Loading...
HomeMy WebLinkAbout20081265 Ver 2_Triage Comments_20090513 Use this form instead of writing inside the folder oNQz Triaged By: Reviewer 1 Reviewer 2 Reviewer 3 Triage Comment Sheet Date: Date: U Date: Issue with conditions (Reviewer 2) More Information (Reviewer 1) ? Return Application (Reviewer 1) ? Send to Regions (Reviewer 1) ? Send to Regions (Reviewer 2) ? More Information (Reviewer 2) ? Return Application (Reviewer 2) SATriage Forms\Triage Issue Sheet.doc PLEASE PRINT CLEARLY Issue Project (Reviewer 1) ? Issue Project (Reviewer 2) 08-1265v2 Two Bale Lane AML comments May 13, 2009 1. Please provide a stormwater management plan that removes a minimum of 85 percent TSS from the stormwater runoff from Two Bale Lane (roadway). For each proposed BMP, please provide a completed BMP Supplement Form, with all the required items. The BMP Supplement Forms are available at the following web site: http://h2o.enr.state.nc.us/su!bmp forms.htm.