Loading...
HomeMy WebLinkAbout20090158 Ver 1_DCM Permit_20090512A,-?.. _..,.h .-._ ?_ ?.. z P?'rma Class NEW D q- p is g Permit :number D STATE OF NORTH CAROLINA 59-09 Department of Environment and Natural Resources f-LIZ P y?11 - and ?~ I . ?:,/ Coastal Resources Commission U, MAY 1 2009 Permit DENR - WATER QUALITY for WETLA140S AND STDRIMATER BRANCH X Major Development in an Area of Environmental Concern pursuant to NCGS 113A-118 Excavation and/or filling pursuant to NCGS 113-229 Issued to Rob Boswell, 308 Bradley Dr., Wilmington, NC 28409 Authorizing development in New Hanover County adj. to Bradley Creek, at 308 Bradley Drive, in Wilmington , as requested in the permittee's application dated 12/8/08, including the attached workplan drawings (3), all dated 2/3/09 This permit, issued on May 4. 2009 , is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may be subject to fines, imprisonment or civil action; or may cause the permit to be null and void. Docking Facility 1) Unless specifically altered herein, this permit authorizes the removal of the existing docking facility and the new construction of only the docks, piers, and other structures and uses located in or over the water that are expressly and specifically set forth in the permit application. No other structure, whether floating or stationary, may become a permanent part of this docking facility without permit modification. No non-water dependent uses of structures may be conducted on, in or over public trust waters without permit modification. (See attached sheet for Additional Conditions) This permit action may be appealed by the permittee or other qualified persons within twenty (20) days of the issuing date. An appeal requires resolution prior to work initiation or continuance as the case may be. This permit must be accessible on-site to Department personnel when the project is inspected for compliance. Any maintenance work or project modification not covered hereunder requires further Division approval. All work must cease when the permit expires on December 31, 2012 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. Signed by the authority of the Secretary of DENR and the Chairman of the Coastal Resources Commission. -'Z V1 Z James H. egson, Director /1fision of Coastal Management This permit and its conditions are hereby accepted. Signature of Permittee •`-.:v>ti.Ga}; [+y'.=N?'4ti?.v?Y.v?rrv'r??J ? 'A;?wdr.K.-0t?:Sr.ru,.Y.+).k}0-`a.A..n%w.,il+NVW, }Y' ,:. ... .i rr .aim.:.... n.+.. rr:w4?..iie,.;..rr,.. ...., . ...i..?..Yr?ir.'.C.v,.:N .}..i?'??' _ .r.^? :.V-p. Y.,J Y??..d iKP'e.'rV?? Y? Permit # 59-09 } Rob Boswell Page 2 of 3 h ADDITIONAL CONDITIONS r 2) The pier and associated structures shall have a minimum setback distance of 15 feet between any parts of the structure and the adjacent property owner's riparian access corridor, which is determined by drawing a line parallel to the channel, then drawing a line perpendicular to the channel line that intersects with the shore at the point where the upland property line meets the water's edge. 3) Any portion of the permitted access pier and docking facilities built over coastal wetlands must not exceed six feet in width and must be elevated a minimum of three feet over the wetland substrate as measured from the bottom of the decking. 4) No attempt shall be made by the permittee to prevent the full and free use by the public of all navigable waters at or adjacent to the authorized work. 5) The permittee shall maintain the authorized work in good condition and in conformance with the terms and conditions of this permit. The permittee is not relieved of this requirement if he abandons the permitted activity without having it transferred to a third party. 6) This permit does not authorize the interference with any existing or proposed Federal project, and the permittee will not be entitled to compensation for damage to the authorized structure or work, or injury which may be caused from existing or future operations undertaken by the United States in the public interest. 7) The permittee shall install and maintain at his expense any signal lights or signals prescribed by the U.S. Coast Guard, through regulation or otherwise, on the authorized facilities. At a minimum, permanent reflectors shall be attached to the structure in order to make it more visible during hours of darkness or inclement weather. 8) This permit authorizes a maximum of four formalized boat slips. General 9) The permittee understands and agrees that, if future operations by the United States requires the removal, relocation, or other alteration of the structure or work authorized by this permit, or if in the opinion of the Secretary of the Army or his authorized representative, said structure or work shall cause unreasonable obstruction to free navigation of the navigable waters, the permittee will be required, upon due notice from the Corps of Engineers, to remove, relocate or alter the structural work or obstructions caused thereby, without expense to the United States or the state of North Carolina. No claim shall be made against the United States or the state of North Carolina on account of any such removal or alteration. 10) No open water areas or vegetated wetlands shall be excavated or filled, even temporarily. 11) This permit shall not be assigned, transferred, sold, or otherwise disposed of to a third party without the written approval of the Division of Coastal Management. 1 ' ' . ..,v ,ti f.. ?a , . oY"•rrv'°.',4hN.}iK..:wv.: ?:a.-;?'-C -+r ?'.;-. . - qrY: ;- r' - k ' (.?d-Y.•..f.?,? rte. ?r... ?A; ?r n'?Y.p.... ?,w +.rH r,.Y'r' ?r? ?r?ir'?. r.F .t.'^,?..y.l?.. n ?-,o;.?Yr!^d}Yr . . . . , .. r, i? i .....w rv rr.n.. ` Permit # 59-09 Rob Boswell s Page 3 of 3 ADDITIONAL CONDITIONS NOTE: This permit does not eliminate the need to obtain any additional state, federal or local permits, approvals or authorizations that may be required. NOTE: Future development of the permittee's property may require a modification of this permit. Contact a representative of the Division at (910) 796-7215 prior to the commencement of any such activity for this determination. The permittee is further advised that many non-water dependent activities are not authorized within 30 feet of the normal high water level. NOTE: The N.C. Division of Water Quality has authorized the proposed project under General Water Quality Certification No. 3687 (DWQ Project No. 09-0158), which was issued on 3/12/09. NOTE: The U.S. Army Corps of Engineers has assigned the proposed project COE Action Id. No. SAW- 2009-00645. - 1'?=20' Rob Boswell Drawn By: TITLE Charlie Booth 308 Bradley Dr Waterline Marine . ?/3/09 Construction - - _ SIZE u.n CAGECODE OWG NO REV SCALE 1n_20' SHEET 1 of I 1 109X,8 1 v J N? \N O r---q 0 'IT ,0z 0 H a? c13 a? 1 z M? 1 R Sx24' M M1 9M p - 0 4'x 16' a ? ?0 h N M I M ? O M a ? O ^C3 O O ? o a ct ? tt t Fisting Bulkhead 102' Shoreline O O U 04 Q ?4 P-4 t? L 1M^1 O M h? cl O? 1~ O 1--q . CD O? ?"h P C ?r bd w 0 td Q ko? d W T IOZ=lii 3 0 x N 7 (?l O N a N 0 ? .5 ? a a ? >~ x N_ O bA O cc! N W 0 N cam. iy Q N ?r U b 3 o ? ? M W ? ,? ?0 ? M N w $ o i y I I ? ? ? •? I I O ? ? I I ? I I ? U I I r I I U I I I I