Loading...
HomeMy WebLinkAboutNCG500180_Inspection_20180504Water Resources ENVIRONMENTAL QUALITY ROY COOPER Governor MICHAEL S. REGAN Secretary LINDA CULPEPPER Interim Director May 4, 2018 Mr. Jimmy Summers Vice President EHS & Sustainability American & Efird, LLC. P.O. Box 507 Mount Holly, NC 28120 Subject: Compliance Evaluation Inspection American & Efird Dyeing & Finishing Plant #15 NPDES Permit No. NCG500180 Gaston County Dear Mr. Summers: Enclosed is a copy of the Compliance Evaluation Inspection report for the inspection conducted at the subject facility on May 4, 2018, by Ori Tuvia. Your cooperation during the site visit was much appreciated. Please advise the staff involved with this NPDES Permit by forwarding a copy of the enclosed report. The report should be self-explanatory; however, should you have any questions concerning this report, please do not hesitate to contact Ori Tuvia at (704) 235-2190, or at ori.tuviagncdenr.gov. Sincerely, DocuSigned by: A14CC681 AF27425... W. Corey Basinger Regional Supervisor Mooresville Regional Office Division of Water Resources Cc: NPDES, MRO Files (Laserfiche) Mooresville Regional Office Location: 610 East Center Ave., Suite 301 Mooresville, NC 28115 Phone: (704) 663-16991 Fax: (704) 663-60401 Customer Service: 1-877-623-6748 United States Environmental Protection Agency Form Approved. EPA Washington, D.C. 20460 OMB No. 2040-0057 Water Compliance Inspection Report Approval expires 8-31-98 Section A: National Data System Coding (i.e., PCS) Transaction Code NPDES yr/mo/day Inspection Type Inspector Fac Type 1 IN I 2 15 I 3 I NCG500180 111 12 I 18/05/03 I17 18 I S i 19 LG] i 201 I 211111 1 1 1 1 1 111 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 111 1 1 1 1 1 166 Inspection Work Days Facility Self-Monitoring Evaluation Rating B1 QA ----------------------Reserved------------------- 67 1.0 70 71 I„ I 72 n 73 �74 751 I I I 1 1 1 I80 u Section B: Facility Data Name and Location of Facility Inspected (For Industrial Users discharging to POTW, also include Entry Time/Date Permit Effective Date POTW name and NPDES oermit Number) 09:45AM 18/05/03 15/10/26 Dyeing & Finishing Plant #15 22 American St Exit Time/Date Permit Expiration Date Mount Holly NC 28120 10:35AM 18/05/03 20/07/31 Name(s) of Onsite Representative(s)/Titles(s)/Phone and Fax Number(s) Other Facility Data Jimmy Summers//704-951-2578 /7048272618 Name, Address of Responsible Official/Title/Phone and Fax Number Contacted John Eapen,PO Box 507 Mount Holly NC 28120/VP of Environmental, Health & Safety/704-951-2578/7048270721 No Section C: Areas Evaluated During Inspection (Check only those areas evaluated) Permit 0 Flow Measurement Operations & Maintenance 0 Records/Reports Self-Monitoring Program 0 Facility Site Review Effluent/Receiving Waters Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary) (See attachment summary) Name(s) and Signature(s) of Inspector(s) Agency/Office/Phone and Fax Numbers Date DocuSigned by: Ori A Tuvia MRO WQ//704-663-1699/ 5/4/2018 Signature of Management Q A Reviewer Agency/Office/Phone and Fax Numbers Date W. Corey Basinger MRO WQ//704-235-2194/ EPA Form 3560-3 (Rev 9-94) Previous editions are obsolete. Doc/u�SSiignneed by: 5/4/2018 Page# A14CC681 AF27425... NPDES yr/mo/day Inspection Type NCG500180 111 121 18/05/03 1 17 18 JCJ Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary) Page# Permit: NCG500180 Owner -Facility: Dyeing & Finishing Plant #15 Inspection Date: 05/03/2018 Inspection Type: Compliance Evaluation Yes No NA NE Are records kept and maintained as required by the permit? 0 Permit Yes No NA NE (If the present permit expires in 6 months or less). Has the permittee submitted a new ❑ ❑ 0 ❑ application? Are all records maintained for 3 years (lab. reg. required 5 years)? 0 ❑ ❑ Is the facility as described in the permit? 0 ❑ ❑ ❑ # Are there any special conditions for the permit? ❑ 0 ❑ ❑ Is access to the plant site restricted to the general public? 0 ❑ ❑ ❑ Is the inspector granted access to all areas for inspection? 0 ❑ ❑ ❑ Comment: The subject permit expires on 7/31/2020. Record Keeping Yes No NA NE Are records kept and maintained as required by the permit? 0 ❑ ❑ ❑ Is all required information readily available, complete and current? 0 ❑ ❑ ❑ Are all records maintained for 3 years (lab. reg. required 5 years)? 0 ❑ ❑ ❑ Are analytical results consistent with data reported on DMRs? 0 ❑ ❑ ❑ Is the chain -of -custody complete? 0 ❑ ❑ ❑ Dates, times and location of sampling and downstream data were reviewed for 2017. Flow meter used for reporting is calibrated Name of individual performing the sampling annually. last calibrated on 3/16/218 by ISI. Results of analysis and calibration Dates of analysis Name of person performing analyses Transported CM Are DMRs complete: do they include all permit parameters? ❑ ❑ ❑ Has the facility submitted its annual compliance report to users and DWQ? ❑ ❑ ❑ (If the facility is = or > 5 MGD permitted flow) Do they operate 24/7 with a certified operator ❑ ❑ ❑ on each shift? Is the ORC visitation log available and current? ❑ ❑ 0 ❑ Is the ORC certified at grade equal to or higher than the facility classification? ❑ ❑ 0 ❑ Is the backup operator certified at one grade less or greater than the facility classification? ❑ ❑ 0 ❑ Is a copy of the current NPDES permit available on site? ❑ ❑ ❑ Facility has copy of previous year's Annual Report on file for review? ❑ ❑ 0 ❑ Comment: Records were well organized and maintained. DMRs, COCs, calibration lops, upstream, and downstream data were reviewed for 2017. Flow meter used for reporting is calibrated annually. last calibrated on 3/16/218 by ISI. Operations & Maintenance Yes No NA NE Page# 3 Permit: NCG500180 Inspection Date: 05/03/2018 Owner -Facility: Dyeing & Finishing Plant #15 Inspection Type: Compliance Evaluation Operations & Maintenance Yes No NA NE Is the plant generally clean with acceptable housekeeping? 0 ❑ ❑ ❑ Does the facility analyze process control parameters, for ex: MLSS, MCRT, Settleable ❑ ❑ ❑ Solids, pH, DO, Sludge Judge, and other that are applicable? Comment: The facility pumps water from the Catawba River to an on-site pond for use in the non -contact cooling water system. The pH and temperature monitoring is completed on site. pH sampling lops must include calibration as well as sampling time Effluent Sampling Yes No NA NE Is composite sampling flow proportional? ❑ ❑ 0 ❑ Is sample collected below all treatment units? 0 ❑ ❑ ❑ Is proper volume collected? ❑ ❑ 0 ❑ Is the tubing clean? ❑ ❑ 0 ❑ # Is proper temperature set for sample storage (kept at less than or equal to 6.0 degrees ❑ ❑ 0 ❑ Celsius)? Is the facility sampling performed as required by the permit (frequency, sampling type ❑ ❑ 0 ❑ representative)? Comment: The subject permit requires grab sampling. Effluent Pipe Yes No NA NE Is right of way to the outfall properly maintained? 0 ❑ ❑ ❑ Are the receiving water free of foam other than trace amounts and other debris? 0 ❑ ❑ ❑ If effluent (diffuser pipes are required) are they operating properly? ❑ ❑ 0 ❑ Comment: At the time of the inspection no discharge was observed. Upstream / Downstream Sampling Yes No NA NE Is the facility sampling performed as required by the permit (frequency, sampling type, and 0 ❑ ❑ ❑ sampling location)? Comment: Page# 4