Loading...
HomeMy WebLinkAboutNC0085839_Inspection_20180501WaterResou ces EHWROMMEWAl QUALITY May 2, 2018 Rick Singleton Unimin Corporation PO Box 100 Bakersville, NC 28705 SUBJECT: Compliance Inspection Report Red Hill Quartz Processing Plant NPDES WW Permit No. NCO085839 Mitchell County Dear Mr. Singleton: ROY COOPER Gorerna, MICHAEL S. R[E.GAN SBGlB1CQti LT -NDA CFULPEPPER lhJ err m Direclar The North Carolina Division of Water Resources conducted an inspection of the Red Hill Quartz Processing Plant on 4/03/2018. This inspection was conducted to verify that the facility is operating in compliance with the conditions and limitations specified in NPDES WW Permit No. NC0085839. The enclosed inspection report has action items we discussed during the inspection that require your attention. If you should have any questions, please do not hesitate to contact me at 828-296-4500 or via email at linda.wiggs@ncdenr.gov. Sincerely, E-4 DocuSigned by: tiwol,� wl, l y 6C38CDE295CF449... Linda Wiggs Water Quality Regional Operations Section Asheville Regional Office Division of Water Resources, NCDEQ ATTACHMENTS -Inspection Report Cc: WQS ARO Server Laserfiche G:\WR\WQ\Mitchell\Wastewater\Industrial\Unimin Red Hill 85839\4-3-2018 visit\20180501_NC0085839_CEI.rtf State of North Carolina I Environmental Quality I Water Resources 2090 U.S. 70 Highway, Swannanoa, NC 28778 828-296-4500 DocuSign Envelope ID: 2DD4996B-DEDB-4262-BEBA-54D3152BB57A United States Environmental Protection Agency Form Approved. EPA Washington, D.C. 20460 OMB No. 2040-0057 Water Compliance Inspection Report Approval expires 8-31-98 Section A: National Data System Coding (i.e., PCS) Transaction Code NPDES yr/mo/day Inspection Type Inspector Fac Type 1 IN I 2 15 I 3 I NCO085839 111 12 I 18/04/03 I17 18 I S J 19 LG] 201 I 211111 1 1 1 1 1 111 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 111 1 1 1 1 1 166 Inspection Work Days Facility Self -Monitoring Evaluation Rating B1 QA ----------------------Reserved------------------- 67 70 I I 71 I I 72 I r l 73 I I 174 751 I I I 1 1 1 I80 u I� I I i Section B: Facility Data Name and Location of Facility Inspected (For Industrial Users discharging to POTW, also include Entry Time/Date Permit Effective Date POTW name and NPDES oermit Number) 09:30AM 18/04/03 12/06/01 Red Hill Quartz Processing Plant Unimin Quartz Processing Exit Time/Date Permit Expiration Date Spruce Pine NC 28777 03:30PM 18/04/03 16/02/29 Name(s) of Onsite Representative(s)/Titles(s)/Phone and Fax Number(s) Other Facility Data Name, Address of Responsible Official/Title/Phone and Fax Number Contacted Steve Westmoreland,PO Box 588 Spruce Pine NC 287770588//828-765-0912/ Yes Section C: Areas Evaluated During Inspection (Check only those areas evaluated) Operations & Maintenance Records/Reports Self -Monitoring Program 0 Facility Site Review Effluent/Receiving Waters Laboratory Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary) (See attachment summary) Name(s) and Signature(s) of Inspector(s) Agency/Office/Phone and Fax Numbers Date Linda S Wiggs EW ARO WQ//828-296-4500 Ext.4653/ 5/2/2018 Sigr Management Q A Reviewer Agency/Office/Phone and Fax Numbers Date EPA Form 3560-3 (Rev 9-94) Previous editions are obsolete. Page# DocuSign Envelope ID: 2DD4996B-DEDB-4262-BEBA-54D3152BB57A NPDES yr/mo/day Inspection Type (Cont.) NCO085839 111 121 18/04/03 1 17 18 ICI Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary) Inspector, Linda Wiggs, met onsite with several Unimin staff to follow up on a complaint received by EPA and to perform a laboratory inspection with Jason Smith from the DEQ Laboratory Section. Unimin staff present during the inspections were, Andy Greene, Rick Singleton, Steve Wilson and Dennis Johnson. Sampling below the raw water dam shall take place weekly for pH, TSS and Fluoride. The analysis results, date, time and precipitation within 24 hours shall be recorded in the operator log. This information shall also be sent to Linda Wiggs via email monthly until further notice. Photo documentation has been requested of E Pond #2 once it has been cleaned. Maintenance activities, such as the cleaning of the E Pond, weir and troughs should be recorded in the operator log. Process water pH is monitored in several locations. Location of the probes were discussed for more representative monitoring. Also discussed as a contingency, the trigger pH values be reconsidered, i.e. the set 9.7 pH 5 -minute trigger be altered to 9.0 pH. The diverter valve for #1 did not activate during the inspection. Maintenance staff took immediate repair actions which were documented the following day to the inspector. The diverter valves are an integral component of the wastewater system to avoid non-compliant effluent discharged to the river. Increased inspection/exercising of these valves may be warranted. Page# DocuSign Envelope ID: 2DD4996B-DEDB-4262-BEBA-54D3152BB57A Permit: NCO085839 Owner - Facility: Red Hill Quartz Processing Plant Inspection Date: 04/03/2018 Inspection Type: Compliance Evaluation Operations & Maintenance Yes No NA NE Is the plant generally clean with acceptable housekeeping? 0 ❑ ❑ ❑ Does the facility analyze process control parameters, for ex: MLSS, MCRT, Settleable ❑ ❑ ❑ Solids, pH, DO, Sludge Judge, and other that are applicable? Comment: See summary. Record Keeping Yes No NA NE Are records kept and maintained as required by the permit? 0 ❑ ❑ ❑ Is all required information readily available, complete and current? 0 ❑ ❑ ❑ Are all records maintained for 3 years (lab. reg. required 5 years)? 0 ❑ ❑ ❑ Are analytical results consistent with data reported on DMRs? 0 ❑ ❑ ❑ Is the chain -of -custody complete? 0 ❑ ❑ ❑ Dates, times and location of sampling ❑ Name of individual performing the sampling ❑ Results of analysis and calibration ❑ Dates of analysis ❑ Name of person performing analyses ❑ Transported CDCs ❑ Are DMRs complete: do they include all permit parameters? 0 ❑ ❑ ❑ Has the facility submitted its annual compliance report to users and DWQ? ❑ ❑ 0 ❑ (If the facility is = or > 5 MGD permitted flow) Do they operate 24/7 with a certified operator ❑ ❑ ❑ on each shift? Is the ORC visitation log available and current? Yes No NA NE ❑ ❑ ❑ Is the ORC certified at grade equal to or higher than the facility classification? ❑ ❑ ❑ ❑ Is the backup operator certified at one grade less or greater than the facility classification? ❑ ❑ ❑ ❑ Is a copy of the current NPDES permit available on site? ❑ ❑ ❑ ❑ Facility has copy of previous year's Annual Report on file for review? ❑ ❑ 0 ❑ Comment: Secondary Clarifier Yes No NA NE Is the clarifier free of black and odorous wastewater? 0 ❑ ❑ ❑ Is the site free of excessive buildup of solids in center well of circular clarifier? 0 ❑ ❑ ❑ Are weirs level? 0 ❑ ❑ ❑ Is the site free of weir blockage? 0 ❑ ❑ ❑ Is the site free of evidence of short-circuiting? 0 ❑ ❑ ❑ Page# 3 DocuSign Envelope ID: 2DD4996B-DEDB-4262-BEBA-54D3152BB57A Permit: NCO085839 Owner - Facility: Red Hill Quartz Processing Plant ■ ❑ Inspection Date: 04/03/2018 Inspection Type: Compliance Evaluation ■ ❑ ❑ Secondary Clarifier Yes No NA NE Is scum removal adequate? 0 ❑ ❑ ❑ Is the site free of excessive floating sludge? 0 ❑ ❑ ❑ Is the drive unit operational? 0 ❑ ❑ ❑ Is the return rate acceptable (low turbulence)? ❑ ❑ 0 ❑ Is the overflow clear of excessive solids/pin floc? 0 ❑ ❑ ❑ Is the sludge blanket level acceptable? (Approximately '/, of the sidewall depth) M ❑ ❑ ❑ Comment: 50' thickener #1, back online —30 days. 70' thickener #2, weir and trough need cleaning. Record in operator log. See summary. Lagoons Type of lagoons? # Number of lagoons in operation at time of visit? Are lagoons operated in? # Is a re -circulation line present? Is lagoon free of excessive floating materials? # Are baffles between ponds or effluent baffles adjustable? Are dike slopes clear of woody vegetation? Are weeds controlled around the edge of the lagoon? Are dikes free of seepage? Are dikes free of erosion? Are dikes free of burrowing animals? # Has the sludge blanket in the lagoon (s) been measured periodically in multiple locations? # If excessive algae is present, has barley straw been used to help control the growth? Is the lagoon surface free of weeds? Is the lagoon free of short circuiting? Yes No NA NE N Series ■ ❑ ❑ ❑ ■ ❑ ❑ ❑ ■ ❑ ❑ ❑ ■ ❑ ❑ ❑ ■ ❑ ❑ ❑ ■ ❑ ❑ ❑ ■ ❑ ❑ ❑ ■ ❑ ❑ ❑ ❑ ■ ❑ ❑ ■ ❑ ❑ ❑ ■ ❑ ❑ ❑ ■ ❑ ❑ ❑ Comment: E Donds and raw water ponds were evaluated. SamDlina below the dam of the raw water ponds shall take place. See summary. Equipment was onsite to clean E Pond #2. Effluent Pipe Yes No NA NE Is right of way to the outfall properly maintained? 0 ❑ ❑ ❑ Are the receiving water free of foam other than trace amounts and other debris? 0 ❑ ❑ ❑ If effluent (diffuser pipes are required) are they operating properly? ❑ ❑ 0 ❑ Page# 4 DocuSign Envelope ID: 2DD4996B-DEDB-4262-BEBA-54D3152BB57A Permit: NCO085839 Inspection Date: 04/03/2018 Effluent Pipe Comment: Owner - Facility: Red Hill Quartz Processing Plant Inspection Type: Compliance Evaluation Laboratory Are field parameters performed by certified personnel or laboratory? Are all other parameters(excluding field parameters) performed by a certified lab? # Is the facility using a contract lab? # Is proper temperature set for sample storage (kept at less than or equal to 6.0 degrees Celsius)? Incubator (Fecal Coliform) set to 44.5 degrees Celsius+/- 0.2 degrees? Incubator (BOD) set to 20.0 degrees Celsius +/- 1.0 degrees? Comment: Jason Smith will send the laboratory inspection report under separate cover. Yes No NA NE Yes No NA NE ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ■ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ Page# 5