Loading...
HomeMy WebLinkAbout20090312 Ver 2_401 Application_20090509 CLH design, p.a. Regency Park, 400 Regency Forest Dri ve, Suite 120 Cary, North Carolina 27918 Phone: (919) 319-6716 Fax: (919) 319-7,516 Email clhdesign@clhdesignpa.com LETTER OF TRANSMITTAL 8-May-09 To: Lia M. Gilleski Company: NCDENR- DWQ Address: 2321 Crabtree Blvd, Suite 250 City, State Zip: Raleigh, NC 27604 Phone: 919-733-1786 Fax: 919-733-6893 Method: Hand Deliver Subject: Wake County Continuum of Care CLH Project Number: 08-106-Prmt ® ® Prints Reports ? Originals ? Copy of Letter ? Specifications ® Applications ? Submittals ® Other: Fee We are sending you the following items: No. of Copies Date Description • 1 5-6-09 Express Review Acceptance Letter • 1 5-7-09 Check in the Amount of $2000 • 5 5-08-09 PCN FORM • 1 5-08-09 PCN Checklist • 3 5-08-09 BMP Supplement Form with Checklist • 5 5-08-09 Full Size Set of Construction Drawings • 2 5-08-09 Half Size Set of Construction Drawings • 3 5-08-09 Design Summary, Maps and Figures (Supporting Calculations) • 5 5-08-09 Signed and Notarized BMP O and M agreement • 3 6-14-05 Preliminary Geotech Report • 3 6-19-08 Geotech Report • 1 7-03-08 Stream Determination by DWQ Additional Remarks: Please find enclosed our application for buffer impact approval for the above referenced project. As discussed at our meeting on 2/19/09 with Annette Lucas and Amy Chapman we are unable to obtain diffuse flow to the buffer and must build a BMP prior to discharging to Crabtree Creek. We will make ourselves available to answer any questions or provide addition information during your review. Please feel free to contact me if you have any questions at 919-459-6056 Thank you, Jason Kennedy Signed cc: ile, 08-106/Permit ?A;;;? ICD-EWR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Coleen H. Sullins Governor Director May 6, 2009 EXPRESS REVIEW ACCEPTANCE LETTER Wake County Attn: Mr. Phillip D. Stout 336 Fayetteville Street Raleigh, NC 27602 Project Name: Wake County Continuum of Care, Raleigh, NC Crabtree Creek [030402, 27-33-(10), C, NSW] Dear Mr. Stout: Dee Freeman Secretary Wake County DWQ EXP#: 09-0312v2 119U11;N20W/R1MAY 1 1 2009 WETLANDS AND STS On May 6, 2009, the 401 Oversight/Express Permitting Unit of the Division of Water Quality received a request from Mr. Jason Kennedy of CLH Design, P.A., regarding a project known as "Wake County Continuum of Care" for acceptance into the Express Review Program. This letter advises you that your project will be accepted into the Express Review Program once the following items are received: 1) The application fee of $2,000.00 [for a Riparian Buffer Authorization ($2,000)], made payable to the North Carolina Division of Water Quality]; 2) Five (5) complete and collated copies of the PCN Application and site plan information pertaining to this project (instead of providing 5 copies of the full size plans you may provide two copies of the full size plans along with three copies of the I 1 X 17); 3) One (1) copy of the completed PCN Checklist (http://h2o.enr.state.nc.us/ncwetlands/documents/PCNCheeklist_v 1_4.doc); 4) Three (3) copies of the details for on-site diffuse flow provisions, if applicable (refer to http://h2o.enr.state.nc.us/su/bmp_forms.htm). Additionally, a pre-application meeting (to include the property owner) is required prior to the submittal of your completed application package. The clock for this project will not start until receipt of the completed application package and required fee are received. If the impacts are greater than indicated on the Initial Interest Form and/or the services are different, you may be required to remit an additional fee. If you have any questions or wish to discuss these matters further please do not hesitate to call Lia Myott Gilleski at 919-733-9502. Sincerely, 44 Cyndi Karoly, Supervisor 01/Express Review Oversite Unit CBMmg cc: File copy Mr. Jason Kennedy, CLH Design, P.A., 400 Regency Forest Dr., Ste 120, Cary, NC 27518 401 OversightlExpress Review Permitting Unit ?TOne 1650 Mail Servioe Center, Raleigh, North Carolina 27699-1650 1 ? O h Carolina Location: 2321 Crabtree Blvd., Raleigh, North Carolina 27604 Phone: 919-733-17861 FAX: 919-733693 mmiall ff Internet: http:/lh2o.enr.state.nc.usincwetiands/ An Equal Opportunity I Affirmative Action Employer Version 1.4 January 9, 2009 401 Oversight/Express Permitting PCN Submittal Checklist ® The application fee (Checks may be made out to "N.C. Division of Water Quality" - $240.00 for 401 Water Quality Certification with minor impacts - $570.00 for 401 Water Quality Certification with major impacts - Express Review Fee (Amount requested on Acceptance Letter) ® Five (5) complete and collated copies of the PCN Application and supporting documentation (instead of providing 5 copies of the full size plans you may provide two copies of full size plans along with three copies of 11 X 17 plans) ® Stormwater Management Plan (if applicable - see PCN Form Help File Section E) 1) Please provide three (3) copies of the stormwater management plans along with all supporting information pertaining to this project including the following: a. Entire site development/layout plans delineating all drainage areas; b. Design calculation sheets for all proposed BMP(s) sized for both on-site and off-site drainage; c. BMP supplements for each proposed BMP and Required Items Check List (http://h2o.enr.state.nc.us/su/bmp forms.htm) along with all required items; d. A Notarized Operation & Maintenance Agreement for each stormwater management facility; e. Detailed construction drawing sheets shall include (i) Erosion and sediment control plans; (ii) Installation and planting schedules for the proposed BMPs; (iii) Appropriately scaled plan views and cross sectional details of all BMPs and associated components - inlet and outlet structures, forebay, respective zones and pertinent elevations. ® If your project is located within a State implemented Riparian Buffer Rule Area, submit the following along with site plans and PCN form: 1) Three (3) copies of the details for on-site diffuse flow provisions, (refer to http://h2o.enr.state.nc.us/su/bmp_forms.htm). ® DWQ Stream Determination Forms for streams on property and DWQ determination letter for wetlands or streams (if applicable). The following is the most critical of all the information that you must provide. The quality and detail of the information will often determine the expeditiousness of the review. The following is a checklist of the types of pertinent information required at a minimum: Maps and Plans: ® The most recent version of the 1:24,000 USGS Topographic Map - Please cleanly draw or delineate the site boundaries on the topographic map. ® The most recent version of the bound and published County NRCS Soil Survey Map - (required for projects within the Neuse River Basin, Tar-Pamlico River Basin, Randleman Lake Watershed and the Catawba River Basin, also recommended for all projects) - Please clearly delineate the site boundaries, etc. on the map. If the delineation obscures any of the features, it is recommended that a clean copy be provided. Copies of the Version 1.4 January 9, 2009 current soil survey and/or soil survey map sheets can be obtained from the local NRCS County Office (http://www.nc.nres.usda.gov/). GIS soil layers are not acceptable. ® Vicinity map - Please clearly mark the location and approximate boundaries of the property and project on the map. Please indicate north arrow and scale. Please include applicable road names or State Road numbers. ® The Site Plan - The most critical map to be provided is the site plan. You must provide full sized plans. The following is the minimum list of plans that are typically needed. ® Pre-construction/Pre-existing conditions - This sheet (or sheets) must include: • All jurisdictional and non-jurisdictional wetland, stream, water features, State regulated buffers (delineated into Zones 1 and 2) • Topographic contours with elevations • Any existing structures and impervious areas • Existing utility lines and easements • Existing roads, culverts, and other pertinent features • North arrow and the scale (1":50' scale is recommended). ® Proposed conditions - This sheet (or sheets) must include: • All jurisdictional and non-jurisdictional wetland, stream, water features, State regulated buffers (delineated into Zones 1 and 2) • Lot layout (if a subdivision or commercial development is proposed) - lots must be developable without further impacts to jurisdictional and non-jurisdictional wetlands streams, water features, and State regulated buffers Building envelopes must be provided when streams, wetlands, riparian buffers, or water features exist on a lot • All built-out structures and impervious cover • Final grading contours with elevations • All utilities and easements (including septic fields on all lots within 100 feet of stream, wetland, or water features - if applicable) • Impacted areas - these should correspond with the Impact numbers listed on your PCN form. ® Drainage Plans - Final drainage plans must include the following: • Locations and pertinent elevations and sizes of the stormwater collection system and drainage ways • All inlets and outlets must also be shown with pertinent elevations (All outlets to wetlands must be at a non-erosive velocity, generally less than 2 ft/sec during the peak flow from the 10-yr storm) • Scaled stormwater BMPs must also be indicated as required by DWQ rules and policies • In certain cases (see Section E of PCN form), final stormwater management plans must also be provided (see Stormwater Management Plan Checklist) ® Proposed Impacts - All impacts to jurisdictional and non jurisdictional wetland, stream, water features, and State regulated buffers must be shown and labeled on the site plans at a scale no smaller than 1" = 50'. All excavation, fill, flooding, stabilization, and other impacts that will be conducted in or near jurisdictional and non-jurisdictional wetland, stream, water features, and State regulated buffers must be indicated. Please provide cross sectional details showing the provisions for aquatic life passage (burial of culvert 20% for culverts 5 48 inches, and 1-foot for culverts > 48 inches). Version 1.4 January 9, 2009 Wetland Impacts: N/A ? Precise grading and final elevation contours must be provided. Existing vegetation and any clearing must be specified. ? All subsurface utility lines must indicate the location of anti-seep collars. Construction detail for anti-seep collars must be provided. ? Roadway or other crossings of riparian wetlands may require floodway culverts to maintain existing hydrological conditions. ? Plans should show that the hydrology of remaining wetlands on the site will be maintained. Stream Impacts: N/A ? Stream impacts must be clearly shown on the plans. The centerline as well as the banks of the stream must be surveyed or located by GPS for the portion of the stream to be impacted. ? The inlet and the outlet of all culverts should be aligned with the stream as much as possible. Inlet and outlet elevations and streambed elevations should be indicated. Any inlet or outlet protection must be shown and enumerated on the impact map(s). ? For bottomless culverts or other spans, a vertical cross section should be provided that shows the minimum distance from each span to each stream bank, the stream cross section, the height of the span above the stream and the minimum distance from the edge of each footer to each stream bank. Additionally, please provide a signed and sealed geotechnical report of subsurface soils at the proposed bottomless culvert location. The report must comply with the Division of Highways - Guidelines for Drainage Studies and Hydraulic Design, prepared by A.L. Hankins, Jr., State Hydraulics Engineer - 1999. ? Multiple culverts or sectioned box culverts typically require the use of sills, off- setting or other means to match the cross section of the existing stream (in order to maintain stream stability and provide aquatic life passage). A vertical cross section of the culverts should be shown overlain with the up and downstream stream cross section including the stream flood-prone area. ? Impacts associated with dam construction must indicate and enumerate all fill associated with the dam footprint, spillway and any bank stream bank stabilization. The length of stream impounded must also be indicated and enumerated. WET [WETLAND] DETENTION BASIN OPERATION AND MAINTENANCE AGREEMENT [Wetland maintenance wording is bracketed. Please modify the document as appropriate.] The wet [wetland] detention basin system is defined as the wet [wetland] detention basin, pretreatment including forebays and the vegetated filter if one is provided. Maintenance activities shall be performed as follows: 1. After every significant runoff producing rainfall event and at least monthly: a. Inspect the wet [wetland] detention basin system for sediment accumulation, erosion, trash accumulation, vegetated cover, and general condition. b. Check and clear the orifice of any obstructions such that drawdown of the temporary pool occurs within 2 to 5 days as designed. 2. Repair eroded areas immediately, re-seed as necessary to maintain good vegetative cover, mow vegetative cover to maintain a maximum height of six inches, and remove trash as needed. 3. Inspect and repair the collection system (i.e. catch basins, piping, swales, riprap, etc.) quarterly to maintain proper functioning. 4. Remove accumulated sediment from the wet [wetland] detention basin system semi-annually or when depth is reduced to 75% of the original design depth (see diagram below). Removed sediment shall be disposed of in an appropriate manner and shall be handled in a manner that will not adversely impact water quality (i.e. stockpiling near a wet [wetland] detention basin or stream, etc.). The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the permanent pool depth reads 3 feet in the main pond, the sediment shall be removed. [For stormwater wetlands: If the elevation of the marsh areas exceed the permanent pool elevation, the sediment should be removed to design levels. This shall be performed by removing the upper 12 inches of soil and stockpiling it. Then the marsh area shall be excavated 12 inches below design elevations. Afterwards the stockpiled soil should be spread over the marsh surface. The soil should not be stockpiled for more than two weeks.] When the permanent pool depth reads 3 feet in the forebay [and micro-pool], the sediment shall be removed. BASIN DIAGRAM (fill in the blanks) Sediment nova) El. 204 ------------ Permanent Pool Elevation 207 Bottom E FOREBAY Sediment Removal Elevation 204 75% MAIN POND 5. Remove cattails and other indigenous wetland plants when they cover 50% of the basin surface. These plants shall be encouraged to grow along the vegetated shelf and forebay berm. [For wetlands: Wetland planting densities in the marsh areas should be maintained by replanting bare areas as needed. Wetland plants should be encouraged to grow in the marsh areas.] 6. If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain shall be minimized to the maximum extent practical. 7. All components of the wet [wetland] detention basin system shall be maintained in good working order. 8. Level spreaders or other structures that provide diffuse flow shall be maintained every six months. All accumulated sediment and debris shall be removed from the structure, and a level elevation shall be maintained across the entire flow spreading structure. Any down gradient erosion must be repaired and/or replanted as necessary. I acknowledge and agree by my signature below that I am responsible for the performance of the seven maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Print name: David Goodwin Title: Director of General Services Addr Phor Sigm Date Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. I, -:,"r4 t - AA - Av,,A 1 a Notary Public for the State of County of In/ t , do hereby certify that ?w&a 6rpod usj,?% personally appeared before me this day of rAg:y and acknowledge the due execution of the forgoing wet [wetland] detention basin maintenance requirements. Witness my hand and official seal, ?• Y i ffy V C 0 U%4 %% ,,""l o t t"00 , SEAL My commission expires :Q_7.po t p v • -?r p William G. Ross Jr., Secretary y North Carolina Department of Environment and Natural Resources > r Coleen H. Sullins, Director 0 Division of Water Quality July 3, 2008 Charlie Musser Sungate Design Group, PA 915 Jones Franklin Rd Raleigh, NC 27606 NBRR0#08-130 Wake County BASIN: Neuse River X Tar-Pamlico (15A NCAC 2B .0233) (15A NCAC 2B .0259) Project Name: Sunnybrook Rd Property Location/Directions: Subject parcel is located on Stmnybrook Rd, north of Carl Sandburg Court Subject Stream: UT to Crabtree Creek Date of Determination: May 5, 2008 Feature(s) Not Subject Subject Start @ stop@ Stream Form Pts. Soil Survey USGS Topo A X Flag - 'Start NRB' X B X X Crabtree Creek X Throughout X X Explanation: The feature(s) listed above -has or have been located on the Soil Survey of Wake County, North Carolina or the most recent copy of the USGS Topographic map at a 1:24,000 scale. Each feature that is checked "Not Subject" has been determined not to be a stream or is not present on the property. Features that are checked "Subject" have been located on the property and possess characteristics that qualify it to be a stream. There may be other streams located on your property that do not show up on the maps referenced above but, still may be considered jurisdictional according to the US Army Corps of Engineers and/or to the Division of Water Quality. This on-site determination shall expire five (5) years from the date of this letter. Landowners or affected parties that dispute a determination made by the DWQ or Delegated Local Authority that a surface water exists and that it is subject to the buffer rule may request a determination by the Director. A request for a determination by the Director shall be referred to the Director in writing c/o Cyndi Karoly, DWQ Wetlands/401 Unit, 2321 Crabtree Blvd., Raleigh, NC 27604-2260. Individuals that dispute a determination by the DWQ or Delegated Local Authority that "exempts" a surface water from the buffer rule may ask for an ad judicatory hearing. You must act within 60 days of the date that you receive this letter. Applicants are hereby notified that the 60-day statutory appeal time does not start until the affected party (including downstream and adjacent landowners) is notified of this decision. DWQ recommends that the applicant conduct this notification in order to be certain that third party appeals are made in a timely manner. To ask for a hearing, send a written petition, which conforms to Chapter 150B of the North Carolina General North Carolina Division of Water Quality Raleigh Regional Office Surface Water Protection Phone (919) 7914200 Customer Service Intemet: h2o.enr.state.naus 1628 Mail Service Center Raleigh, NC 27699-1628 FAX (919) 571-4718 1-877-623-6748 One N Caro ru wrally An Equal Opportunity/Affirmative Action Employer- 50% Recycled110% Post Consumer Paper waKe uounry July 3, 2008 Page 2 of 2 Statutes to the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, N.C. 27699-6714. This determination is final and binding unless you ask for a hearing within 60 days. The (owner/future owners) should notify the Division of Water Quality (including any other Local, State, and Federal Agencies) of this decision concerning any future correspondences regarding the subject property (stated above). This project may require a Section 404/401 Permit for the proposed activity. Any inquiries should be directed to the Division of Water Quality (Central Office) at (919)-733-1786, and the US Army Corp of Engineers (Raleigh Regulatory Field Office) at (919)-876-8441. Respectfully, ' Martin Ric ottnd nd Environmental Specialist CC: Wetlands/ Stormwater Branch, 2321 Crabtree Blvd, Suite 250, Raleigh, NC 27604 RRO/SWP File Copy Central Files u;!, North Carolina Division of Water Quality Raleigh Regional Office Surface Water Protection Phone (919) 791-4200 Customer Service Internet: h2o.enr.state.nc.us 1628 Mail Service Center Raleigh, NC 27699-1628 FAX (919) 5714718 1-877-623-6748 An Equal Opportunity/Affirmative Action Employer- 50% Recycled110% Post Consumer Paper i i Gf6s ?k#s?cCesf ?Vlq 04 wl,/ f a 7pm A-P LoC N i.r f/Y'. {,. AP 2 . C +APC2 AD62 APC2 APB y oe 04,. ,.: - APB ti . B 14 1??' APB2 L C 1??? Lod y ApC2 . Q' P ADC2 s ?.. '1 LOW. t our rt i A p? Lob LoC / ?i C r ? J.• ? Du8 ? ? • j, w r P . + O ° t APC2 C? B LoC I 1Q. Ma _ f v I *. W ApC2.: o ` AKE r LoB ApC2 LbQ = ' ; g j T.'iFA40 IAL HOSP L o • . WhE ' . AP62 w r, ` M LL ? ••- Lo n CP` : P? R!tEl1 -ADC2- ? • j F I } t J AfA Fa62 Ag? .bC. .. C /? RAS EE Cfi y ? L .4I t ? Y f LOCI ' ??' ' p Wks 4? ? I -' LoC ?,lf?,? ? e?" L D ? .e LoC: -t> pC2 ? a t+'r. 1.qf? u AP62 P CC ` :' p> .• ; IL , ` ,iz "z, t ApB ° Du62 R Aj ._rr ,K' ..'Loo ` ? •'.? ++ F'?t ,! 4?? S•r ,c :k ?m ,? .? .•.! Ap6 „ _yr T a ., , r : Mato ' A 'S AptC? t C .,I -WkC ?. r s . LoC P w?W wwtj Me . ? ? ' S: ? LoC i LoC ''.s..!' L -II LoB4 •, yL_ APC A-OC y DU 4aa. t 7A C I n S C ,"i' Lob ?.? ?I APB ,.x. a 'o +? r c c "i Me ApC 1 L h. . _ I t OD Z? ffZ . + Cy 1oQ h? : tom « LoB ' .Apt- ? ``_ ? ' r r M?'r WkC tt A????;.'' ?? liy •? ^ ' loC oC .r o i .+w t t. '". I f?• P A ' 0'?' C :. ? ?,4b? ADCZ S 'Ap6 7 . Ap AP ii i.! *nfS CFiOYj? y s *1?:? "r ' ?, r LO.O r-' < 4b l? Ap6 r + e , ' APB ! \. ADg2' ry =' LoGI APB n, AP8 ?' L B ° LoC N ?f* APC2 + ^?op j atti s . LOC ?I +`l 1 131- ?`'+ +..i:: -?'•. S+A ??+{ i.l' ,+ `' ys. ?Y u" i( Frye k - C IMAGE t + •° v ?A Pr3POSAf. PLANTN Cr I N t 1, . p¢., + APB r -i.. a ' •Yid'\) M8 ,S!d± yy 4it e.fir f o° > f..; LOB U ' Mo r ?+ + dM APg2;r Il" Cf LoC ;yq 5 YSC2'?.-' j4d I,APtl?,xA I . nn + ' Ap62 t;o O W$ i 5 j v r ? APB ° o LOC < ?r .yo? r `e WkE s} 5 . Ap ; 1 ... 1f ' LOC '° ; Y!I ti - s yG° B APC2 ?'OOa ''•3 W W! AP i z Apg lU r. LoC `o APB2 O Lob APC2 '.i, oC! 5"•..:, . ADC Ii 1 `o?ot WA TFq pG 1 y p < 03 t a. Office Use Only: Corps action ID no. DWQ project no. Form Version 1.3 Dec 10 2008 Pre-Construction Notification PCN Form A. A Hcant Information 1. Processing 1 a. Type(s) of approval sought from the Corps: Section 404 Permit El Section 10 Permit ZI ? P JM ._ 1 b. Specify Nationwide Permit (NWP) number: or General Permit (GP) number: 1c. Has the NWP or GP number been verified by the Corps? ? Yes ? No 1 d. Type(s) of approval sought from the DWQ (check all that apply): ? 401 Water Quality Certification - Regular ? Non404 Jurisdictional General Permit ? 401 Water Quality Certification - Express ® Riparian Buffer Authorization 1 e. Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification: ? Yes ® No For the record only for Corps Permit: ? Yes ® No 1f. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in-lieu fee program. ? Yes ® No 1g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1h below. ? Yes ® No 1h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ? Yes ® No 2. Project Information 2a. Name of project: Wake County Continuum of Care 2b. County: Wake County ow n 2c. Nearest municipality / town: City of Raleigh I M 2d. Subdivision name: N/A MAY 1 1 2009 2e. NCDOT only, T.I.P. or state project no: N/A DENR-WATER QUALITY 3. Owner Information 3a. Name(s) on Recorded Deed: County of Wake 3b. Deed Book and Page No. DB-2005 Pg. 1650 3c. Responsible Party (for LLC if applicable): Philip D. Stout 3d. Street address: 336 Fayetteville Street. 3e. City, state, zip: Raleigh, NC 27602 3f. Telephone no.: 919-856-6357 3g. Fax no.: 919-856-5305 3h. Email address: pstout@co.wake.nc.us Page 1 of 10 PCN Form - Version 1.3 December 10, 2008 Version 4. Applicant Information (if different from owner) 4a. Applicant is: ? Agent ? Other, specify: 4b. Name: 4c. Business name (if applicable): 4d. Street address: 4e. City, state, zip: 4f. Telephone no.: 4g. Fax no.: 4h. Email address: 5. Agent/Consultant Information (if applicable) 5a. Name: Jason Kennedy 5b. Business name (if applicable): CLH Design, P.A. 5c. Street address: 400 Regency Forest 5d. City, state, zip: Cary, NC 27511 5e. Telephone no.: 919-617-6716 5f. Fax no.: 919-319-7516 5g. Email address: jkennedy@clhdesignpa.com Page 2 of 10 PCN Form - Version 1.3 December 10, 2008 Version B. Project Information and Prior Project History 1. Property Identification 1a. Property identification no. (tax PIN or parcel ID): 1724401187 1 b. Site coordinates (in decimal degrees): Latitude: 35.4715 Longitude: - 78.3494 (DD.DDDDDD) (-DD.DDDDDD) 1 c. Property size: 18.924 acres 2. Surface Waters 2a. Name of nearest body of water (stream, river, etc.) to proposed project: Crabtree Creek 2b. Water Quality Classification of nearest receiving water: C:NSW 2c. River basin: Neuse 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: Undeveloped, mostly wooded site with some severe slopes and an on-site stream subject to Neuse Buffer rules. General land use in vicinity varies from high density residental to mixed office 3b. List the total estimated acreage of all existing wetlands on the property: N.A. 3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: Crabtree Creek: 600 LF. Other: 500 LF. 3d. Explain the purpose of the proposed project: Mental Health medical treatment facility 3e. Describe the overall project in detail, including the type of equipment to be used: New commercial construction, associated parking, utilities, and roadway improvments to Sunnybrook and Merrell Drive 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / project (including all prior phases) in the past? Comments: Y ? es ®No ? Unknown 4b. If the Corps made the jurisdictional determination, what type of determination was made? ? Preliminary ? Final 4c. If yes, who delineated the jurisdictional areas? Name (if known): Agency/Consultant Company: Other: 4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. 5. Project History 5a. Have permits or certifications been requested or obtained for this project (including all prior phases) in the past? [01 Yes ® No El Unknown 5b. If yes, explain in detail according to "help file" instructions. 6. Future Project Plans 6a. Is this a phased project? ? Yes ® No 6b. If yes, explain. Page 3 of 10 PCN Form - Version 1.3 December 10, 2008 Version C. Proposed Impacts Inventory 1. Impacts Summary 1 a. Which sections were completed below for your project (check all that apply): ? Wetlands ? Streams - tributaries ® Buffers ? Open Waters ? Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. 2b. 2c. 2d. 2e. 2f. Wetland impact Type of jurisdiction number - Type of impact Type of wetland Forested (Corps - 404, 10 Area of impact Permanent (P) or (if known) DWQ - non-404, other) (acres) Temporary T W1 ? P ? T ? Yes ? Corps ? No ? DWQ W2 ? P ? T ? Yes ? Corps ? No ? DWQ W3 ? P ? T ? Yes ? Corps ? No ? DWQ W4 ? P ? T ? Yes ? Corps ? No ? DWQ W5 ? P ? T ? Yes ? Corps ? No ? DWQ W6 ? P ? T ? Yes ? Corps ? No ? DWQ 2g. Total wetland impacts 2h. Comments: 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. 3b. 3c. d. 3e. 3f. 3g. Stream impact Type of impact Stream name Perennial r Type of jurisdiction Average Impact number - Permanent (P) or (PER) or intermittent (Corps - 404, 10 DWQ - non-404 stream width length (linear Temporary (T) (INT)? , other) (feet) feet) S1 ? P ? T ? PER ? Corps ? INT ? DWQ S2 ? P ? T ? PER ? Corps ? INT ? DWQ S3 ? P ? T ? PER ? Corps ? INT ? DWQ S4 ? P El T ? PER ? Corps ? INT ? DWQ S5 ? P ? T ? PER ? Corps ? INT ? DWQ S6 ? P ? T F-1 PER El Corps ? INT ?DWQ 3h. Total stream and tributary impacts 3i. Comments: Page 4 of 10 PCN Form - Version 1.3 December 10, 2008 Version 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then individually list all open water impacts below. 4a. 4b. 4c. 4d. 4e. Open water Name of waterbody impact number - (if applicable) Type of impact Waterbody type Area of impact (acres) Permanent (P) or Temporary T 01 ?P?T 02 ?P?T 03 ?P?T 04 ?P?T 4f. Total open water impacts 4g. Comments: 5. Pond or Lake Construction If and or lake construction proposed, then complete the chart below. 5a. 5b. 5c. 5d. 5e. Pond ID Proposed use or purpose Wetland Impacts (acres) Stream Impacts (feet) Upland b (acres) num er of pond Flooded Filled Excavated Flooded Filled Excavated Flooded P1 P2 K Total 5g. Comments: 5h. Is a dam high hazard permit required? ? Yes ? No If yes, permit ID no: 5i. Expected pond surface area (acres): 5j. Size of pond watershed (acres): 5k. Method of construction: 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below. If an impacts require mitigation, then you MUST fill out Section D of this form. 6a. ® Neuse ? Tar-Pamlico ? Other: Project is in which protected basin? ? Catawba ? Randleman 6b. 6c. 6d. 6e. 6f. 6g. Buffer impact number - Reason Buffer Zone 1 impact Zone 2 impact Permanent (P) or for Stream name mitigation (square feet) (square feet) Temporary T impact required? B1 ®P ? T Storm Outfall Crabtree Creek ? Yes ® No 600 400 B2 ?P?T ?Yes ? No B3 ? P ? T ? Yes ? No 6h. Total buffer impacts 600 400 6i. Comments: Buffer impact for outfall of stormwater BMP. Diffuse flow to the buffer is not possible due to toDooranhv_ Page 5 of 10 PCN Form - Version 1.3 December 10, 2008 Version D. Impact Justification and Mitigation 1. Avoidance and Minimization 1 a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. Development plan includes no other impacts to the buffers. Proposed impact is required by DWQ BMP manual and Neuse Buffer Rules. 1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. With the exception of the stormwater outfall, the site development plan does not create any additional impacts to the buffer. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? ? Yes ® No 2b. If yes, mitigation is required by (check all that apply): ? DWQ ? Corps 2c. If yes, which mitigation option will be used for this project? ? Mitigation bank ? Payment to in-lieu fee program ? Permittee Responsible Mitigation 3. Complete if Using a Mitigation Bank 3a. Name of Mitigation Bank: 3b. Credits Purchased (attach receipt and letter) Type Quantity 3c. Comments: 4. Complete if Making a Payment to In-lieu Fee Program 4a. Approval letter from in-lieu fee program is attached. ? Yes 4b. Stream mitigation requested: linear feet 4c. If using stream mitigation, stream temperature: ? warm ? cool ?cold 4d. Buffer mitigation requested (DWQ only): square feet 4e. Riparian wetland mitigation requested: acres 4f. Non-riparian wetland mitigation requested:. acres 4g. Coastal (tidal) wetland mitigation requested: acres 4h. Comments: 5. Complete if Using a Permittee Responsible Mitigation Plan 5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan. Page 6 of 10 PCN Form - Version 1.3 December 10, 2008 Version 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) - required by DWQ 6a. Will the project result in an impact within a protected riparian buffer that requires ® Yes ® No buffer mitigation? 6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required. 6c. 6d. 6e Zone Reason for impact Total impact Multiplier . Required mitigation (square feet) (square feet) Zone 1 3 (2 for Catawba) Zone 2 1.5 6f. Total buffer mitigation required: 6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank , permittee responsible riparian buffer restoration, payment into an approved in-lieu fee fund). 6h. Comments: Page 7 of 10 PCN Form - Version 1.3 December 10, 2008 Version E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan 1 a. Does the project include or is it adjacent to protected riparian buffers identified ® Yes ? No within one of the NC Riparian Buffer Protection Rules? 1 b. If yes, then is a diffuse flow plan included? If no, explain why. Comments: Diffuse flow to the buffer is not possible given the topography of the site ? Yes ® No and the buffer. A stormwater wetland is proposed to provide 30% nutrient reduction and will discharge directly to Crabtree Creek. . 2. Stormwater Management Plan 2a. What is the overall percent imperviousness of this project? (20.0) % 2b. Does this project require a Stormwater Management Plan? ? Yes ® No 2c. If this project DOES NOT require a Stormwater Management Plan, explain why: Project is excempt from City of Raleigh Stormwater Regulations. However, a report has been prepared which outlines the design and performance of the stormwater wetland. 2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan: ® Certified Local Government 2e. Who will be responsible for the review of the Stormwater Management Plan? ? DWQ Stormwater Program ? DWQ 401 Unit 3. Certified Local Government Stormwater Review 3a. In which local government's jurisdiction is this project? City of Raleigh ® Phase II 3b. Which of the following locally-implemented stormwater management programs ? NSW ? USMP apply (check all that apply): ? Water Supply Watershed ? Other: 3c. Has the approved Stormwater Management Plan with proof of approval been ? Yes ® No attached? 4. DWQ Stormwater Program Review ? Coastal counties 4a. Which of the following state-implemented stormwater management programs apply ? HQW ? ORW (check all that apply): ? Session Law 2006-246 ® Other: None 4b. Has the approved Stormwater Management Plan with proof of approval been attached? ? Yes ? No 5. DWQ 401 Unit Stormwater Review 5a. Does the Stormwater Management Plan meet the appropriate requirements? ? Yes ? No 5b. Have all of the 401 Unit submittal requirements been met? ? Yes ? No Page 8 of 10 PCN Form - Version 1.3 December 10, 2008 Version F. Supplementary Information 1. Environmental Documentation (DWQ Requirement) 1 a. Does the project involve an expenditure of public (federal/state/local) funds or the Yes ? No use of public (federal/state) land? 1 b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State ? Yes ® No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1 c. If you answered "yes" to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval letter.) ? Yes ? No Comments: 2. Violations (DWQ Requirement) 2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, ? Yes ® No or Riparian Buffer Rules (15A NCAC 2B .0200)? 2b. Is this an after-the-fact permit application? ? Yes ® No 2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s): 3. Cumulative Impacts (DWQ Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in ? Yes ® No additional development, which could impact nearby downstream water quality? 3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy. If you answered "no," provide a short narrative description. 4. Sewage Disposal (DWQ Requirement) 4a. Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater enerated from g the proposed project, or available capacity of the subject facility. Sanitary Sewage generated from the proposed facilities will be conveyed to the City of Raleigh Sewer main located to the east of the site running along Crabtree Creek. Page 9 of 10 PCN Form - Version 1.3 December 10, 2008 Version 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or ? Yes ® No habitat? 5b. Have you checked with the USFWS concerning Endangered Species Act ? Yes ® No impacts? 5c. If yes, indicate the USFWS Field Office you have contacted. El Raleigh ? Asheville 5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? N/A 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as essential fish habitat? ? Yes ® No 6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat? N/A 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation ? Yes ® No status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)? 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? City of Raleigh Planning Department 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA-designated 100-year floodplain? ? Yes ® No 8b. If yes, explain how project meets FEMA requirements: 8c. What source(s) did you use to make the floodplain determination? Flood plan as shown on project survey. Jason Kennedy, P.E. --? 5-08-09 Applicant/Agent's Printed Name Applic gent's Signature Date (Agent'socinature is val' my if an authorization letter from the applicant is rovided. Page 10 of 10 PCN Form - Version 1.3 December 10, 2008 Version Ex-P 01- 0 31 a, U Z Permit Number (to be provided by DWQ) O?o? W AT?c9QG WDENR STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM WETLAND SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part 111) must be printed, filled out and submitted along with all the required information. 1. PROJECT INFORMATION ---{ Project name Wake County Continuum of Care Contact name Jason Kennedy Phone number 919.456.6056 Date March 25, 2009 Drainage area number - Post Area 2 (See attached Drainage Area Map) P 1. DESIGN INFORMATION Site Characteristics Drainage area 343,688.40 ft2 Impervious area 158,122.80 ft2 Percent impervious 46.0%% Design rainfall depth 1.00 inch Peak Flow Calculations 1-yr, 24-hr rainfall depth 3.00 in 1-yr, 24-hr intensity 3.00 in/hr Pre-development 1-yr, 24-hr runoff 24.67 ft3/sec Post-development 1-yr, 24-hr runoff 15.73 ft3/sec Pre/Post 1-yr, 24-hr peak control -8.94 ft3lsec Storage Volume: Non-SA Waters Minimum required volume 13,301.00 ft3 Volume provided (temporary pool volume) 17,972.00 ft3 OK Storage Volume: SA Waters Parameters 1.5" runoff volume ft3 Pre-development 1-yr, 24-hr runoff volume fts Post-development 1-yr, 24-hr runoff volume ft3 Minimum volume required ft3 Volume provided ft3 Outlet Design Depth of temporary pool/ponding depth (DPiants) 12.00 in OK Drawdown time 3.20 days OK Diameter of orifice 1.50 in OK Coefficient of discharge (CD) used in orifice diameter calculation 0.60 (unitless) Driving head (Ho) used in the orifice diameter calculation 1.00 ft OK Form SW401-Wetland-Rev.4-2/10/09 Parts i and 11. Project Design Summary, Page 1 of 3 Permit Number (to be provided by DWQ) Surface Areas of Wetland Zones Surface Area of Entire Wetland Shallow Land The shallow land percentage is: Shallow Water The shallow water percentage is: Deep Pool Forebay portion of deep pool (pretreatment) The forebay surface area percentage is: Non-forebay portion of deep pool The non-forebay deep pool surface area percentage is: Total of wetland zone areas Add or subtract the following area from the zones Topographic Zone Elevations Temporary Pool Shallow Land (top) Permanent Pool Shallow Water (top) Deep Pool (top) Most shallow point of deep pool's bottom Deepest point of deep pool's bottom Design must meet one of the following two options: This design meets Option #1, Deep pool is Cinches below SLWT, If yes: SLWT (Seasonally Low Water Table) This design meets Option #2, Has a clay liner If yes: Depth of topsoil above clay liner Topographic Zone Depths Temporary Pool Shallow Land Permanent Pool Shallow Water Deep Pool (shallowest) Deep Pool (deepest) Planting Plan Are cattails included in the planting plan? Number of Plants recommended in Shallow Water Area: Herbaceous Wcubic-inch container) Number of Plants recommended in Shallow Land Area: Herbaceous Wcubic-inch container), OR Shrubs (1 gallon or larger), OR Trees (3 gallon or larger) and Herbaceous (4+ cubic-inch) Number of Plants provided in Shallow Water Area: Herbaceous (4+cubic-inch container) Number of Plants provided in Shallow Land Area: Herbaceous Wcubic-inch container) Shrubs (1 gallon or larger) Trees (3 gallon or larger) and Grass-like Herbaceous (4+ cubic-inch) 17,972.00 ft2 OK 7,165.00 ft2 OK 0.40% 7,136.00 ft2 OK 0.40 % 1,924.00 ft2 OK 0.11 % 1,747.00 ft2 OK 0.10% 17,972.00 ft2 OK 0.00 ft2 208.00 fmsl 207.00 fmsl 206.50 fmsl 205.00 fmsl 204.00 fmsl (Y or N) fmsl Y 6.00 in 12.00 in OK 6.00 in OK 18.00 in OK 30.00 in OK N (Y or N) OK 1,800 1,800 288 36 and 1,440 1,800 OK 1,800 OK 288 OK 0 More recommended if not planting herb. and/or shrubs. 1,440 OK Form SW401-Wetland-Rev.4-2/10/09 Parts I and II. Project Design Summary, Page 2 of 3 Additional Information Can the design volume be contained? Does volume in excess of the design volume flow evenly distributed through a vegetated filter? What is the length of the vegetated filter? Are calculations for supporting the design volume provided in the application? Is BMP sized to handle all runoff from ultimate build-out? Is the BMP located in a recorded drainage easement with a recorded access easement to a public Right of Way (ROW)? The length to width ratio is: Approximate wetland length Approximate wetland width Approximate surface area using length and width provided Will the wetland be stabilized within 14 days of construction? Form SW401-Wetland-Rev.4-2/10/09 Y (Y or N) Y (Y or N) 50.00 ft Y (Y or N) Y (Y or N) Y (Y or N) 2.63 :1 226.00 ft 86.00 ft 19,436.00 ft2 Y (Y or N) Permit Number (to be provided by DWQ) OK OK OK OK OK OK This approx. surface area is within this number of square feet of the entire wetland surface area reported above: OK Parts I and II. Project Design Summary. Paoe 3 of 3 Permit No. (to be provided by DWQ) Nl. RMUIREDITEMS CHECKUST Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Initials Pagel Plan Sheet No. ' CL01-502) 1. Plans (1" - 50' or larger) of the entire site showing: • C'7o97. - Design at ultimate build-out, ?a Off-site drainage (if applicable), Q Delineated drainage basins (include Rational C coefficient per basin), Wetland dimensions (and length to width ratio), Pretreatment system, ' Maintenance access, - Proposed drainage easement and public right of way (ROW), Overflow device, and Boundaries of drainage easement. SY C101 C 34 1-, 2. Plan details (1" = 50' or larger) for the wetland showing: Wetland dimensions (and length to width ratio) - Pretreatment system, Maintenance access, - Proposed drainage easement and public right of way (ROW), Design at ultimate build-out, Off-site drainage (if applicable), - Overflow device, and - Boundaries of drainage easement. 3. Section view of the wetland (1" = 20' or larger) showing: - Side slopes, 3:1 or lower - Wetland layers All wetlands: Shallow land depth, shallow water depth, deep pool depth Option 1, no clay liner: SLWT depth Option 2, clay liner: Depth of topsoil on top of liner, liner specifications ...alt C•1o 4. A detailed planting plan (1" = 20' or larger) prepared by a qualified individual showing: A variety of several suitable species (not including cattails), - Sizes, spacing and locations of plantings, - Total quantity of each type of plant specified, - A planting detail, The source nursery for the plants, and Fertilizer and watering requirements to establish vegetation. C41D7, 5. A construction sequence that shows how the wetland will be protected from sediment until the entire drainage area is stabilized. Jpy- 5 0,e- Attl1cti1Ep6. The supporting calculations (including drawdown calculations). JM Sec ATAC6K)o 7. A copy of the signed and notarized operation and maintenance (0&M) agreement. 8. A copy of the deed restrictions (if required). 9. A soils report that is based upon an actual field investigation and soil borings. County soil maps are not an acceptable source of soils information. F,kp oq - tala U ? DESIGN SUMMARY, MAPS AND FIGURES ?M@Mpvjgp MAY 1 X 2009 DENR - WATER QUALITY CnnLISrrE WORK V00M.AWSTMWATERPAW' WAKE COUNTY CONInNUUM OF CARE RALEIGH, NORTH CAROLINA MAY, 2009 ?`?lttlflf?I?// 1C IL 337 4 ?KENa CLH des' . ?, pa. Regency Park, 400 Regency Forest Drive, suite 120 Cary, North Carolina 27918 Phone: (919) 319-6716 Fax: (919) 319-7916 STORMWATER AND EROSION AND SEDIMENT CONTROL PLAN WAKE COUNTY CONTINUUM OF CARE SUNNYBROOK RD. RALEIGH, NC MARCH 2009 PROJECT DESCRIPTION: A new mental health facility is proposed at the intersection Sunnybrook Road and Falstaff Road in Raleigh, North Carolina. The site is 17.86-ac and is mostly wooded with the exception of a small gravel parking area that is used for overflow parking for the Wake Med campus. STORMWATER MANAGEMENT: The project is located within the Neuse River watershed and a Neuse River Stream buffer is located on the site as shown on the plans. This project is exempt from City of Raleigh Stormwater Regulations per Section 10-9003(b)(8) of Raleigh City Code. However, North Carolina Buffer Rules require that stormwater is conveyed via diffuse flow to a Neuse River Buffer. Given the existing topography of the site, it is not possible to construct a Best Management Practice (BMP) that will provide diffuse flow to the buffer. In order to comply with the Neuse River Buffer Rules a stormwater BMP capable of providing 30% nutrient reduction, prior to discharging to a buffered stream, must be provided. In order to comply with this requirement, a stormwater wetland is proposed to convey treated runoff to the adjacent stream. The project includes removal of the existing gravel parking area, and disturbance of approximately 12.00 acres. There will be substantial clearing and grading for the construction of this proposed work and the clearing limits are shown on sheets C-401 and C-402. EROSION AND SEDIMENT CONTROL PRACTICES: 1. Silt Fence: Silt fence will be utilized to filter sediment laden runoff in locations where the drainage area is less than '/ acre per 100-ft of fence. 2. Tree Protection Fencin Tree protection fencing will be installed to protect existing trees that are intended to remain. In some locations, silt fence will serve as tree protection fence. 3. Inlet Protection: Block and gravel inlet protection devices will be installed at new inlets as they are constructed to filter sediment-laden runoff prior to the runoff entering the storm drainage system. 4. Construction Entrance: Temporary gravel construction entrances will be utilized to minimize soil being tracked off the site by construction traffic. 5. Outlet Protection: Riprap outlet protection aprons will be installed at outlets as they are constructed to slow storm-water velocities and dissipate energy to protect downstream channels from erosion. 6. Sediment Skimmer Basins: Sediment traps and basins will be installed to filter concentrated sediment laden runoff prior to discharge from the site. 7. Channel Matting: Straw or excelsior matting will be installed in permanent channels and swales to stabilize the seedbed and promote vegetative growth. 8. Check Dams: Rock check dams will be installed in permanent channels to reduce flow velocities and erosion in the channel. 9. Temporary Slope Drains: Slope Drains will be installed to prevent erosion over long newly graded slopes. USGS QUAD MAP WAKE COUNTY MAP NAME RALBGH EAST, IM CONTINUUM OF CARE scak ,t lsoo 3#MNXW RD, Date 3/16/09 RALBGR, NC Drawn by. PK r J t t CC, kPSYOEic / Ald A B Apo 1 r SITE Dug 14? Laflr,. J WAKE COUNTY SOILS WAKE COUNTY Q SURVEY CONTINUUM OF CARE scaW 11500 MAP MR DAR WO s ? AD, Date 3/,6/09 Drawn by, PK STORMWATER MANAGEMENT DESIGN 9MZ-610 (6T6) :xGd 9TG9-610 (616) :aaogd 8T4zZ eurioaeD WON 'Z.IE?o Oar GWIS anra(l 7sa.[Od dbua2ad 006 Yd 'NDIS3a HD dV kV Wad/ am cvr4Z 1, Wawd o-, 3Aaq - 3'Aj 90L•90 -ON ID3fO*dd 600Z•9L•£ 91Va dVW VMV 3DVNI"G mv:) 30 wnnNI1N0:) AiNno:) 3)ivm ,001. = „ L 31VDS 3 f „ W W \ \ Co W W 09 cc Lo K 13 UM .1 I I I i I I I II I 1 I I I I ? 1 \i-? ??orr-_i?- y_-???'----?\ \\\\\\\?? \\\??o\?r?\\\\\\?\ \\ \\ \ ? 8? 1111 _/ =i??-- \\ \? \\\\ \\? \\\\\\ \ \\\ I I I ?I- --?i?= ???? -V=.? -_\??\?\ \\\\\ \\\\\\\?\? 11 III I ,- - ? \ \? ? \\ \\ \\\\ 111 1 I 1 ? \\\\\111111111' I? LI\ i \\\\ \?\?\\111 11 1111 11 o.r=_???\\?????\?\\?\\\?\ \\\ \1111 I / l///?j/l/? ?\?\\\\\\\\?\ \\\I I I ////?// //? \ \ \\ \ III / / // \\\\\\\ III I / ?// / ? \ \ \ \ IIIIII I I (///// ?/?? /7? ??\\ \ \\ \\\\ \\\ \\ \\\\ 11111 \X o\1 \ \\\111\ 111''\1\\ I?l( jl????j 1\11 \\\ ll ? \\\1111 11\ \Ip?(?ll(? I /? \\ ?\ \\ \ \ \ 1 11 \ ll ((? \\\\\\\\%\ `\\\`\I?111 1``Jiifl(?l ? I 1 ( / , , \ \ \ \\\\?\\? \ \ \\ \\ \ \1111 \??\ N?11I111111( 0l 1 ?I I I I lhJ 1 1 1 l l l l l / %/ \\ \\ \\ \ \ i \\\\\\ \\\\\l III 1 I1\1 \\1\\jJll ll\ \\\ll IJI?1111?I? II III I i ? I? I 1 / ? / / / \ \\1 I I 1\\\ \ \IIII III I? II 1 IJI IJJj ?jJ/IIIII?I? 1 i1 I , I 1 , , / I , I / I///, , / \\ \\\ \ ? ? IJ 11, `?, I 1 I ? I I I III ??I, i I ,,1? JII J,;I; /ll llll I I III I I I I I ? J I I , // / \ )/ I/11R11`I' 111111 III I?1 II 111 111//llll?/), I ihl I I III i III \\\ \ 111 ? ?? \ 1 I I I I 11 I s/ /////?/ ? II 1111 1, I it i I I 1 1 I i I I I `` \ \ \ ? l \ \ 1 `; \?\\\\C 111 I1111? III III IIIIIII111?11 ,?////y G 1111111 III I II II ilm 1 1 I 1 1 \ \ \\\ \ \ \? \ \ 1\ ?\\\\\1 IIII )1)J 111 (IIII III III 111 1 %l?l??llll?l 1 1 IIII I I I I \\\\ \\ \\11 I' I f 1(( I I I I I //// I?? \? IIII 1 I l I I I I I I \ \\\\ \ \ \ \\1?\\\?\?`II III (I II Jill IIII?IIIIIIIII II 1 11 I 11 , I I IIIII I 1 I I I 1 , \ \ \ , ?\ `1 \,?;\ \?ll\\?\\\I'? 1 '? ` 1 I II??11111'1,1 /NU) r ? III ?i I. , I I I I I I I? I 1 ? 1 I 1 1 I 1 1 \ \ \\ \ ` \ \ \`? \\\\`?\?\\\\\ ?\ ? \\?1`\?\??II IIII rlil?I((?(l 1? II I I I'I I I' I I I I I I I I I I I I\\\\ \ \\ 1 1 1 1 1\\\ \ \\\\ \\\\?\ 1111 IIIIII 3! /kj IIVI III II I? I I 1 1 1 L ? \ \ \ \ ? \? II 11111}11\\\ ?\\??\\\\?\Illllllllllll IIIA? I I I I ? I r ?? I 1 \\ \\ I II I IR IIII li I I I I I I I I 1 1 1 1 1 rt-\-_\.? \ )/ ,?? 1111 II\\l\\\\? \\\\ \`1111 II pll / '% \ ? 11?111?I1?1i1?1??\\\\ ??\ ?\\?\?\?\? 11111g11i?li?/( I ?i 11111 y1i1 I I I I ? I ? I I ? 1 1 1 1 ?I \ \ \\ \ l ?1? ' 1 I I \ \ \ i 1 I \ I I \ / 1 \??\\\\ ?\ \ II Ip I I' ?I 1 I I I I \ \1 I ?' / / I I / 1111- ?? \ \\?\ II I I? ?ql // III 1? I I I I I I ? \\1 l l l l l l l (I / / IIII I\ \\ i / 11\\\ ?\\ ?\? \ \\ \\\\?? \\? p II IIII 1 I I ? I ? ? I I I I ( 1 7- _ \ \?\\ \ \ \?? IIII 1 I,I,,II ;I I I ,\\1\\I 1,1 1 111 ?\ \\ / > v>>\\\\\\ I Jill, Ilr I \ \ \\ \ , I 1 \ , ,/f \ \ \??\?\ ?\\\\\ \??? ?\ III II III 111 11 I h II \ I I I 1 \ \ ?, ? \ \ \ \\\\\\\ \ ??? I R 11111V111Iiill I `\\1 j i l I 1\/ 1\ \???\??\\\?\ ?\\\NIIIII 1 1 1 \ \ I I J I \\ X \ \\\\ \\\jjl 11111?111? 11 \?\ ? ) :? l I I ? , , ? / I \\? \ 1 \ \\\\? 8 1 1 111 1 ? I I I / I_--? I 1 1 \\? ?-? // Il 111111 11 ?\ 1 l 1 I I / ?? \? \\\ ?/ 1 1 I I I II / / ; f \ 1 1 1 11 ??? \\\ I I \ 1 \i 11 It -? I i?l l l l l l 1 \?\ \` ?\ / \\?? ?Jy/ \1111 Ij ? I I I I ?iV //??// / ??/ -?? ? r-- ?\? -' -_--?\\\? jJ J 111 I Ili 11 I I / (I?r1<r c I ? I J I I 1111 1 ????_ ??=\?? ? ? ? l l / / 1111 / t \ \ \ \ `\ 11 1 IIII I / l I R l / ?--,?\ ? ?\\ \ \ \ \ \ I 11111 II _( ? \ 1 1 I JI ? // ?r\\\ \ L I '?? \11 \ 1 111\\?\\\ \ \\\ 1111\IIII\ I ?I(IIII j/^h?/'`\\\ \\\? \ \\\y ' ?1 'i\ \\ \\\\\\\\?\ \\\11111 111 \I II I( Jll , / /\\?\???\\?\??? ?-? I -? I \ \\\\\ \ \\\ \ \ 1 I IIII I 1111(( ? ?\\ \ \ \\\ 3nww EC-r-? - - _ z LM- E_ C - dro .a o = - - - '0 N g 1 h d0 .s 9 ? I ga~- y / ME o` I / o0 ?o (n a Ost 4j It? o W t7S ti it III) 1 111 ?lll 11( 1111 ill ?? ll l 1,'111111, l 111/? ( ii(1 ? I Iii //I?JIII?I i/ /% ? IIII / o 175 - AVa --1TOA\ a a M/a 9194-6T0 (6T6) :XPJ 9TG9-6T6 (6T6) :au011d ST91,0 euTIOJPD g7-10H 'ZJPJ Oar a7Tng 9A.[JQ 7saaO,4 Zouagag 00th b'd 'NDIS3a HID dbW VMV 1DVNIb21a 1N3Wd013A3a-1SOd 9OL•80 --ON IDNOIld 600Z•9L-£ 31VQ dVW V311V 30VNI"G 3NyD 30 wnnNI1NOD AiNnoD 3)iym ,001. = „ L :31vDS \NIL \ W < CL S W m .? t-AL co LLAJ P-6 _ i t \\ \ / cr, 8d Q I ?p?h IVV?SSO Cbt°? \\\? ??\? a ap 00 st p/ r/ =?. - ?- ?\ r \\ \ \ -s \\ \ \ I y/r /// z ZmW t IM i? III \?\\ \\?\\\??\ ?\\ ?\\\ ?? ////? 'K ' o I?ill?l I T= -_-- \\\ ?N\ jvii I It 1\\IIII I?II?III 1(1,1 i i ?/ i I\?,?,=?__ _? ? ? \?\\\?\??\? It 111111 II II 1 111 %ir, I-`? ? ,\ r ,--? -?? \? \ ? \\ \?\\ \ ?)II lilttitll II 1111 ? j? I I ,?. ? -- ?? , ? \ \ \ \\x?\? I I ? i ?'?,? ? ?? ? ? - ? \? \ \ \ \?` \\ \ \IIIIIIII I I I?I I III (l?jl?ll?jl/ l%/ ?// \\\\ I i i? \ \\? ?\ \11 1? \II//1111 i ? \ ?I /iii ?? ?\\\?\\\\\\ \t\ \JI??/ (\\ 1 ?\I ? I I I ? ?? ? / / \ ?? \ \ \ \\\ \\\?\\\ \?\?t 111; \ ?\ IpIIIIIIjIIIINl/ 11 ?\\?\ _hII IIII I l / / \ \ \ \\ \?\\? \\\ \\ \\ 11\ \\\?Il??ll I/?ll i 1111 i ?? Il I R? I ,III I I ? , // ? \\ \\\ \ i \ ?\ \ \ \ I I l 1 t I\ 1\ \I1\\ 1111 l? \\\j? Illll?tll? 1? III I Ill 11- . 1 ?h IIIIIIII I ? I ,\\ ll?I ill,? ?? 1111 ?l),I,Ilulll, ,Ill '- I II I I I 1 1 \\ \\ I I I I I I IRI ? I l I l,l,? ,l?i,l1 1?i? hll iq? 111 1111 ??l 1 rf (Iil I I I I I o. / I "III ili?lIIII ,/ ll llll??/?/Ij ,11 /1 /11 ' 11 1 1 1 1 I I I z i \ 't 1 tl 111 1 1 1 1 1 II ll',j?? ?l?///y/Ill II 1111 ?l III III,'I I I , 1 g? \ \\ \\ \ I I I?I ?I 111111,1, l /?/////?? l/ I/ll/ , W 1 \\\ (1?11(ll)I I I III IIII IIIIIIII, l%?ljlll ?l 111 l llll?l III 111 I it I I I I \ I Il?ll l h I I ? I I I I 1 t l ? 3 ? \\ III I I I I III III 11111141 IIII /l%l//l?/lj (?l ?ll/ ?( I 111, , I 1 N \ \? \ \\\\\? \? \\ 1111p1?I //?////%/ /, //?11( III III cc ?h I I I, I I i I I 1 Ly er Lai \\ \\?\\\\\ ?\ I/lll?, i/, I I I it III I I \\ \ \ \\ \ \\ I I ICI I I I ?II I? I i I I V 3 \ 1111111111 tt\\\ \ \\?\\\\??\ \l?l1111111111i1 qll?/ 111 I lllljl III I I l ? l l t \\?? \?\\\ I I IIII III I ? ? I III Q ? I I tll\ ??\\ \\ \\ \ \ \?I II Ii q l / / III illltltllltill III I I I I 1 IN , 11111 II\\\?\ \? \\\\ \?\? \?lllll IIP // /, 111 11 t III \ 1 Q ^ o I 11\t\I?lll`1,\\\\?\??\?\\??u lil Ii?l? I,l // // I X114 IW ^ H \ \ / \ 1t11?????\\ \??\??\\\\ \\ IIII Iq?11/ /j/ it III 11 \ I'i? \ I I I I I I OC CC \ o I \ / 1 ? \ \ \\?I III !/ I I I ? I I 1 I •• W ? I\ 1 t\ \?\? \\\\\ \\?\?\\?\,? \?\?- ??11 // i/1)11111 illlllllll? I ?! I I ` I a y \\ \\??>>\\?\\\\\\???\?111111?M11?1/ IIII tll ,111 ?I I \\ H Q ? n Z \ ?i \??\\?\\?IIIII II IIII ?/i'i 11111i1til,lhl II ? \ O O '' Z ? \ \??\?\ ????hlllll?lJlJ ;?i/% 1111 11111111 I ??I\ I I lCL I• V \ ?\ Jl/l//// i? 11 1 1 \ 111 1 ? ¢ _/ / ?i W ?"1 h 011 J ? ' / \?_ \_ \ \ ? LEI ?/? I f \ 1 I, ?r \\ \ \\\I= J/Q ?1 _ W 71 to O LLI 27- Q v? \\ _ ` a ? , i , ; ?r?`-?- ?; \ ? ??? ?l? `I ? `?T? \ \? ICI \? _ ?? ?,? , --a I? ? V Q I' _ _--•?--??r? ?? \ \ \ \ _ \ ._-. 115 -Z ?- 4 C-- CL- r w r t' max: DATE e ` vi: % 4-May-09 PROJECT NAME PROJECT NO Wake County Contiuum of Care 08-106 ?Y U LOCATION BY ?r [C Raleigh, NC JPK !J Jf Drainage Area, (DA) = 7.89 ac Impervious Area c= 0.95 3.63 ac Pervious Area c= 0.30 4.26 ac Cc= 0.60 Wetland Surface Area Drainage area % Impervious = 46% Design Storm Rainfall 1.00 in (Typically 1-in) Runoff Coeff. (Rv = 0.05 + 0.009 (% Imperv.)) = 0.46 in/in Required Volume (design rainfall)(Rv)(DA) = 13,301 cf (3,630 cf minimum req.) Depth of Temporary Pool (Dplants) = 12 in (12-in max) Required Surface Area = 13,301 sf Surface Area Provided= 17,972 sf Surface Area at 1" Storage Volume= 20,930 sf 1" Storage Volume Provided= 19,451 cf Temp. Storage Depth above Dewatering Hole = 1.0 ft Diameter of Dewatering Hole = 2.00 in Detention (Draw-Down) Time = 2.7 days (Typcially 2-5 days) T days=(Req. Temp. Storage Vol / (0.6 * A * (2*g*(h)) ^1/2) * 86400 (where h = one third temp. storage depth measured to centroid of orifice) Wetland Zones Required Elevation Range % of SA Forebay surface area required = 1797 sf 36" deep 10.00% Deep pool at outlet required = 1797 sf 18-36" deep 10.00% Shallow water (low marsh) required = 7189 sf 0-6" deep 40.00% Shallow land (high marsh) required = 5392 sf 12" above perm. pool 30-40% Wetland Zones Provided Elevation Range % of SA Forebay surface area = 1,924 sf 207.00-204.00 10.71% Deep pool at outlet = 1,653 sf 206.50-204.00 9.20% Shallow water (low marsh) = 7,136 sf 207.00-206.50 39.71% Shallow land (high marsh) = 7,140 sf 208.00-207.00 39.73% ... Hydrograph Return Period Recap Page 1 Hyd. N Hydrograph Inflow Peak Outflow (cfs) Hydrograph o. type Hyd(s) - description (origin) 1-Yr 2-Yr 3-Yr 5-Yr 10-Yr 25-Yr 50-Yr 100-Yr 1 SCS Runoff ------- 3.14 5.06 - .?..._ 1$.&! ....,.. ....._ 36.311 2 SCS Runoff ------- 24.67 34.18 ....... W.12 - f13r.* 1! t fMPC^4) 5 SCS Runoff ------- 6.04 f.l1 •-- --- x-20 ••..••-. ---- 14.13 l ?ilt?t (WAL To Po") 6 SCS Runoff ------- 19.99 26.64 ------ ------- 47.11 ------- ------- 77.71 POST-AREA-2 (TO POA-B) 7 SCS Runoff ------- 15.65 22.06 ------- ------- 42.58 ------- ------- 74.48 POST-AREA-3 (TO POA-B) 8 SCS Runoff ------- 0.62 0.76 ------- ------- 1.17 -.------ ------- 1.76 POST-AREA-4 (TO POA-B) 9 Combine 6,8 20.61 27.39 ------- ------- 48.28 ------ ------- 79.47 COMBINE POST-2 & 4 11 Reservoir 9 1.78 7.93 ------- ------- 34.43 ------- ------- 67.18 Area to Wetland 13 7, f 1s W-73 22.87 ----- ------ 71.68 136.52 TOTAL, 0 TO POA41 This project is exempt from City of Raleigh Stormwater Requirements. However, Post Development Peak Flows for the 1 and 2-year 24 hour storm have been reduced to below pre-development levels with the Stormwater Wetland. PrOj. file: 08-106 PRE VS POST.gpw Run date: 03-18-2009 STORM SEWER SYSTEM 0 a 0 3 Z MI X CD O Ol m .i O m n W n N n -? cc) 07 W Cn W p co W po N W D I D D D N D D D D D V D O D Cn D A D W D ;a O , 4 O Cn A W p 0 D UUU I ' n n C co co W co co D D D D D D y D D D v D I D D D D `'` W N D O Cn A W N W C) W V A W Cn p 00 D V Cn C71 A W O p V L? r O N 0 71 W N 0 G O W cn W W N co a7 V (O O A W (n Ou NO 0 D Z D 1 % m co C l O o O co O U1 O O p OD O Cn p .? O (n 0 A 0 Cn W CD N O O O A X r 'T7 m - - O e n O O p O O O O O p O O O 0 O O CD + O O O 0 Cn 0 CD p m - O p - O p D Z Z C Z (7 ? D ? I 1 0 0 0 0 0 o o 0 0 0 0 0 0 0 0 x,0 0 0 0 0 0 0 0 0 0 0 DZ O co + O O A A aD O O N CD N O O N O O IV N s W Cn Cn • O OD N A ! N O) O O (n to O N O O A m O N D e r n m 7 C ! m C 0) O ' X0 Co co W O A 0 ' O ; N co CO V OD 0 V O) p CD V N O ' o ZI W O 0 W O) co V Cn A 00 N N W W C. Cn 'V V 0 O O ; C N i ? I . O V O (D O CO O O c V o O O O O O W O O O O O O O 0 0 W 0 W 0 0 0 O O O C Z Z 0 +a Cn to to O D O 4 W 0 ) 0 N CD Cn O I 1 A CD 00 V CO O V V OD A CO 0 I V 0 V O 0 N OD 0 P. w W O 0 Cn 0 U r m n r. T O « ?I ' v 0 0 0 O O O O -+ --+ O O O -? O W O O N O O O O O O W O 0 Z A V o N OD CD O N W O Cn W CD O A V N V O CD bO 0 0 -? T M M m o OD 00 00 co O Cn A w W A V CA O CO CAD V 0 0 0 W O O V W (n D v ? G) - - - ? - - m 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o O CD C, 0 0 0 0 N N W O -+ W O) W -? to V A CO A co N O O N O W CO N V O M cn M N Cn w A N CO O CAD O 00 O to Cn O P, OD A, co O N D f? O n D D - - - - V7 r 1 _ = .ZI o -< 03 oX O cn cn cn cn cn cn cn cn cn cn cn cn cn cn cn cn cn cn cn rn cn N cn p cn cn 3 Z n C- W m 0 0 0 0 0 0 0 0 0 0 0 0 o 0 0 0 0 0 0' 0 0 O 0 o o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 r Z m x m o N 1 m - i m O Z c) O CD 1 0 0 0 C. 0 0 0 0 0! o o O Cl C, O CD o . . . . 0 0 0 0 _I W A -? O O O O 00 Cn CO A Cn N co W O O O O O O O O N O O W O O P. N N 0n O O W 0 W 0 N 0 O m CA w in 0 A O O Z I m m I O Cn Cn N 01 Cn Cn Cn Cn Cn Cn W (n Cn Cn W Cn Cn Cn O) a> Cn N W Ut Cn W A 0 O 0 CA OD Cn Co A Cn N 00 W O O O O O O O O N O O W O O A N N CA O O Cn --? W Cn N O O 0 01 00 Cn O A O O n n Z Z m (n O :Cl ;1 0 -V v -i m m 0;a m V V V V V V V V V V V V V V V V V V rn 9) P) rn V V V V _ Z I 1 n x 0 m 0 < Z m (n (n V) r --? W N C. N N O A O V O Cn (D N N N N N N N N s V N N N N s Cn N N OD A O 0 CD N CO Cn 0 A 0 W 00 IV N ?J O -{ Z v Z ? D - - -_ _ (? 0 W 0 C 0 0 0 o p p o 0 0 o 0 0 0l 0 0 0 0 0 0 0 0 0 0 0 p C Cn o CA Co Cn ?I V V O N A N W V w 0 N, Co CA w O A O) 00 Oo O N V bD O ?-l co V O bD V iO O iD o CD O ifl W [D Cn CD CA Co 0 M m 0 n ?) -n 0 0 m 1 z 0 O K Cl N 00 I -n C) W 0 N 0 _a co O co Ui ao A ao W 07 N co -? D V D -' O D CA D A D W D N D ? D p D co D D V D O D Cn D A D W D D x Q \ n \\ _. .-- ---- - _. -- --- ?_- - _. __ -_ _ 7 CQ Tl' it 11 If Il 0 A n W n N 0 W lA co Cn W A co W W N D W D D D D D D D D D D D D D yy -{ a D O W V A W Cn p N D V W Cn A W iJ Q 0 \ N N (p N N Cn W - .,. O O . Cn O co O o A A W N N O. O O Cn A W OD W N O A ,p W t- W W o - (? lA A W c) N W p Ul N Cn V Cn W to A --? Cn O W Cn A W A O O O) V V W -? N V A G1 A m A w Cn U) Co W Co W W O Cn -i S O m . C-) 0 V Z C Z < _ w 0 0 0 0 0 0 0 0 to 0 0 0 0 0 0 o w o cn o (D w o 0 0 0 Cl) m =a -? v 0 O 0 0 0 o 0 0 0 0 0 0 0 0 0 0 O 0 O 0 O 0 0 0 0 0 0 0 O 0 N co O O N rn O 0 O o N V O O CA o 0 0 0 0 -n Q O (n?"m rt , ? 0 n C 3 -- O 0 0 p 0 O o ' o O O O O O O O O O O O O O O O O O O O O p p (n n p O A O O o N o 0 W 0 A 0 o Co 0 co 0 0 O 0 O 0 O 0 0 10 0 0 , 0 W 0 Co 0 0 N 0 0 O 0 N 0 N Q w CO 17 W W V N Ch ID ?a A A N N A W N (A CA V V + (0 00 W A W OD V Co O W 'p O W - A Co A N A Cl N A A A V m a I ? N Cn Cn N U1 Cn Cn (n (n W CA Cn N W (h W A co A A A A A CT N N O Z D I r? CA CA O W V W Cn Co j0 m O 0 N N W CA O Co -? V N W 97 O o Vi N I Co (o Co IV 0 C/7 CA 00 0 4, ,N n OD DD O OD Cn W A (n - i O Co II A (n O' A W N Ut W O) A A A V Cn OD NO C» N d7 A rn A TI T (A W V W (n 00 V CA -? Ln A O p W v N Co A (n A C - - - - - r - - - - 2 w p p ? r W ' D A ) V A Of D W A 00 A W O o A A A N U1 _I O A V m on N o A V 0 n W O W m T Z 0 -? c- wm O A O W Co p, W V U1 0 V W (n N N 00 -q Q O m O N I - - - < O CO - - - Cl) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0, 3? 0 V A O coi t00 A V Cn W OOD COL) A ? OD W cn V CNn 000 O A V N N A Z m m v z N N N W N 0 N Cn N M N Cn N M N O N CA N W N En N A N A N A N A N A N Cn N -+ N A N A N A N A W N N L" N Cn C c O (b A V N W U) A s V (o N A W O A cn O O W W A O V i OD I O O N W 0 p p p A TI Z -0 O O O Cn U) O C, O 0 O U) V (n A O W Ln O n 0 V 0 0 0 O 0 00 0 (0 0 Co 0 V 0 0 Ln 0 Cn 0 -I G m - r - - - - O :U A 0 'U O N Cn N N N (n N Cn N Cn N (n N Cn N O N to N A N Cn N A N A N A N A N A N A N N N N N N N N r mxcmi<Zm cm i> O 0 N N W A CO N 0 W 0 N . W W V V co O W W 0 A N A A A V A 0 Ut o CA W "11 Z O CJ m Q r 0 fn ? i U O O O O N Cn 0) U) N O O O 0 O CA O W O CT O CO) O U) O CO . al ! O O V O CO O C, 0 O 0 Co 0 0 0 0 0 0D 0 N 0 6) 0 G m Q Z „ ' o { . ? Z x m N Cn N CA N Ln N CA N CA N U) N Q? N O) N O) N (n N Cn N (A N A N A N A N Cn N U N CA N A N Cn N (n N Cn N (n N U7 N Cn N Cn m (n O O V V V A C V C V C 9), g) i V W W V V Cn W A Cn O o o N p O) W V T1 r -1 0 0 (n o n p n o n o V (n Cn o t 0 (n o -? CA V cn Ut 0 O o U) p N o O 0 N o O 0 O 0 Of 0 W 0 o O 0 W 0 g 0 '-I m m D C+) W -? O N N N N N N -a -? N ' W A W , (n A W U7 P •-? N 0 1? A CID Co Co 0 CO C. - A p co V A A C A n CA A Cn A V A C ?1 o A A N O O A N ; O D V .P -? p N N N N N A -- • Cn m m ?1 O W 0 CO A Z ,Z7 ti x U) 0 ;U K d m W n W n N C) > W O W Cn W A co Cl) W N W -r D V D_ m D D D D D D p D D D V D O D CT D A D W DD N D O Cn I A W N p S O 7 ? 1 II n A n W n N W m W W m (p D D D y D ' D y D D D D D D D D D D Cn A W N W O W V A W Cn C) OD D V m (n A W F.) O p I I V ? p N N JI W ?0 ??•- ?t N N N N V m N N N N N N N N N N N N --? p N N N N N N N N N N A. V O) A ? 4 A A N N V 00 V m p D m _' D -? C- O r? V N V N CA A V N V N V N V N V N V N m W V N V N !V ! N V N V N m V _ m m m _ m _ m V N CA A N A m W "D m z . 0 k) --I Z 0 - C Z ee '" 0 D 0 0 0 0 o I 0 N o W 0 0 0 0 0 o 0 W 0 0 0 o 0 W 0 o 0 0 0 0 o 0 o 0 3 n' N N Cn O N N -' N N N N N CA ?'') N N N N N 0 0 V Cn 0 C) Cn O Cn O in O in O Cj IU m N Cn N TI , .' Cn m O (n (n Cn Cn Cn Cn O Cn m cn cn Cn O 0 0 O O O O O O O O N U1 O O 0 O CA O C I_ -h 0 N) A 0 0 OD 0 O O O O O O O O 0 O O 0 O O 1 0 O O 0 O O O O O O O 0 O ! O 0 0 O 0 0 O 0 0 1 CIi N (D Cn N (0 O O O A V p A Cn Co A m co A Cn O m co O m CO O O C) O O 0 c: m ?1 -? D cn (p -- °e. ?m I I ' ? I I z> ON a 0 0 0 l0 0 0 0 - 0 0 0 ' 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 w 0 N 0 O CO N N + W m m O N O W O O O O U7 m m O N -? O W Cn O V V al V w W V in W w 0 W W O W M '- z O O O O O O O O O O O O O O O O O O O O O O O O O O O C3 O o 0 0 1 0 Cn I 0 W 0 W 0 N 0 N 0 O O O O O O O O V i O A O N O Cl) O (O O O I m 0 m 0 m 0 V 0 A -? o O V O 0 -- - -- --- - -' - - - - -- O I m O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 oI ' o 0 0 0 ' 0 0 0 0 0 0 0 0 D 0 o m O O O V A N N -+ O O 0 O O! , o O o W o O N 0 O 0 O O o m A 0 0 0 0 0 fD = r 0 m O o 0 , - - fA to V T co r -< 2 M O > O O O 0 0 0 . 0 . o . c) o O O O p p O O O O O O O 0 o O O \ m 0 0 ? 0 A O QOi Ii A ° o O O I O I (00 0 0 0 0 0 m -?+ m 0 ? 000 ° I o Q v ? m v Cl n N ? , cn o ca O - ? - - - - + i o I I c , o o oi o o O p p p o 0 0 0 0 0 0 0 0 I ? o o o o ? o O D 0 A 0 N I 0 O 40 CA W s N W IV A O O N O W O O o l O V CO N m o A N A ? A O N N N V m CI <n 0 Co O o m A m 0 w m mm fA -) N C) OD 0 W O 0 O oI 0 O o ? O -4 0 0 O 0 0 V 0 0 I m m O V 0 O O 0 O O O O O O O O O 0 CJt (n 0 o o 0 0 0 0 o O 0 m En 0 0 o O C II Cn ? Cn (n 0 Cyl Cn 0 O 0 0 - 0 0 W 0 0 V 0 0 O 0 O m Cf) Z v - I ? O T7 0 O 0 o 0 0 0' 0 0 o 0 c 0 o 0 0 0 0 0 0 o p p ' o o o 0 0 0 0 0 o p o 'n M ? m m Z m rn G 1- 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o I 0 0 p 0 o 0 0 0 0 0 0 0 0 o o o n n m 0 0 Fn m 0 N 0 0 CJf .p VI W O m _ m O A O O O O m m W 00 1 N N n m N O -? m 0 A O 0 j 0 m W 0 mW N 0 m U7 0 V O T -j -I O --j K Z m O v Z •0 - - ? - - z 2 - - - - - - m --? O O Cl) W N N N -? O O O A W N N A O m A A 1 A W A A O m n N V V M --? 0 V Cn 0 A Ou m O m 0 O V O A W N A V m V A Cn Cn N N p V O O m N A A Cn 00 W m N V M Co CC W (D m Cn (/) (') v Z 0 Cc 0 Cn X 0 v a? m p 0 W C) N 0 co ccoo ccoo ccoo W co D L, D ? D D D C0 D D D V D CA D CT D A D W p N D ' X O V O Cn A W N p - f j TF H 11 11 f{ lf I 111111 c? n A n W n N C3, W O co CA co A W W co N D W D ' D W ?D D D D ? D iD y D D D D D D ? -? D O V A W Cn ,.? p 0D D V 0 Cn p. W O O 'l V -? O am N N CO ? N N (n W ? CNn CN)) (n CNn N CNn CA O CNn A CN7) A A A A ? A rl) O co A A A cnn CA CA (n O CD O T. ? ? N co W A 0 CID W O O W P. Cn W co CO CO O N U7 w o A TI -i . - . CD m ... W A 0 l0 A Cn O O W CO V N O (b V -+ N N to O W O CT O ! CO O W A - O (n 0 CID A CO O (A O O O CO O 00 N V O V loo O CA V CD) m r `r m i ? O (7 ? C? _ T, <? z c z o z P 7 D N to N C n N cn N W N 0 N N N 0 N En N 0 N rn N A N cn N A N A N A N A N A N A N_ N W N A N A N A N Cn N to N Cn C) O O C C) m O a N W W A Vt aD W O CD - A Cn Cn C7D co CO O w W M 0 --? W A TI z -{ Cn OD V A Cn W Cn V O CO Cn W N CO N A CO W W O Cn O O) CO O A 00 A W OD CO N O N N V Gl Cn W -? cn O A A A V CO -1 r O m 7 '. - v m v v v v v r z C N N - N N N - m - N - - T r 3 " N N Cn N N cn N N 0 W N Cn A N U7 CA N CA W N (A W N 0 W N (n A N to O N Cn N A N A N A N A N A N 0 _N N A N A N A N Cn N ' N Cn W Z z O ( N - - A A A 0 CO . .. ?D A Cn 00 O A :P r TI 0 CA 0 A CA O M E W W l N O O l - N N 0 OD m V OD M V W M (D W W M N CD A CO W CO W M CO A (D O O N M Co N V Co N V O N OD CA 00 V O V V m ;o -1 (n ? < < c < < CD n r m -1 - am) < N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N = Cn -? CA N CA Cn CA W Cn W Cn A cn Cn Cn Oo CD) W CA W Cn O Cn : A ' A CO al O al a, A W t A Cr A Cn A OD A 00 A CO ? O CO _ OD ??aa A A C7C A O 0 CA 0, c :r 6) CO A Cn N 0 O O CO CO V N O 00 V N N 0 CO V W N 0 Cn w pppp M CD Cfl O M 0 N O D N O V O) A V A V c , m 0 O 0 O w 0 0 0 A O A O A O N O N N O oD Oo O CO ' r 3 I n z z z z z O 00 ? r r r r r z r z r z r z r z r z r c -I z r -I O - O z r z z Z z z z z z z Z z -n M m m m m m m m m m m r m r r m r m r m r m r m r m r m r m r m r m r z O O r z W A N O N W N N N N N N O i W W I W ? A A I W A A N OD -? V O (n O CD) -? N co f0 N O A V co W N ?I N W V N cn 0 0 co a) 0 000 oD CVp G ' O N N A n p = n n n K' o o O S n n n 0 0 0 3 O O O O K K O ? 1 W - m co , co co x co ao - m - co cu co W x co x co co co co x x x "OmA M > I 0 0 0 T 0 0 0 0 0 0 0 0 O O O O 0 i 0 0 0 0 0 0 0 0 0 0 0 0 0 T T T T T T T T T T T T T T T T T.i T T T, ? T T m ? z I l U) 0 ;u co x D M W 00 M m m o 0) w o 0 co N O p n A W N - O Cp > z D D IM M z n i G) z m m z c Dr 0 ? a m o -?-i _ 3 c : o rn O S D p -, m m c) C) 0 O O ° z A 0 o S np o 3 z I O w z z O m K Cl) z --I o in O;a ;u n v 0 o z -0 -1 m m 0;u m x n< m (1) z -i m z z o p --1 K z 8 z y D M z O M rrr I?I?I? v Al m N O h m m 12 o o rn > O a c o w D i, c O -=r co m W N v 0 W N i ` - N C) N 7 o m > y V i O ? N N UOi W O W > O ? N N W O 01 V7 W W O W D Z . m,. O 0 O 0 N O cn O O O A O O O N ° W 0 W 0 N ° (A iL7 r T m m ? O 0 n :?® 00 o D - Z 0 Z Z a f? - -- - m . 0 0 0 0 0 0 0 0 0 0 0 o D Z w ? N ° o c°n cD NN, n m m D " c rr 3 IQD A O O O O O O Cn A -' O V UI N A ? o.. r 0 C Cf) ? 0 O t+ co O m N O m , O fo C, O O Ut w O Cl) w O cn V O 0 cn O r co O A m C Z 0 M Z 0 r T O n m T T 1 r r v N -+ N O O O O j -+ O O 0 Ln Cn O A co N O O co V V V N A W A O 00 O V T S Z (n > M X m ? 0 0 0 0 0 0l 0 0 0 o D DSO VWi v CO -4 N -4 OAD 0 D D i ? - - (A r - - - 0 co - ° M W 0 0 c , D cn cn cn 0 v, w cn vt (n cn cn (A 2 Z O 2 w m 0 O 0 o 0 0 o 0 O 0 0 0 0 0 0 0 0 0 0 o ° Z m m rn rn n o N ? - - - < 0 co - o 0 0 0 0 0 0; ? -. o o h -I ? N O O O O O O O cD V A V A 00 co Cn m m i N O O O rn 0) Ln CA n _I (o O O O O O O O O O V 4 V 4 OD Co CA - Z O m n v ° -° 0< V + V V V V V V O) Q) OD V zm , m Z m c - n N N N N N j N N N N N N N V OD V OD co co 0 co = Z - ?'J +n (n 50 Z X .0 L 2 D C O p p o p o 0 0 0 0 0 0 O a C m A N -4 o) O Uf c c o n w o w w 0) A -j O 0) o 0) W m Z 0 T O n I 1 T T 1 V N T 0 coo c OD rn D > al p O C\ ? =r to 1 j W N 0N m N W O D V 1 O N N O N N Ut w W ' O +P W -+ N O O O O Cn CO A W CD D ?? ?. cn O N O V N O . -I CD T O A Oo O co V V CA A O V ?O a (?? Z Z C Z - - C1 D IV - - - ? r r f l f O m o o o ? o 0 0 0 o a o o -i (n Cm 0 ) 0 o I ' o 0 0 0 b o) o ? T i p p m i 0 0 to 0 0 o O N o v cn m 3 C - - f O .O O O O O O O O 0 O . 0 O 0 C. O O O O NO O 0 O 6 O 0 0 6 0 r p N w CA w (A 00 O 0 O o W cn V 0 CA o to w Cn o P. co - N m TI a A n n n c A c A c Cn cn O cn I !tA cn .co CA go CA Cn Ua 0) Cn A 01 A Z D O V W Cn (n CO (A , O N 6) Ua A W A W (n 90 V A Ln W W -n T . O W W W W O V 0 C r r 0 ;o -< O D r 2 Co O o ;U ( O Z 0 O w m ( a O i N O O OOi O CO oo T 2 0 -? p co < Z C) 0 co U) 0 A 0 N 0 O 0 l 0 0 0 -+ ? 0 ? 0 N 0 O 0 W ?_ m 3 O C O O (A m A O co O (;I co Z T T Z -I N O W N O V N Cn N N A N (n N C7a N Cn N A N A N CA N Ln C O (p A A A CD t0 O O T Z Cn Ua O IV O V O N O Oo O A O O O CD O Cn G O CT CT O ;0 X 0 -0 0 N O N O N Cn N A N N CT N N N N N r m= < Z m U) (A CA N C D c ) W W W O A A CO A O m O TI Z O C) fn r G) C) O 0) CA W O 0 C A O "< z { A O O O C 1a Z 2 - D C T - j -' C N OO C N a ? N N N V C N A N N N N 9) N V V . a N V O V 4 A 9 T r --I -I m 0 C T O O O V o O o V C 0 D a W ; 0 C p n M m D ? W 71 ' 7 1 N O 7 1 Ir Ir A A A A p? A A A C OD A O m m 'G nmi m o co a rn y 0 n A 0 W N ?N m N C?Ti W ' Obi 0 0 O o D V o N N COTi W c N N N N N D C ) O, D 1 C- N V N v N V N V N .i N N -4 N N V N N V N [-%4) 'NN V N N V ' m P, O t 0 0 N N N N N N N N N N N D M " ' Z _ Z C Z 7 D m o o ? 0 0 0 0 0 0 0 0 0 '? O ? o o c _ N CT N (A N Ul N CT N Ul N Ul N 0 N Ul N Ul N Ul N Cn j `? O Cn r 0 n cn 0 O O O O O O O UI s m N O O O O O O O O O O O O O O 0 -+ 0 W 0 -+ 0 -+ -n (/? > m O I Z ? n t ? ! ,0 0 0 o o o 0 0 0 0 N CO O N O W O O O O O O ?o V V On O OD 0 N 0 2 r O O O O O O O O O O O O O O I O O O O O N O O 2 W O i C, O O O V A W 0 l 0 O O O O O O 0 0 0 0 M 0 m 0 0 0 0 0 0 0 0 0 0 0 0 0 o 0 OD 0 O 0 A 0 -+ 2 r- r0 m 0 Cl) 0 Cl) ? V D m 2 W 00 .u 0 0 0 0 0 0 0 0 0 0 o z m 0 O i c- m 0 0 0 0 0 0 0 0 0' 0 0 0 0 o w o o 0 o 0 2 0 r m 71, C) m O (M O N - - - o cn v < o 0 0 o 0 4 0 0 0 O 0 O 0 0 o o m m D N 0 N O A O O O O O O W CO Ul OD OD N Cn 2 G) G) fn O O ' N 0 00 ? o o; 0 o ? 0 0 0 0 ° 0 ° 0 0 0 0 0 0 Om 0 0 0 l o o o o 0 0 ccCYI n ? Z v m 0 ;o ;q 0 m m ? m m O m 0 0 0 0 0 0 0 0 0 0 0 m0< Z 0 0 W 0 0 O 0 0 0 0 O 0 0 O 0 0 O 0 0 O 0 0 O 0 Cp 0 0 A 0 0 N irn O "l'I n -n t i? Z O W N O O ? O O) N N A "'I m O Q A Z ? Z 2 D < T N O O O O O A V W r '?- o co OD A bD N o OD 0 rn N W N V ia A c O in V -p0n (n (") 0 1 w V s? f? 00 0 OD N m co 00 m IIn T O D A S ( 7 , 11 II Q 11 m W m N o N n O n N n I n D n n I Cn W o D M 0 O V ? O N N co N N UI W C ` N N N N N N N N N C O O .? O O CA (7 w cn W A A N Vt N U) c CD D ` .. O V V W O A 'A A c0 Co O T? _. (a (D m . O O U7 A O Cn N O V O IV Cn V O W O W O A N N cp m --I r, ?'' r m ? O ?4 0 C? < Z z c z - - - - - - -- - - C- 7 > e N N V N ?N N A N A N N N 7, N N - n O 0 m W O ? O T z -A a W N C o) O (fl N O V O N O V O w W N U1 N co Ln A ? r O m 7 r - m v - v - v - R -- Z C T. 3 N N N N v N N 0 N V N -4 N L" N CD N O N A (CD N C n CD N W C D N O N N N Cn N Z ci O O O W n C C . -• < ' M A O m V m 0 m w W m A A m O W m A N w A v m cn N N N (D (D Z (p V W O O? (D < < < °- -- < < < < r r m -n e) 0 N N N N N N N N N N N N N N N N N N 4 O V O V O V CA W W W U7 O U7 O CA A U7 A Cn A CJI Cn Cn A Cn cn A co Cn O Vt N c TI 0 A 0 O V m U 7 ( O O' W W CC." A O W O I N c0 A m fq n 0 O _ _ 0 O -n O z z c Z Z Z Z Z Z c c Z r r m r m -1 r r m r m r m r m r rn r m -1 r --1 r - z 0 I -i -1 -? - I -1 I m m O O r z W N O N V A V V CA M w V r) 00 W in A c 1 ? m n n Im n g W n W co o o am o o ccn o o m m m a D ' C) O O O O O O O O 0 0 0 0 K ? o r m z ;u co m m 00 D -? C- m n m o m °) n W 0 --1 o IOU N z O C) < G A W N 0 a11, Z z N m c z <o m co (n G) z c O 22 Z N m 0 1 3 u c X m 1 u m 29 p D+ Z m m D c, 0 mM . r 00 0 CI 0 0, O° z A o O 3 zm w ° w 0 Z A m A " -- (n T -4 --q 0 !n O ;a ;o n O O z n< Z m i M 2 m u z K o n m 0 c n r Lb z ?n 0 p z z y D m z m r ??r?? OUTLET PROTECTION DESIGN t K t ? ( ti , DATE 4/10/2008 PROJECT NAME + PROJECT NO Wake Count Continuum of Care Facility 08-106 LOCATION BY Ralei h, NC RBT F CHECKED BY JPK Storm Outlet Structure FES No.= A8 Pipe Dia= 24 in Q10 = 20.43 cfs Qfull = 65.65 cfs Vfull = 20.87 fps From Fig. 8.06.b.1: From Fig. 8.06.b.2: Storm Outlet Structure FES No.= A18 Pipe Dia= 24 in Quo = 34.43 cfs Qfull = 68.40 cfs Vfull = 21.74 fps From Fig. 8.06.b.1: From Fig. 8.06.b.2: Q1o/Qfull = VNfull = V= DESIGN PHASE PRELIM CONSTR REVISION RECORD OTHER (SPECIFY) 0.31 0.87 18.2 fps Zone 6 D5o = 14 in DMAx = 23 in Riprap Class = 2 Apron Thickness = 36 in Apron Length = 20 ft Apron Width = 3xDia = 6 ft Quo/Qfull = 0.50 VNfull = 1.00 V = 21.7 fps Zone = 6 D5o = 14 in DMAx = 23 in Riprap Class = 2 Apron Thickness = 36 in Apron Length = 20 ft Apron Width = 3xDia = 6 ft T DATE .:, 4/10/2008 PROJECT NAME PROJECT NO Wake Count Continuum of Care Facility 08-106 LOCATION BY Raleigh, NC RBT CHECKED BY Storm Outlet Structure FES No.= E3 (Merrell Drive) Pipe Dia= 15 in Q10 = 3.56 cfs Qfull = 4.92 cfs Vfull = 4.00 fps From Fig. 8.06.b.1: Zone From Fig. 8.06.b.2: D50 DMAX Riprap Class Apron Thickness Apron Length Apron Width = 3xDia Q10/Qfull = V/Vfull = V= DESIGN PHASE PRELIM CONSTR REVISION RECORD OTHER (SPECIFY) 0.72 1.08 4.3 fps 2 8 in 12 in B 18 in 7.5 ft 4ft ,r TEMPORARY SEDIMENT SKIMMER BASIN DESIGN T DATE .,. tit Y ! r 3-2-09 ? OJECT NAME PROJECT NO J1( ake Count Continuum of Care Facility 08-106 CATION BY Heigh, NC RBT/JPK ?i !1 Skimmer Basin No.: TSSB-1 Site Conditions Init ial Einal Disturbed Area: 2.92 8.30 ac Additional Drainage Area: 1.12 0.30 ac Total Drainage Area: 4.04 8.60 ac Runoff Coeff [Cc]: 0.40 0.78 10-yr Rainfall Intensity [I]: 7.22 7.22 in/hr 10-yr Discharge [Q10]: 11.67 48.45 cfs Max Required Sed. Storage Vol: Dist.A. x 1800 = 5256 14940 14940 cf Required Surface Area: 325 sf/cfs = 3793 15745 15 745 sf Basin Volume: Bottom Elevation of Basin: 207.0 it Elevation Interval of Basin: 1.00 ft Elevation Area(sf) Depth(ft) Incr. Vol. (cf) Cumm. Vol. (cf) 207.0 18110 0 0 0 208.0 20930 1.0 17972 17972 209.0 22411 2.0 21671 39643 210.0 24691 3.0 23551 63194 211.0 0 4.0 12346 7,1539 Top of Req. Sediment Pool (per Surface Area): 207.00 ft Top of Req. Sediment Pool (per Volume): 207.80 ft ?Principle Spillway Design: Skimmer Size: 3.0 in Skimmer Orifice Size: 2.5 in Skimmer Drainage Rate: 6788 cf per day Days to Drain: 2.2 days Emergency Spillway Weir Elevation: 208.00 ft Weir Width: 15.00 ft Weir Capacity: 48.44 cfs 10-yr Water Surface Elevation: 209.05 ft Freeboard: 1.00 ft Min. Embankment Elevation: 210.05 ft Set Embankment Elevation: 210.0 ft Surface Area Required: 15745 sf Surface Area Provided: 20930 sf OK Sediment Storage Volume Required: 14940 cf Sediment Storage Provided: 17972 cf OK 08-106-SED-SKIM-BASIN-)a.S LATEST PRINTING: 3118120094:31 PM Pam 1 of 1 ,V "DATE ° 2-13-09 PROJECT NAME PROJECT NO Wake Count Continuum of Care Facility 08-106 Y, r LOCATION BY Raleigh, NC 1RBT/JPK Skimmer Basin No.: TSSB-2 site conditions initial E w Disturbed Area: 1.84 0.40 ac Additional Drainage Area: 0.33 0.00 ac Total Drainage Area: 2.17 0.40 ac Runoff Coeff [Cc]: 0.35 0.35 10-yr Rainfall Intensity [I]: 7.22 7.22 in/hr 10-yr Discharge [Q10]: 5.49 1.01 cfs Max Required Sed. Storage Vol: Dist.A. x 1800 = 3312 720 3312 cf Required Surface Area: 'Basin Volume: 325 sf/cfs = 1783 329 1783 sf Bottom Elevation of Basin: Elevation Interval of Basin: 232.0 ft 1.00 ft Elevation Area(sf) Depth(ft) Incr. Vol. (cf) Cumm. Vol. (cf) 232.0 1170 0 0 0 233.0 1650 1.0 1410 1410 234.0 2162 2.0 1906 3316 235.0 2708 3.0 2435 5751 F Top of Req. Sediment Pool (per Surface Area): 233.26 ft Top of Req. Sediment Pool (per Volume): 234.00 ft • • Design: Skimmer Size: 2.0 in Skimmer Orifice Size: 1.5 in Skimmer Drainage Rate: 1847 cf per day Days to Drain: 1.8 days Emergency Spillway Weir Elevation: 234.50 ft Weir Width: 10.00 ft Weir Capacity: 5.49 cfs 10-yr Water Surface Elevation: 234.82 ft Freeboard: 1.00 ft Min. Embankment Elevation: 235.82 ft Set Embankment Elevation: 236.0 ft Surface Area Required: 1783 sf Surface Area Provided: 2162 sf OK Sediment Storage Volume Required: 3312 cf Sediment Storage Provided: 3316 cf OK <<_f t. - , . e h a ; DATE - 2-13-09 `f /r PROJECT NAME PROJECT NO G ? = I r Wake Count Continuum of Care Facility 08-106 ? l . J LOCATION BY Raleigh, NC RBT/JPK tI Skimmer Basin No.: TSSB-3 Site Conditions Initial Find Disturbed Area: 4.00 0.56 ac Additional Drainage Area: 0.10 0.00 ac Total Drainage Area: 4.10 0.56 ac Runoff Coeff [Cc]: 0.35 0.35 10-yr Rainfall Intensity [I]: 7.22 7.22 in/hr 10-yr Discharge [Q10]: 10.36 1.42 cfs Max Required Sed. Storage Vol: Dist.A. x 1800 = 7200 1008 7200 cf Required Surface Area: Basin Volume: 325 sf/cfs = 3368 460 3368 sf Bottom Elevation of Basin: 233.0 ft Elevation Interval of Basin: 1.00 ft Elevation Area(sf) Depth(ft) Incr. Vol. (cf) Cumm. Vol. (cf) 233.0 3600 0 0 0 234.0 5040 1.0 4320 4320 235.0 6500 2.0 5770 10090 236.0 8340 3.0 7420 17510 237.0 10310 4.0 9325 26835 Top of Req. Sediment Pool (per Surface Area): 233.00 ft Top of Req. Sediment Pool (per Volume): 234.50 ft Principle I Spillway Design: - ------- Skimmer Size: 2.0 in Skimmer Orifice Size: 2.0 in Skimmer Drainage Rate: 3283 cf per day Days to Drain: 2.2 days Emergency Spillway Weir Elevation: 235.00 ft Weir Width: 15.00 ft Weir Capacity: 10.38 cfs 10-yr Water Surface Elevation: 235.38 ft Freeboard: 1.00 ft Min. Embankment Elevation: 236.38 ft Set Embankment Elevation: 237.0 ft Surface Area Required: 3368 sf Surface Area Provided: 6500 sf OK Sediment Storage Volume Required: 7200 cf Sediment Storage Provided: 10090 cf OK "-, CHANNEL. DESIGN `/ DATE DESIGN PHASE f 3/03/09 SID PROJECT NAME PROJECT NO DID L-1 Wake Count Continuum of Care 08-106 CD /X LOCATION BY REV Raleigh, NC RBT OTHER CHECKED BY (SPECIFY) JPK PERMANENT LINING - Permissible Velocity and Capacity Channel No: CHANNEL-1 Drainage Area: 0.21 ac Sta from: Design Fequency: 10 yrs Sta to: Time of Conc: 5 min Section Length: 155 ft Intensity: 7.24 in/hr Section Slope: 10.30 % Runoff Coeff: 0.47 Ret Class: C Discharge: 0.71 cfs Permissible Velocity: 4.50 fps Allowable Depth: 1.00 ft Swale sizing method done by manipulation of Manning's Equation to find the depth of flow that matches the known flow conditions. Performed by trial and error. INPUT DATA Qp = 0.71 cfs flow by Rational Method n= 0.191 Grass Manning's Coefficient (dimensionless) S= 0.103 ft/ft longitudinal slope (ft of fall per ft of run) Zreq = 0.29 quantity to equate to Zav M= 3 :1 side slope of channel ft of run : 1 ft of rise NORMAL DEPTH AND VELOCITY B D A P R Zav Remark 0.35 0.37 2.21 0.17 0.11 shallow 0.40 0.48 2.53 0.19 0.16 shallow 0.45 0.61 2.85 0.21 0.22 shallow 0.50 0.75 3.16 0.24 0.29 OK B = bottom width of trapezoidal channel D = normal depth of flow Zav = Sreq A = cross-sectional area of flow =3 Qn A R P = wetted perimeter of the channel - 1.49 s R = hydraulic radius of the channel Normal Depth, D = 0.50 ft Depth O.K. Velocity= 0.95 fps Vel. O.K. SHEAR STRESS, T = yds = shear stress in Ib/sq-ft Y = unit weight of water, 62.4 lb/cu-ft D = normal depth of flow in ft S = longitudinal slope in ft/ft shear stress, T = 3.21 Ib/s -ft FINAL CHANNEL LINING DIMENSIONS B= ft side slopes, M = 3 :1 D= 1.0 ft top width, W = 6.0 ft Permanent Channel Lining: Grass (REF' Mnlnnm 10QII Page 1 11 l/ s DATE DESIGN PHASE 3/03/09 SD j PROJECT NAME _ PROJECT NO DID Wake Count Continuum of Care 08-106 CD /X LOCATION BY REV / Raleigh, NC RBT OTHER ] CHECKED BY (SPECIFY) JPK TEMPORARY LINING - Permissible Shear Channel No: CHANNEL-1 Drainage Area: 0.21 ac Sta from: Design Fequency: 2 yrs Sta to: Time of Conc: 5 min Section Length: 155 ft Intensity: 5.80 in/hr Section Slope: 10.30 % Runoff Coeff: 0.47 Lining Type: Curled Wood Mat Discharge: 0.57 cfs Permissible Shear: 2.00 Ib/sf Channel Depth: 1.00 ft Swale sizing method done by manipulation of Manning's Equation to find the depth of flow that matches the known flow conditions. Performed by trial and error. INPUT DATA Qp = 0.57 cfs flow by Rational Method n= 0.036 Manning's Coefficient (dimensionless) S= 0.103 ft/ft longitudinal slope (ft of fall per ft of run) Zreq = 0.043 quantity to equate to Zav M= 3 :1 side slope of channel ft of run : 1 ft of rise NORMAL DEPTH AND VELOCITY B D A P R Zav Remark 020 0.12, 1.26 0.09 0.025 shallow 0.22 0.15 1.39 0.10 0.032 shallow 0.23 0.16 1.45 0.11 0.036 shallow 0.25 0.19 1.58 0.12 0.045 OK B= bottom width of trapezoidal channel D = normal depth of flow Zav - Zre q A= cross-sectional area of flow P= wetted perimeter of the channel V3 Qn AR - R = hydraulic radius of the channel 1.49 Is Normal Depth, D = 0.25 ft Velocity= 3.05 fps SHEAR STRESS T = yds = shear stress in Ib/sq-ft Y = unit weight of water, 62.4 lb/cu-ft D = normal depth of flow in ft S = longitudinal slope in ft/ft shear stress, T = 1.61 Ib/s -ft Temp Liner O.K. FINAL CHANNEL LINING DIMENSIONS B = ft side slopes, M = 3 :1 D= 1 ft top width, W= 6.0 ft Line Channel with: Curled Wood Mat (REF: Malcom. 1991) Page 2 ¦ 1. i IMPACT MAP WgZ-61E (6T6) :Xud 9TZ9-6TS (616) :auogd 9T51,Z eurlo.reD 117-ION `XIGO 02'T a}tng anrz(r 4salod douaDIarT ook Y'd 'NDIS3a HD dbW 1DbdWl 'd333f18 113AIN 3sn3N 906.80 -ON IDIOM 60OZ-SZ•£ 91Va dVW.DVdWI 3NV:) 30 wnnNIIN0:) uNno:) 3)ivm ,OZ = „ I. :IIVDS 1- LL- O O \ ? Q LL- C:) QO ^ \\\\ \ \ \ \`? +++ +t V \ + + \ \ \ \ _ _ + + ++ ++++tt \\ \ \\ OO \ + ++t \? r \ \ ? - - - - -- \\ \ ?\ ------- --- - ----- -- --- --- \\ ?\ Ey-p oq -v31 D. v r?- MAY Z 1 2009 'R 01,11,Ty IMETIAMOSNANp STOR M 77M PRELIMINARY GEOTECHNICAL ENGINEERING REPORT SPRING LAKE PROPERTIES SITE (SUNNYBROOK ROAD) RALEIGH, NORTH CAROLINA JOB NO. 70056040 June 14, 2005 Prepared For.• WAKE COUNTY FACILITIES DESIGN AND CONSTRUCTION Raleigh, North Carolina Prepared by: Irerracon Raleigh, North Carolina June 14, 2005 Wake County Facilities Design & Construction P.O. Box 550 Raleigh, North Carolina 27602 Attn: Mr. Phil Stout Director Re: Preliminary Geotechnical Engineering Report Spring Lake Properties Site (Sunnybrook Road) Raleigh, North Carolina Job No. 70055040 Dear Mr. Stout: Irerracon Consulting Engineers & Scientists Terracon Consultants, Inc. 5240 Green's Dairy Road Raleigh, North Carolina 27616 Phone 919.873.2211 Fax 919.873.9555 www.terracon.com We are submitting, herewith, the results of subsurface exploration for the Spring Lake Properties site off Sunnybrook Road in Raleigh, North Carolina. The purpose of this exploration was to obtain information on subsurface conditions at the proposed project site and, based on this information, to provide preliminary recommendations regarding site development and foundation design considerations. We appreciate the opportunity to be of service to you on this project. If you have any questions concerning this report, or if we may be of further service to you in any way, please do not hesitate to contact us. Sincerely, ?•ISV- lrerracon ?•? ?? r Matthew S. Balven, P.E. Project Engineer North Carolina No. 030731 8 Bp? S:k S C. //r? Barney C. ale, P.E. Principal North Carolina No. 11285 Attachments Copies to: Addressee (8) Delivering Success for Clients and Employees Since 1965 , More Than 70 Offices Nationwide TABLE OF CONTENTS Cover Letter ...................................................................................................................... INTRODUCTION ............................................................ 1 ................................................... PROJECT DESCRIPTION ................................................................................................ 1 SITE EXPLORATION PROCEDURES ..... 1 ......................................................................... Field Exploration .......................................................................................................... Laboratory Testing . 1 ............................................................................... ...................... 2 SUBSURFACE CONDITIONS ....... . 2 ........................................ ........................................... Geology ....................................................................................................................... Site Conditions 2 ............................................................................................................ Soil Conditions 3 ............................................................................................................ Groundwater Conditions 3 .............................................................................................. 4 PRELIMINARY ENGINEERING RECOMMENDATIONS ............................ 4 ...................... Geotechnical Considerations ....................................................................................... 4 GENERAL COMMENTS ...................................................... 5 ............................................. APPENDIX Figure 1 - Site Vicinity Map Figure 2 - Boring Location Diagram Boring Logs General Notes Unified Soil Classification System PRELIMINARY GEOTECHNICAL ENGINEERING REPORT SPRING LAKE PROPERTIES SITE (SUNNYBROOK ROAD) RALEIGH, NORTH CAROLINA JOB NO. 70056040 June 14, 2005 INTRODUCTION Terracon has completed the preliminary subsurface exploration for the Spring Lake Properties site off Sunnybrook Road in Raleigh, North Carolina. Twelve borings were drilled to depths of approximately 2 to 19 feet below the existing ground surface at the site. Individual boring logs and a boring location diagram are included with this report. The purpose of this report is to describe the subsurface conditions encountered in the borings, analyze and evaluate the test data, and provide preliminary recommendations regarding site development and foundation design considerations. A Phase I ESA was also performed at the site and reported separately. PROJECT DESCRIPTION General project information was provided by Mr. Glenn Blackley representing Wake County during an on-site meeting on May 16, 2005. The site is located on the east side of Sunnybrook Road near its intersection with Falstaff Drive. The site is an undeveloped parcel of approximately 19 acres, and is currently owned by Spring Lake Properties. The site elevations range from less than El. 190 feet to approximately El. 260 feet. An east- west trending ridgeline crosses about 2/3 of the center of the site and then begins falling to Crabtree Creek which follows the east property line. An unnamed tributary to Crabtree Creek flows along the south portion of the site. . The site is being considered for purchase and ultimately development as office and parking space. However, the development plans have not been formulated at this time. SITE EXPLORATION PROCEDURES Field Exploration The subsurface exploration consisted of drilling and sampling twelve borings at the site to depths ranging from about 2 to 19 feet below existing grade. Auger refusal on rock was encountered at the majority of the borings prior to reaching planned termination depths. The borings were located on-site by Terracon by pacing and taping distances from available reference features. Right angles for the boring location measurements were estimated. Spring Lake Properties Site (Sunnybrook Road) Project No. 70055040 June 14, 2005 1rerracon Ground surface elevations indicated on the boring logs are approximate (rounded to the nearest 1 foot) and were obtained by interpolation from contours on the site plan provided by Wake County. The locations and elevations of the borings should be considered accurate only to the degree implied by the means and methods used to define them. The borings were drilled with an ATV-mounted rotary drill rig using hollow stem augers to advance the boreholes. Representative soil samples were obtained by the split-barrel sampling procedure in general accordance with the appropriate ASTM standard. In the split-barrel sampling procedure, the number of blows required to advance a standard 2-inch O.D. split-barrel sampler the last 12 inches of the typical total 18-inch penetration by means of a 140-pound hammer with a free fall of 30 inches, is the standard penetration resistance value (N). This value is used to estimate the in-situ relative. density of cohesionless soils and the consistency of cohesive soils. The sampling depths and penetration distance, plus the standard penetration resistance values, are shown on the boring logs. The samples were sealed and returned to the laboratory for testing and classification. Field logs of each boring were prepared by the drill crew. These logs included visual classifications of the materials encountered during drilling as well as the driller's interpretation of the subsurface conditions between samples. Final boring logs included with this report represent an interpretation of the field logs and include modifications based on laboratory observation and tests of the samples. Laboratory Testing The samples were classified in the laboratory based on visual observation, texture and plasticity. The descriptions of the soils indicated on the boring logs are in accordance with the enclosed General Notes and the Unified Soil Classification System. Estimated group symbols according to the Unified Soil Classification System are given on the boring logs. A brief description of this classification system is attached to this report. The laboratory testing program consisted of performing water content, Atterberg limits, and percent material passing the No. 200 sieve (P200) tests on representative soil samples. Information from these tests was used in conjunction with field penetration test data to evaluate soil strength in-situ, volume change potential, and soil classification. Results of these tests are provided on the boring logs. SUBSURFACE CONDITIONS Geology The project site is located in the Piedmont Physiographic Province, an area underlain by ancient igneous and metamorphic rocks. The residual soils in this area are the product of in- place chemical weathering of rock. The typical residual soil profile consists of clayey soils 2 Spring Lake Properties Site (Sunnybrook Road) Project No. 70055040 June 14, 2005 lrarracon near the surface where soil weathering is more advanced, underlain by sandy silts and silty sands that generally become harder with depth to the top of parent bedrock. According to the 1985 Geologic Map of North Carolina, the bedrock under the site belongs to the Raleigh Belt and consists of metamorphosed granitic rock. The transition from soil to rock can occur gradually. This transition zone is locally termed "partially weathered rock" and is defined for engineering purposes as residual materials that can be drilled with soil drilling methods but exhibit standard penetration test values in excess of 100 blows per foot. Groundwater is typically present in the residual soils and within fractures in the underlying partially weathered rock and bedrock in the Piedmont. On upland ridges in the Piedmont, groundwater may or may not be present in the residual soils above the partially weathered rock and bedrock. Alluvial soils in floodplains are generally saturated to within a few feet of the ground surface. Fluctuations in groundwater levels on the order of 2 to 4 feet are typical in residual soils and partially weathered rock in the Piedmont, depending on variations in precipitation, evaporation, and surface water runoff. Seasonal high groundwater levels are expected to occur during or just after the typically wetter months of the year (November through April). Site Conditions The site is located east of Sunnybrook Road near its intersection with Falstaff Drive in Raleigh, NC. The site is an undeveloped property which is partially wooded. A ridge extends east-west through the center of the site from the west edge of the property to approximately the east 1/3 where the ground surface begins sloping downward to the east. A gravel drive/parking lot area is currently present on the ridge. Tractor trailers, trucks, and equipment are currently being stored on the lot. A "dirt" trail/road extends north from the gravel drive near the west boundary of the site and curves to extend along the north property boundary. Some trash and debris were observed at the ground surface along the "dirt" road and gravel drive/parking lot. Additionally, it appeared that fill material containing boulders and possibly debris had been placed on the slope south of the gravel parking lot to level the site grades. Crabtree Creek extends along the east property line and an unnamed tributary to Crabtree Creek flows along the south property line. Based on the provided site plan, the ground surface elevations at the site range from approximately El. 190 feet to El. 260 feet. Soil Conditions Conditions encountered at each boring location are indicated on the individual boring logs. Stratification boundaries on the boring logs represent the approximate location of changes in soil types; in-situ, the transition between materials may be gradual. Based on the results of the borings, subsurface conditions on the project site can be generalized as follows. 3 Spring Lake Properties Site (Sunnybrook Road) Project No. 70055040 June '14,2005 lrerracon Approximately 2 to 8 inches of topsoil was encountered at the majority of the boring locations. At borings B-3 and B-6, approximately 7 inches of gravel was encountered at the surface. Fill material was encountered below the topsoil at boring B-12 to a depth of 7 feet, and consisted of gray and reddish-brown silt and sand with possible boulders. Residual soil and partially weathered rock (PWR) was encountered below the fill at boring B-12 and the topsoil or gravel at the remaining borings. The residual soils generally consisted of silty sand (SM) and sandy clay and silt (CH, MH) with reddish-brown, brown, gray, and tan coloration. The sand was generally medium dense to dense and the clay and silt ranged from stiff to very stiff. Partially weathered rock (PWR) was encountered below the surface materials and residual soils at depths ranging from about 0.5 to 16.5 feet. The PWR material visually classified as reddish-brown, brown, gray, and tan, silty sand with some rock fragments. The N-values within the PWR ranged from 50 blows for 6 inches of penetration to 50 blows for zero penetration. The borings were terminated in the PWR material at depths ranging from 2 to 18.4 feet. Auger refusal was encountered at the boring termination depths, with the exception of boring B-1. Groundwater Conditions The borings were monitored while drilling and immediately after completion for the presence and level of groundwater. No groundwater was observed in the borings at the time of the exploration. The occurrence and location of groundwater can vary throughout the year due to variations in the amount of rainfall, runoff and evaporation. Although groundwater inflows were not observed in the borings, the possibility of encountering groundwater should be considered when developing the design and construction plans for trenches and below grade structures. PRELIMINARY ENGINEERING RECOMMENDATIONS Geotechnical Considerations Based on the results of our borings, the primary geotechnical concern with development of this site is the presence of shallow PWR and rock which will be difficult to excavate. Based on the borings, the PWR and rock are generally present at shallower depths at higher elevations of the site. Additionally, it appears there may be boulders of harder material present within the soil and PWR in some areas. The sand and clay residual soils, and the softer PWR material (with SPT blow count values less than 50 blows for 4 inches penetration) encountered at the borings can typically be excavated with heavy-duty excavating equipment such as large track mounted excavators. However, the harder PWR and underlying auger refusal material encountered at the borings will be difficult to excavate. These materials were encountered at depths of 1 foot or less at some of the borings. Large track-mounted backhoes supplemented by pneumatic hammers 4 Spring Lake Properties Site (Sunnybrook Road) Irerracon Project No. 70055040 June 14, 2005 or blasting will generally be required to excavate the harder materials. We recommend site grades be established so that excavation below the depths indicated by auger refusal can be avoided. With respect to the support of structures, the native materials encountered in the borings are suitable for supporting shallow foundations. However, considering the relatively steep slopes at the site, we expect buildings could be supported on a combination of the native PWR/rock and potentially deep fills. Because of the different support characteristics of these materials, differential settlement will be a concern where buildings are supported on fill and native materials. If the buildings will be relatively light, we expect the differential settlement could be controlled by placing high quality fill material and using stringent compaction criteria. However, if the site will be developed with heavier multi-level structures, a foundation system consisting of shallow foundations where PWR/rock is near the surface and drilled shaft foundations in deeper fill areas may be required. The residual soils and properly constructed fill placed over the residual soils, would also be suitable for the support of on-grade floor slabs and pavements. It should be noted that existing fill material was encountered at boring B-12 to a depth of 7 feet. Based on boring B-12, the fill material is marginal for the support of foundations, but may be suitable for supporting slabs or pavements. There is some risk of unpredictable settlement with supporting structures and pavements over existing fill materials. This risk cannot be eliminated unless the full-depth of existing fill material is removed and replaced with engineered fill, or the structures and slabs are supported on foundations extending through the fill material to native soil. If structures or pavements will be constructed over the area of existing fill material, we recommend additional borings be performed to further evaluate its condition. GENERAL COMMENTS Terracon should be retained to review the final design plans and specifications so comments can be made regarding interpretation and implementation of our geotechnical recommendations in the design and specifications. Terracon also should be retained to provide testing and observation during excavation, grading, foundation and construction phases of the project. The analysis and recommendations presented in this report are based upon the data obtained from the borings performed at the indicated locations and from other information discussed in this report. This report does not reflect variations that may occur between borings, across the site, or due to the modifying effects of weather. The nature and extent of such variations may not become evident until during or after construction. If variations appear, we should be immediately notified so that further evaluation and supplemental recommendations can be provided. 5 Spring Lake Properties Site (Sunnybrook Road) lrerraco n Project No. 70055040 June 14, 2005 The scope of services for this geotechnical evaluation does not include either specifically or by implication any environmental or biological (e.g., mold, fungi, bacteria) assessment of the site or identification or prevention of pollutants, hazardous materials or conditions. If the owner is concerned about the potential for such contamination or pollution, other studies should be undertaken. This report has been prepared for the exclusive use of our client for specific application to the project discussed and has been prepared in accordance with generally accepted geotechnical engineering practices. No warranties, either express or implied, are intended or made. 6 APPENDIX ,,='.."R,°. ? I $ i0,x'? 'w,?A . d ,Y ,- ?,? ? ., amen ,;; "_`•"-° `?...? ice. i. i t" „ t ?„faicc t ... 3 .v,. 4. ( xx? ?"S -u" 2. F'••F.. x a { 1a r ,,,,, r F ^5,yw''^•w....?. .... -.;. 116 t ;.z 9 ,........ :x`'` iRoxctro .r^ .r y" -.-w,..w,,,,,.; .i •f T ?.?, 4 "'m"' . , M < r s t a:' - ".??'t"' i _ f 1..••....s'` ; a ?! a ... `Q ?•w`w? `'mom..' ""«2' "'"-`.: a *'q' -r.- -1 ,r<#s? - ? - s {.:,.... C?"'? '` Z ? .,? `?• °'R",?` ? • v Y s„ `? Z+• :^ 1,- ?`""..?, i 4 i F,. 7.r x'??? i .,., ? w.,, ?x C?t!' r ?,a ., '. ?.?" '° ?5 :c ?Q77[? i. I ;'w ??o, y...,_? ? l ?•......... ?CY i ` ? t },,+"`' h _ .?, 't ?.. 12 ! f `'i a 121 i! J ?+. 771 l fix,..:. WWII ''---`s f Y,f t t f f( # .r:`" t CTS' alp f. .. < \ 13.4,,,=... 04 rui B 1 ?,, n W ?'r I 4 "_ I 's. ' r " "A ` f paµ Ywood park Lj s ' sw? I yBk 44' j-4- 31;jr8' aka ik } > ?.. I . i??T "#""'""}'^"e x r < f3.. y.• k ?,-4-!'"?, 'Y.2 < 1 k a I,Uanber tERN t? PROXIMATE SITE LOCATION 4- F III -7r CrJ c h. a 7 }t Tswwr s y°i s t ?4JS Park ?.?w-^pa 'W..?, ? ? 'r°`"< ? ?;` a ?xf 'kg- f I ?.c ? s. SRi ? •-I• ,?, _?*??(",r?'s:?? Ei a. 3 i" ...' C 1, tip :k - $? .?.^.,.......: _?•. ".. I .! " i .. .", ?xa (n - f ) ':'4 _ t I b:M,vs ;f>ti.. f wrv..rv.r«. a , l d.W Parr T 3 1 3 300E Mae 90 301 jj - astparkl z Y ? f t-... _ _.. .._ x .: 10 SITE LOCATION DIAGRAM Irerracon SPRING LAKE PROPERTIES SITE SUNNYBROOK ROAD & FALSTAFF DRIVE PROJECT NO.: 70055040 RALEIGH, NORTH CAROLINA DATE: 6/1012005 DRAWN BY: MSB SCALE: NTS DRAWING NO. 1 DEPTH (FT.) 0.0 0.4 3.0 6.0 16.5 18.9 DESCRIPTION ELEV. • PENETRATION - BLOWS/FOOT (FT.) 0 241 0 10 20 30 40 60 80 5" Topsoil. Brown and gray, moist, medium dense, clayey SAND (SC). Reddish-brown, moist, very stiff, sandy SILT (MM. Moisture Content on S-2: w=30% Atterberg Limits on S-2: U=63, PI=29 Washed No. 200 Sieve on S-2: P200=58% Tan and gray, moist, medium dense, silty SAND (SM) with rock fragments. V I .. Partially Weathered Rock (PWR) - appears as tan, silty sand with rock fragments. Boring terminated at 18.9 feet 40.0 Classified By: MSB Driller: Terracon Drill Rig: ATV Boring Type: HSA GROU NDWATER REA DINGS DATE TIME DEPTH ELEVATION STABILIZATION TIME 6/31/05 DRY TOB SEE KEY SHEET FOR EXPLANATION OF SYMBOLS AND ABBREVIATIONS BORING LOG BORING NUMBER B-1 DATE DRILLED 6/1/2005 PROJECT NUMBER 70055040 PROJECT Spring Lake Properties Site PAGE 1 OF 1 L I rerracon 240.6 238 -235 • • -224.5 -222.1 26 20 16 17 10 50/5" DEPTH (FT.) 0.0 0.5 1.5 4.5 DESCRIPTION 6" Topsoil. Tan, moist, dense, silty SAND (SM). Partially Weathered Rock (PWR) - appears as tan and brown, silty sand with rock fragments. Boring terminated at 4.5 feet with auger refusal. 40.0 Classified By: MSB Driller: Tenon Drill Rig: ATV Boring Type: HSA GROU NDWATER REA DINGS DATE TIME DEPTH ELEVAT70N STABILIZATION TIME 6/31105 DRY TOB SEE KEY SHEET FOR EXPLANATION OF SYMBOLS AND ABBREVIATIONS ELEV. • PENETRATION - BLOWS/FOOT (FT.) 242 0 10 20 30 40 60 80 -241.5 -240.5 -237.5 BORING LOG BORING NUMBER B-2 DATE DRILLED 6/1/2005 PROJECT NUMBER 70055040 PROJECT Spring Lake Properties Site Irerracon 31/6" 50/4" 50111, DEPTH (FT.) 0.0 0.6 9.0 40.0 Classified By: MSB Driller: Terracon Drill Rig: ATV Boring Type: HSA DESCRIPTION ELEV. • PENETRATION - BLOWS/FOOT (FT.) 228 0 10 20 30 40 60 80 7" Gravel. Flo 22 Partially Weathered Rock (PWR) - appears as reddish-brown and tan, silty sand with rock fragments. (softer zone from approximately 6 to 8 feet) 21 Boring terminated at 9 feet with auger refusal. GROU NDWATER REA DINGS DATE TIME DEPTH ELEVATION sTABII.rzATION TIME 651105 DRY TOB SEE KEY SHEET FOR EXPLANATION OF SYMBOLS AND ABBREVIATIONS 11 BORING LOG 11 DATE DRILLED 6/1/2005 PROJECT NUMBER 70055040 PROJECT Spring Lake Properties Site PAGE 1 OF 1 rerracon 7.4 50/6-- 50/1" 42 50/0" DEPTH (FT.) 0.0 0.5 2.0 DESCRIPTION ELEV. • PENETRATION - BLOWS/FOOT (FT.) 6" Topsoil. Partially Weathered Rock (PWR) - appears as tan and gray, silty sand with clay seams. Boring terminated at 2 feet with auger refusal. 265 -264.5 -263 50/6" 40.0 Classified By: MSB Driller. Terracon Drill Rig: ATV Boring Type: HSA GROU NDWATER REA DINGS DATE TIME DEPTH ELEVATION STABII.zAnONT & 651/05 DRY TOB SEE KEY SHEET FOR EXPLANATION OF SYMBOLS AND ABBREVIATIONS BORING LOG BORING NUMBER B-4 DATE DRILLED 6/1/2005 PROJECT NUMBER 70055040 PROJECT Spring Lake Properties Site Irerracon DEPTH (FT.) 0.0 0.3 DESCRIPTION ELEV. • PENETRATION - BLOWS/FOOT (Fr.) 261 0 10 20 30 40 60 80 260.7 5011" 3.5 40.0 Classified By: MSB Driller: Terracon Drill Rig: ATV Boring Type: HSA GROU NDWATER REA DINGS DATE Ma DEPTH ELEVATION STABILIZATION TIME 01/05 DRY TOB SEE KEY SHEET FOR EXPLANATION OF SYMBOLS AND ABBREVIATIONS I BORING LOG 1 Irerracon DATE DRILLED 6/1/2005 PROJECT NUMBER 70055040 PROJECT Spring Lake Properties Site 7.5 50/0" DEPTH (FT.) 0.0 0.6 3.0 4.0 DESCRIPTION 7" Gravel. Brown and gray, moist, medium dense, silty SAND (SM) with rock fragments. Partially Weathered Rock (PWR) - appears as gray, silty sand with rock fragments. Boring terminated at 4 feet with auger refusal. 40.0 Classified By: MSB Driller. Terracon Drill Rig: ATV Boring Type: HSA GROU NDWATER REA DINGS DATE TIME DEPTH ELEVATION STABILIZATION M.T- 6/31/05 DRY TOB SEE KEY SHEET FOR EXPLANATION OF SYMBOLS AND ABBREVIATIONS ELEV. (FT.) 260 -259.4 • PENETRATION - BLOWS/FOOT • -257 -256 BORING LOG I 6/1/2005 70055040 Spring Lake Properties Site I rracon BORING NUMBER DATE DRILLED PROJECT NUMBER PROJECT 26 50/1" DEPTH (FT.) 0.0 0.3 3.0 3.5 DESCRIPTION 4" T soil. Gray and reddish-brown, moist, medium dense, silty SAND (SM) with clay seams. Weathered Rock (PWR) - appears as tan and Partiall y silty sand with rock fragments. Boring terminated at 3.5 feet with auger refusal. 40.0 Classified By: MSB Driller. Terracon Drill Rig: ATV Boring Type: HSA GROU NDWATER REA DINGS DATE TAE DEPTH ELEVATION STABUIZ.ATION TIME 5/31/05 DRY TOB SEE KEY SHEET FOR EXPLANATION OF SYMBOLS AND ABBREVIATIONS ELEV. • PENETRATION - BLOWS/FOU1' (FT.) 260 0 10 20 30 40 60 80 :259.7 -257 -256.5 19 50/0" I BORING LOG I DATE DRILLED 5/31/2005 PROJECT NUMBER 70055040 PROJECT Spring Lake Properties Site ? I rerracon DEPTH DESCRIPTION (FT.) 0.0 0.6 2.5 9.0 13.0 7" Topsoil. ? ..' , Partially Weathered Rock (PWR) - appears as brown, silty sand. (possible boulder Reddish-brown and brown, moist, hard, sandy CLAY (CH). . Moisture Content on S-2: w=26% Atterberg Limits on S-2: LL=58, P1=34 Washed No. 200 Sieve on S-2: P200=58% Tan, moist, dense, silty SAND (SM). Boring terminated at 13 feet with auger refusal. 40.0 Classified By: MSB Driller. Terracon Drill Rig. ATV Boring Type: HSA GROU NDWATER REA DINGS DATE TIME DEPTH ELEVATION STABILIZATION TIME 5/31/05 DRY TOB SEE KEY SHEET FOR EXPLANATION OF SYMBOLS AND ABBREVIATIONS ELEV. • PENETRATION - BLOWS/F00T (FT.) 254 0 10 20 30 40 60 80 -253.4 -251.5 • • -245 -241 5011 " 46 34 39 DEPTH (FT.) 0.0 0.5 14.0 DESCRIPTION ELEV. • PE'NE1RNHUN - BLUW,/k*UUl (FT.) 6" Topsoil. V. A Partially Weathered Rock (PWR) - appears as tan, brown, and gray, silty sand with rock fragments. Boring temlinated at 14 feet with auger refusal. 40.0 Classified By: MSB Driller: Terracon Drill Rig: ATV Boring Type: HSA GROU NDWATER REA DINGS DATE TIME DEPTH ELEVATION STABILIZATION TIME 5/31/05 DRY TOB SEE KEY SHEET FOR EXPLANATION OF SYMBOLS AND ABBREVIATIONS 227 -226.5 -213 Isv ivv 50/5" 50/3" 419 50/2" 50/4" 50/2" BORING LOG DATE DRILLED 5/31/2005 PROJECT NUMBER 70055040 PROJECT Spring Lake Properties Site PAGE 1 OF 1 Irerracon DEPTH (FT.) 0.0 0.3 2.5 DESCRIPTION 40.0 Classified By: MSB Driller: Teiracon Drill Rig: ATV Boring Type: HSA GROU NDWATER REA DINGS DATE TIME DEPTH ELEVATION STABRlZATION TIME 513 VOS DRY TOB SEE KEY SHEET FOR EXPLANATION OF SYMBOLS AND ABBREVIATIONS ELEV. • PENETRATION - BLOWS/FOOT (FT.) 262 0 10 20 30 40 60 80 100 5011" 5010" BORING LOG BORING NUMBER B-10 DATE DRILLED 5/31/2005 PROJECT NUMBER 70055040 PROJECT Spring Lake Properties Site Irerracon DEPTH (FT.) 0.0 0.2 2.5 DESCRIPTION ELEV. • PENETHSHUN - BLOWS/1+'00T (FT.) 2" Topsoil. Partially Weathered Rock (PWR) - appears as gray, silty sand with rock fragments. Boring temrinated with auger refusal at 2.5 feet. 40.0 Classified By: MSB Driller: Terracon Drill Rig. ATV Boring Type: HSA GROU NDWATER REA DINGS DATE TIME DEPTH ELEVATION STABmvATION TIME 5131105 DRY TOB SEE KEY SHEET FOR EXPLANATION OF SYMBOLS AND ABBREVIATIONS 241 =240.8 -238.5 ou su JIM TT-T7-F1 50/1" BORING LOG BORING NUMBER B-11 DATE DRILLED 5/31/2005 PROJECT NUMBER 70055040 PROJECT Spring Lake Properties Site PAGE 1 OF 1 Irerracon DEPTH (FT.) 0.0 0.7 7.0 12.0 14.0 DESURIF11U1N 8" Topsoil. ..? Possible fill: Gay and caddish-brown, moist, SILT / SAND with possible boulders. Reddish-brown, moist, medium dense, clayey SAND (SC). Moisture Content on S-4: W--23% Atterberg limits on S-4: LL-51, P1=25 Washed No. 200 Sieve on S4: P200=440% Partially Weathered Rock (PWR) - appears as tan and gray, silty sand with rock fragments. Boring terminated at 14 feet with auger refusal. 40.0 Classified By: MSB Driller: Terracon Drill Rig: ATV Boring Type: HSA GROU NDWATER REA DINGS DATE TIME DEPTH ELEVATION STABILIZATION TIME 5/31/05 DRY TOB SEE KEY SHEET FOR EXPLANATION OF SYMBOLS AND ABBREVIATIONS L+'LL?'V. • YE1VL?'1KA11U1V - l3LVWJ/1+VU1 (FT.) 216 0 10 20 30 40 60 80 10( -215.3 • -209 -204 -202 9 6 50/6" 11 50/0" GENERAL NOTES DRILLING & SAMPLING SYMBOLS: SS: Split Spoon -1 3/8" I.D., 2" O.D., unless otherMse.noted HS: Hollow Stem Auger ST: Thin-Walled Tube - 2" O.D., unless otherwise noted PA: Power Auger RS: Ring Sampler - 2.42" I.D., 3" O.D., unless otherwise noted HA: Hand Auger DB: Diamond Bit Coring - 4", N, B RB: Rock Bit BS: Bulk Sample or Auger Sample WB: Wash Boring or Mud Rotary The number of blows required to advance a standard 2-inch O.D. split-spoon sampler (SS) the last 12 inches of the total 18-inch penetration with a 140-pound hammer falling 30 inches is considered the "Standard Penetration" or "N-value". WATER LEVEL MEASUREMENT SYMBOLS: WL: Water Level WS: While Sampling N/E: Not Encountered WCI: Wet Cave in WD: While Drilling DCI: Dry Cave in BCR: Before Casing Removal AB: . After Boring ACR: After Casing Removal Water levels indicated on the boring logs are the levels measured in the borings at the times indicated. Groundwater levels at other times and other locations across the site could vary. In pervious soils, the indicated levels may reflect the location of groundwater. In low permeability soils, the accurate determination of groundwater levels may not be possible with only short-term observations. DESCRIPTIVE SOIL CLASSIFICATION: Soil classification is based on the Unified Classification System. Coarse Grained Soils have more than 50% of their dry weight retained on a #200 sieve; their principal descriptors are: boulders, cobbles, gravel or sand. Fine Grained Soils have less than 50% of their dry weight retained on a #200 sieve; they are principally described as clays if they are plastic, and silts if they are slightly plastic or non-plastic. Major constituents may be added as modifiers and minor constituents may be added according to the relative proportions based on grain size. In addition to gradation, coarse-grained soils are defined on the basis of their in-place relative density and fine-grained soils on the basis of their consistency. CONSISTENCY OF FINE-GRAINED SOILS RELATIVE DENSITY OF COARSE-GRAINED SOILS Standard Unconfined Penetration or Standard Penetration Compressive N -value (SS) or N-value (SS) Strength. Qu, Psf Blows/Ft. Consistencv Blows/Ft. < 500 <2 Very Soft 0-3 500 - 1,000 2-3 Soft 4-9 1,001 - 2,000 4-6 Medium Stiff 10-29 2,001 - 4,000 7-12 Stiff 30 - 49 4,001 - 8,000 13-26 Very Stiff 50+ 8,000+ 26± Hard RELATIVE PROPORTIONS OF SAND AND GRAVEL Descriptive Term(s) of other Percent of constituents Dry Weight Trace < 15 With 15-29 Modifier > 30 RELATIVE PROPORTIONS OF FINES Descriptive Tenn(s) of other Percent of constituents Dry Weight Trace < 5 With 5-12 Modifiers > 12 Relative Density Very Loose Loose Medium Dense Dense Very Dense GRAIN SIZE TERMINOLOGY Major Component of Sample Particle Size Boulders Over 12 in. (300mm) Cobbles 12 in. to 3 in. (300mm to 75 mm) Gravel 3 in. to #4 sieve (75mm to 4.75 mm) Sand #4 to #200 sieve (4.75mm to 0.075mm) Silt or Clay Passing #200 Sieve (0.075mm) PLASTICITY DESCRIPTION Term Plasticity Index Non-plastic 0 Low 1-10 Medium 11-30 High 30+ lrerracon UNIFIED SOIL CLASSIFICATION SYSTEM Criteria for Assigning Group Symbols and Group Names Using Laboratory Tests" Soil Classification Group Symbol Group Name° Coarse Grained Soils Gravels Clean Gravels Cu ? 4 and 1:5 Cc :5 3E GW Well-graded graver More than 50°k retained More than 50% of coarse fraction retained on Less than 5% fines` Cu < 4 and/or 1 > Cc > 3E GP Poorly Y graded gravel` on No. 200 sieve No. 4 sieve Gravels with Fines More Fines classify as ML or MH GM Silty graver.- than 12% fines` Fines classify as CL or CH GC Clayey graver-'-" Sands Clean Sands Cut 6 and 1 s Cc s 3E SW Weil-graded sand' 50% or more of coarse Less than 5% fines° fraction passes Cu < 6 and/or 1 > Cc > 3E SP Pooh y graded sand' No. 4 sieve Sands with Fines Fines classify as ML or MH SM Silty sand°•"' More than 12% fines° Fines Classify as CL or CH SC Clayey sand'-" Fine-Grained Soils Silts and Clays inorganic PI > 7 and plots on or above A" line' CL Lean clayr` 50% or more passes the Liquid limit less than 50 No. 200 sieve PI < 4 or plots below A" line' ML SiftKL.M organic Liquid limit - oven dried Organic CIWLM•M < 0.75 OL Liquid limit - not dried Organic siltK•11 Silts and Clays Liquid limit 50 or more inorganic PI plots on or above "A" line CH Fat clayrL-" PI lots below "A" line MH Elastic Sift'Ll organic Liquid limit - oven dried Organic clayl-- ' < 0.75 OH Liquid limit - not dried Organic siftKLM.° Highly organic soils Primarily organic matter, dark in color, and organic odor PT Peat >I 60 50 d W 40 O Z 30 U g 21) 0.. 10 7 4 0 0 Forth 111--6198 "Based on the material passing the 3-in. (75-mm) sieve a If field sample contained cobbles or boulders, or both, add "with cobbles or boulders, or both" to group name. Gravels with 5 to 12% fines require dual symbols: GW-GM well-graded gravel with silt, GW-GC well-graded gravel with clay, GP-GM poorly graded gravel with sift, GP-GC poorly graded gravel with clay. °Sands with 5 to 12% fines require dual symbols: SW-SM well-graded sand with silt, SW-SC well-graded sand with clay, SP-SM poorly graded sand with sift, SP-SC poorly graded sand with clay z ECU = DBdD1o Cc = (D- Dro x Dso F If soil contains z 15% sand, add "with sand" to group name. G If fines classify as CL-ML, use dual symbol GC-GM, or SC-SM. "If fines are organic, add "with organic fines" to group name. ' If soil contains >_ 15% gravel, add 'with gravel" to group name. If Atterberg limits plot in shaded area, soil is a CL-ML, silty clay. K If soil contains 15 to 29% plus No. 200, add "with sand" or "with gravel," whichever is predominant. L If soil contains >- 30% plus No. 200 predominantly sand, add "sandy" to group name. mIf soil contains >- 30% plus No. 200, predominantly gravel, add "gravelly" to group name. "PI >- 4 and plots on or above "A" line. PI < 4 or plots below "A" line. P PI plots on or above "A" line. "PI plots below "A" line. For classification of fine-grained soils and fine-grained fraction of coarse-grained soils I o0 '? r e Equation of "A" - line I Horizontal at PI=4 to LL=25.5. then PI=0.73 (LL-20) V" - 0R` - I -- Equation of "U" - line Vertical at LL=16 to PI=7, o? then PI 0 9 LL 6 = . ( ) ' - ?N, o i ,, .' E MH o r OH i _ j - ML OL or 10 16 20 30 40 50 60 70 60 90 100 110 LIQUID LIMIT (LL) Ireirracon I E s x.p 09 - 0 .3 1 4 0 GEOTECHNICAL ENGINEERING REPORT PROPOSED MENTAL HEALTH FACILITY SUNNYBROOK ROAD RALEIGH, NORTH CAROLINA Terracon Project No. 70085034 June 9, 2008 Prepared For. WAKE COUNTY Raleigh, North Carolina Prepared by. 1remacon Raleigh, North Carolina I I June 9, 2008 t Wake County Facilities Design & Construction Wake County Office Building -12"' Floor P.O. Box 550 Raleigh, North Carolina 27602 Attn: Mr. Mark Forestied, AIA Re: Geotechnical Engineering Report Proposed Mental Health Facility Sunnybrook Road Raleigh, North Carolina Terracon Project No. 70085034 Dear Mr. Forestied: Ireffaccm nsultlng EnyY?eers 3 Sclantlsts rerraoon Cons, inc. 5240 Green's Dairy Road Raleigh, North Carolina 27616 Phone 919.873.2211 Fax 919.873.9555 www.tenacon.oom We are submitting, herewith, the results of subsurface exploration for the proposed Mental Health Facility in Raleigh, North Carolina. The purpose of this exploration was to obtain information on subsurface conditions at the proposed project site and, based on this information, to provide recommendations regarding the design and construction of foundations and site development for the facility. We appreciate the opportunity to be of service to you on this project. If you have any questions concerning this report, or if we may be of further service to you in any way, please do not hesitate to contact us. Sincerely, Terracon Consultants, Inc. -!'PAhilip J. Ramsey, El Geotechnical Professional /-3a---J--l CIO Barney C. H#, PE ;.? Senior Principal ' •? 0-% =AL C. HAS' North Carolina No. 11285 Attachments Copies to: Addressee (3) Delivering Success for Clients and Employees Since 1865 More than 95 Offices Nationwide } t TABLE OF CONTENTS Cover Letter ........................................................................................................................ i INTRODUCTION ................................................................................................................. 1 PROJECT DESCRIPTION .................................................................................................. 1 SITE EXPLORATION PROCEDURES ............................................................................... 1 Field Exploration ........................................................................................................... 1 Laboratory Testing ........................................................................................................ 2 SUBSURFACE CONDITIONS ............................................................................................ 3 Geology ......................................................................................................................... 3 Seismic Site Classification ............................................................................................ 3 Site Conditions ...... 4 Soil Conditions .............................................................................................................. 4 Table 1 - Partially Weathered Rock and Auger Refusal Elevations ............................. 5 Groundwater Conditions ............................................................................................... 6 ENGINEERING RECOMMENDATIONS ............................................................................. 6 Geotechnical Considerations ........................................................................................ 6 Site Preparation and Earthwork ................................................................................... 7 Excavations .................................................................................................................. 8 Foundations .................................................................................................................. 9 Floor Slabs ....................................................................................................................10 Pavements ....................................................................................................................11 Table 2 - Recommended Pavement Sections ..............................................................12 GENERAL COMMENTS .....................................................................................................13 APPENDIX Figure 1 - Site Vicinity Map Figure 2 - Boring Location Diagram Boring Logs General Notes Unified Soil Classification System GEOTECHNICAL ENGINEERING REPORT PROPOSED MENTAL HEALTH FACILITY SUNNYBROOK ROAD RALEIGH, NORTH CAROLINA Terracon Project No. 70085034 June 9, 2008 INTRODUCTION Terracon has completed the subsurface exploration for the proposed Mental Health Facility planned at the northeast quadrant of the intersection of Sunnybrook Road and Falstaff Road in Raleigh, North Carolina. Sixteen borings extending to depths of approximately two to ten feet below the existing ground surface were drilled at the site. Results of the borings and a location diagram are included with this report. The purpose of this report is to describe the subsurface conditions encountered in the borings, analyze and evaluate the test data, and provide recommendations regarding the design and construction of new pavements, foundations and earthwork for the facility. A Preliminary Geotechnical Engineering Report was issued on June 14, 2005 for the subject property. We have included the boring logs from this preliminary study in the appendix of this report. A Phase I ESA was also performed at the subject site and issued under separate cover. PROJECT DESCRIPTION We understand Wake County is considering developing the site as a mental health facility consisting of two buildings, and associated parking and driveway areas. A potential third future building is also shown on the eastern portion of the site. Three stormwater management areas are shown. Our understanding of the project is based on phone conversations and emails with Mr. Mark Foristeri with Wake County, a preliminary site drawing provided by Wake County, and the site topographic plan provided by Mr. Robin Lee with McKim & Creed. Structural information for the two proposed buildings was not provided at the time of this report. However, we anticipate the buildings will be two-story, with maximum isolated column loads less than 150 kips and continuous wall loads on the order of 3 to 5 kips per linear foot. We anticipate cut / fill depths for the development will be less than 10 feet. Field Exploration The subsurface exploration consisted of drilling and sampling sixteen borings at the site to depths ranging from about two to ten feet below existing grades. The distribution of the borings consisted of seven borings drilled in the proposed building footprints, two borings in the proposed parking areas, one boring in the southern proposed stormwater management area, and six borings drilled in the alignment of the proposed new roadway. The borings t Mental Health Facility lkwacon Terracon Project No.: 70085034 June 9, 2008 were staked by McKim & Creed, the project surveyor prior, to Terracon mobilizing to the site. The borings were drilled with a track-mounted rotary drilling rig using hollow stem augers to advance the boreholes. Representative soil samples were obtained using the split-barrel sampling procedure in general accordance with the appropriate ASTM standard. Ground surface elevations indicated on the boring logs are approximate (rounded to the nearest 1 foot) and were obtained by interpolation from contours on the topographic site plan provided. The locations and elevations of the borings should be considered accurate only to the degree implied by the means and methods used to define them. Disturbed samples are obtained in the split-barrel sampling procedure by driving a 2-inch O.D. split-barrel sampler into the ground using a 140-pound hammer falling 30 inches. The number of blows required to advance the sampler the final 12 inches or less of a standard 18-inch sampling interval is termed the standard penetration resistance, or N-value. The N-values are shown on the boring logs and indicate the in-place relative density of granular soils and, to a lesser degree of accuracy, the consistency of cohesive soils and hardness of weathered bedrock. The sampling depths and penetration distance, plus the standard penetration resistance values are shown on the boring logs. The samples were sealed and transported to Terracon's laboratory for testing and classification. Field logs of each boring were prepared by the drill crew. These logs included visual classifications of the materials encountered during drilling as well as the driller's interpretation of the subsurface conditions between samples. Final boring logs included with this report represent an interpretation of the field logs and include modifications based on visual classification and laboratory testing of the samples. Laboratory Testing The samples were classified in the laboratory based on visual observation, texture, and plasticity. The laboratory testing program consisted of performing six wash minus the number 200 sieve tests and six natural moisture content tests. The results of the laboratory testing are provided on the logs of boring in the appendix of this report. The descriptions of the soils indicated on the boring logs are in accordance with the enclosed General Notes and the Unified Soil Classification System (USCS). Estimated group symbols according to the USCS are given on the boring logs. A brief description of this classification system titled Unified Soil Classification System is provided in the appendix of this report. 2 Mental Health Facility 1rerracon Terracon Project No.: 70085034 June 9, 2008 SUBSURFACE CONDITIONS Geology The project site is located in the Piedmont Physiographic Province, an area underlain by ancient igneous and metamorphic rocks. The residual soils in this area are the product of in- place chemical weathering of rock. The typical residual soil profile consists of clayey soils near the surface where soil weathering is more advanced, underlain by sandy silts and silty sands that generally become harder with depth to the top of parent bedrock. According to the 1985 Geologic Map of North Carolina, the bedrock under the site belongs to the Raleigh Belt and consists of metamorphic and intrusive rocks, specifically biotite gneiss and schist, intruded by numerous sills and dikes of granite, pegmatite, and aplite. Previous experience nearby at the site of the Wake Med campus indicates the potential for encountering shallow rock outcrops and large boulders within the residual soil zone. The boundary between soil and rock in the Piedmont is not sharply defined. A transitional zone termed "partially weathered rock" is normally found overlying the parent bedrock. For engineering purposes, partially weathered rock (PWR) is defined as residual material that can be drilled with soil drilling methods and exhibits standard penetration test resistance values exceeding 100 blows per foot. The transition between hard/dense residual soils and partially weathered rock occurs at irregular depths due to variations in degree of weathering. Groundwater is typically present in the residual soils and within fractures in the underlying partially weathered rock and bedrock in the Piedmont. On upland ridges in the Piedmont, groundwater may or may not be present in the residual soils above the partially weathered rock and bedrock. Alluvial soils in floodplains are generally saturated to within a few feet of the ground surface. Fluctuations in groundwater levels on the order of 2 to 4 feet are typical in residual soils and partially weathered rock in the Piedmont, depending on variations in precipitation, evaporation, and surface water runoff. Seasonal high groundwater levels are expected to occur during or just after the typically wetter months of the year (November through April). Seismic Site Classification Based on the borings and our knowledge of the geologic conditions at the site, the project site corresponds most closely with a Site Class Type C as described in Section 1615.1.1 of the 2006 North Carolina State Building Code (2003 International Building Code with North Carolina Amendments). This type classifies as a "very dense soil and soft rock profile", with an average standard penetration resistance (N-value) greater than 50 blows per foot in the top 100 feet. 3 a Mental Health Facility Terracon Project No.: 70085034 Site Conditions 1rerracon June 9, 2008 The project site is located at the northeast quadrant of the intersection of Falstaff Road and Sunnybrook Road in Raleigh, North Carolina. At the time of our exploration the center portion of the site was developed with a gravel parking lot. The site is predominately wooded and overgrown with brush. A "dirt" trail, which appeared to contain brick and rock fragments spread across the surface, extends north from the gravel drive near the west boundary of the site and curves to extend along the north property boundary. Based on the topographic map provided by the site surveyor, the topography of the site includes a central ridgeline extending east-west with the ground sloping moderately downward in the north, east and south portions of the site. The site has an approximate topographic low of 195 feet in the eastern portion and an approximate topographic high of 275 feet in the western portion. Borings B-1 through B-12, performed during the preliminary exploration, and borings B-13 through B-28 generally encountered shallow rock along the central ridge line. Weathered rock outcrops were observed near borings B-25 and B-26 during our exploration. Soil Conditions Conditions encountered at each boring location are indicated on the individual boring logs. Stratification boundaries on the boring logs represent the approximate location of changes in soil types; in-situ, the transition between materials may be gradual. A brief summary of the conditions encountered in our borings is provided below. Approximately two to eight inches of topsoil was encountered at the majority of the boring locations. At borings B-3, B-6, B-14, B-16, and B-26, approximately three to seven inches of gravel was encountered at the surface. Fill material was encountered below the gravel and topsoil at borings B-14, B-17 and B-26 to an approximate depth of three feet, and consisted of gray and reddish-brown silt and sand. Possible boulders was noted at boring B-12. Residual soil and partially weathered rock (PWR) was encountered below the fill at these borings and below the topsoil or gravel at the remaining borings. The residual soils generally consisted of silty sand (SM) and sandy clay and silt (CUCH, MUMH) with reddish- brown, brown, gray, and tan coloration. The sand was generally medium dense to very dense and the clay and silt ranged from stiff to hard. Partially weathered rock (PWR) was encountered below the surface materials and residual soils at depths ranging from about 0.5 to 16.5 feet. The PWR material visually classified as reddish-brown, brown, gray, and tan, silty sand with some rock fragments. The N-values within the PWR ranged from 50 blows for 6 inches of penetration to 50 blows for zero penetration. The borings were terminated in the PWR material at depths ranging from 1 to 18.4 feet. Boring B-19 was offset approximately 100 feet to the north due to access limitations caused by the steep terrain. Table 1 below provides the boring surface elevations based on the site topographic plan, the approximate elevations of encountered PWR and the approximate elevations of auger refusal encountered in each boring, if applicable. 4 Mental Health Facility Terracon Project No.: 70085034 1ren*acon June 9, 2008 Table 1 - Partially Weathered Rock and Auger Refusal Elevations Boring Boring Surface Elevation PWR Elevation Auger Refusal Elevation B-1 244 227.5 - B-2 244 242.5 239.5 B-3 228 227 219 B-4 266 265.5 264 B-5 258 257.5 254.5 B-6 258 255 254 B-7 258 255 254.5 B-8 249 248.5* 236 B-9 223 222.5 209 B-10 261 260.5 258.5 B-11 242 241.5 239.5 B-12 218 206 204 B-13 256 252.5 252 B-14 251 248 245 B-15 245 244 242 B-16 258 255 254 B-17 255 249 - B-18 275 267 - B-19 - - - B-20 236 235 233.5 B-21 234 233 232 B-22 217 - - B-23 209 203 - B-24 253 248.5 247 B-25 265 264 262 B-26 256 251 249.5 B-27 242 236 - B-28 249 248 246.5 * Possible Boulder a Mental Health Facility Terracon Project No.: 70085034 Groundwater Conditions 1 arracon June 9, 2008 Groundwater was not observed in the test borings at the time of drilling. We do not expect shallow groundwater to be a significant issue at this site. Longer term monitoring in piezometers would be required to evaluate the potential range of groundwater levels at this site. Groundwater is typically present in the residual soils and within fractures in the underlying partially weathered rock and bedrock in the Piedmont. On upland ridges in the Piedmont, groundwater may or may not be present in the residual soils above the partially weathered rock and bedrock. Alluvial soils in floodplains are generally saturated to within a few feet of the ground surface. Fluctuations in groundwater levels on the order of two to four feet are typical in residual soils and partially weathered rock in the Piedmont, depending on variations in precipitation, evaporation, and surface water runoff. Seasonal high groundwater levels are expected to occur during or just after the typically wetter months of the year (November through April). ENGINEERING RECOMMENDATIONS Geotechnical Considerations Based on the results of our borings, the buildings can be supported on shallow foundations bearing on a combination of the residual soils, weathered rock, and tested and approved new fill material. Close observation of the materials should be performed during subgrade preparation and footing construction to confirm suitable conditions below footings. Softer soils, if encountered, can be addressed through localized overexcavation (undercutting) and replacement with suitable materials. Borings B-14 and B-16, drilled in the existing gravel parking lot, and boring B-17, drilled in a proposed stormwater management area, encountered existing soil fill from the ground surface to an approximate depth three feet below grades. Support of footings, floor slabs, and pavements on or above existing fill soils is discussed in this report. However, even with the recommended construction testing services, there is an inherent risk for the owner that compressible fill or unsuitable material within or buried by the fill will not be discovered. This risk of unforeseen conditions cannot be eliminated without completely removing the existing fill, but can be reduced by performing additional testing and evaluation during construction. Additionally, the site soils appear suitable for the support of on-grade floor slabs and pavements. However, it should be noted that the near surface sandy silt, sandy clay and silty sand soils are very moisture sensitive and will become soft and unstable when wet. Due to the potential for unstable subgrades during wet weather, we recommend earthwork operations be performed during warmer, drier periods of the year (May through October), if feasible. 6 A Mental Health Facility 1refracon Terracon Project No.: 70085034 June 9, 2008 The partially weathered rock and materials that could not be drilled with the augers (auger refusal) will present excavation difficulties for conventional grading and trenching operations. The very shallow auger refusal material encountered at most of the borings will likely require blasting or pneumatic hammers to remove. In addition, rock outcroppings were noted at the surface near borings B-25 and B-26, within the proposed building footprints. We recommend that mass rock excavation and blasting beneath building, pavement, and utility trenching areas should extend approximately 2 to 5 feet below the design subgrade elevations to reduce the extent that foundation and utility trenches must be excavated in rock and reduce the extent that pavement sections will be constructed over rock subgrades. Site Preparation and Earthwork Any surface vegetation, topsoil, soft or otherwise unsuitable material should be stripped from the entire construction area. Topsoil may be re-used in areas to be landscaped. Topsoil should not be used as structural fill or backfill. The near surface sandy silt, sandy clay and silty sand at the site are very moisture-sensitive and will lose strength and rut or deflect excessively under construction traffic when wet. For these reasons, we recommend site preparation and earthwork be performed during drier periods of the year (May through October), if feasible. The exposed subgrade soils also should be protected from infiltration of surface water by keeping the site grades sloped to promote runoff. Placing a crushed stone base course as a protective layer and working surface in the building area could also be considered to protect the subgrade soils. After stripping is completed the exposed subgrade soils in areas to receive fill or at the subgrade elevation in cut areas should be proofrolled to detect remaining soft or loose soils. Proofrolling should be performed with a moderately to heavily loaded tandem-axle dump truck or similar piece of rubber-tired construction equipment. The geotechnical engineer's representative should observe this operation to aid in delineating problem soil areas. Proofrolling should be performed after a suitable period of dry weather to avoid degrading an otherwise acceptable subgrade and to reduce the amount of undercutting required. If problem soil areas are observed during the proofrolling operation, the soil in these areas should be undercut down to firmer/dryer bearing conditions and replaced with compacted soil fill as recommended below. The undercut soils may be spread and aerated, if saturated, and stored on-site for possible use in non-structural fill locations. We do not anticipate a significant amount of undercutting will be required if site preparation is performed during a period of dry weather. All fill material imported to the site should consist of approved materials, free of organics and debris. The fill should be a low to moderate plasticity cohesive soil with a liquid limit less than 50 and a plasticity index less than 25. Based on the borings, the residual soils on-site are generally acceptable for use as fill. All proposed fill materials should be approved prior to their use. "Clean" sand with less than 15% passing the No. 200 sieve (silt and clay fraction) should not be used as a surface fill to avoid surface water infiltrating the surface sand and becoming 7 i Mental Health Facility 1rerracon Terracon Project No.: 70085034 June 9, 2008 trapped above the underlying silt and clay soils. All proposed fill materials should be approved prior to their use. All fill materials should be placed in loose lifts not exceeding 9 inches in thickness and thoroughly compacted. All fill should be compacted to at least 98% of the material's standard Proctor maximum dry density (ASTM D-698). Some adjustments in the moisture content of on-site soils may likely be required to achieve adequate compaction. The soil's water content at the time of compaction should be at -3 to +3% of the soil's optimum moisture value as determined by the standard Proctor test. The geotechnical engineer's representative should perform in-place field density tests to evaluate the compaction of the structural fill and backfill placed at the site. We recommend a minimum testing frequency of one test per lift per 5,000 square feet of fill area. At least one test per foot of fill thickness per 100 lineal feet of utility trench also should be performed. Excavations The majority of the site soils may be excavated with conventional construction equipment, such as bulldozers, backhoes, and trackhoes. Partially weathered rock (PWR) material, as encountered in most of the borings from roughly 1 foot to 16.5 feet below grades can be difficult to excavate, especially for smaller, lower-force equipment. The softer PWR material (with SPT blow count values of 50 blows for 4 inches or more of penetration) encountered at the borings can typically be excavated with heavy-duty excavating equipment such as a Caterpillar D-8 assisted by single-tooth ripping tools. However, the harder PWR and auger refusal material encountered near the surface of most of the borings will require pneumatic hammers or blasting for effective excavation. Mass rock excavation and blasting beneath building areas should extend approximately 3 feet below the design subgrade elevation to reduce the extent that foundation and utility trenches must be excavated in rock. Dense/hard residual soils can also present difficulties to trenching machines. Due to the confinement presented by the sidewalls, trench excavations extending into either soft or hard weathered rock will likely require blasting or pneumatic hammers. All excavations should be sloped or braced as required by OSHA to provide stability and safe working conditions. Since exposure to weather can significantly weaken the sidewalls of a trench, a competent person should evaluate the excavations for stability prior to each entry by personnel. 8 S Mental Health Facility Terracon Project No.: 70085034 Foundations 1rerracon June 9, 2008 Based on our borings, the building can be supported on shallow spread footings bearing on a combination of approved existing in-place fill, residual soils, and tested and approved new fill material. Foundations bearing in the stiff to hard silt and medium dense to very dense silty sand soils and tested and approved new fill material can be designed for a maximum net allowable soil bearing pressure of 3,000 pounds per square foot (psf). The recommended net allowable bearing pressure is the pressure in excess of the minimum surrounding overburden pressure at the footing base elevation. Continuous wall footings should have a minimum width of 16 inches and isolated column footings should have a minimum width of 24 inches. Perimeter footings and footings beneath unheated areas should bear at a minimum depth of 18 inches below lowest adjacent finished grade for frost protection and protective embedment. The foundation settlement will depend upon the variations within the subsurface soil profile, the structural loading conditions, the embedment depth of the footings, the thickness of compacted fill, the presence of PWR beneath foundation bearing areas, and the quality of the earthwork operations. Based on the existing site grades, we expect the south portion of Building 1 and the east portion of Building 2 may be supported in dense PWR or rock and the north portion of Building 1 and the west portion of Building 2 may be supported on residual soil or compacted soil fill. Footings supported in soil or soil fill will likely experience more settlement than footings supported directly in PWR or rock. Assuming that footing construction and site grading is performed in accordance with our recommendations, we expect total settlement will be about 1 inch or less. Due to the potential different bearing conditions, differential settlement could approach the total settlement. If this anticipated differential settlement is unacceptable, additional steps could be taken to decrease this magnitude; such as, removing a portion of the rock below foundations and replacing it with soil fill material. If the buildings will be relatively light, we anticipate the differential settlement could be controlled by placing high-quality fill material and using stringent compaction criteria. However, if the site will be developed with heavier, multi-level structures, a foundation system consisting of shallow foundations where PWR / rock is near the surface and drilled shaft foundations in deeper soil / soil fill areas may be required. We would be pleased to discuss alternatives to further reduce differential settlement if desired. We recommend the footing excavations be observed and tested, using hand augers and dynamic cone penetrometer (DCP) testing, by a representative of the geotechnical engineer prior to placing reinforcing steel and concrete. If unsuitable materials are encountered, they should be overexcavated to a depth recommended by the geotechnical engineer and replaced with washed, crushed stone meeting the gradation requirements of NCDOT size No. 57 or 67. When washed, crushed stone is used as the replacement material, additional compaction of the stone is not required. 9 a Mental Health Facility 1rerracon Terracon Project No.: 70085034 June 9, 2008 The base of all foundation excavations should be free of water and loose soil prior to placing concrete. Concrete should be placed as soon as possible after excavating to minimize bearing soil disturbance. Should the soils at bearing level become disturbed or saturated, the affected soil should be removed prior to placing concrete. Floor Slabs The residual soils and properly placed and compacted fill material should be suitable for support of on-grade floor slabs. We recommend that the floor slabs be designed using a modulus of subgrade reaction (k) of 125 pounds per cubic inch (pci). Prior to floor slab construction, the floor slab subgrade should be proofrolled as outlined in the Earthwork section of this report. Loose or excessively wet soils delineated by the proofrolling operations should be undercut and backfilled as directed by the geotechnical engineer. We do not anticipate a need for extensive overexcavation and replacement of on-site soils if the subgrade preparation is performed during a period of dry weather. Upon completion of any necessary undercutting and fill placement, the subgrade should be adequate for support of the floor slab construction described below. The floor slabs should be supported on a 4-inch thick layer of washed, crushed stone (NCDOT No. 57). The purpose of this layer is to help distribute concentrated loads and act as a capillary break beneath the slab. The need for a vapor retarder, and where to place it, should be determined by the architect based on the proposed floor treatment, building function, concrete properties, placement techniques, and the construction schedule. When moisture retarders are used, precautions should be taken during the initial floor slab concrete curing period to reduce differential curing and possible curling of the slabs. The recommendations provided in ACI 302 should be followed. Pavements The residual soils and existing fill soils encountered in the borings appear to be suitable for support of the planned pavement sections. Prior to constructing pavements, the subgrade should be proofrolled as outlined in the Site Preparation and Earthwork section of this report. Loose soils delineated by the proofrolling operations should be undercut and backfilled as directed by the geotechnical engineer. We do not anticipate a need for extensive overexcavation and replacement of the on-site soils if the subgrade preparation is performed during a period of dry weather. Upon completion of any necessary remedial work, the subgrade should be adequate for support of the pavement sections recommended below. If site grades are set such that the pavement surfaces will be constructed over areas of rock outcrops, the potential exists for premature distress / cracking of the pavements due to differences in flexure at the soil to rock transition. Mass rock excavation and blasting in pavement subgrade areas should extend at least 2 feet below the design subgrade elevation so that a soil subgrade can be prepared beneath the pavement section. 10 t Mental Health Facility 1refracon Terracon Project No.: 70085034 June 9, 2008 Pavement thickness design is dependent upon: • the anticipated traffic conditions during the life of the pavement, • subgrade and paving material characteristics, and • climatic conditions of the region. Traffic patterns and anticipated loading conditions were not available; however, we anticipate that traffic loads will be produced primarily by automobile traffic and a limited number of delivery and trash removal trucks. Two pavement section alternatives have been provided. The light-duty pavement sections are for car traffic only. Heavy-duty pavement sections assume ten 18-kip Equivalent Single Axle Loads (ESAL's) per day and should be used for concentrated car traffic (driveways) and truck traffic areas. If heavier loading is required, Terracon should review these pavement sections. A design life of 15 years was assumed in our analyses. We estimate a California Bearing Ratio (CBR) value of about 4 for design of pavement sections constructed on subgrades prepared as recommended in this report. It should be noted that these systems were derived based on general characterization of the subgrade. No specific testing (such as CSR's, resilient modulus tests, etc.) was performed for this project to evaluate the support characteristics of the subgrade. Climatic conditions are considered in the design subgrade support value listed above and in the paving material characteristics. Recommended paving material characteristics, taken from the North Carolina Department of Transportation (NCDOT) "Standard Specifications for Roads and Structures", are included with each pavement design recommendation. We note that the 2006 NCDOT Standard Specifications for asphalt materials are based on "Superpave" mixes. Asphalt materials that have been traditionally used for commercial projects "Marshall" mixes are covered under the 1995 NCDOT Standard Specifications. Recommended pavement sections are listed below in Table 1. 11 y Mental Health Facility Neuman Terracon Project No.: 70085034 June 9, 2008 TABLE 2 - RECOMMENDED PAVEMENT SECTIONS Pavement Material Layer Thickness (inches) Type Light Duty Heavy Duty Portland Cement Concrete 5 7 Ri id 4,000 psi) g Crushed Stone 4 4 NCDOT ABC, Type A or B Asphalt Surface (NCDOT S-9.5B) 2.5 1.5 Flexible Asphalt Binder (NCDOT 1-19.5B) - 2.5 (Superpave) Crushed Stone NCDOT ABC, Type A or B 6 6 Asphalt Surface (NCDOT Type 1-2) 2.5 1.5 Flexible Asphalt Binder (NCDOT Type H) - 2.5 (Marshall) Crushed Stone (NCDOT ABC, Type A or B) 6 6 Asphalt concrete aggregates and base course materials should conform to the applicable North Carolina Department of Transportation (NCDOT) "Standard Specifications for Roads and Structures", Sections for Aggregate Base Course material, Hot Mix Asphalt Base Course, and Surface Course. Concrete pavement should be air-entrained and have a minimum compressive strength of 4,000 psi after 28 days of laboratory curing (ASTM C-31). Prevention of infiltration of water into the subgrade is essential for the successful performance of any pavement. Both the subgrade and the pavement surface should be sloped to promote surface drainage away from the pavement structure. Preventative maintenance should be planned and provided for an on-going pavement management program in order to enhance future pavement performance. Preventative maintenance activities are intended to slow the rate of pavement deterioration, and to preserve the pavement investment. Preventative maintenance of rigid pavement consists of localized maintenance. Preventative maintenance is usually the first priority when implementing a planned pavement maintenance program and provides the highest return on investment for pavements. Prior to implementing any maintenance, additional engineering observation is recommended to determine the type and extent of preventative maintenance most applicable to the proposed project. GENERAL COMMENTS Terracon should be retained to review the final design plans and specifications so comments can be made regarding interpretation and implementation of our geotechnical recommendations in the design and specifications. Terracon also should be retained to 12 Mental Health Facility lrerracon Terracon Project No.: 70085034 June 9, 2008 provide testing and observation during excavation, grading, foundation and construction phases of the project. The analysis and recommendations presented in this report are based upon the data obtained from the borings performed at the indicated locations and from other information discussed in this report. This report does not reflect variations that may occur between borings, across the site, or due to the modifying effects of weather. The nature and extent of such variations may not become evident until during or after construction. If variations appear, we should be immediately notified so that further evaluation and supplemental recommendations can be provided. The scope of services for this project does not include either specifically or by implication any environmental or biological (e.g., mold, fungi, bacteria) assessment of the site or identification or prevention of pollutants, hazardous materials or conditions. If the owner is concerned about the potential for such contamination or pollution, other studies should be undertaken. This report has been prepared for the exclusive use of our client for specific application to the project discussed and has been prepared in accordance with generally accepted geotechnical engineering practices. No warranties, either express or implied, are intended or made. Site safety, excavation support, and dewatering requirements are the responsibility of others. In the event that changes in the nature, design, or location of the project as outlined in this report are planned, the conclusions and recommendations contained in this report shall not be considered valid unless Terracon reviews the changes and either verifies or modifies the conclusions of this report in writing. 13 APPENDIX c I BR e l y 1 f f ' LVmmerc ??f?.orl-- r #L i ` 1 f ,,.ter t t ,Ao5z` - r Approximate Site U d _ 64 co!w' &y Pine Rd CA#b - 5M le Ea tOPo RQ ,Q 2006 rNapcw stt Inc_ gap Ek QirlE'ST. 1 :.;.?.... 19 SITE VICINITY MAP PROJEC MENTAL HEALTH FACILITY ? o n DATE: SUNNYBROOK ROAD DRAWN RALEIGH, NORTH CAROLINA SCALE: Derived from 2008 ?ma?-mss ' 11¢ --- Ali 1 1 811 ig pF --_-__-__.- ... sa_. .-r _ .._..._-_ Il 1 ? rte, r- ii ..,,, i s ni I ? l -1 - ! 'Ift ?? I j I ; ; a l ? I B-27 N a ' N1 I i i ?i` I I B-28 if I ! t 1 tzs N B-13 B-24 lu i i i I( ii 1 I a ? I ? B-16 it B-2 I I S - 6 Ilr I I A I I N I r I lr r ! I I I`,a c3+a hFM loe m I ( B-26 !l I N I oil I 1 ®J N ?IIII?Iitl/ -17 B-1 9 (OF lip I I o ! ,? s r ..,,? .-- 1 f i . I1 ? I 1 _- J 11 - I I I I11 ? r? i \ -I --------- ----------------------- - lip w PROPOSED BORING , PREVIOUSLY COMPLF BORING LOCATION DIAGRAM PROPOSED MENTAL HEALTH FACILITY SUNNYBROOK ROAD RALEIGH NORTH CAROLINA LOG OF BORING NO. B-01 Page 1 of 1 CLIENT Wake County SITE Sunnybrook Road PROJECT Raleigh, North Carolina Mental Health Facility SA MPLES TESTS X o DESCRIPTION m 2 > z: -j. U _ = Cl) of W W 8 Zrn Z XW o LL ZZ L .U a. '- Wo p EL a. (0 C) CO Uj 0- Q HC' w ?- F-Z U p Ow 0 ?dpN II C7 Surface Elev.: 244 ft o z W vai m U a co -i a o z 0.4 TOPSOIL 243.6 brown and gray, moist, CLAYEY SAND , medium dense SC 1 SS 26 3 241 SANDY SILT, reddish brown, very stiff, moist MH 2 SS 20 30.0 58 LL = 63 PI = 29 5.0 6 238 SILTY SAND with rock fragments, gray, SM 3 SS 16 medium dense, moist SM 4 SS 17 10.0 SM 5 SS 10 n ' 0 15.0 3 : •:: 16.5 227.5 i Partially Weathered Rock: appearing as § tan, SILTY SAND with rock fragments Y L 18.9 225.1 6 SS 50 / 5" IL ? BORING ENDED AT 18.9 FEET x J 20.0- Z J Q ? The stratification lines represent the approximate boundary lines 'Calibrated Hand Penetrometer L LU between soil and rock types: in-situ, the transition may be gradual. WATER LEVEL OBSERVATIONS, ft BORING STARTED WL ? 1 BORING COMPLETED $ WL 7- 13Z erracon RIG FOREMAN $ WL Not Encountered APPROVED BCH JOB # 70085034 LOG OF BORING NO. B-02 Page 1 of 1 CLIENT Wake County SITE Sunnybrook Road PROJECT Raleigh, North Carolina Mental Health Facility SA MPLE S TESTS wz X DESCRIPTION M r Z= ; m U } W Z z F- LL? v.?a? CL F=- m w p z3 W? o ° pZ QM u O Surface Elev 244 ft W (0 : a w a.q QO z? JaN o .: o z it cn m U a. CIO a a z '-"• ^? o.5 TOPSOIL 243.5 SILTY SAND, tan, dense, moist ? •5 242.5 SM 1 SS 31 Partially Weathered Rock: appearing as 50 14' tan and brown, SILTY SAND with rock fragments 2 SS 50 / 1" 4.5 239.5 BORING ENDED IN AUGER REFUSAL i AT 4.5 FEET 5.0 The stratification lines represent the approximate boundary lines between soil and rock types: in-situ, the transition may be gradual. WATER LEVEL OBSERVATIONS, ft BORING STARTED WL 1 BORING COMPLETED WL err Icon RIG FOREMAN WL Not Encountered APPROVED BCH JOB # 70085034 B-03 LOG OF BORING NO . Page 1 of 1 CLIENT Wake County SITE Sunnybrook Road PROJECT Raleigh, North Carolina Mental Health Facility SA MPLES TESTS o O o x c c DESCRIPTION z o d W Z w o ZZ 7t Q. a V Z. Q 8 O 1-0 W Q t0 II F o Surface Elev.: 228 ft o z v a i m QO ? U N o- Z cn N O J J o- o_ z o.s TOPSOIL 227.4 Partially Weathered Rock: appearing as SILTY SAND with reddish brown and tan 1 SS 50 / 6" , rock fragments 2 SS 50 / 1" 5.0 - - Softer zone from approximately 6 to 8 SM 3 SS 42 feet g 219 4 SS 50 / 0" BORING ENDED IN AUGER REFUSAL AT 9 FEET 10.0 z a i J _ IL Z 0 ?a W 'a 0 x QJ W J Q W The stratification lines represent the approximate boundary lines -2 between sal and rock types: in-situ, the transition may be gradual. WATER LEVEL OBSERVATIONS, ft BORING STARTED WL SZ BORING COMPLETED -1 WL I 3Z I erracon r RIG FOREMAN o WL Not Encountered APPROVED BCH JOB # 70085034 W LOG OF BORING NO. B-04 Page 1 of 1 CLIENT Wake County SITE Sunnybrook Road PROJECT Raleigh, North Carolina Mental Health Facility SA MPLE S TESTS C? JO = • N x OD 01 DESCRIPTION ? Z = J 4 y (L = m O Z W ao Q - F CO w 1 i F- i- Z ow it o -J N c? Surface Elev.: 266 ft W o U) D z W IX a- U) m Qp 3 0 N d Z U) J1NO -j o_ o z 0.5 TOPSOIL 265 5 . Partially Weathered Rock: appearing as M tan and gray, SILTY SAND with clay seams 1 SS 50 / 6" 2 264 BORING ENDED IN AUGER REFUSAL AT 2 FEET 5.0- i i e stratification lines represent the approximate boundary lines ry 1 ween sal and rock types: in-situ, the transition may be gradual. WA TER LEVEL OBSERVATIONS, ft BORING STARTED WL = 1 i BORING COMPLETED T 1r WL erracon RIG FOREMAN WL Not Encountered APPROVED BCH JOB # 70085034 B-05 LOG OF BORING NO . Page 1 of 1 CLIENT Wake County SITE Sunnybrook Road PROJECT Raleigh, North Carolina Mental Health Facility SAM PLES TESTS J yy n px G N DESCRIPTION g > of 4? \ F: W ~ ? U > w w > - zcn z Xw o LL ? zz '0. a' Qm u (L a U M wa O 1.-0 Hz 0 c 0UW J 0 Cj 04 n D- ° 0 Surface Elev.: 258 ft o ? z W U) m 3 0 a co m a n z 7 3 TOPSOIL 257 0 . . Partially Weathered Rock: appearing as brown and tan, SILTY SAND with rock 1 SS 50 / 1" fragments 5 254.5 3 . BORING ENDED IN AUGER REFUSAL 2 SS 50 / 0" AT 3.5 FEET 5.0 0 'U a J _ a z 0 U F 'a 0 x QJ w x J Q The stratification lines represent the approximate boundary lines between soil and rock types: in-situ, the transition may be gradual. WATER LEVEL OBSERVATIONS, ft BORING STARTED WL -7 1 BORING COMPLETED WL erracon RIG FOREMAN W WL Not Encountered APPROVED BCH JOB # 70085034 m LOG OF BORING NO. B-06 Page 1 of 1 CLIENT Wake County SITE Sunnybrook Road PROJECT Raleigh, North Carolina Mental Health Facility SA MPLE S TESTS 7 J O = 0 X m 0 C DESCRIPTION z _ i r Of W W 8 z? z ?W o U- zz 0 ?av) No p 1- n W t :n a c? Surface Elev.: 258 ft W o ( z w rc a-j v, m a0 ?() N a z? n v- J I_ l O a a z :. TOPSOIL 0.6 257.4 SILTY SAND with rock fragments, brown and gray, medium dense, moist SM 1 SS 26 3 255 Partially Weathered Rock: appearing as 4 gray, SILTY SAND with rock fragments 254 2 SS 50 / 1" BORING ENDED IN AUGER REFUSAL AT 4 FEET i 5.0 The stratification lines represent the approximate boundary lines between soil and rock types: in-situ, the transition may be gradual. WATER LEVEL OBSERVATIONS, ft BORING STARTED WL V 1 - 1 BORING COMPLETED WL 7 1 3Z 1 err Icon RIG FOREMAN WL -- Not Encountered APPROVED BCH JOB # 70085034 F c c 0 7 O C C O LL h LOG OF BORING NO. B-07 Page 1 of 1 CLIENT Wake County SITE Sunnybrook Road PROJECT Raleigh, North Carolina Mental Health Facility SA MPLES TESTS O X c DESCRIPTION Co > w F_: z U a m w O Z W? LL Ow d_ arm a ° CO a 2 w a w a0 z o :D FL 0 o Surface Elev.: 258 ft w 0 i =) z Ir a? cn co U ° a- ? Z) rn J 1 0 _j a n z 7 TOPSOIL 257 . gray and SILTY SAND with clay seams , reddish-brown, medium dense, moist SM 1 SS 19 .' 3 255 3.5 Partially Weathered Rock: appearing as 254.5 2 SS 50 / 1" tan and gray, SILTY SAND with rock fragments BORING ENDED IN AUGER REFUSAL AT 3.5 FEET 5.0 D L J _ C L Z Y L 1 7 L QJ L L J Q z The stratification lines represent the approximate boundary lines f between sal and rock types: in-situ, the transition may be gradual. WATER LEVEL OBSERVATIONS, ft BORING STARTED M WL 1 BORING COMPLETED $ WL T 3z err Icon RIG FOREMAN $ WL Not Encountered APPROVED BCH JOB # 70085034 LOG OF BORING NO. B-08 Page 1 of 1 CLIENT Wake County SITE Sunnybrook Road PROJECT Raleigh, North Carolina Mental Health Facility SA MPLE S TESTS O J 0 c • '? w ° X N p) ?? J U DESCRIPTION co r w: ? y ca m o } W W > zcn z Xuj e z v,o - m 0 W?_ 0W gmu° J o Surface Elev.: 249 ft W o m 5 z W m (L _1 cn m QO 3 v N a zI.- U) JaN O J o_ o- z .'. `.. :: 0.6 TOPSOIL 248 4 . Partially Weathered Rock: appearing as brown, SILTY SAND (Possible Boulder) 1 SS 50 / 1" 2.5 246.5 SANDY CLAY, reddish-brown to brown, hard, moist CH 2 SS 46 26.0 58 LL = 58 PI=34 5 0 . CH 3 SS 34 - 9 240 SM 4 SS 39 SILTY SAND, tan, dense, moist 10 0 . 13 236 BORING ENDED IN AUGER REFUSAL AT 13 FEET i i 15.0 The stratification lines represent the approximate boundary lines between sal and rock types: in-situ, the transition may be gradual. WA TER LEVEL OBSERVATIONS, ft BORING STARTED WL V I i BORING COMPLETED WL Irerracon RIG FOREMAN WL Not Encountered APPROVED BCH JOB # 70085034 F C a a C C 0 0 F B-09 LOG OF BORING NO . Page 1 of 1 CLIENT Wake County SITE Sunnybrook Road PROJECT Raleigh, North Carolina Mental Health Facility SAM PLES TESTS Q C '? 0 ? X m rn C N DESCRIPTION g > ? z :if - E m m L) 4? >- (!) w Lu > zcn tt w o LL zz Qt5 _ a = w 0 ? a O a? QO c°4 z? J 1 0 o (D Surface Elev.: 223 ft o z W- U) m a U) _, a n z 0.5 TOPSOIL 222.5 appearing as Partially Weathered Rock T - - - : brown and gray, SILTY SAND with rock tan - 50 / 5" , fragments 2 SS 50 / 3" 5.0- -3 SS 7 4 SS 50/ 10.0 14 209 5 SS 50 / 2" BORING ENDED IN AUGER REFUSAL AT 14 FEET 0 15 . 0 d J _ x a z U W F IL' c? x QJ W J Q LU The stratification lines represent the approximate boundary lines between soil and rock types: in-situ, the transition may be gradual. WATER LEVEL OBSERVATIONS, ft BORING STARTED WL SZ 1 BORING COMPLETED WL erracon RIG FOREMAN WL Not Encountered APPROVED BCH JOB # 70085034 LOG OF BORING NO. B-10 Page 1 of 1 CLIENT Wake County SITE Sunnybrook Road PROJECT Raleigh, North Carolina Mental Health Facility SA MPLE S TESTS JO w D a x m ? c c q DESCRIPTION 00 r H W = ? in > m? U a 2 U m > ) zv WW a zz Qmu° W U) D a WWO > > QO O N W z? l 0 (9 Surface Elev.: 261 ft o z CL U) m 3 0 a D rn a 4 O C -ja a z `' 0.3 TOPSOIL 260.7 Partially Weathered Rock: appearing as tan, SILTY SAND with rock fragments 1 SS 50 / 1" 2.5 5 258.5 BORING ENDED IN AUGER REFUSAL 2 SS 50 / 0" AT 2.5 FEET i 5.0 The stratification lines represent the approximate boundary lines between soil and rock types: in-situ, the transition may be gradual. WATER LEVEL OBSERVATIONS, ft BORING STARTED WL BORING COMPLETED L W err Icon RIG FOREMAN W L Not Encountered APPROVED BCH JOB # 70085034 F c c 0 7 0 2 C C 0 F LOG OF BORING NO. B-11 Page 1 of 1 CLIENT Wake County SITE Sunnybrook Road PROJECT Raleigh, North Carolina Mental Health Facility SA MPLES TESTS C7 0 0 ca > I N f z X So _ DESCRIPTION : It m LU z z W 6 LL '0.205 m° a ° a W } 0 3 -j - w I HZ a N Ow U ? g i i o JaoN I N (9 Surface Elev.: 242 ft W o V) D Z W W a V) an 0 6 a Z co J I O a a Z ' 0.2 TOPSOIL 241.8 Partially Weathered Rock: appearing as gray, SILTY SAND with rock fragments 1 SS 50 / 1" 2.5 239.5 BORING ENDED IN AUGER REFUSAL AT 2.5 FEET 5.0 n 0 7 i J _ L 1 Z J Y L 1 P L QJ W J Q The stratification lines represent the approximate boundary lines between soil and rock types: in-situ, the transition may be gradual. WATER LEVEL OBSERVATIONS, ft BORING STARTED WL SZ 1 BORING COMPLETED WL M I erracon r RIG FOREMAN o WL Not Encountered APPROVED BCH JOB # 70085034, m LOG OF BORING NO. B-12 Page 1 of 1 CLIENT Wake County SITE Sunnybrook Road PROJECT Raleigh, North Carolina Mental Health Facility SA MPLE S TESTS DESCRIPTION JO W = X ' rn U = X X w H z ? u O - m = . z a U w W > O zcn 3 aw Hz o o z Ow 5 0o Jao c? Surface Elev : 218 ft W t!1 Z a w a_j QO N z? N J ?? N O . o US z ir co m 3: U a cn _j a n z TOPSOIL 0.7 217 3 . FILL: consisting of gray and reddish-brown, loose SILTY SAND, moist 1 SS 9 with possible boulders 2 SS 6 5 0- . 3 SS 50 _/6' 7 211 CLAYEY SAND, reddish-brown, medium dense, moist SC 4 SS 11 10 0 . 12 206 Partially Weathered Rock: appearing as tan and gray, SILTY SAND with rock fragments 14 204 5 SS 50 / 0" BORING ENDED IN AUGER REFUSAL AT 14 FEET 15.0 i i i I The stratification lines represent the approximate boundary lines ry between soil and rock types: in4tu, the transition may be gradual WA TER LEVEL OBSERVATIONS, ft BORING STARTED WL 1 ' BORING COMPLETED WL Y rerracon RIG FOREMAN WL Not Encountered APPROVED BCH JOB # 70085034 LOG OF BORING NO. B-13 Page 1 of 1 CLIENT Wake County SITE Sunnybrook Road PROJECT Raleigh, North Carolina Mental Health Facility SA MPLES TESTS (D JO c v a X v yrn DESCRIPTION o W z E m m a U) w > zu? 0:w o zz a0 (L a U) V °° w a p U ~O Fz Q o N Ow Z? vm .Ja0N 1 N c9 Surface Elev.: 256 ft o US z W Cl) am D ? U a U) O J ? ? a a z ` A 7 3 TOPSOIL 255 0 . . medium dense brown SILTY SAND , , , moist SP 1 SS 11 5.0 9 SM 3.5 252.5 4 Partially Weathered Rock: appearing as 252 2 SS 50 / 1" SILTY SAND, gray and brown BORING ENDED IN AUGER REFUSAL 5.0 AT 4 FEET n 'n P i J_ Z 0 W a c? x QJ W 2 J Q W The stratification lines represent the approximate boundary lines 2 between sal and rock types: in-situ, the transition may be gradual. c WATER LEVEL OBSERVATIONS, ft BORING STARTED 5-27-08 10 WL -V 1 BORING COMPLETED 5-27-08 WL Irerracon RIG D-50 FOREMAN SubTec 2 WL Not Encountered APPROVED BCH JOB # 70085034 LOG OF BORING NO. B-14 Page 1 of 1 CLIENT Wake County SITE Sunnybrook Road PROJECT Raleigh, North Carolina Mental Health Facility SA MPLE S TESTS (7 - C • y X ? C.n DESCRIPTION 42 M > of z 3 J y> m(D _ a z r cn W > zcn z ?W o LL? zz v?a? om o a U CO W O HZ o 0 OW L) Jd011 N Surface Elev.: 251 ft o z X of Co 3 L) a c~n 11 0 J a a z° 0.3 SILTY SANDY GRAVEL 250.7 FILL consisting of SILTY SAND, trace rock and wood fragments, dark brown 1 SS 18 3 248 Partially Weathered Rock: appearing as - - fine to coarse SAND, trace silt, gray to tan, 2 SS " 50 / 5 moist 5.0- ,- 6 245 BORING ENDED IN AUGER REFUSAL 3 SS 50 / 0" AT 6 FEET 10.0 i 7 i i i 1 I The stratification lines represent the approximate boundary lines between soil and rock types: in-situ, the transition may be gradual WAT ER LEVEL OBSERVATIONS, ft BORING STARTED 5-27-08 WL = BORING COMPLETED 5-27-08 Ir WL ? erracon RIG D-50 FOREMAN SubTec WL Not Encountered APPROVED BCH JOB # 70085034 4 LOG OF BORING NO. B-15 Page 1 of 1 CLIENT Wake County SITE Sunnybrook Road PROJECT Raleigh, North Carolina Mental Health Facility SAMPLES TESTS x j DESCRIPTION M > -C z U x = } (0 ix m w > zv? z w? LL O v:K!LL- vm LL LL ao w z o a Surface Elev.: 245 ft W p (0 0 z w x a_5 kn Co L) C', LL P kn N o j LL LL z 0.3 TOPSOIL 244.7 ` 1 SILTY SAND, brown 244 Partially Weathered Rock: appearing as 1 SS 50 / 3" SILTY SAND with rock fragments, brown 3 242 BORING ENDED IN AUGER REFUSAL AT 3 FEET 5.0 s s i i S 1 ) S J The stratification lines represent the approximate boundary lines e between sal and rock types: in-situ, the transition may be gradual. WATER LEVEL OBSERVATIONS, ft BORING STARTED 5-28-08 WL S? 1 BORING COMPLETED 5-28-08 WL Irerracon RIG D-50 FOREMAN SubTec WL Not Encountered APPROVED BCH JOB # 70085034 B-16 LOG OF BORING NO . Page 1 of 1 CLIENT Wake County SITE Sunnybrook Road PROJECT Raleigh, North Carolina Mental Health Facility SA MPLES TESTS J O S t N p a X 2 c DESCRIPTION \ z m U r U) Q W Z Z WW o u v na 05 m a H CL CO w 6 0 0 ? ~ a0 Ow z Q 11 o F c? Surface Elev.: 258 ft o ai ? z - w X a- rn m ? U N a ? U) N o J a n z 7 0 3 SANDY SILTY GRAVEL 257 . . , SILTY SAND with rock fragments, trace clay, brown, dense, moist SM 1 SS 42 15.0 37 .: 3 255 Partially Weathered Rock: No Recovery 9 4 254 2 SS 50 / 0" BORING ENDED IN AUGER REFUSAL AT 4 FEET 5.0 The stratification lines represent the approximate boundary lines between soil and rock types: in-situ, the transition may be gradual. WA TER LEVEL OBSERVATIONS, ft BORING STARTED 5-27-08 WL BORING COMPLETED 5-27-08 WL 3Z ire rracon RIG D-50 FOREMAN SubTec WL Not Encountered APPROVED BCH JOB # 70085034 c c 0 0 c c a u F LOG OF BORING NO. B-17 Page 1 of 1 CLIENT Wake County SITE Sunnybrook Road PROJECT Raleigh, North Carolina Mental Health Facility SA MPLE S TESTS V 0 J M C o * y p a X -pa' r- C.- DESCRIPTION z X U X zt? I >_ U) rY m W > rn Z wH e U_ 0 zz O V n 05 ?o ? L) W ?emu 0 0 Surface Elev.: 255 ft W o U) Z) D z } W W d J U) M QO ? U N a z? U) JaN O J a o_ z '' "' `' 0.3 TOPSOIL 254.7 FILL consisting of SANDY CLAY with wood debris and trace rock fragments, dark 1 SS 10 brownish-gray, moist 3 3 252 SILTY SAND, brown, dense, moist SM 2 SS 32 5 0- - . 'A 6 249 Partially Weathered Rock: appearing as 3 SS 50 / 4" SILTY SAND, tan, brown, gray, moist 8.5 246.5 BORING ENDED AT 8.5 FEET 4 SS 50 / 5" i 10.0 The stratification lines represent the approximate boundary lines between soil and rock types: in-situ, the transition may be gradual. WATER LEVEL OBSERVATIONS, ft BORING STARTED 5-27-08 WL 1 BORING COMPLETED 5-27-08 WL erracon RIG D-50 FOREMAN SubTec WL Not Encountered APPROVED BCH JOB # 70085034 B-18 LOG OF BORING NO . Page 1 of 1 CLIENT Wake County SITE Sunnybrook Road PROJECT Raleigh, North Carolina Mental Health Facility SA MPLES TESTS C7 J 0 = 1 N p a X p y 0 DESCRIPTION In > W F_: z U X r U) Of m W U) z Z w U_ n ?a05 m ° H 0- CO L) W (L O 0 W ? d? H QO N Ow Z? g o C'j JaN O (9 Surface Elev.: 275 ft W o U) 0 z of J co m ? U a. S W J a. a z ' 0.2 TOPSOIL 274.8 SANDY SILT brownish orange, very stiff to hard, moist ML 1 SS 23 31.0 64 6000* ML 2 SS 69 6000* 5.0 - - with coarse sand sized rock fragments ML 3 SS 24 6000* 8 267 Partially Weathered Rock: appearing as 9 SILTY SAND, gray, moist 266 4 SS 50 / S' BORING ENDED AT 9 FEET 10.0 The stratification lines represent the approximate boundary lines between soil and rock types: in-situ, the transition may be gradual. WATER LEVEL OBSERVATIONS, ft BORING STARTED 5-28-08 WL 1 1 i BORING COMPLETED 5-28-08 WL 1 rerracon RIG D-50 FOREMAN SubTec WL Not Encountered APPROVED BCH JOB # 70085034 c c n n Z C C a a n LL F LOG OF BORING NO. B-19 Page 1 of 1 CLIENT Wake County SITE Sunnybrook Road PROJECT Raleigh, North Carolina Mental Health Facility Boring Location: Offset SAMPLE S TESTS 0 J C • y a X ? p C.- U DESCRIPTION w Z = ? ? 2 = to w W Z U) Z w o UL Z Z v U 7 ?n o p Q. (L cn Co ww a w?- d 0Ow W 0 z . H ir vaim ?UO a Zu~i Jaaz° TOPSOIL SILTY SAND white and gray, medium dense, moist SM 1 SS 16 = 3 SILTY SAND with coarse sand to gravel sized rock fragments, grayish-brown, SM 2 SS 10 medium dense, moist 5 0 . 6 Partially Weathered Rock: appearing as 3 SS 50 / 5" FINE TO COARSE SAND trace silt, light reddish-brown, moist 8 SAND with silt, light tan and gray, dense, moist SP 4 SS 33 SM 10 BORING ENDED AT 10 FEET 10.0 The stratification lines represent the approximate boundary lines between sal and rock types: in-situ, the transition may be gradual. WATER LEVEL OBSERVATIONS, ft BORING STARTED 5-28-08 WL Q 1 I r BORING COMPLETED 5-28-08 WL erracon RIG D-50 FOREMAN SubTec % WL Not Encountered APPROVED BCH JOB # 70085034 c c n n 2 G C a n u r C c C 0 s 0 2 C c a a LL LL F LOG OF BORING NO. B-20 Page 1 of 1 CLIENT Wake County SITE Sunnybrook Road PROJECT Raleigh, North Carolina Mental Health Facility SA MPLE S TESTS J 0 • y CL X S C7 C.- DESCRIPTION g > Z = _j. fn W Zf W, W o ZZ 7 No (L g . CO U Co W O 3: F-Q W QZ p w UoX Q ?I J?.pN (9 Surface Elev.: 236 ft W o co D D W V) M O U a z U) 11 _j a n z° 0.3 TOPSOIL 235.7 `. 1 SILTY SAND, brown 235 Partially Weathered Rock: appearing as 1 SS 50 / 3" SILTY SAND, brown 2.5 233.5 BORING ENDED IN AUGER REFUSAL AT 2.5 FEET 5.0 The stratification lines represent the approximate boundary lines between soil and rock types: in-situ, the transition may be gradual. WA TER LEVEL OBSERVATIONS, ft BORING STARTED 5-28-08 WL 1 BORING COMPLETED 5-28-08 WL rerracon RIG 13-50 FOREMAN SubTec WL Not Encountered APPROVED BCH JOB # 70085034 LOG OF BORING NO. B-21 Page 1 of 1 CLIENT Wake County SITE Sunnybrook Road PROJECT Raleigh, North Carolina Mental Health Facility SA MPLES TESTS C7 0 o pp X cc DESCRIPTION M > W i 5 U 2 = W W (n Z Q'W o ? LL ZZ a'_ v u 7 u)o q a (? M a O f-0 ~Z p OQ' Ja0(j a 0 Surface Elev.: 234 ft o z fur, vai m cc) a (~n J a a z° 0.3 TOPSOIL 233.7 '. I SILTY SAND, brown 233 Partially Weathered Rock: appearing as 1 SS 50 / 1" 2 weathered rock fragments, light tan 232 BORING ENDED IN AUGER REFUSAL AT 2 FEET 5.0 s i i i 1 1 1 i I i c The stratification lines represent the approximate boundary lines between soil and rock types: in-situ, the transition may be gradual. WATER LEVEL OBSERVATIONS, ft BORING STARTED 5-28-08 WL 1 BORING COMPLETED 5-28-08 WL I rerracon RIG D-50 FOREMAN SubTec > WL Not Encountered APPROVED BCH JOB # 70085034 B-22 LOG OF BORING NO . Page 1 of 1 CLIENT Wake County SITE Sunnybrook Road PROJECT Raleigh, North Carolina Mental Health Facility SA MPLES TESTS 0 J p C t N p a x IST c DESCRIPTION g > z 3 ? Clog U > U) w w z z H U_0 CL w co co D W a p w ? a2 w QO N ow z? cmu 0 JaN o o Surface Elev.: 217 ft o c o z m m 3 a in J a a z 7 3 TOPSOIL 216 0 . . SILTY SAND trace clay, reddish-brown, medium dense, moist SM 1 SS 13 19.0 40 .: 3 214 SILTY SAND reddish-brown, medium dense, moist SM 2 SS 23 5.0 SM 3 SS 25 SM 4 SS 28 • ••? 10 207 i i BORING ENDED AT 10 FEET 10.0 The stratification lines represent the approximate boundary lines between soil and rock types: in-situ, the transition may be gradual. WATER LEVEL OBSERVATIONS, ft BORING STARTED 5-28-08 WL V 1 BORING COMPLETED 5-28-08 WL T I rerracon RIG D-50 FOREMAN SubTec WL Not Encountered APPROVED BCH JOB # 70085034 LOG OF BORING NO. B-23 Page 1 of 1 CLIENT Wake County SITE Sunnybrook Road PROJECT Raleigh, North Carolina Mental Health Facility SA MPLE S TESTS 0 o a X 1 0 ( D DESCRIPTION > ? z = ,0 , U = 2 >- it W w ZVJ z lYW o v ZZ v °a? Qm j o IL U a UO Fp Hz 0 o UO? -j a.0 c? Surface Elev.: 209 ft W o W Z) D z >- W tr dJ U) m aO 00 N a Zf- Z) U) J??N O D a n z ,. 0.2 TOPSOIL 208.8 SILTY SAND trace rock fragments, brown, medium dense, moist SM 1 SS 13 SM 2 SS 12 5 0- 1 . 6 203 Partially Weathered Rock: appearing as 3 SS 50 / 1" SILTY SAND with rock fragments, gray 9 200 4 SS 50 / 1" BORING ENDED AT 9 FEET 10.0 The stratification lines represent the approximate boundary lines between sal and rock types: in-situ, the transition may be gradual. WATER LEVEL OBSERVATIONS, ft BORING STARTED 5-27-08 WL Q t BORING COMPLETED 5-27-08 WL I rerracon RIG D-50 FOREMAN SubTec WL Not Encountered APPROVED BCH JOB # 70085034 c L a 2 a z C C: a a a LL F LOG OF BORING NO. B-24 Page 1 of 1 CLIENT Wake County SITE Sunnybrook Road PROJECT Raleigh, North Carolina Mental Health Facility SA MPLE S TESTS ESCRIPTION J 0 C > * y = X •D C) C.- 00 4 ) z ' - U _ = >- w w w > zcn Z WZW o if zz a m o ' a O ?- Z ° U v -a-0 C-4 o Surface Elev.: 253 ft W o US US z ? W a a J co co QO 3 v N a z? ? co J ?? N O _ a S' 71 • 0.5 TOPSOIL 252.5 SILTY SAND brown, dense, moist SM 1 SS 50 / 4" --- hard seam SM 2 SS 50 / 3" 28.0 44 .•' 4.5 248.5 Partially Weathered Rock: appearing as 5 0 SILTY SAND, trace rock fragments, gray . 6 247 BORING ENDED IN AUGER REFUSAL 3 SS 50 / 0" AT 6 FEET 10.0 The stratification lines represent the approximate boundary lines between soil and rock types: in-situ, the transition may be gradual. WATER LEVEL OBSERVATIONS, ft BORING STARTED 5-27-08 WL t BORING COMPLETED 5-27-08 LZ 7- e rr acon RIG D-50 FOREMAN SubTec Not Encountered APPROVED BCH JOB # 70085034 c c 0 i 0 2 C c a a a LL F LOG OF BORING NO. B-25 Page 1 of 1 CLIENT Wake County SITE Sunnybrook Road PROJECT Raleigh, North Carolina Mental Health Facility SA MPLES TESTS 0 DESCRIPTION co > :f z -J. _ X w w > zcn z 0:w o U-0 zz av? o o a U CO W a OV Hp a ?z 3 0 °o L) 0111 Z L7.2 if -j(L0F,. If 110 0 Surface Elev.: 265 ft o Z) z ? ? v i m U d co i a a z o.5 TOPSOIL 264.5 Partially Weathered Rock: appearing as SILTY SAND, brownish orange 1 SS 50 / 5" 3 262 BORING ENDED IN AUGER REFUSAL AT 3 FEET 5.0 I s s i i 0 i I i S C r The stratification lines represent the approximate boundary lines E between soil and rock types: in-situ, the transition may be gradual. WATER LEVEL OBSERVATIONS, ft BORING STARTED 5-27-08 A WL Q BORING COMPLETED 5-27-08 Jr WL I rerracon RIG D-50 FOREMAN SubTec WL Not Encountered APPROVED BCH JOB # 70085034 Y , ?r c c 0 3 0 2 C c a 0 D u F LOG OF BORING NO. B-26 Page 1 of 1 CLIENT Wake County SITE Sunnybrook Road PROJECT Raleigh, North Carolina Mental Health Facility SA MPLES TESTS J O * N p a X •Op 01 c DESCRIPTION \ z: :- 01 : Z Q) 0 2 _ (A w > Zf z Wuj o U- (9 ZZ . ulo p W to W m D w CL O W 3 0 22 Wz aO o N Ow 0 Of ZH ?aoN N O c? Surface Elev.: 256 ft p z of - U) m a C#) j o_ n z 7 0 3 SILTY SANDY GRAVEL 255 . . FILL: consisting of SILTY SAND with gravel, fine to coarse, gray 1 SS 7 3 253 SILTY FINE TO MEDIUM SAND brown, very dense, moist SM 2 SS 54 8.0 24 5 251 Partially Weathered Rock: No Recovery 5.0 6.5 249.5 3 SS 50 / 0" BORING ENDED IN AUGER REFUSAL AT 6.5 FEET 10.0 The stratification lines represent the approximate boundary lines between sal and rock types: in-situ, the transition may be gradual. WATER LEVEL OBSERVATIONS, ft BORING STARTED 5-27-08 WL Q 1 BORING COMPLETED 5-27-08 WL - err Icon RIG D-50 FOREMAN SubTec WL Not Encountered APPROVED BCH JOB # 70085034 LOG OF BORING NO. B-27 Page 1 of 1 CLIENT Wake County SITE Sunnybrook Road PROJECT Raleigh, North Carolina Mental Health Facility SAMPLES TESTS (7 ESCRIPTION J G R r?/1 z X 'O U _ } U) W W kn Z ' o Z ?a•- 7i o a _ Cl) M > 0 Z 0 W HZ Z 0 n o S f El 242 ft a o D a U of ?p a ? 0 °o a U ? - a0N J a a ° ur ace ev.: z n in c D U) Z 0.4 TOPSOIL 241.6 SANDY CLAY, brown, stiff, moist CL 1 SS 13 6000* 3 239 SANDY SILT, brownish-orange, very stiff, moist ML 2 SS 28 5 0- - . 6 236 Partially Weathered Rock: appearing as 3 SS 50 / 3" SILTY SAND, trace rock fragments, gray 9 233 4 SS 50 / 1" BORING ENDED AT 9 FFET i i i I 10.0 The stratification lines represent the approximate boundary lines between soil and rock types: in-situ, the transition may be gradual. WATER LEVEL OBSERVATIONS, ft BORING STARTED 5-27-08 WL 1 BORING COMPLETED 5-27-08 WL I rerracon RIG D-50 FOREMAN SubTec WL Not Encountered APPROVED BCH JOB # 70085034 LOG OF BORING NO. B-28 Page 1 of 1 CLIENT Wake County SITE Sunnybrook Road PROJECT Raleigh, North Carolina Mental Health Facility SA MPLES TESTS C7 J O = w CL X ? _? C C O J DESCRIPTION Co g W o Z W = - 10 Na - U > W W > z z a' W o ?? ZZ .v-.9a 7 MO O ' a a v M a U0 ?-0 F-Z $ OVW m 11 JC a0N 11 Surface Elev_: 249 ft o D z W ai m 00 a vi J a a Z° 0 3 TOPSOIL 248 7 . . '. 1 SILTY SAND, brown 248 Partially Weathered Rock: appearing as 1 SS 50 / 3" SILTY SAND, trace rock fragments, brown 2.5 to gray 246.5 BORING ENDED IN AUGER REFUSAL AT 2.5 FEET 5.0 The stratification lines represent the approximate boundary lines between soil and rock types: in-situ, the transition may be gradual. WATER LEVEL OBSERVATIONS, ft BORING STARTED 5-27-08 WL V 1 BORING COMPLETED 5-27-08 WL W 7- err Icon RIG D-50 FOREMAN SubTec W Not Encountered APPROVED BCH JOB # 70085034 or GENERAL NOTES DRILLING S SAMPLING SYMBOLS: SS: Split Spoon - 113/&' I. D., 2" O.D., unless otherwise noted HS: Hollow Stem Auger ST: Thin-Walled Tube - 2" O.D., unless otherwise noted PA: Power Auger RS: Ring Sampler - 2.42" I.D., 3" O.D., unless otherwise noted HA: Hand Auger DB: Diamond Bit Coring - 4", N, B RB: Rock Bit BS: Bulk Sample or Auger Sample WB: Wash Boring or Mud Rotary The number of blows required to advance a standard 2-inch O_D. split-spoon sampler (SS) the last 12 inches of the total 18-inch penetration with a 140-pound hammer falling 30 inches is considered the "Standard Penetration" or "N-value". WATER LEVEL MEASUREMENT SYMBOLS: WL: Water Level WS: While Sampling N/E: Not Encountered WCI: Wet Cave in WD: While Drilling DCI: Dry Cave in BCR: Before Casing Removal AB: After Boring ACR: After Casing Removal Water levels indicated on the boring logs are the levels measured in the borings at the times indicated. Groundwater levels at other times and other locations across the site could vary. In pervious soils, the indicated levels may reflect the location of groundwater. In low permeability soils, the accurate determination of groundwater levels may not be possible with only short-term observations. DESCRIPTIVE SOIL CLASSIFICATION: Soil classification is based on the Unified Classification System. Coarse Grained Soils have more than 50% of their dry weight retained on a #200 sieve; their principal descriptors are: boulders, cobbles, gravel or sand. Fine Grained Soils have less than 50% of their dry weight retained on a #200 sieve; they are principally described as clays if they are plastic, and silts if they are slightly plastic or non-plastic. Major constituents may be added as modifiers and minor constituents may be added according to the relative proportions based on grain size. In addition to gradation, coarse-grained soils are defined on the basis of their in-place relative density and fine-grained soils on the basis of their consistency. CONSISTENCY OF FINE-GRAINED SOILS RELATIVE DENSITY OF COARSE-GRAINED SOILS Standard Unconfined Penetration or Standard Penetration Compressive N -value (SS) or N -value (SS) Strenath. Qu, psf Blows/Ft. Consistency Blows/Ft. Relative Density < 500 0-1 Very Soft 0-3 Very Loose 500 - 1,000 2-4 Soft 4-9 Loose 1,000 - 2,000 4-8 Medium Stiff 10 - 29 Medium Dense 2,000 - 4,000 8-15 Stiff 30 - 49 Dense 4,000 - 8,000 15 - 30 Very Stiff > 50 Very Dense 8,000+ > 30 Hard RELATIVE PROPORTIONS OF SAND AND GRAVEL GRAIN SIZE TERMINOLOGY Descriptive Term(s) of other Percent of Major Component constituents Dry Weiaht of Sample Particle Size Trace <15 Boulders Over 12 in. (300mm) With 15 - 29 Cobbles 12 in. to 3 in_ (300mm to 75 mm) Modifier > 30 Gravel 3 in. to #4 sieve (75mm to 4.75 mm) Sand #4 to #200 sieve (4.75mm to 0.075mm) RELATIVE PROPORTIONS OF FINES Silt or Clay Passing #200 Sieve (0.075mm) Descriptive Term(s) of other Percent of PLASTICITY DESCRIPTION constituents Dry Weiaht Term Plasticity Index Trace <5 Non-plastic 0 With 5-12 Low 1-10 Modifiers >12 Medium 11-30 High > 30 Irerracon UNIFIED SOIL CLASSIFICATION SYSTEM Criteria for Assigning Group Symbols and Group Names Using Laboratory Tests" Soil Classification Group Symbol Group Name° Coarse Grained Soils Gravels Clean Gravels Cu >_ 4 and 1 < Cc < 3E GW Well-graded gravel' More than 50% retained More than 50% of coarse Less than 5% fines' Cu < 4 and/or 1 > Cc > 3E GP Poorly graded gravel' fraction retained on on No. 200 sieve No. 4 sieve Gravels with Fines More Fines classify as ML or MH GM Silty gravel','." than 12% fines' Fines classify as CL or CH GC Clayey gravel '•o•" Sands Clean Sands Cu > 6 and 1 <_ Cc <_ 3' SW Well-graded sand' 50% or more of coarse Less than 5% fines' Cu < 6 and/or 1 > Cc > 3E SP Poorly graded sand' fraction passes No. 4 sieve Sands with Fines Fines classify as ML or MH SM Silty sand',"' More than 12% fines' Fines Classify as CL or CH SC Clayey sand G.H.1 Fine-Grained Soils Silts and Clays inorganic PI > 7 and plots on or above "A" line' CL Lean clay`?',M 50% or more passes the Liquid limit less than 50 PI < 4 or plots below "A" line' ML Silt" M No. 200 sieve organic Liquid limit - oven dried Organic clay",`"'" < 0.75 OL Liquid limit - not dried Organic siltK`",o Silts and Clays inorganic PI plots on or above "A" line CH Fat clay"-' Liquid limit 50 or more PI plots below "A" line MH Elastic Silt",`,"' organic Liquid limit - oven dried Organic clay",-"'P < 0.75 OH Liquid limit - not dried Organic silt",`"-' Highly organic soils Primarily organic matter, dark in color, and organic odor PT Peat "Based on the material passing the 3-in. (75-mm) sieve "If fines are organic, add "with organic fines" to group name. B If field sample contained cobbles or boulders, or both, add "with cobbles ' If soil contains > 15% gravel, add "with gravel" to group name. or boulders, or both" to group name. ' If Atterberg limits plot in shaded area, soil is a CL-ML, silty clay. cGravels with 5 to 12% fines require dual symbols: GW-GM well-graded K If soil contains 15 to 29% plus No. 200, add "with sand" or "with gravel with silt, GW-GC well-graded gravel with clay, GP-GM poorly gravel," whichever is predominant. graded gravel with silt, GP-GC poorly graded gravel with clay. If il t i > 30% 'Sands with 5 to 12% fines require dual symbols: SW-SM well-graded so con a ns _ plus No. 200 predominantly sand, add " " sand with silt, SW-SC well-graded sand with clay, SP-SM poorly graded sandy to group name. sand with silt, SP-SC poorly graded sand with clay M If soil contains >_ 30% plus No. 200, predominantly gravel, add "gravelly" to group name. ECU = D60010 Cc = (D30) "PI > 4 and plots on or above "A" line. D1o x D6o °PI < 4 or plots below "A" line. F If soil contains > 15% sand, add "with sand" to group name. P PI plots on or above "A" line. cif fines classify as CL-ML, use dual symbol GC-GM, or SC-SM. °PI plots below "A" line. 60 For classification of fine-grained soils and fine-grained fraction So . of coarse-grained soils Equation of "A" - line +J ,? +Q d Horizontal at P1=4 to LL=25.5. th PI -0 73 LL 2 X 40, en : . - ( 0) p Equation of "U" - line o? ? ? Vertical at LL= 16 to P1=7, G 30 ` then PI_0.9 (LL-6) U ' 0 20. MH or OH 0- ' 10, 7-- 41 - ``ML or OL 0 0 10 16 20 30 40 50 60 70 60 90 100 110 LIQUID LIMIT (LL) 1rerracon__. Form