HomeMy WebLinkAboutncg500308_Inspection_20180504Environmental
Quality
ROY COOPER
Governor
MICHAEL S. REGAN
Secretary
LINDA CULPEPPER
Interim Director
May 4, 2018
Mr. Dallas D. Crotts
President and Technical Director
CEKAL Specialties, Inc.
P.O Box 788
Mt. Holly, NC 28120
Subject: Compliance Evaluation Inspection
CEKAL Specialties, Inc.
NPDES Permit No. NCG500308
Gaston County
Dear Mr. Crotts:
Enclosed is a copy of the Compliance Evaluation Inspection for the inspection conducted
at the subject facility on May 3, 2018, by Ori Tuvia. Ken Dake's cooperation during the site visit
was much appreciated. Please advise the staff involved with this NPDES Permit by forwarding a
copy of the enclosed repot.
The site review conducted on May 3, 2018 revealed the site has been connected to the city
of Mount Holly sewer system and is not discharging to the creek, therefore the permit may be
rescinded. If interested in rescinding the permit, please submit a written request to:
Charles Weaver
NC Division of Water Resources
NPDES Permitting Unit
1617 Mail Service Center
Raleigh, NC 27699
If you any questions, please contact Ori Tuvia at (704) 235-2190, or via email at
ori. tuvia(ancdenr. gov.
Sincerely,
DocuSigned by:
A14CC681 AF27425...
W. Corey Basinger
Regional Supervisor
Mooresville Regional Office
Division of Water Resources
Cc: NPDES, MRO Files (Laserfiche)
Mooresville Regional Office
Location: 610 East Center Ave., Suite 301 Mooresville, NC 28115
Phone: (704) 663-16991 Fax: (704) 663-60401 Customer Service: 1-877-623-6748
Internet: www.ncwaterquality.org
United States Environmental Protection Agency
Form Approved.
EPA Washington, D.C. 20460
OMB No. 2040-0057
Water Compliance Inspection Report
Approval expires 8-31-98
Section A: National Data System Coding (i.e., PCS)
Transaction Code NPDES yr/mo/day Inspection Type Inspector Fac Type
1 IN I 2 15 I 3 I NCG500308 111 12 I 18/05/03 I17
18 I S J 19 LG] 201 I
211111 1 1 1 1 1 111 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 111 1 1 1 1 1 166
Inspection Work Days Facility Self -Monitoring Evaluation Rating B1 QA
----------------------Reserved-------------------
67 1.0 70 IJ 71 I„ I 72 n
u
73 �74 751 I I I 1 1 1 I80
Section B: Facility Data
Name and Location of Facility Inspected (For Industrial Users discharging to POTW, also include
Entry Time/Date
Permit Effective Date
POTW name and NPDES oermit Number)
10:45AM 18/05/03
15/12/22
Cekal Specialties
101 Brickyard
Exit Time/Date
Permit Expiration Date
Mount Holly NC 28120
11:00AM 18/05/03
20/07/31
Name(s) of Onsite Representative(s)/Titles(s)/Phone and Fax Number(s)
Other Facility Data
Ken Dake///
Name, Address of Responsible Official/Title/Phone and Fax Number
Contacted
Dallas D Crotts,PO Box 788 Mount Holly NC
28120/President/704-822-6206/7048226641 No
Section C: Areas Evaluated During Inspection (Check only those areas evaluated)
Permit 0 Operations & Maintenance 0 Facility Site Review
Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary)
(See attachment summary)
Name(s) and Signature(s) of Inspector(s) Agency/Office/Phone and Fax Numbers
Date
DocuSigned by:
Ori A Tuvia MRO WQ//704-663-1699/
c :f
Eppnr,7A,)nr-nl7AQA
5/4/2018
Signature of Management Q A Reviewer Agency/Office/Phone and Fax Numbers
Date
W. Corey Basinger MRO WQ//704-235-2194/
EPA Form 3560-3 (Rev 9-94) Previous editions are obsolete.
DocuSigned by:
5/4/2018
Page#
IA14CC681AF27425...
NPDES yr/mo/day Inspection Type
NCG500308 111 121 18/05/03 1 17 18 JCJ
Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary)
Page#
Permit: NCG500308 Owner - Facility: Cekal Specialties
Inspection Date: 05/03/2018 Inspection Type: Compliance Evaluation
Permit
Yes No NA NE
(If the present permit expires in 6 months or less). Has the permittee submitted a new
❑
❑
0
❑
application?
Is the facility as described in the permit?
0
❑
❑
❑
# Are there any special conditions for the permit?
❑
0
❑
❑
Is access to the plant site restricted to the general public?
0
❑
❑
❑
Is the inspector granted access to all areas for inspection?
0
❑
❑
❑
Comment: The subject permit expires on 7/31/2020.
Operations & Maintenance Yes No NA NE
Is the plant generally clean with acceptable housekeeping? 0 ❑ ❑ ❑
Does the facility analyze process control parameters, for ex: MLSS, MCRT, Settleable ❑ ❑ ❑
Solids, pH, DO, Sludge Judge, and other that are applicable?
Comment: The site grounds were well maintained. The facility has continued to use the City of Mt.
Holly's potable water system to supply the boiler and cooling water systems. The boiler
blowdown and non -contact cooling water discharges are connected to the City of Mt. Holly's
wastewater collection system.
Page# 3