Loading...
HomeMy WebLinkAboutNCG550805_Compliance_20180412 w ROY COOPER (i(vernor MICHAEL S. REGAN • Secretary Water Resources LINDA CULPEPPER Environmental Quality Interior Director April 12, 2018 Michael and Leah Bergman Lee Ray Bergman LLC PO Box 685 • Durham,NC 27702 Subject: Compliance Evaluation Inspection RECEIVED/DENR/DWR Single Family Wastewater Treatment System 110 Michael Drive, Durham,NC 27704 APR 2 7 2018 Permit No.NCG550805 Durham County Water Resources Permitting Section Dear Mr. and Ms. Bergman: On April 11,2018 Mitch Hayes and Andy Neal from the Raleigh Regional Office visited the subject single- family residence (SFR) wastewater treatment system to evaluate compliance with the above permit to discharge wastewater. The checked boxes below show what conditions were noted at your facility: ❑ In compliance: You are reminded to regularly maintain the chlorine disinfection and dechlorination systems, have the effluent sampled once a year, and have the septic tank pumped out every 3 to 5 years.Your good record of operation and meeting the permit requirements is highly commended. ❑ Your home is improperly plumbed: Some of the wastewater discharges are going directly to the environment without first passing through the treatment system. This must be corrected immediately. Please submit a schedule to this office within 30 days of receipt of this letter that states your plan for correcting this deficiency. The work is to be completed within the next 3 months. ❑Disinfection: Your system is lacking disinfection, either chlorine tablets or a UV light system. New rules put into place on August 1,2007 require all SFR systems to have a means of disinfection (and dechlorination when chlorine tablets are used to disinfect, if the system was installed since that date). Since your system had no disinfection, the installation is to include a chlorine tablet dispenser,a contact chamber capable of providing a minimum 30-minute contact time,and another tablet dispenser that will hold dechlorination tablets. Please submit a schedule to this office within 20 calendar days of receipt of this letter that states your plan for correcting this deficiency. ❑Treatment tablets missing or are wrong kind:You are responsible for always having chlorine tablets and dechlorination tablets(if a required part of your system)in place.They must be the kind for wastewater treatment and not for swimming pools. ❑ Dechlorination: Your system was installed after August 1, 2007, so must have a means of dechlorination located downstream of the chlorinator and its contact chamber. See Disinfection paragraph above. Please submit a schedule to this office within 20 calendar days of receipt of this letter stating.your plan for correcting this deficiency. --"-'`Nothing Compares:-._..... Division of Water Resources,Raleigh Regional Office,Water Quality Operations Section http://portal.ncdeur.org/web./wq/aps 1628 Mail Service Center,Raleigh,NC 27699-1628 Phone:(919)791-4200 Location:3800 Barrett Drive,Raleigh,NC 27609 Fax:(919)788-7159 ❑ Pumping the septic tank:The septic tank should be pumped out every 3 to 5 years.A pumping company can check the status periodically and determine when pumping is required. 0 Failure to analyze the effluent: The effluent that is discharged from your system must be analyzed once each year. See Part I(A)of your permit about his requirement.A list of NC certified laboratories that provide this service was left at your residence during the inspection. Make arrangements for sampling to be carried out within the next 3 months, and submit results to this office within 3 weeks after the sampling has been done. ® Locations of the chlorinator/ contact tank and discharge pipe are unknown: Determine this and report to this office within 30 days of receipt of this letter with a sketch or map. ® Other: Please clear out the thick bamboo growth to expose the chlorinator/contact tank and discharge pipe. If you have questions or comments about this inspection or the requirements to take corrective action,please contact Mitch Hayes at 919-791-4200. Licensed plumbers should be used to make plumbing changes within your home. Contractors for installing disinfection or other equipment may be found in the Yellow Pages under Environmental Consultants. incerely, c_ Z• /l/ S. Daniel Smith,Regional Supervisor Water Quality Regional Operations Section Raleigh Regional Office cc: RRO/SWP Files Charles Weaver,NPDES Permitting U it Attachments i I