HomeMy WebLinkAbout20160400 Ver 2_Approval Letter_20180502ROY COOPER
r;nrrruor
MICHAEL 5. REGAN
Sen�rrui�r
Envirunmen tal LINDA CULPEPPER
lnlfi'un l)ii'e['IOr'
Quolity
May 3, 2018
Haywood County
NCDWR Project No. 20160400 V. 2
Bridee 102 on SRI 173
TIP Project No. 17BP.14.R.138
APPROVAL oP401 WATGR QUALITY CERTIFICATION, wi[h ADDITIONAL CONDITIONS
Mc David G. MeHenrv. Division Environmental Officer
NCDOT, Division 14
253 Webster Road
Sylva, North Carolina 28779
Dear Mr. McHenry:
You have our approval, in accordance with the conditions listed below, for the following impacts for the purpose of
bridge replacement in Haywood County:
Stream Im acts in Ihe French Broad River Basin
Perm�nen[ FII Temporary FII
in Perennial in Perennial Total Stream
Site ImpaM
Stream S[ream
(linear 17)
linear fl linear ft
SI R9 89
S? I45 14�
S3 I? 12
Sa I� �'-
TOTAL II3 1a5 258
Total Stream Impact for Projecl: 258 linear fee[.
The projec[ shall be construc[ed in accordance wi[h your applica[ioo dated received April 30, 2018 After reviewing
your application, wz have decided that these impacts are covered by General Water Quality Certitication Number
4135. This cerfification corresponds to the Nationwide Permit 14 issued by the Corps oF F.ngineers in addition, you
should acquire am� o[her federal, sta[e or local pemiits before you proceed with your p%ject includin� (but not
limited to) Sedimen[ and Erosion Control, Non-Discharge and Water Supply Wa[ershed regulations. This approval
will expire with thz accompanying 404 permit.
This approval is valid solely for the purpose and desien described in your application (unless modified below).
Should your projecl change, you must no[ify the NCDW R and submi[ a new application. If Ihe property is sold, [he
new owner must be �=iven a copy of this Cenitication aod approval letter, and is thereby responsible for complying
with all the conditions. If rotal wetland fills for this project (now or in the future) exceed one acre, or of rotal
impacts to streams (now or in the future) exceed 150 linear feet, compensatory mitigation may be required as
described in I SA NCAC 2H .Oi06 (h) (6) and (7). For this approval to remain valid, you must adhere to the
conditions listed in the attached certification(s) and any additional conditions listed below.
State of North Carolina I Environmental Quallty
I G I7 Mzil Sernce Cencer I Raleigh, North Cnrolina 27699-I b U
Condition(s) of Certi�cation: '
Project Specific Conditions
1. The permittee will need to adhere to all appropriate in-water work moratoria (including the use of pile
driving or vibration techniques) prescribed by the NC Wildlife Resources Commission. No in-water
work is permitted between October 15 and April 15 of any year, without prior approval from the NC
Division of Water Resources and the NC Wildlife Resources Commission.
In-stream work and land disturbance within the 25-foot buffer zone are prohibited during the trout-
spawning season of October 15 through April 15 to protect the egg and fiy stages of trout.
2. The NCDOT Division Environmental Officer or Environmental Assistant will conduct a pre-construction
meeting with all appropriate staff to ensure that the project supervisor and essential staff understand the
potential issues with stream and pipe alignment at the permitted site. NCDWR staff shall be invited to
the pre-construction meeting. [15A NCAC 02H.0506(b)(2) and (b)(3)
General Conditions ,
Unless otherwise approved in this certification, placement of culverts and other structures in open waters
and streams shall be placed below the elevation of the streambed by one foot for all culverts with a
diameter greater than 48 inches, and 20 percent of the culvert diameter for culverts having a diameter
less than 48 inches, to allow low flow passage of water and aquatic life. Design and placement of
culverts and other structures including temporary erosion control measures shall not be conducted in a
manner that may result in dis-equilibrium of wetlands or streambeds or banks, adjacent to or upstream
and downstream of the above structures. The applicant is required to provide evidence that the
equilibrium is being maintained if requested in writing by NCDWR. If this condition is unable to be met
due to bedrock or other limiting features encountered during construction, please contact NCDWR for
guidance on how to proceed and to determine whether or not a permit modification will be required.
[15A NCAC 02H.0506(b)(2)]
2. If concrete is used during construction, a dry work area shall be maintained to prevent direct contact
between curing concrete and stream water. Water that inadvertently contacts uncured concrete shall
not be discharged to surface waters due to the potential for elevated pH and possible aquatic life and
fish kills. [15A NCAC 02B.0200]
3. During the construction of the project, no staging of equipment of any kind is permitted in waters of
the U.S., or protected riparian buffers. [15A NCAC 02H.0506(b)(2)]
4. The dimension, pattern and profile of the stream above and below the crossing shall not be modified.
Disturbed floodplains and streams shall be restored to natural geomorphic conditions. [15A NCAC
02H.0506(b)(2)]
5. The use of rip-rap above the Normal High Water Mark shall be minimized. Any rip-rap placed for
stream stabilization shall be placed in stream channels in such a manner that it does not impede
aquatic life passage. [15A NCAC 02H.0506(b)(2)]
6. The Permittee shall ensure that the final design drawings adhere to the permit and to the permit
drawings submitted for approval. [15A NCAC 02H .0507(c) and 15A NCAC 02H .0506 (b)(2) and
��)�2)�
7. All work in or adjacent to stream waters shall be conducted in a dry work area. Approved BMP
measures from the most current version of NCDOT Construction and Maintenance Activities manual
such as sandbags, rock berms, cofferdams and other diversion structures shall be used to prevent
excavation in flowing water. [15A NCAC 02H.0506(b)(3) and (c)(3)]
8. Heavy equipment shall be operated from the banks rather than in the stream channel in order to
minimize sedimentation and reduce the introduction of other pollutants into the stream. [15A NCAC
02H.0506(b)(3)]
9. All mechanized equipment operated near surface waters must be regularly inspected and maintained to
prevent contamination of stream waters from fuels, lubricants, hydraulic fluids, or other toxic materials.
[15A NCAC 02H.0506(b)(3)]
10. No rock, sand or other materials shall be dredged from the stream channel except where authorized by this
- certification. [15A NCAC 02H.0506(b)(3)]
11. Discharging hydroseed mixtures and washing out hydroseeders and other equipment in or adjacent to
surface waters is prohibited. [15A NCAC 02H.0506(b)(3)]
12. The permittee and its authorized agents shall conduct its activities in a manner consistent with State water
quality standards (including any requirements resulting from compliance with §303(d) ofthe Clean Water
Act) and any other appropriate requirements of State and Federal law. If the NCDWR determines that
such standards or laws are not being met (including the failure to sustain a designated or achieved use) or
that State or federal law is being violated, or that further conditions are necessary to assure compliance,
the NCDWR may reevaluate and modify this certification. [15A NCAC 02B.0200]
13. All fill slopes located in jurisdictional wetlands shall be placed at slopes no flatter than 3:1, unless
otherwise authorized by this certification. [15A NCAC 02H.0506(b)(2)]
14. A copy of this Water Quality Certification shall be maintained on the construction site at all times. In
addition, the Water Quality Certification and all subsequent modifications, if any, shall be maintained with
the Division Engineer and the on-site project manager. [15A NCAC 02H .0507(c) and 15A NCAC 02H
.0506 (b)(2) and (c)(2)]
15. The outside buffer, wetland or water boundary located within the construction corridor approved by this
authorization shall be clearly marked by highly visible fencing prior to any land disturbing
activities. Impacts to areas within the fencing are prohibited unless otherwise authorized by this
certification. [15A NCAC 02H.0501 and .0502]
16. The issuance of this certification does not exempt the Permittee from complying with any and all statutes,
rules, regulations, or ordinances that may be imposed by other government agencies (i.e. local, state, and
federal) having jurisdiction, including but not limited to applicable buffer rules, stormwater management
rules, soil erosion and sedimentation control requirements, etc.
17. The Permittee shall report any violations of this certification to the Division of Water Resources within
24 hours of discovery. [15A NCAC 02B.0506(b)(2)]
18. Upon completion of the project (including any impacts at associated borrow or waste sites), the NCDOT
Division Engineer shall complete and return the enclosed "Certification of Completion Form" to notify
the NCDWR when all work included in the 401 Certification has been completed. [15A NCAC
02H.0502( fl]
19. Native riparian vegetation (ex. list herbaceous, trees, and shrubs native to your geographic region)
must be reestablished in the riparian areas within the construction limits of the project by the end of the
growing season following completion of construction.[15A NCAC 02B.OXXX(10)]
20. There shall be no excavation from, or waste disposal into, jurisdictional wetlands or waters associated
with this permit without appropriate modification. Should waste or borrow sites, or access roads to waste
or borrow sites, be located in wetlands or streams, compensatory mitigation will be required since that is
a direct impact from road construction activities.[15A NCAC 02H.0506(b)(3) and (c)(3)]
21. Erosion and sediment control practices must be in full compliance with all specifications governing the
proper design, installation and operation and maintenance of such Best Management Practices in order to
protect surface waters standards [15A NCAC 02H.0506(b)(3) and (c)(3]):
a. The erosion and sediment control measures for the project must be designed, installed, operated,
and maintained in accordance with the most recent version of the North Carolina Sediment and
Erosion Control Planning and Design Manual.
b. The design, installation, operation, and maintenance of the sediment and erosion control measures
must be such that they equal, or exceed, the requirements specified in the most recent version of the
North Caro(ina Sedrment and Erosion Conbol Manual. 7'he devices shall be maintained on all
construction sites, borrow sites, and waste pile (spoil) projects, induding conVactor-owned or leased
borrow pits associated with the project.
c. For borrow pit sites, the erosion and sediment control measures must be designed, installed,
operated, and maintained in accordance with the most recent version of the North Carolina Sarface
Minrng Manual.
d. T'he reclamation measures and implementation must comply with the reclamation in accordance
with the requirements of the Sedimentation Pollution Control Act.
22. Sediment and erosion control measures shall not be placed in wetlands or waters unless otherwise
approved by this Certification. [ 15A NCAC 02H.0506(bx3) and (c)(3)]
If you wish to contest any statement in the attached Certification you must file a petition for an administrative
hearing. You may obtain the petition form from the office of Administrative hearings. You must file the petition
with the office of Administrative Hearings within sixty (60) days of receipt of this notice. A petition is considered
filed when it is received in the office of Administrative Hearings during normal office hours. The Office of
Administrative Hearings accepts filings Monday tivough Friday between the hours of 8:OOam and S:OOpm, except
for official state holidays. The original and one (1) copy of the petition must be filed with the Office of
Administrative Hearings.
The petition may be faxed-provided the original and one copy of the document is received by the Office of
Administrative Hearings within five (5) business days following the faxed transmission.
The mailing address for the Office of Administrative Hearings is:
Office of Administrative Hearings
6714 Mail Service Center
Raleigh, NC 27699-6714
Telephone: (919) 431-3000, Facsimile: (919) 431-3100
A copy of the petition must also be served on DEQ as follows:
Mr. Bill F. Lane, General Counsel
Department of Environmenhl Quality
1601 Mail Service Center
This letter completes the review of the Division of Water Resources under Section 401 of the Clean Water Act. If you
have any questions, please contact Kevin Barnett at (828) 296-4657 or kevin.bamett@ncdenr.gov.
Sincerely,
�d •
Lind Culpepper, terim Director
Division of Wa[er Resources
Electronic copy only distribution:
Crystal Amschler, US Army Corps of Engineers, Asheville Field Office
Marla Chambers, NC Wildlife Resources Commission
File Copy
Environmeniul
QUQ�itY
NCDWR Project No.:
Applicant:
Project Name:
Date of Issuance of 301 Water Quality Certifica[ion:
County:
ROY COOPER
<�,» ���,��,�„�
MICHAEL S. REGAN
s�-<, � ���� r
LINDA CULPEPPER
lrrlrrin� 1)ireclur
Certificate of Completion
Upon completion of all worh approved within the 401 Water Quality Certification or applicable Buffer Rules, and
any subsequent moditications, the applicant is required to remrn this certificate to the 401 Transportation Permittin�
Unit, North Carolina Division of Water Resources, 1617 Mail Service Cen[er, Raleigh, NC, 27699-1617. This form
may be reWmed to NCDWR by the applicant, the applicant's authorized aeent, or the project engineec It is not
necessarv to send certiticares from all of these.
Applican7's Certificalinn
1. , hereby s[ate [ha[, ro the best of my abili[ies, due care and diligence
was used in the observation of the construction such that the cunstruction was observed lo be built within substantial
compliance and intent ofthe 401 Water Quality Certification and Buffer Rules, the approved plans and
specifications, and other supportine ma[erials.
Signa[ure: Date:
AgenPs Certijrcutioiv
I, , hereby s[ate that, to the best of my abilities, due care and diligence
was used in the observation of the construction such that the construction was observed to be built within substantial
compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and
specifications, and other supporting materials.
Signature:
Engineer's Cetlificnlimt
Partial Final
I, , as a duly registered Professional Engineer in the Sta[e of North
Carolina, having been authorized to observe (periodically, weekly, tLll time) [he construction of the projec[ for the
Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the
construction such that the construction was observed to be built within substantial compliance and intent of the 401
Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials.
Signature
Da[e
Reaisira[ion No.
Statz o(North Carolina I Em'ironmzntal Qualiq'
1617 Mad Sen�ice Conter I Raleigh. Nurth Carolina 27699-1617