Loading...
HomeMy WebLinkAbout20180631 Ver 1_20180631 Ver 1_Agent Authorization_20180509 (2)_20180509�� .v U.S. Department of Transportation Federal Aviation Administration Karen Dorrell Senior Environmental Engineer Parsons/T4 3 800 Camp Creek Pkwy Building 2400, Suite 106 Atlanta, GA 30331 NAS Implementation P. O. Box 20636 Center, Atlanta, Georgia Atlanta, Georgia 30320 Re: Pre-construction Notification (PCN) for Wetland Impacts Rocky Mount-Wilson Airport - Localizer Relocation and MALSR Replacement Project Dear Ms. Dorrell: Please accept this letter as authorization from the FAA for Luke Eggering to sign the Pre- Construction Notification form for the Localizer Relocation and MALSR Replacement Proj ect. Please feel free to contact me should you have any questions regarding this issue at (404) 305-7401. Sincerely, WILLIAM E PRICE DigitallysignedbyWILLIAME PRICE JR � R Date: 2018.04.27 14:19:31 -04'00' William E. Price Jr Manager, Navaids Engineering Center — Atlanta AJW-2E 14C cc: Carol Ann Stewart, Parsons TSSGIV