Loading...
HomeMy WebLinkAboutncg500308_Inspection_20180504Environmental Quality ROY COOPER Governor MICHAEL S. REGAN Secretary LINDA CULPEPPER Interim Director May 4, 2018 Mr. Dallas D. Crotts President and Technical Director CEKAL Specialties, Inc. P.O Box 788 Mt. Holly, NC 28120 Subject: Compliance Evaluation Inspection CEKAL Specialties, Inc. NPDES Permit No. NCG500308 Gaston County Dear Mr. Crotts: Enclosed is a copy of the Compliance Evaluation Inspection for the inspection conducted at the subject facility on May 3, 2018, by Ori Tuvia. Ken Dake's cooperation during the site visit was much appreciated. Please advise the staff involved with this NPDES Permit by forwarding a copy of the enclosed repot. The site review conducted on May 3, 2018 revealed the site has been connected to the city of Mount Holly sewer system and is not discharging to the creek, therefore the permit may be rescinded. If interested in rescinding the permit, please submit a written request to: Charles Weaver NC Division of Water Resources NPDES Permitting Unit 1617 Mail Service Center Raleigh, NC 27699 If you any questions, please contact Ori Tuvia at (704) 235-2190, or via email at ori. tuvia(ancdenr. gov. Sincerely, DocuSigned by: A14CC681 AF27425... W. Corey Basinger Regional Supervisor Mooresville Regional Office Division of Water Resources Cc: NPDES, MRO Files (Laserfiche) Mooresville Regional Office Location: 610 East Center Ave., Suite 301 Mooresville, NC 28115 Phone: (704) 663-16991 Fax: (704) 663-60401 Customer Service: 1-877-623-6748 Internet: www.ncwaterquality.org United States Environmental Protection Agency Form Approved. EPA Washington, D.C. 20460 OMB No. 2040-0057 Water Compliance Inspection Report Approval expires 8-31-98 Section A: National Data System Coding (i.e., PCS) Transaction Code NPDES yr/mo/day Inspection Type Inspector Fac Type 1 IN I 2 15 I 3 I NCG500308 111 12 I 18/05/03 I17 18 I S J 19 LG] 201 I 211111 1 1 1 1 1 111 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 111 1 1 1 1 1 166 Inspection Work Days Facility Self -Monitoring Evaluation Rating B1 QA ----------------------Reserved------------------- 67 1.0 70 IJ 71 I„ I 72 n u 73 �74 751 I I I 1 1 1 I80 Section B: Facility Data Name and Location of Facility Inspected (For Industrial Users discharging to POTW, also include Entry Time/Date Permit Effective Date POTW name and NPDES oermit Number) 10:45AM 18/05/03 15/12/22 Cekal Specialties 101 Brickyard Exit Time/Date Permit Expiration Date Mount Holly NC 28120 11:00AM 18/05/03 20/07/31 Name(s) of Onsite Representative(s)/Titles(s)/Phone and Fax Number(s) Other Facility Data Ken Dake/// Name, Address of Responsible Official/Title/Phone and Fax Number Contacted Dallas D Crotts,PO Box 788 Mount Holly NC 28120/President/704-822-6206/7048226641 No Section C: Areas Evaluated During Inspection (Check only those areas evaluated) Permit 0 Operations & Maintenance 0 Facility Site Review Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary) (See attachment summary) Name(s) and Signature(s) of Inspector(s) Agency/Office/Phone and Fax Numbers Date DocuSigned by: Ori A Tuvia MRO WQ//704-663-1699/ c :f Eppnr,7A,)nr-nl7AQA 5/4/2018 Signature of Management Q A Reviewer Agency/Office/Phone and Fax Numbers Date W. Corey Basinger MRO WQ//704-235-2194/ EPA Form 3560-3 (Rev 9-94) Previous editions are obsolete. DocuSigned by: 5/4/2018 Page# IA14CC681AF27425... NPDES yr/mo/day Inspection Type NCG500308 111 121 18/05/03 1 17 18 JCJ Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary) Page# Permit: NCG500308 Owner - Facility: Cekal Specialties Inspection Date: 05/03/2018 Inspection Type: Compliance Evaluation Permit Yes No NA NE (If the present permit expires in 6 months or less). Has the permittee submitted a new ❑ ❑ 0 ❑ application? Is the facility as described in the permit? 0 ❑ ❑ ❑ # Are there any special conditions for the permit? ❑ 0 ❑ ❑ Is access to the plant site restricted to the general public? 0 ❑ ❑ ❑ Is the inspector granted access to all areas for inspection? 0 ❑ ❑ ❑ Comment: The subject permit expires on 7/31/2020. Operations & Maintenance Yes No NA NE Is the plant generally clean with acceptable housekeeping? 0 ❑ ❑ ❑ Does the facility analyze process control parameters, for ex: MLSS, MCRT, Settleable ❑ ❑ ❑ Solids, pH, DO, Sludge Judge, and other that are applicable? Comment: The site grounds were well maintained. The facility has continued to use the City of Mt. Holly's potable water system to supply the boiler and cooling water systems. The boiler blowdown and non -contact cooling water discharges are connected to the City of Mt. Holly's wastewater collection system. Page# 3