Loading...
HomeMy WebLinkAbout20170705 Ver 1_Culvert 133 Dull Road Inspection_20180501 Wanucha, Dave From:Euliss, Amy Sent:Wednesday, May 02, 2018 3:08 PM To:Wanucha, Dave Cc:Braquet, Stephanie Subject:RE: Culvert 133 Dull Road Yes, the floodplains after construction were below water, so we had them place some we would have a defined channel. Amy Euliss Division 9 Environmental Officer North Carolina Department of Transportation 336 747 7802 office aeuliss@ncdot.gov 375 Silas Creek Parkway Winston Salem, NC 27127-7167 From: Wanucha, Dave Sent: Wednesday, May 02, 2018 2:56 PM To: Euliss, Amy <aeuliss@ncdot.gov> Cc: Braquet, Stephanie <scbraquet@ncdot.gov> Subject: Culvert 133 Dull Road I did a spot check yesterday and cannot quite figure if the floodplain benches were constructed per the plans. The culvert looks good. Pictures are attached. There doesn’t appear that benches were constructed at the inlet. Outlet benches were covered in rock vs. core fiber. Was there a reason for this? 1 Dave Wanucha Division of Water Resources Transportation Permitting Unit NC Department of Environmental Quality 336-776-9703 office 336-403-5655 mobile Dave.Wanucha@ncdenr.gov NC DEQ Winston Salem Regional Office 450 West Hanes Mill Road, Suite 300 Winston Salem, NC 27105 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties. 2 DETAIL__ INLELOUTLEi CHNNNEI I �a� m smla� [�uv�n �a�uF�eFvc�i �i�TiTi�IF --� ..:.vd'- �A..e c.ewm.—' �" cvssn—'-�-� , a a EST 90 TONS CtA55 IIRIP RAP EST )5 SV GFOiE%IIIE EST 35 ST COIR FIBER MHT EST SS CY E%CnVATION