HomeMy WebLinkAbout20180613 Ver 1_MCDC (Signed)_20180503MINIMUM CRITE1tiA DET�RMINATION CHECKLIST
The following quesYions provide direction in determining when the Department is
required to prepare cnviromnental documents for state-fimded consti•uction and
maintenance activities. Answer quesfions For Parts A tluough C by checlting eitl�er "Yes"
or "No". Complete Part D of tl�e checklist when Minimum Criteria Rule categories #8,
#12(i), or#IS are used.
TIP Project No.:
State Projcct No.: 17BP.14.R.86
Project Location: Bridge No. 226 on SR 1350 (Grape Creek Road) over Grape Creek
Cherokee County, North Carolina
Project Description: Replace Bridge No. 226 with an 18'-T' W x 5'-4" D alumimim
box culvert sttlictwe on existing location, near Muiphy, Nor[h Carolina. The project will
use stage constiuciion methods during construction.
Anticipated Permit or Consultation Requirements: Anticipatecl Permit or
Consultation Requirements:
1. Outside river corridor = no (permit verification required)
2. Below impacY threshold for applicable NWP = yes
3. Tree clearing = Yes, and otherwise have no effect on T&E = No effect
4. Trout watershed = yes (follow inoratoritmi unless verification NC WRC letter
states no)
5. NLEB INC = clear, no located within a red huc.
NWP 14 will require written authurizatiou and written 401 Certification.
Special Project Information: Mitigation Required. Bridge to Culvert.
04/20/18 1 of4
PART A: MINIMUM CRIT�RIA
YES NO
Item I to;be corrip,lele�l by tlie Engi,n'eer '; =;- .,. „:. ; '
1. Is the proposed pio�ect IisYed as a type and class of activity allowed under �� �X �
the Minimum Criteria Rule in which environmental documentation is not
required?
If the answer to number 1 is "no", then the project does not gualify as a
minimnm criteria projecY. A state environmental assessment is required.
If yes, under which categot'y? (9) Reconstruction of existine crossroad or
railroad seaxrations and existina stream crossinEs,
includin¢, but not limited to pipes, culverts, and
bridEes,
If either catego�y #8, #12(i) or #15 is used complete Part D of this checklist.
PART B: MINIMUM CRITERIA EXCEPTIONS
2, Could the proposed activiry cause significant changes in land use
concentrations that would be expeeted to create adverse air quality
impacts?
3. Will the proposed activity have secondary impacts or cumulative impacts
that may result in a significant adverse impact to human health or Yhe
enviranment?
4. Is the proposed activity of such an unusual nature or does the proposed
activity have such widespread implications, that an uncommon concern
for its environmenYal effects has been expressed to the Department?
❑ �
❑ �
❑ �
w..... � ..... _. . ..... ........ . . _,_.�.. ___�
5. Does the proposed activity have a signiiicant adverse effect on wetlands; � �
surface waters such as rivers, streams, and estuaries; parklands; prime or
unique agricultural lands; or areas of recognized sceniq recreational,
archaeological, or historical value7
6. Will the proposed activity endanger the existence of a species on the � �
Deparhnent of Interior's threatened and endangered species list?
7, Could the proposed activity cause signiiicant changes in land use
concentrations that would be expected to create adverse water quality or
ground water impacts?
04/20/ 18 2 of 4
❑ �
I'ES NO
8. Is tlie proposed activity expecYed to have a significant adverse effect on � �
long-term recreationel benetits or shellfish, finf7sl�, wildlife, or their
nzhiral habitats
If any questions 2 tiv�ough 8 are answered "yes", the �,no�osed project may not qualify as a
Minimum Criteria project. A state enviromnental assessment (�A) may be requued. For
assistance, contact:
Muiager, Project Development and Iinvironmental Analysis 13i��uich
P. O. Box 25201
Raleigh, NC 27611
(919) 733 —3141
Fax: (919) 733-9794
PART C: COMPLIANCE WITH STATF, ANll FEDEI2AL REGULATIONS
Items 9-12 to be compdeted Gy Division Environnzentn! Officer.
9. Is a fedcrally protected threatened or endangered species, or its
habitat, likely to be impacted by the proposed action?
10. Does the action requii•e the placement of tempoc•aiy or permanent
fill in waters of thc Uiuted States? NWP 14 Required
11. Does the project require the placement of a significant amount of
fill in high quality or relatively rare wetland ecosystems, such as
mountain bogs or pine savannahs?
12. Is the proposed action located in an Area of Environmental
Concern, as defined in the coastal Area Management Act?
Items 13 — IS to be campleted by the Et:gineer.
13. Does tlie pro.ject require sh�eam relocation or channel changes?
Cultural Resources
14. Will the project have an "effect" on a property or site listed on the
National Register of Historic Places?
15. Will the proposed action i•equii•e acquisition of additional right of
way from publicly owned parkland or recreatioual areas?
Y�S NO
❑ �
� ❑
❑ �
❑ �
❑ �
❑ �
❑ �
Questions in Part "C" are designed to assist the rngineer and the Division Envn•omnental
Officer in determining whether a permit or consultation with a state or federal resource
agency may be required. If any questions in Part "C" are answered "yes", follow the
appropriate permitting procedures prior to beginning project constiuction.
04/20/IS 3 of4
PART D: (To be completed when either cate�orv #S, #12(i), m• #15 of the rules are
used.
Itehrs 16- 22 fo Ge eompleted by Dii�ision Eravi�ronmentul Officer.
16. Projectlength:
17. Right of Way wicith:
18. Project completiou date:
19. Tocal acres oFnewly distiu�bed ground
surface:
20. Total acres of weYland impacts:
2l . Total linear feet of stream impacts:
22. Projectpurpose:
If Part D of the checldist is completed, send a copy oFthe entire checldist document to:
Don G. Lee
State Roadside Enviromnental Engineer
Mail Seivice Ce��Yer 1557
Raleigh, NC 27699-1557
(919) 733-2920
Fax (9l9) 733-9810
EmaiL• dlee@dot.state.nc.us
oe�usic�.a nv:
C�.I f1�Lb� 2/5/2018
,1t SIA, i/ T
RCVIEWCU UY: CF151BGCC10AtE Date:
Josh B. Dcyton, PE
Division la Bricige Managemc��tEngineer
�ooa�sia�.e ny:
�� �� 2/S/2018
� � Date:
Patricic.. ��I'bSf�"o
Division 14 Environmental Specialist
o2iosit s a of a
Cherokee County
Replace Bridge Number: 226 (West Prong Grape Creek) under
SR 1350 (Grape Creek Road) near Murphy, N.C.
WBS No. 17BP.14.R.86
. A NWP 14 will be required for this project as well as a written 401.
• Project will comply with the standard 2017 NWP 14 and 2017 GC 4085
conditions.
• Project will adhere to NCDOT best management practices.