Loading...
HomeMy WebLinkAboutNC0026565_Compliance Evaluation Inspection_20180425 ROY COOPER Govei nor MICHAEL S.REGAN Sec rerari. Watet Resources LINDA CULPEPPER Ern ironmental Qualit Interim Urrectvt April 25,2018 Grant Cheek Town of Ramseur P O Box 545 Ramseur,NC 27316 RECEIVED/DENR/DWR SUBJECT: Pretreatment Compliance Inspection(PCI) MAY 10 2018 Town of Ramseur NPDES#NC0026565 Water Resources Permitting Section Randolph County Dear Mr. Cheek: On April 4, 2018 a Pretreatment Compliance Inspection (PCI) was performed by Jim Gonsiewski of the Winston-Salem Regional Office. Ms. Nadine Blackwell, Pretreatment Coordinator for the Town of Ramseur was present for the inspection along with Mr. Terry Lewallen, ORC for the facility. The purpose of this inspection was to determine the effectiveness of the Town's pretreatment program, which includes reviewing the files,POTW plant performance, industry monitoring data,and adherence to the enforcement response plan(ERP). Background This is a 0.48 MGD permitted facility. The City has one (1) Significant Industrial User (SIU) which is categorical The publicly owned treatment works (POTW) has not had any limits violations since the last pretreatment compliance inspection. POTW Interview There are no plant problems related to pretreatment issues and there are no NPDES permit limit or monitoring violations recorded from January 2017 through February 2018 The facility is very well operated. Pretreatment Program Elements Review The Headworks Analysis(HWA)renewal was submitted on December 20,2017. The HWA was approved on February 8, 2018.The next HWA is due on October 1,2022. The last Industrial Waste Survey (IWS) was submitted on January 15, 2016. The IWS- vas approved on March 7, 2016.The next IWS is due on April 1, 2021. The Sewer Use Ordinance(SUO)was approved on October 2,2015. The Enforcement Response Plan(ERP)was approved on October 2,2015. The Short Term Monitoring Plan(STMP)was approved on October 2, 2015. ''''Nothin Compares':-_, State of North Carolina I Environmental Quality 450 W Hanes Mill Road,Suite 300,Winston-Salem,North Carolina 27105 Phone 336-776-98001 FAX 336-776-9797 STMP File Review The Short Term Monitoring Plan(STMP) is being conducted at the proper locations and frequencies. Industrial User Permit(IUP)File Review The SIU(Matlab,Inc.)was in significant noncompliance(SNC)in 2017 for Zinc Fines totaling$350 were assessed. A review of the file for Matlab, Inc. (#002) revealed that the monitoring data was well organized and compliant. The slug control plan for Matlab,Inc(#002)was in good order. Action Items No other action items were noted. The pretreatment program is considered satisfactory Ms Blackwell implements the pretreatment program in an excellent manner.If you have any questions please contact Jim Gonsiewski or me at(336)776-9800. Sincerely, 5t/piv � Sherri V. Knight,PE Regional Supervisor Water Quality Regional Operations Section Division of Water Resources,NCDEQ—WSRO cc• PERCS Unit—Monti Hassan Nadine Blackwell-Suez Central Files WSRO Files NORTH CAROLINA DISION OF WATER RESOURCES PRETREATMENT COMPLIANCEVIINSPECTION(PCI)REPORT /later ResutLrces ETISMCRYENTAIau.,t BACKGROUND INFORMATION (Complete Prior To PCI;Review Program Info Database Sheet(s11 1 Control Authority(POTW)Name:--Tdv.;,^ r 2. Control Authority Representative(s). C(4( n (c c k UJ e(( 3 Trtle(s). /eI`)-- !`ecA ",(Y\e�"r C DC) et tion e- 4. 4. Last inspection Date-Z ��I/ t, Inspection Type(Check One): [ CI ❑ Audit 5. Has Program Completed All Requirements from the Previous Inspection and,,PProg��ram Info Sheet(s)7 ❑YES CI NO 6. Is POTW under an Order That Includes Pretreatment Conditions'? [1:1 YES I v� Order Type,Number,Parameters- Are Milestone Dates Being Met? ❑YES ❑NO ICIS CODING Main Program Permit Number MM/DD/YY NIC ( 0 to I`aICQISI (pIgI I©LiIviIIe 7. Current Number Of Significant Industrial Users(SIUs)7 ( - 8 Number of Sills With No IUP,or With an Expired IUP? 9 Number of SIUs Not Inspected By POTW in the Last Calendar Year? 10 Number of SIUs Not Sampled By POTW in the Last Calendar Year? C 11.Number of SIUs In SNC For Limits Violations During Either of the Last 2 Semi-Annual Periods? 0 12.Number of SIUs in SNC For Reporting During Either of the Last 2 Semi-Annual Penods7 13 Number of SIUs in SNC with Pretreatment Schedule? C. 14 Number of SIUs on Schedules? 0 15.Current Number Of Categorical Industrial Users(CIUs)711 16 Number of CIUs in SNC? POTW INTERVIEW 17 Since the Last PCI,has the POTW had any NPDES Limits Violations? ❑YES [-IO If Yes,What are the Parameters and How are these Problems Being Addressed? 18. Since the Last PCI,has the POTW had any Problems Related to an Industrial ❑YES ❑XO Discharge(Interference,Pass-Through,Blockage,Citizens' Complaints,Increased Sludge Production,Etc)9 If Yes,How are these Problems Being Addressed? 19 Which Industries have been m SNC for Limits or Reporting during SNC for Limits' -k-iab,I,\C - either of the Last 2 Semi-Annual Periods?Not Been Published for SNC for Reporting Zi vt.L Public Notice7(May refer to PAR if Excessive SIUs in SNC) Not Published: '\le S 20 Which Industries are on Compliance Schedules or Orders?For all Sills on an Order,Has a Signed Copy of the Order been sent to the Division? d N& 21 Are Any Permits or Civil Penalties Currently Under Adjudication If Yes,Which ❑YES ®NO Ones" LTMP/STMP FILE REVIEW: 22. Is LTMP/STMP Momtormg Being Conducted at Appropriate Locations and Frequencies" []''ES ❑NO 23 Are Correct Detection Levels being used for all LTMP/STMP Monitoring? [l'iES ❑NO 24. Is LTMP/STMP Data Maintained in a Table or Equivalent? ❑'XES ❑NO Is Table Adequate? [1AES ❑NO 25 All LTMP/STMP effluent data reported on Discharge Monitoring Report? [ ES❑NO Division Inspector,please verify yourself! 26 IfNO to 23-26,list violations 27 Should any Pollutants of Concern.be Eliminated from or Added to LTMP/STMP" ❑YES [4O If yes,which ones?Eliminated- Added. NC DWR Pretreatment Compliance Inspection(PCI)Form Updated December 2016 Page 1 28. PRETREATMENT PROGRAM ELEMENTS REVIEW-Please review POTW files,verify POTW has copy of Program Elen?snt m their files,complete with supporting documents and copy of PERCS Approval Letter,and dates consistent with Program Info. Program Element Last Submittal Last Approval Date Next Due, Date In file? Date In file If Applicable Headworks Analysis(HWA) ©-Yes ❑ No EYes❑ No 1'0 I(/d Industrial Waste Survey(IWS) 1-j (5�t 6es El No 3/ it (, ['Yes❑ No y r f a I Sewer Use Ordinance(SUO) q( lr [ yes❑ No (o(a IC [U'Yes❑ No Enforcement Response Plan(ERP) 9 /acit is- El/Yes❑ No I OW'S— [,]•Yes❑ No Long Term Monitoring Plan(LTMP) cr)a Ja- Res❑ No ipfgps-, EL.Wes❑ No INDUSTRIAL USER PERMIT(IUP)FILE REVIEW(3 IUP FILE REVIEWS OR 1 FILE REVIEW AND 1 IU INSPECTION) 29. User Name 1 MVx kl,iv\ 2. 3. 30. IUP Number1111 31 Does File Contain Current Permit? 'u' es ❑ No ❑Yes ❑ No El Yes ❑ No 32. Permit Expiration Date (ar 3 ( /a_n 33. Categorical Standard Applied(I.E.40 CFR,Etc)Or N/A Li 3 34 Does File Contain Permit Application Completed Within One Year Prior ®Yes ❑ No ❑Yes ❑ No ❑Yes ❑ No to Permit Issue Date? 35 Does File Contain an Inspection Completed Within Last Calendar Year? [ Yes ❑ No ❑Yes ❑ No ❑Yes ❑ No 36 a.Does the File Contain a Slug/Spill Control Plan? a glYes❑No a. ❑Yes ONo a ❑Yes ONo b If No,is One Needed?(See Inspection Form from POTW) b ❑Yes ONo b DYes ONo b. ❑Yes ONo 37 For 40 CFR 413 and 433 TTO Certification,Does File Contain a Toxic .Yes❑No❑N/A ❑Yes❑No❑N/A ❑Yes❑No❑N/A Organic Management Plan(TOMP)7 38 a Does File Contain Original Permit Review Letter from the Division a. [ Yes ONo a. ❑Yes ONo a. ❑Yes ONo b All Issues Resolved'? b❑Yes❑NoEdTl/A b❑Yes❑No❑N/A b❑Yes❑No❑N/A 39 During the Most Recent Semi-Annual Period,Did the POTW Complete ]Yes ❑ No ❑ Yes ❑ No ❑Yes ❑ No its Sampling as Required by IUP,including flow? 40 Does File Contain POTW Sampling Chain-Of-Custody Forms? ®Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No 41 During the Most Recent Semi-Annual Period,Did he SIU Complete its I lYes❑No❑N/A ❑Yes❑No❑N/A ❑Yes❑No❑N/A Sampling as Required by lOP,including flow 41b During the Most Recent Semi-Annual Period,Did SIU submit all reports ®Yes❑No❑N/A ❑Yes❑No❑N/A ❑Yes❑No❑N/A on time' 42a.For categorical IUs with Combined Wastestream Formula(CWF),does ❑Yes❑No[[UA ❑Yes❑No❑N/A ❑Yes❑No❑N/A file include process/dilution flows as Required by IUP? 42b For categoncal IUs with Production based limits,does file include ❑Yes❑NoNN/A ❑Yes❑No❑N/A ❑Yes❑No❑N/A production rates and/or flows as Required by IUP? 43a During the Most Recent Semi-Annual Period,Did the POTW Identify NI Yes ❑ No ❑Yes ❑ No ❑Yes ❑ No All Limits Non-Compliance from Both POTW and SIU Sampling? 43b During the Most Recent Semi-Annual Period,Did the POTW Identify XYes❑No❑N/A ❑Yes❑No❑N/A ❑Yes❑No❑N/A All Reporting Non-Compliance from SIU Sampling? 44 a.Was the POTW Notified by SIU(Within 24 Hours)of All Self- a.❑Yes❑NoN/A a❑Yes❑No❑N/A a.❑Yes ONo❑N/A Monitoring Violations? b Did Industry Resample and submit results to POTW Within 30 Days? b❑Ye,sEl.No❑N/A b❑Yes❑No❑N/A b❑Yes❑No❑N/A c If applicable,Did POTW resample within 30 days of becoming aware c.❑Ye No❑N/A of SIU limit violations in the POTW's sampling of the SIU c❑Yes❑No❑N/A c❑Yes❑No❑N/A 46 During the Most Recent Semi-Annual Period,Was the SIU in SNC? Cl Yes ❑ No ❑Yes ❑ No ❑Yes ❑ No 47 During the Most Recent Semi-Annual Period,Was Enforcement Taken '( Yes❑No❑N/A ❑Yes❑No❑N/A ❑Yes❑No❑N/A as Specified in the POTW's ERP(NOVs,Penalties,timing, etc)v 48. Does the File Contain Penalty Assessment Notices'? Wes❑No❑N/A ❑Yes❑No❑N/A ❑Yes❑No❑N/A 49 Does The File Contain Proof Of Penalty Collection) ❑YesEINoDN/A ❑Yes❑No❑N/A ❑Yes❑No❑N/A 50 a Does the File Contain Any Current Enforcement Orders? a.❑YesNNo❑N/A a.❑Yes❑No❑N/A a.❑Yes❑No❑N/A b Is SIU in Compliance with Order? b❑Yes❑NogIN/A b❑Yes❑No❑N/A b❑Yes❑No❑N/A 51 Did the POTW Representative Have Difficulty in Obtaining Any of This ❑Yes XI No ❑Yes ❑ No ❑ Yes ❑ No Requested Information For You? NC DWR Pretreatment Compliance Inspection(PCI)Form Updated December 2016 Page 2 FILE REVIEW COMMENTS: e po-r-cm sc,,,-oes .c„r * SLU d-wiee_ a Reza r, UL I IN S(l/C Z.Q.A.1. 7 Kc (r ck.( S 1 STD) INDUSTRY INSPECTION ICIS CODING: Mam Program Permit Number MM/DD/YY 1 I I I I I I I I 1.Industry Inspected. 2 Industry Address. 3 Type of Industry/Product- 4 Industry Contact: Title. Phone: Fax: 5 Does the POTW Use the Division Model Inspection Form or Equivalent? ❑YES ❑NO 6 Did the POTW Contact Conduct the Following Parts of the Industrial Inspection Thoroughly? Comments. A Initial Interview ❑YES ❑NO B Plant Tour ❑YES ❑NO C Pretreatment Tour ❑YES ❑NO D Sampling Review ❑YES ❑NO E. Exit Interview ❑YES ❑NO Industrial Inspection Comments- OVERALL SUMMARY AND COMMENTS: Comments: i1 e 'UM-- ` -- u tA, 4-n Requirements Recommendations: NOD: ❑YES ']NO NOV: ❑YES p NO QNCR: ❑YES NO POTW Rating: Satisfactory Marginal UnSatisfactory PCI COMPLETED BY „rv`.o�✓ DATE: `k l l J 7S NC DWR Pretreatment Compliance Inspection(PCI)Form Updated December 2016 Page 3