been completed in accordance with the permit and approved plans, and the staff of
the Division of Water Resources has inspected and approved of the facilities. In order to change the name
of the permit holder, the DEVELOPER must request that the permit be reissued to the Association. The
request must include a copy of the Association Bylaws and Declaration.
3. The DEVELOPER shall not transfer, convey, assign or otherwise relinquish or release its responsibility
for the operation and maintenance of its Disposal System until a permit has been reissued to the
DEVELOPER'.s successor.
rllnl.d. T MLAO 11 n,..-- 1 ,.r'1
4. The DEVELOPER shall provide in the Declaration and Association Bylaws that the uisposai system ana
appurtenances thereto are part of the common elements and shall thereafter be properly maintained and
operated in conformity with law and the provisions of the permit for construction, operation, repair, and
maintenance of the system and facilities. The Declaration and Bylaws shall identify the entire wastewater
treatment, collection and disposal system as a common element which will receive the highest priority for
expenditures by the Association except for Federal, State, and local taxes and insurance.
5. The DEVELOPER shall provide in the Declaration and Association Bylaws that the Disposal System will
be maintained out of the common expenses. In order to assure that there shall be funds readily available to
repair, maintain or construct the Disposal System, beyond the routine operation and maintenance
expenses, the Declaration and Association Bylaws shall provide that a fund be created out of the common
expenses. Such fund shall be separate from the routine maintenance funds allocated for the facility and
shall be part of the yearly budget.
6. In the event the common expense allocation and separate fund are not adequate for the construction,
repair, and maintenance of the Disposal System, the Declaration and Association Bylaws shall provide for
special assessments to cover such necessary costs. There shall be no limit on the amount of such
assessments, and the Declaration and Bylaws shall provide that such special assessments can be made as
necessary at any time.
7. If a wastewater collection system and wastewater treatment and/or disposal facility provided by any city,
town, village, county, water and sewer authorities, or other unit of government shall hereinafter become
available to serve the Development, the DEVELOPER shall take such action as is necessary to cause the
existing and future wastewater of the Development to be accepted and discharged into said governmental
system, and shall convey or transfer as much of the Disposal System and such necessary easements as the
governmental unit may require as condition of accepting the Development's wastewater.
8. Recognizing that it would be contrary to the public interest and to the public health, safety and welfare for
the Association to enter into voluntary dissolution without having made adequate provision for the
continued proper maintenance, repair and operation of its Disposal System, the DEVELOPER shall
provide in the Association Bylaws that the Association shall not enter into voluntary dissolution without
first having transferred its said system and facilities to some person, corporation or other entity acceptable
to and approved by the COMMISSION by the issuance of a pen nit.
9. The agreements set forth in numbered paragraphs 1, 2, 3, 4, 5, 6, 7, and 8 above shall be conditions of any
permit issued by the COMMISSION to the DEVELOPER for the construction, maintenance, repair and
operation of the Disposal System.
10. A copy of this agreement shall be filed at the Register of Deeds in the County(ies) where the Declaration is
filed and in the offices of the Secretary of State of North Carolina with the Articles of Incorporation of the
Association.
IN WITNESS WHEREOF, this agreement was executed in duplicate originals by the duly authorized
representative of the parties hereto on the day and year written as indicated by each of the parties named below:
FOR THE ENVIRONMENTAL
MANAGEMENT COMMISSION
S. Jay Zimmerman, P.G.
Director, Division of Water Resources
(Date)
Lennar Carolinas, LLC
Name of DEVELOPER
(Si nature)
Print Name and Titer
(Date)
r.nnne. nrvno 11 n......n..an
m
PROP. MELWOOD 8"
GRAVITY SEWER
FORCE
��illLLilu nKq
..=r�a:.6[a E'rllxx 1�vassbk�A'J�.rya3E
PROP. MELWOOD
PROJECT NAME:
Denver, NC
PROJECT NUMBER:
6854.0217
CES GROUP
ENGINEERS, LLP
NC FIRM LICENSE# F-1240
274 N. Hwl.16, SUITE 300
DENVER. NC 28037
ar.�n
PROP. MELWOOD 8"
GRAVITY SEWER
SCALE: 1" = 500'
SHEET NAME:
Waste Water System Map -
Mclwood Subdivision
DATE:
January 10, 2018
State of North Carolina
1 Department of Environmental Quality
Division of Water Resources
Division of Water Resources Flow Tracking/Acceptance for Sewer Extension Applications
(FTSE 04-16)
Entity Requesting Allocation: Lennar Carolinas, LLC
Project Name for which flow is being requested: Melwood
More than one FTSE maybe required for a single project if the owner of the IVIVTP is not responsible for all pump
stations along the route of the proposed wastewater flow.
I. Complete this section only if you are the owner of the wastewater treatment plant.
a. WWTP Facility Name: Killian Creek WWTP
b. WWTP Facility Permit #: NC0088722
All flows are in MGD
c. WWTP facility's permitted flow 3.35
d. Estimated obligated flow not yet tributary to the WWTP 1.405
e. WWTP facility's actual avg. flow 1.103
f Total flow for this specific request 0.039
g. Total actual and obligated flows to the facility 2.547
h. Percent of permitted flow used 76.03%
Il. Complete this section for each pump station you are responsible for along the route of this
proposed wastewater flow.
List pump stations located between the project connection point and the WWTP:
(A) (B) (C) (D)=(B+C) (E)=(A-D)
Design Obligated,
Pump Average Daily Approx. Not Yet Total Current
Station Firm Flow** Current Avg. Tributary Flow Plus
(Name or Capacity, * (Firm / pf), Daily Flow, Daily Flow, Obligated Available
Number) MGD MGD MGD MGD Flow Capacity***
#12 1.584 0.634 0.213 0.294 0.507 0.127
#37 7.776 3.110 0.895 1.361 2.295 0.815
* The Firm Capacity of any pump station is defined as the maximum pumped flow that
can be achieved with the largest pump taken out of service.
** Design Average Daily Flow is the firm capacity of the pump station divided by a peaking
factor (pf) not less than 2.5.
*** A Planning Assessment Addendum shall be attached for each pump station located
between the project connection point and the WWTP where the Available Capacity is < 0.
Downstream Facility Name (Sewer): Lincoln County Sewer System
Downstream Permit Number: WQCS00149
Page I of 6
FTSE 04-16
III. Certification Statement:
I Donald V. Chamblee certify to the best of my knowledge that the addition of
the volume of wastewater to be permitted in this project has been evaluated along the route to the
receiving wastewater treatment facility and that the flow from this project is not anticipated to
cause any capacity related sanitary sewer overflows or overburden any downstream pump station
en route to the receiving treatment plant under normal circumstances, given the implementation
of the planned improvements identified in the planning assessment where applicable. This
analysis has been performed in accordance with local established policies and procedures using
the best available data. This certification applies to those items listed above in Sections I and II
plus all attached planning assessment addendums for which I am the responsible party.
Signature of this form indicates acceptance of this wastewater flow.
s/,/els
Signing Official Signature Date
Page 2 of 6
FTSE 04-16
PLANNING ASSESSMENT ADDENDUM (PAA)
Submit a planning assessment addendum for each pump station listed in Section II where Available
Capacity is < 0.
Pump Station (Name or Number):
Given that:
a. The proportion and amount of Obligated, Not Yet Tributary Daily Flow (C) accounts for
% and MGD of the Available Capacity (E) in Pump Station
; and that
b. The rate of activation of this obligated, not yet tributary capacity is currently approximately
MGD per year; and that
c. A funded Capital Project that will provide the required planned capacity, namely
is in design or under construction with
planned completion in ; and/or
d. The following applies:
Therefore:
Given reasonably expected conditions and planning information, there is sufficient justification
to allow this flow to be permitted, without a significant likelihood of over -allocating capacity in
the system infrastructure.
I understand that this does not relieve the collection system owner from complying with G.S.
143-215.67(a) which prohibits the introduction of any waste in excess of the capacity of the
waste disposal system.
Signing Official Signature
Date
Page 3 of 6
FTSE 04-16
Instructions for Flow Tracking/Acceptance form (FTSE) and Planning Assessment Addendum (PAA)
Section I
a. WWTP Facili. Name: Enter the name of the WWTP that will receive the wastewater flow.
b. WWTP Facility Permit #: Enter the NPDES or Non -Discharge number for the WWTP receiving the
wastewater flow.
C. WWTP facility's permitted flow, MGD: From WWTP owner's NPDES or Non -Discharge permit.
d. Estimated obligated flow not yet tributary to the WWTP, MGD: This includes flows allocated to
other construction projects not yet contributing flow to the collection system. Flows allocated through
interlocal agreements or other contracts not yet contributing flow to the collection system are also
included. For POTWs that implement a pretreatment program, include flows allocated to industrial
users who may not be using all of their flow allocation. Please contact your Pretreatment Coordinator
for information on industrial flow tributary to your WWTP.
As of January 15, 2008 the POTW should have reviewed flow allocations made over the last two
years and reconciled their flow records, to the best of their ability, so it is known how much flow has
been obligated and is not yet been made tributary to the WWTP, in accordance with local policies and
procedures employed by the reporting entity.
e. WWTP facility's actual avg. flow, MGD: Previous 12 month average.
f. Total flow for this specific request, MGD: Enter the requested flow volume.
g. Total actual and obligated flows to the facility, MGD Equals [d + e + f]
It. Percent of permitted flow used: Equals [(g / c)* 100]
For example:
On January 15 a POTW with a permitted flow of 6.0 MGD, reported to the Regional Office that there
is 0.5 MGD of flow that is obligated but not yet tributary. The annual average flow for 2007 is 2.7
MGD. There is a proposed flow expansion of 0.015 MGD.
The first Form FTSE submitted after January 15, 2008 may have numbers like this:
c. = 6.0 MGD
d. = 0.5 MGD
e. = 2.7 MGD
f. = 0.015 MGD
g. = 3.215 MGD
h. = 53.6 %
The next Form FTSE may be updated like this with a proposed flow expansion of 0.102 MGD:
c. = 6.0 MGD
d. = 0.515 MGD
e. = 2.73 MGD
f. = 0.102 MGD
g. = 3.349 MGD
h. = 55.8 %
Each subsequent FTSE form will be updated in the same manner.
Page 4 of 6
FTSE 04-16
Section II
List the pump station name or number and approximate pump station firm capacity, approximate design
average daily flow (A) approximate current average daily flow (B), and the obligated, not yet tributary
flow through the pump station (C) for each pump station that will be impacted by the proposed sewer
extension project. Calculate the total current flow plus obligated flow (D=B+C) and the available
capacity (E=A-D). Include the proposed flow for this project with other obligated flows that have been
approved for the pump station but are not yet tributary (C).
Firm capacity is the maximum pumped flow that can be achieved with the largest pump out of service as
per the Minimum Design Criteria.
Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor (pf) of
not less than 2.5.
If the available capacity (E) for any pump station is < 0, then prepare a planning assessment for that pump
station if the system has future specific plans related to capacity that should be considered in the
permitting process.
Page 5 of 6
WWWOi9Gi
(A)
(B)
(C)
(D)=(B+C)
(E)=(A-D)
Obligated,
Design
Approx.
Not Yet
Total Current
Firm
Average
Current Avg.
Tributary
Flow Plus
Pump Station
Capacity
Daily Flow
Daily Flow,
Daily Flow,
Obligated
Available
(Name or Number)
MGD
(Firm / pf)
MGD
MGD
Flow
Capacity*
Kaw Creek PS
0.800
0.320
0.252
0.080
0.332
-0.012
Valley Road PS
1.895
0.758
0.472
0.135
0.607
0.151
Page 5 of 6
WWWOi9Gi
Planning Assessment Addendum Instructions
Submit a planning assessment addendum for each pump station listed in Section II where available
capacity is < 0.
A planning assessment for Kaw Creek PS (see example data above) may be performed to evaluate
whether there is significant likelihood that needed improvements or reductions in obligated flows will be
in place prior to activating the flows from the proposed sewer extension project.
If the system decides to accept the flow based on a planning assessment addendum, it is responsible to
manage the flow without capacity related sanitary overflows and must take all steps necessary to
complete the project or control the rate of flow to prevent sanitary sewer overflows.
The planning assessment may identify a funded project currently in design or construction, or a planned
project in the future not yet funded but in a formal plan adopted by the system. The system should
carefully weigh the certainty of successful timely project completion for any expansion, flow
management diversion or infiltration and inflow elimination projects that are the foundation of a planned
solution to capacity tracking and acceptance compliance.
For example:
Given that:
a. The proportion and amount of obligated, not yet tributary flow accounts for 24 % and 0.080
MGD of the committed flow in Pump Station Kaw Creek; and that
b. The rate of activation of this obligated, not yet tributary capacity is currently approximately 0.01
MGD per year; and that
c. A funded capital project that will provide the required planned capacity, namely
is in design or under construction with
planned completion in ; and/or
d. The following applies:
The master plan and ten year capital plan contain recommended scope and funding for a capital project
elevates this project's priority for funding and construction to be implemented ahead of the activation of
obligated not vet tributary flows in amounts that exceed the firm pump station capacities identified in
Section II above.
Therefore:
Given reasonably expected conditions and planning information, there is sufficient justification to allow
this flow to be permitted, without a significant likelihood of over -allocating capacity in the system
infrastructure.
Page 6 of 6
FTSE 04-16
Water Resources ~
Environmernal Quality
February 1, 2017
Chris Henderson
Engineering Associate
Lincoln County Public Works
115 West Main Street
Lincolnton, NC 28092
Subject: Killian Creek WWTP, NPDES # NCO088722
Residential Flow Reduction
Lincoln County
Dear Mr. Henderson:
ROY COOPER
Gmernor
MICHAEL S. REGAN
secretnn
S. JAY ZIMMERMAN
Director
On January 29, 2007 the Division of Water Quality (now Division of Water Resources) granted a
flow reduction for residential flow to Middle Forney Creek WWTP (NC0074012). Middle Forney
Creek has been decommissioned and the NPDES permit rescinded. The flow previously being
treated at Middle Forney Creek WWTP is now being treated at Killian Creek WWTP. All areas
currently served by Killian Creek WWTP and conveyed through pump stations # 15 and # 37
were included in the analysis done for the flow reduction granted in 2007.
Based upon the data provided by the County for the 2007 flow reduction, the Division of Water
Resources hereby approves the use of 80 GPD per residential bedroom, with a minimum of 160
gpd for one and two bedroom units in all applicable non -discharge permit applications to Killian
Creek WWTP (NC0088722). Flow shall be incremented by 80 gpd for each bedroom above two.
Regardless of the adjusted design daily wastewater flow rate, at no time shall the wastewater
flows exceed the effluent limits defined in the NPDES permit for the treatment facility of exceed
the capacity of the sewers downstream of nay new sewer extensions or service connection(s).
The granting of this flow reduction does not prohibit the Division from reopening, revoking,
reissuing and /or modifying the flow reduction as allowed by the laws, rules, and regulation
contained in 15A NCAC 02T, NCGS 143-215.1, or as needed to address changed in State and/or
Federal regulations with respect to wastewater collection systems, protection of surface waters
and/or wastewater treatment.
"Nothing Compares --_
Slate or North Carolina I Environmental Quality
1617 Mail Service Center I Raleigh, North Carolina 27699-1617
919-707-9000
If you have any questions, please contact me at (919) 807-6383, or via email at
deborah.gore@ncdenr.gov.
Sincerely,
for S. Jay Zimmerman
Director, Division of Water Resources
by Deborah Gore, Supervisor
Pretreatment, Emergency Response and Collection Systems Branch
Cc: Mooresville Regional Office, Water Quality Regional Operations
Central Files: NC0088722
PERCS (electronic copy)
LOAN ALL
v�2 � ATF
COUNTY OF LINCOLN, NORTH CAROLINA
2O�Te "cARo��2°'
115 WEST MAIN STREET, 2ND FLOOR CITIZENS CENTER, LIN COLNTON, NORTH CAROLINA
28092
DEPARTMENT OF PUBLIC WORKS
PHONE (704)736-8497
FAX (704) 736-8499
WWW. LI NCOLN COUNTV.ORG
May 1, 2018
Lennar Carolinas, LLC
Attn: Michael Neff
11230 Carmel Commons Blvd
Charlotte, NC 28226
RE: Mehvood
Mr. Neff,
This letter is provided in response to your request, dated April 19, 2018, for flow acceptance of the
wastewater treatment infrastructure (the "System") for the Melwood Development (the "Project').
Lincoln County (the "County") has the actual average daily flow capacity at its Killian Creek Wastewater
Treatment Plant to treat the domestic wastewater as requested, and does conditionally grant approval for
the Project, subject, however, to the terms and conditions below:
1. The amount of flow requested for the Project is for 162 lots with a total flow of 38,880 gallons
per day of additional flow at the NCDEQ approved reduced flow rate of 240 gallons per day per
home into LS -12; and
2. For the NCDEQ Permits, the receiving sewer treatment facility is the Killian Creek W WTP,
Permit #NC 0088722. The sewer collections facility is the East Lincoln County Water and Sewer
District, Penn it #WQCS 00149; and
3. The County shall not be named as the Pennittee on NCDEQ system applications. You must
make the application to NCDEQ in your own name for the System; and
4. Acceptance of the System and transferal of the System to the County is subject to the
following:
a. A complete final inspection and approval of the System by the County, and receipt of other
applicable documentation requested by the County; and
b. Approval of the System by NCDEQ, and proof provided to the County of a valid permit issued
by NCDEQ with an Authorization to Construct (ATC); and
c. Initiating construction of the Project within two years of the date of this conditional approval.
You must notify the Lincoln County Public Works Department in writing when construction of
the Project is initiated; and
d. The County continuing to have actual average daily flow capacity to treat the domestic
wastewater as requested at the time all other conditions precedent have been satisfied.
e. The Developer must make access improvements and provide additional easements to pump
station 9 12 in accordance with the Pump Station 12 — Driveway Exhibit dated February 21, 2018
that was provided by CES Group Engineers and acknowledged by Northstate Development in the
letter dated April 20, 2018 and signed by Mr. Shane Seagle.
f. The Developer must make all necessary improvements, per the approved utility plans, to the
existing gravity sewer system going to Pump Station 12 in order to accommodate the Melwood
Subdivision.
g. Under the general notes section on the approved plans on Sheet C1.0, Note 5 should specify
that the minimum vertical separation between sanitary sewer and storm sewer should be 24" per
the County's Design Manual and NCDEQ Regulations.
This acceptance and allocation of flow shall only be effective upon your compliance with all of
the above terms and conditions and the County providing an acknowledgment that you have complied
with all of the above terms and conditions.
Included in this mailing is the Flow Tracking/Acceptance for Sewer Extension Permit
Applications (FTSE — 04/16) with the County's portion completed.
If you have any questions, please do not hesitate to call me at 704-736-8497.
Sin,
Chris Henderson
Engineering Associate
Cc: File
"8/201
North Carolina Secretary of State Search Results
• Upload a PDF Filing • Order a Documents Online • Add Entity to My Email Notification List
• View Filings • File an Annual Report/Amend an Annual Report
• Print an Amended a Annual Report form • Print a Pre -Populated Annual Report form
Limited Liability Company
Legal Name
Lennar Carolinas, LLC
Information
Sosld: 0791436
Status: Current -Active
Annual Report Status: Current
Citizenship: Foreign
Date Formed: 7/7/2005
Fiscal Month: December
State of Incorporation:
DE
Registered Agent: CT Corporation System
Addresses
Reg Office Reg Mailing Mailing
160 Mine Lake Ct Ste 200 160 Mine Lake Ct Ste 200 700 N.W. 107th Avenue, Suite 400
Raleigh, NC 27615 Raleigh, NC 27615 Miami, FL 33172-3139
Principal Office
700 N.W. 107th Avenue, Suite 400
Miami, FL 33172-3139
Company Officials
All LLCs are managed by their managers pursuant to N.C.G.S. 57D-3-20.
https://w .sosnc.gov/ontine_services/searchlBusiness_Registration_Results 1/2
'/8/2019
Manager
Diane J. Bessette
700 N.W. 107th Avenue, Suite 400
Miami FL 33172
Vice President
Mark Sustana
700 N.W. 107th Avenue, Suite 400
Miami FL 33172
North Carolina Secretary of State Search Results
Manager
Mark Sustana
700 N.W. 107th Avenue, Suite 400
Miami FL 33172
https://www.sosnc.gov/online_services/search/Business_Registration_Results 2/2