HomeMy WebLinkAboutNC0000396_Final IAP Effectiveness Monitoring Report_20180427(� DUKE
ENERGY
April 27, 2018
Mr. Landon Davidson
NC DENR Asheville Regional Office
2090 U.S. 70 Highway
Swannanoa, NC 28778
RE: Asheville Steam Electric Plant 2018 Effectiveness Monitoring Report
Dear Mr. Davidson:
410 S. Wilmington Street.
Raleigh, NC 27601
Mailing Address
Mail Code NC 15
Raleigh, NC 27601
919-546-7863
919-546-6302 (fax)
Duke Energy commenced interim action (accelerated remediation) at the Asheville Steam Electric Plant
with operations of extraction well EXT -1 on March 19, 2018. To date, approximately 980,000 gallons of
groundwater have been extracted. The final Basis of Design (BOD) Report was submitted to you on
December 14, 2017 and approved by the Department of Environmental Quality (DEQ) in a letter dated
February 16, 2018. Section 8.6 of the BOD report includes a requirement to submit by April 30 annually
a report to assess the effectiveness of the extraction system. The enclosed is meant to fulfill that
requirement.
If you have any questions or need any clarification regarding the information provided, feel free to
contact me at iohn.toepfer@duke-enerRy.com or at 919-546-7863 at your convenience.
thToepfer, P.E.
Lead Engineer, Duke Energy EHS CCP
Waste & Groundwater Programs
cc: Ryan Czop — Duke Energy
Ed Sullivan — Duke Energy
Todd Plating — SynTerra Corp.
enc: Interim Action Plan — 2018 Startup and Effectiveness Monitoring Report, Asheville Steam Electric
Plant, April 27, 2018
161p
synTerra
INTERIM ACTION PLAN
2018 STARTUP AND EFFECTIVENESS
MONITORING REPORT
ASHEVILLE STEAM ELECTRIC PLANT
200 CP&L DRIVE ARDEN, NC
APRIL 27, 2018
PREPARED FOR
(� DUKE
� ENERGY.
PROGRESS
DUKE ENERGY PROGRESS, LLC
odd Plating, LG
Project Manager
Bill Lantz, PE
Project Engineer
2018 Startup and Effectiveness Monitoring Report April 27, 2018
Asheville Steam Electric Plant SynTerra
TABLE OF CONTENTS
SECTION
PAGE
1.0 INTRODUCTION............................................................................................................1
1.1 Objective........................................................................................................................ 2
1.2 Model Simulation......................................................................................................... 3
1.3 Installation and Startup............................................................................................... 3
2.0 SYSTEM EFFECTIVENESS........................................................................................... 5
2.1 Hydraulic Monitoring................................................................................................. 5
2.1.1 Groundwater Pumping Rate................................................................................ 5
2.1.2 Water Level Evaluation (Radius of Influence) ................................................... 5
2.2 Analytical Monitoring................................................................................................. 7
2.2.1 Baseline Results...................................................................................................... 7
2.2.2 Post Startup Results............................................................................................... 7
3.0 OPERATIONS AND MAINTENANCE...................................................................... 8
4.0 CONCLUSIONS AND RECOMMENDATIONS...................................................... 9
LIST OF FIGURES
Figure 1-1 Site Location Map
Figure 1-2 Groundwater Extraction Effectiveness Monitoring Locations
Figure 1-3 Simulated Drawdown (EXT -01 ;10 gallons per minute) in Fractured
Bedrock
Figure 1-4 Conceptual Remediation System Layout (As Built)
Figure 2-1
EXT -01 Pumping Rate and pH Time Series
Figure 2-2
Surficial Water Level Map (October 2017)
Figure 2-3
Bedrock Water Level Map (October 2017)
Figure 2-4
Surficial Water Level Map (April 2018)
Figure 2-5
Bedrock Water Level Map (April 2018)
Figure 2-6
Drawdown Contour Map
Figure 2-7
CB -8 Water Level Monitoring
Figure 2-8
CB-8BR Water Level Monitoring
Figure 2-9
CCR-101BR Water Level Monitoring
Page i
P:\Duke Energy Progress.1026\102. Asheville Ash Basin GW Assessment Plan\50.EHS IAP Monitoring &
Reporting \ April 2018 Annual Report \IAP Effectiveness Monitoring Report 2018.docx
2018 Startup and Effectiveness Monitoring Report April 27, 2018
Asheville Steam Electric Plant SynTerra
LIST OF FIGURES CONTINUED
Figure 2-10
CCR -102D Water Level Monitoring
Figure 2-11
CCR-103BR Water Level Monitoring
Figure 2-12
MW-8BR Water Level Monitoring
Figure 2-13
MW-9BR Water Level Monitoring
Figure 2-14
MW -9D Water Level Monitoring
Figure 2-15
MW-16BR Water Level Monitoring
Figure 2-16
MW -16D Water Level Monitoring
Figure 2-17
MW-17BRL Water Level Monitoring
Figure 2-18
MW-18BR Water Level Monitoring
Figure 2-19
Boron Time Series — CB -8, CB-8BR, CCR-101BR,
CCR -102D, EXT -01, EXT -02, MW -8S, MW-9BR
LIST OF TABLES
Table 2-1 October 2017 Water Level Measurements
Table 2-2 April 2018 Water Level Measurements
Table 2-3 Baseline Groundwater Analytical Results
Table 2-4 Baseline AOW Analytical Results
Page ii
P: \ Duke Energy Progress.1026 \ 102. Asheville Ash Basin GW Assessment Plan \ 50.EHS IAP Monitoring &
Reporting \ April 2018 Annual Report \IAP Effectiveness Monitoring Report 2018.docx
2018 Startup and Effectiveness Monitoring Report April 27, 2018
Asheville Steam Electric Plant SynTerra
1.0 INTRODUCTION
Duke Energy Progress, LLC (Duke Energy), owns and operates the Asheville Steam
Electric Plant (Plant or Site), located near Asheville in Buncombe County, North
Carolina (Figure 1-1). The Asheville Plant occupies approximately 786 acres south of
Asheville and began commercial operation in 1964. The Plant consists of two coal-fired
units along with two combustion turbines to generate power. The Asheville Plant
utilizes adjacent 300 -acre Lake Julian as cooling water, as well as the French Broad River
for water supply. Coal combustion residuals (CCR) have been managed at the Plant's
on-site ash basins and used as structural fill at the nearby Asheville Airport. Excavation
of the 1982 ash basin has recently been completed. Ash removal from the 1964 ash
basin is currently underway.
A Settlement Agreement between the North Carolina Department of Environmental
Quality (NCDEQ) and Duke Energy signed on September 29, 2015, requires accelerated
remediation to be implemented at sites that demonstrate off-site groundwater impacts.
Historical and CSA assessment information indicates the potential for off-site
groundwater impact west of the 1964 ash basin at the Asheville Steam Electric Plant.
Figure 1-2 illustrates the area of interest and shows the general area to be addressed for
accelerated remediation by groundwater extraction. Boron, chloride, cobalt, iron,
manganese, selenium, sulfate, total dissolved solids (TDS), and vanadium have been
identified as constituents occurring at levels above 2L or IMAC. Boron, chloride, sulfate,
and TDS impacts, which have the potential to migrate beyond the compliance boundary
offsite, will be the focus of interim action remedial efforts.
A final Basis of Design Report was submitted to NCDEQ on December 14, 2017. The
Asheville Steam Electric Plant 100% Basis of Design was approved by NC DEQ in a
letter from Zimmerman to Sullivan on February 16, 2018. Four considerations prior to
implementation included:
17 All permits that are necessary concerning system operation have been obtained.
'67 Water quality samples should be collected after installation of new wells and prior to
initiating system operations for all wells included in the interim action extraction array
network to provide a baseline of site conditions for evaluating system effectiveness.
101 Water quality samples should be free of turbidity at levels that would interfere with
chemical analysis, and not show signs of grout contamination.
Page 1
P: \ Duke Energy Progress.1026 \ 102. Asheville Ash Basin GW Assessment Plan \ 50.EHS IAP Monitoring &
Reporting \ April 2018 Annual Report \IAP Effectiveness Monitoring Report 2018.docx
2018 Startup and Effectiveness Monitoring Report April 27, 2018
Asheville Steam Electric Plant SynTerra
17 Section 8.1 System Performance Metrics states that water levels will be measured by
manual means or by use of pressure transducers. In addition, the report states that
pressure transducers will be used to obtain daily measurements throughout the first
quarter of operation. Collection of water -level measurements at widely spaced time
intervals may not allow for an effective evaluation of system operation. The use of
pressure transducers to obtain continuous water -level measurements beyond the first
quarter should promote a refined understanding of pumping influence on the fractured
bedrock flow system considering site conditions that may develop as the result of an
interim action, such as dewatering of fractures.
All considerations for approval were evaluated and implemented prior to initializing
system operation.
1.1 Objective
Constituents associated with coal ash pore water have been identified within
groundwater in the surficial, transition, and bedrock flow zones at the compliance
boundary. The area of highest concentration is immediately northwest of the 1964 ash
basin extending toward the French Broad River. Concentrations in this area are
influenced by the former flue gas desulfurization (FGD) wastewater treatment wetlands
as evident by chemical analysis and hydraulic conditions in the area. Groundwater
flow in this area is from the basin to the west, towards the French Broad River.
Groundwater monitoring wells delineating concentrations in this area are located on
Duke Energy property; however, there is a 12 -acre parcel of property within the I-26
corridor not owned by Duke Energy. Seep data downgradient of the 12 -acre parcel
indicate exceedances of 2L standards or IMACs for antimony, boron, chloride, cobalt,
iron, manganese, sulfate, TDS, thallium, and vanadium indicating similar
concentrations are likely present in the underlying shallow groundwater. A summary
of baseline conditions in this area is presented in Section 2.2.
Implementation of a groundwater extraction system adjacent to the northwest corner of
the 1964 basin is expected to capture groundwater and associated constituents in the
area of highest observed concentrations prior to migration offsite. Consistent with the
Settlement Agreement, the primary objective of the groundwater extraction system is to
reduce groundwater migration of source area constituents towards the 12 -acre parcel
and remove constituent mass from the area of highest constituent concentrations. The
reduction of migration from the source area toward the 12 -acre parcel is also expected
to reduce constituent concentrations in the French Broad River floodplain over time.
Constituents observed in groundwater greater than the 2L or IMAC Standard that are
beyond the area of influence or present in another media are being evaluated in
Page 2
P: \ Duke Energy Progress.1026 \ 102. Asheville Ash Basin GW Assessment Plan \ 50.EHS IAP Monitoring &
Reporting \ April 2018 Annual Report \IAP Effectiveness Monitoring Report 2018.docx
2018 Startup and Effectiveness Monitoring Report April 27, 2018
Asheville Steam Electric Plant SynTerra
accordance with CAMA and 15NCAC 02L.0106 and will be discussed in
Comprehensive Site Assessment and Corrective Action Plan (CAP) documents.
1.2 Model Simulation
An initial Groundwater Flow and Transport Modeling Report was submitted with the
CAP Part 1 on November 20, 2015. This report was updated in March 2017 to
incorporate basin closure activities, pumping test results, and subsurface data from
pilot test wells and additional assessment wells installed following initial model
development. Comments on this report were provided during the 60 percent Basis of
Design report review. These comments were further discussed on August 29, 2017 with
the NCDEQ Asheville Regional Office. Revisions to the flow and transport model will
be included in the site -wide Corrective Action Plan document at a later date. The March
2017 flow and transport model was used to evaluate the sustainable groundwater
extraction well flow rates, and simulation of the effects on boron distributions through
time.
Groundwater modeling simulations demonstrate that extraction from EXT -01 could
accelerate the removal of constituent mass and reduce downgradient migration of
constituents through the area of interest. For a single well configuration (pumping from
EXT -01), 10 gpm was the approximate maximum rate that could be sustained without
pulling the water table down into the fractured rock, and inducing large drawdowns in
the pumping well. Figure 1-3 presents simulated drawdown in the vicinity of EXT -01
within the transition zone and fractured bedrock.
1.3 Installation and Startup
Based on pumping test information and groundwater modeling scenarios, installation
of two additional extraction wells (EXT -A and EXT -B) spaced 150 feet to the north and
south of EXT -1 was recommended. Attempts to locate a productive flow zone similar to
EXT -1 were unsuccessful. After four attempts to install additional extraction wells and
considering the flow and transport model simulations, the extraction system installation
proceeded with a single extraction well (EXT -1). Below are field observations from
drilling activities:
07 EXT -A was completed on October 17, 2017. A six-inch PVC surface casing was
installed to a depth of 30 feet below land surface (bls) at auger refusal. Dry
conditions were noted throughout the overburden. Following a 24-hour grout
cure period, a six-inch diameter open borehole was advanced to a depth of 80
feet bls. One water -producing zone was encountered yielding approximately 1
gallon per minute (gpm). A productive transition zone/upper bedrock flow
system observed at EXT -1 was not encountered at EXT -A.
Page 3
P: \ Duke Energy Progress.1026 \ 102. Asheville Ash Basin GW Assessment Plan \ 50.EHS IAP Monitoring &
Reporting \ April 2018 Annual Report \IAP Effectiveness Monitoring Report 2018.docx
2018 Startup and Effectiveness Monitoring Report April 27, 2018
Asheville Steam Electric Plant SynTerra
N EXT -B was completed on November 20, 2017. A six-inch PVC surface casing was
installed to a depth of 38 feet bls at auger refusal. Following a 24-hour grout cure
period a six-inch diameter open borehole was advanced to a depth of 88 feet
bls. No water -producing fractures were encountered. Email correspondence on
October 13, 2017 from Ted Campbell indicated NCDEQ approved the request to
use EXT -B in lieu of proposed monitoring well MW-8BRL. On October 16, 2017,
EXT -B was advanced to 175 feet bls. No water -producing fractures were
encountered. Per the Technical Direction letter dated September 1, 2017
(Risgaard to Sullivan), the boring was advanced an additional 50 feet and
terminated at a depth of 225 feet bls. This boring is considered dry but will
remain open to allow for borehole geophysical logging and hydraulic head
gauging throughout this phase of assessment.
07 EXT -C was completed on November 20, 2017. A six-inch PVC surface casing was
installed to a depth of 20 feet below land surface (bls) at auger refusal. Dry
conditions were noted throughout the overburden. Following a 24-hour grout
cure period, a six-inch diameter open borehole was advanced to a depth of 70
feet bls. Minor fractures were noted, but did not produce water.
07 EXT -D was completed on November 16, 2017. A six-inch PVC surface casing was
installed to a depth of 19.5 feet below land surface (bls) at auger refusal. Dry
conditions were noted throughout the overburden. Following a 24-hour grout
cure period, a six-inch diameter open borehole was advanced to a depth of 70
feet bls. Multiple fractures were noted that produced a cumulative yield of less
than one gpm.
The groundwater extraction system installed within EXT -1 began operation on March
19, 2018.
Page 4
P: \ Duke Energy Progress.1026 \ 102. Asheville Ash Basin GW Assessment Plan \ 50.EHS IAP Monitoring &
Reporting \ April 2018 Annual Report \IAP Effectiveness Monitoring Report 2018.docx
2018 Startup and Effectiveness Monitoring Report April 27, 2018
Asheville Steam Electric Plant SynTerra
2.0 SYSTEM EFFECTIVENESS
2.1 Hydraulic Monitoring
2.1.1 Groundwater Pumping Rate
The extraction well pump is equipped with variable frequency drive (VFD) that
provides the capability to operate the pump at lower flow rates, if necessary,
while not significantly sacrificing efficiency or subjecting the pump to
unnecessary working pressure. The control system includes water level and flow
monitoring feedback to the VFD providing effective operation of the pump.
The system has been programmed to maintain a constant level approximately 58
feet below the top of well casing, which reduces the water level within the well
to 10 feet below the deepest observed water producing fracture (47.5 feet) and
approximately 6 feet below a steeply dipping non-productive fracture. This
depth was selected based on a suite of borehole geophysical logs.
Approximately 980,000 gallons of groundwater have been extracted since system
startup. Initial pumping rates have decreased throughout operation and appear
to be stabilizing at approximately 14.5 gpm. Pumping rate and pH
measurements through time are plotted on Figure 2-1.
2.1.2 Water Level Evaluation (Radius of Influence)
Water level measurements are collected during quarterly effectiveness
monitoring from wells across the site and downloaded from data logging
pressure transducers from select monitoring wells designated as part of the
effectiveness monitoring program. Surficial and bedrock water level maps from
October 2017 (prior to system startup) and April 2018 (after system startup) are
included as Figures 2-2 through 2-5. On a site -wide scale, an area surrounding
EXT -1 shows reduced water levels between October and April. USGS gage
station 03447687 near Fletcher, NC is located approximately two miles upstream
from the Plant and used to evaluate river stage influence on water level data.
The primary flow system targeted by groundwater extraction at EXT -1 consists
of a fractured bedrock matrix. Observed drawdown in surrounding monitoring
wells demonstrates the variable influence of pumping due to the heterogeneous
nature of the flow system. Figure 2-6 provides a conceptual view of radius of
influence approximately 4 weeks after startup, with the assumption that contours
are depicted which more likely represent a homogenous and porous media
matrix. Drawdown of one foot is observed approximate 543 feet to the northwest
Page 5
P: \ Duke Energy Progress.1026 \ 102. Asheville Ash Basin GW Assessment Plan \ 50.EHS IAP Monitoring &
Reporting \ April 2018 Annual Report \IAP Effectiveness Monitoring Report 2018.docx
2018 Startup and Effectiveness Monitoring Report April 27, 2018
Asheville Steam Electric Plant SynTerra
at CB -8 and greater than 300 feet to the southeast in the direction of the CCR -102
cluster.
Figures 2-7 through 2-17 show results of water level readings logged by pressure
transducers installed in effectiveness monitoring wells. Effects of groundwater
extraction are noted in wells: CB-8/8BR, CCR -1021), MW-8BR, MW -91), and MW-
9BR. Once stable conditions are achieved, effects of the pumping well and
observed heads in surrounding wells can be reflected in the flow and transport
model. The model along with particle tracking techniques can be used to perform
a capture zone analysis.
Additional observations from water level time series plots include:
47 An increased rate of response in bedrock well MW-9BR versus transition zone
well MW -91) demonstrates a direct connection between MW-9BR and EXT -1
while MW -91) data indicate a connection through porous media (Figures 2-12
and 2-13).
,67 Water levels measured at the CB -8 cluster have lowered since pumping
began. It is unclear based on data collected to date if pumping at EXT -1 is the
direct cause of water level variation. System shutdown to facilitate aquifer
tests will provide an opportunity to observe recovery and confirm influence
from groundwater extraction.
167 A diurnal variation of approximately four inches is noted in both MW-9BR
and CB-8BR. This variation is attributed to natural earth tides.
,C7 Measurements at MW -16D and MW-16BR indicate a direct response to the
French Broad River level. This response demonstrates a strong connection
between both MW -16D and MW-16BR and the French Broad River (Figure 2-
14 and 2-15)
07 Measurements at MW-17BRL indicate a response to the French Broad River
level. This response demonstrates a strong connection between MW-17BRL
and the French Broad River (Figure 2-16).
07 Measurements at MW-18BRL indicate a direct response to the French Broad
River level. This response demonstrates a strong connection between both
MW-18BRL and the French Broad River (Figure 2-17).
Page 6
P: \ Duke Energy Progress.1026 \ 102. Asheville Ash Basin GW Assessment Plan \ 50.EHS IAP Monitoring &
Reporting \ April 2018 Annual Report \IAP Effectiveness Monitoring Report 2018.docx
2018 Startup and Effectiveness Monitoring Report April 27, 2018
Asheville Steam Electric Plant SynTerra
Additional pressure transducers have been acquired to monitor water levels
across the Asheville Steam Electric Plant. These transducers will be used to
better understand dynamic conditions across the site including groundwater
extraction, French Broad River connection, basin closure activities, and new plant
construction. A site -wide view of water level trends is planned to be included in
future evaluations of system performance.
2.2 Analytical Monitoring
2.2.1 Baseline Results
Groundwater analytical results collected prior to extraction system startup
provide a basis for comparison following system operation. Comprehensive
analytical summary tables for effectiveness monitoring wells are presented in
Table 2-3 and effectiveness monitoring AOWs in Table 2-4. Boron concentration
time series plots (Figure 2-18) for select wells adjacent to EXT -1 demonstrate
relatively stable trends at most locations with increasing trends at CCR-101BR,
MW-09BR, and EXT -02. A notable peak in boron concentration occurred at MW -
08S during November of 2016 and has subsequently reduced to the lowest
observed since monitoring began. Evaluation of this trend (and others) is
beyond the scope of this document and will be discussed in the site wide
Comprehensive Site Assessment report.
2.2.2 Post Startup Results
Post Startup groundwater sampling was completed on April 19, 2018.
Evaluation of post startup analytical results compared to baseline analytical
results will be included in the next annual Effectiveness Monitoring Report. A
submittal date of July 2019 is proposed to facilitate analytical results from Q3 and
Q4 of 2018 and Q1 and Q2 of 2019.
Page 7
P: \ Duke Energy Progress.1026 \ 102. Asheville Ash Basin GW Assessment Plan \ 50.EHS IAP Monitoring &
Reporting \ April 2018 Annual Report \IAP Effectiveness Monitoring Report 2018.docx
2018 Startup and Effectiveness Monitoring Report April 27, 2018
Asheville Steam Electric Plant SynTerra
3.0 OPERATIONS AND MAINTENANCE
No operations or maintenance issues have been identified since the system began
operating on March 19, 2018. Daily checks (work days) of the system are conducted to
verify operation of the pumping well and pH adjustment metering device. Daily flow
rate readings and pH readings are obtained electronically and maintained by Plant
personnel.
Page 8
P: \ Duke Energy Progress.1026 \ 102. Asheville Ash Basin GW Assessment Plan \ 50.EHS IAP Monitoring &
Reporting \ April 2018 Annual Report \IAP Effectiveness Monitoring Report 2018.docx
2018 Startup and Effectiveness Monitoring Report April 27, 2018
Asheville Steam Electric Plant SynTerra
4.0 CONCLUSIONS AND RECOMMENDATIONS
Initial water level data from a four week period following startup suggests a zone of
influence consistent with simulated drawdown in the flow and transport model.
Approximately 980,000 gallons of groundwater have been extracted since startup. The
pumping rate of EXT -1 is stabilizing around 14.5 gpm, similar to the 10 gpm simulated
within the flow and transport model. Decreasing water level trends continue in
monitoring/observation wells:
,67 CB-8/8BR (additional data to confirm influence)
17 CCR -102D
17 MW-8BR
17 MW -9D
17 MW-9BR
Post startup groundwater sampling was completed on April 19, 2018.
SynTerra recommends continued operation using the current system settings pending
additional data for review. Water level data will be downloaded on a monthly basis
until stable conditions are achieved. Once stable pumping conditions occur system
settings will be reviewed and adjusted as necessary.
Page 9
P: \ Duke Energy Progress.1026 \ 102. Asheville Ash Basin GW Assessment Plan \ 50.EHS IAP Monitoring &
Reporting \ April 2018 Annual Report \IAP Effectiveness Monitoring Report 2018.docx
2018 Startup and Effectiveness Monitoring Report April 27, 2018
Asheville Steam Electric Plant
FIGURES
SynTerra
P: \ Duke Energy Progress.1026 \ 102. Asheville Ash Basin GW Assessment Plan \ 50.EHS IAP Monitoring &
Reporting \ April 2018 Annual Report \IAP Effectiveness Monitoring Report 2018.docx
t/j �' �1 c(11F) ✓ STANCL/ F DR W `
0.
OakFO 8t
1 74 SIDE DRa`�0� p3
�4 t 1
�'
Q` SPRINGSIDE R Svd
M
f �J 0L �j J S MMIT AVE L
U i
1 ALLEN AVE P
ST �Ogs RAGGpN�
Long
Shoals /
Lon
Bridg�U _ 25
t %l
r \�,
/ $I10o15 1'N
DAM SPILLWAY zQ; U
V - ® 11
POWELL CREEK LAKE JULIAN
POWER PLANT
(/ i = CAVE.,- l nter �, LRo
Pin
I 1 ' CCR SURFACE — �. „ �"` `' /
IMP; `DMENT BOUNDARY
1�
12 ACRE PARCEL '''' ' ` r uj ISKDR�
(NOT DUKE PROPERTY) 1964 ASH BASIN ( f
i 1
1982 ASH BASIN
HOYTRO
CCR SURFACE IMPOUNDMENT '4r, i _ o PROPERTY BOUNDARY Qp
COMPLIANCE BOUNDARY
WELLINGTON DR' r vc*
�'� Z 'A � � / ,•�� O A vol 8 i
All
AVAL'ONOR
\�J„1 � � AY GJLLIAM RD
i v
J A
m J `•� ?Vti
-E aD Bridge 8�
GLENN �ItW M aril.
L/ J!M JO L/y -A v
f�� , MCKENNA my pESIGN AVE 3 WAnpy
TAIN RO
�� a MOUN\\\
s Y
SOURCE:
USGS TOPOGRAPHIC MAP OBTAINED FROM THE USGS STORE AT
http://store.usgs.gov/b2c_usgs/b2c/start/%%%28xcm=r3standardpitrex_prd%%%29/.do
FIGURE 1-1
SITE LOCATION MAP
DUKE ENERGY PROGRESS
"'N3T°NSALEM. ASHEVILLE STEAM ELECTRIC PLANT
am Terra A3HEV,LLE 200 CP8rL DRIVE
'°""RL°"E- ARDEN, NORTH CAROLINA
148 RIVER STREET, SUITE 220 BUNCOMBE COUNTY SKYLAND NC QUADRANGLE
GREENVILLE, SOUTH CAROLINA DRAWN BY: JOHN CHASTAIN DATE: 11/02/2016
GRAPHIC SCALE
PHONE 864-421-9999
PROJECT MANAGER: TODD PLATING CONTOUR INTERVAL: 20 FEET 1000 O 1000 2000
P: Dwww.Synteffa00fp.COm LAYOUT: FIG 1-1 (SITE LOCATION MAP) MAP DATE: 2013
ukeEner Pro ress.1026 02.ASHEVILLE PLANT43.Basis Of U-g, Re ort & Modelin Desi n R t (30)\Fi ures DE AS EVILLE 16 1-1 USGS I OPO MAV),ftg I IN FEET
f•9
* rf
:i.
1
12 ACRE PARCEL
NOT COMPANY OWN
Ci
®I
C
CCR-101BR
MW -12D �
® jMW-12BR
®mss Wt/131R
GROUNDWATER
EXTRACTION WEL
MW-8BR i MW-8BR
M
Amo 0
!1BR
*CCCR-1
7A/BRL sl
A�iiiiiiiiiiiiiii -)
MW -25S
I� , MW-25BR
MW-25BRL
14
'�J CB-9SL CPANDLDR
t - L tr
t T ti
f
1 � c
ABMW-2 PZ -1 S
ABMW-2S
i PZ -1 D
r k
F;
w 7
4f t
•
>� - •ilk � � ��
•
I t
Y�
'too
-
LEGEND
®DENOTES LOCATIONS TO MONITOR GROUNDWATER
EXTRACTION SYSTEM EFFECTIVENESS
• PROPOSED TRANSDUCER LOCATION
MONITORING WELL IN ALLUVIUM
MONITORING WELL IN SAPROLITE
MONITORING WELL IN TRANSITION ZONE
ti PZ� 0 MONITORING WELL IN BEDROCK
GC ABANDONED MONITORING WELL
O P-103 O PIEZOMETER IN SAPROLITE
MW-7BR ABMW4D
ABMW 4BR
CCR -104D � ABMW-11 BR
P-102 O
r
IIAW-27S
MW-27BR k T
PZ -17S
PZ -17D � ii PZ -16
PZ-17BRL
synTerra
4DUKE
n ENERGY
N... li PROGRESS
O PIEZOMETER IN TRANSITION ZONE
O PIEZOMETER IN BEDROCK
C ABANDONED PIEZOMETER
OO EXTRACTION WELL
AREA OF WETNESS (AOW) LOCATION
- - ASH BASIN WASTE BOUNDARY
• ASH BASIN COMPLIANCE BOUNDARY
DUKE ENERGY PROGRESS ASHEVILLE PLANT
SITE BOUNDARY
p STREAM
NOTES:
AERIAL PHOTOGRAPHY PROVIDED BY NATIONAL AERIAL IMAGERY PROGRAM (NAIP),
UNITED STATES DEPARTMENT OF AGRICULTURE (USDA). IMAGE COLLECTED JUNE 10,
2016.
DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE PLANE
COORDINATE SYSTEM FIPS 3200 (NAD83).
150 75 0 150 300 FIGURE 1-2
GRAPHIC SCALE IN FEET GROUNDWATER EXTRACTION EFFECTIVENESS
148 RIVER STREET, SUITE 220 MONITORING LOCATIONS
G REENVILLE, SOUTH CAROLINA 29601 DUKE ENERGY PROGRESS, LLC
PHONE 864421-9999
DRAW Br. B.cor .com ARDEN NORTH CAROLINA
DRAWN BY: B. YOUNG DATE: 04/26/2018 1
PROJECT MANAGER: T. PLATING
CHECKED BY: T. PLATING
12 ACRE PARCEL
NOT COMPANY OWNED
(AREA OF INTEREST
11111 low-* a
%
1-.1I11lRMEl11___ gal
oil
y1 4
Il
% EXT -01 0),
T
%
Lk 'A
14
1964 ASH
BASIN
w
1982 ASH
BASIN
0 fte
AL
1.0 mum ■
LEGEND
NOTES:
SIMULATED DRAWDOWN WITH EXT -01 ATA PUMPING RATE OF 10 GALLONS PER
GRAPHIC SCALE
200 0 200 400
FIGURE 1-3
EXISTING EXTRACTION WELL
MINUTE.
IN FEET
DRAWDOWN (EXT -01; 10 GALLONS
-SIMULATED
148 RIVER STREET, SUITE 220
DRAWDOWN CONTOUR FOOT INTERVAL)
MODEL SIMULATIONS PREDICT SIGNIFICANT DEWATERING OF THE TRANSITION ZONE
FLOW SYSTEM.
PER MINUTE) IN FRACTURED BEDROCK
(5
GREENVILLE, SOUTH CAROLINA 29601
WASTE BOUNDARY
MARCH 16, 2015 AERIAL PHOTOGRAPH OBTAINED FROM NC GEOSPATIAL PORTAL AT
=,864-.421,=
'�".o
ASHEVILLE STEAM ELECTRIC PLANT
COMPLIANCE BOUNDARY
http://data.nconemap.gov/geoportal/catalog/main/home.page.
Terra
ARDEN, NORTH CAROLINA
DRAWN BY.' B. YOUNG DATE: 05/23/77]
Ir " DUKE ENERGY PROGRESS ASHEVILLE PLANT SITE BOUNDARY
DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE PLANE
II'
PROJECT MANAGER: T. PLATING
I CHECKED BY: T. PLATING
on
COORDINATE SYSTEM FIPS 3200 (NAD83/2011).
P:\Duke Energy Pro gress.1 026\00 GIS BASE DATA\Asheville\Map
Docs\GW Modeliuq\Asheville - Figure 3-1 Simulated Drawdown - Scenariol.mxd
I
_1c iv.ac nin .ter111rnnn VI Erni-r.x__1.ic+ rw caa-ivaa wE.wnw1 1% Vi nVI-1< WlWG4111XUI nye k1JXn ycyipl,Tl. N I iy VVI.- _14
,1 �rIII1+I ❑
� I
_NEW POWER SUPPLY (BY OTHERS)
f ', 1!', 1 NaOH LINE IS HEAT TRACED FROM THE -
f i 7J�1�'r �1 1 ,� BUILDING TO THE UNDERGROUND POINT - -- - ---� _
/ 1 ,--
_�
NEW POWER SUPPLY AND PUMP CONTROL
PANEL FOR EXTRACTION WELL {EXT-1}
THIS SECTION OF ELECTRICAL SUPPLY ----------- ---_-
NaOH DOSAGE PUMP WITH POWER OBTAINE❑ , ABOVE GROUND ON ON THE FEED RACK - -
�� FROM INSIDE THE pH ADJUSTMENT BUILDING
--
1
NaOH SUPPLY LINE USING EXISTING CHEMICAL FEED RACK _ �'. -�'',`;�' •NaOH SUPPLY LINE
UNDERGROUND TO PIPIT G VAULT
N a 0 H SUPPLY LINE TRANSITIONS TO UN DERGROUND DISCHARGE GROUNDWATER
r _ INTO EXISTING MAN HOLE_#I---
AT THE END OF THE CHEMICAL FEED RACK 0
UNDERGROUND POWER SUPPLY AND
SENSOR WIRE CONDUITS TO EXTRACTION
WELL (EXT-1) AND CONDUIT FOR pH SENSOR r/ r UNDERGROUND 2"0 HDPE DISCHARGE PIPE
- NO
SEE TRENCH DETAIL#1 r
WOODS f J __ r' r. \ NaOH SUPPLY LINE
`• - - - - _ _~ r •/ cRAss UNDERGROUND TO PIPING VAULT
WOODS-_ -_ _ SEE SHEET 3 FOR MORE �-------- NEW PIPING VAULT WITH pH SENSOR
DETAILS IN THIS AREA AND NaOH DOSAGE POINT
-
_ A -
---'f i EXISTING UNDERGROUND ELECTRIC
f r -----� AND FIBER OPTIC CABLES
\ - - -- .. _� �.
SEE TRENCH DETAIL #2
UNDERGROUND PUMP POWER SUPPLY AND SENSOR WIRE
CONDUITS TO EXTRACTION WELL (EXT-1)
CPA, , UNDERGROUND 2"0 HDPE
'I Np DISCHARGE PIPE
1 , \ / . r reg
MW-9138
, �1 1', Mw-9D s EXISTING UNDERGROUND CONDUIT 1"
1s
[EMPTY GALV. PIPING]
11 N'\ h II o-' , MW-95 11, I
11111 WOODS
EXT A C j/!
�
1 1 1 1 1 \I �a0 / 1 I / f 1ii Iii 11/ I I
/1
' /r Ili I1117I11i1'; f l l i rl
I' 2rSTO Il rl If17, I , I
I,11111� 11,111 1 1 I UNDERGROUND PUMP POWER SUPPLY AND SENSOR // /� II r1111III I I r + + I + + I
WIRE CONDUITS TO EXTRACTION WELL {EXT-1}
UNDERGROUND 2"0 HDPE DISCHARGE PIPE
wnoos
1
11 ,1, 111,11 , ti f� . r I 1 1 11 ILII fIII I I �
11 111 1 „1 I . _- I i I�Ilj��ifll I I I I
EXTRACTION WELL AND MANHOLE
1; 1, 1 111,11111; 11,1,'111;; ,1,, 1' ' `rr rr ,-_� ' � 1 //� }f `11'yLil�i_,I,1'I'1 •. I I{ I I
1'11'1, Jr. Iil,` I I` {,1111 II1ti1111' , I i 1
1,,, , 1 1 1 1, 1 1 ,, , , / l i 1 1 1 1, 11', 1, \\1I 14
\N
VIN,
r'r
1
N\\
1 ', 1 1 11 1 ',', I,l I, 1'1,1 1 1 /. - , / ' 1 ' ' - - -EXT-1 rl '1 ; 1 !'1 l I'll"'11 I 1
,111111,11 VoI111111, 1111',11 111, rr.' 1I 1 ---- 11 11
11 1 // I I I l i t 111 1 r 1 1 },
1161\\
11'1' 11 1
111,'1 rr / rfr I 1 II I - -2130 1 I 'll'1'lllrlll'111\\\N\ 1 II''•.,
111'1',1'1' 11,1,' rf / /' .� I � 11 1 1 1 11, 11' 1 11 11 , 1 `•
,llrl1 1111,1l 1 --- --r / I I ' 1'1111111'111'11 1
111,1, I1';,
1'1'1'1
, 1
'1, 1,,, I '1'1''''1'1'''11,''1
,,11,,11, 11 1,,11111,11/ I I III I r l 1r 111111�11�111 '1
N.
,'1 1 ,11 1 1 11 1 1 1 l 1'I _ , 1
N. 1 , , , 1 1 1,1,11 , '1 1 1 1 I , 1 111 // .--` �, ? '11 ''111111111 IN
N\ I,', 1, f. 111,11x1 1,'1'11'1''1 11 �, 11 ' MW SBR
1,1111 1 1',11'1111 1 1 1 NIN1 1 I I 11 f ', 1111111 ,111 1 -
, 1 1 1 1 1 1 lx WOODS \ 11
i1 ,I M W$S Fy �1�1 1,'I III
CON ', ',
111,1,11\,
\I N.
A 1
LL
IN'
C 4/19/201 JEC WTDP REDLINE COMMEMA5-BUILT
S I l I 1 , , 1
B 12/1/201 JEC WLL TDP SYSTEM MODIFICATIONS + 1 I '
A 9/17 JEC WILLTDP ISSUED FOR CONSTRUCTION / + 1 ', ' 1 II '1 '4 , ', '', ` 1\\'1�\`\""\' ' ,-
REV DATE DR CK I APP I DESCRIPTION
25 Go PHICSC25E 50 DUKE ENERGY PRnr;RESS
LEGEND IN FEET ASHEVILLE STEAM ELECTRIC PLANT
148 RIVER STREET, SUITE 220 200 CP &L DRIVE
Q EXT-1 EXISTING EXTRACTION WELL GREENVILLE, SOUTH CAROLINA 29601 ARDEN, NORTH CAROLINA
PHONE 864-421-9999
C LEE EXISTING PIEZOMETER www.synterraCorp.COM DRAWING TITLE: FIGURE 1-4 SHEET NO
Terra DRAWN BY: JOHN CHASTAIN ENGINEER: BILLLANrz CONCEPTUAL REMEDIATION SYSTEM LAYOUT 2 OF 10
S MW-8S EXISTING MONITORING WELL SynPROJECT MANAGER: TODD PLATING DUKE DRAWING NUMBER: REV NO
DATE: 12/1/2017
X r
EXT -01
PUMPING RATE and pH
40.0
8.00
7.50
35.0
7.00
30.0
6.50
.-.
a
+=
C7
�
6.00
w
25.0
L
a
OC
5.50
C7
cv
Z
20.0
cj
d
5.00
V
CL
d
4.50
15.0
-
4.00
1O.0
Flow (GPM)
3.50
pH
5.0
3.00
W
\
W
\
W
\
W
\
W
\
A
\
4�:- A A 4�:- A A -0.
\ \ \ \ \ \ \
A �
\ \
l0
N
111
00
N
\
\ \ N lf7 00 N
-4 O
\
\
\
\
\
00
00
N 00 \ \ \ \ \
00 00
\ \
00
00
00
00
00
00 00 00 00 00
00 00
,0p
148 RIVER STREET, SUITE 220
GREENVILLE, SOUTH CAROLINA 29601
PHONE 860.-021-9999
FIGURE
PUMPING RATE AND PHTIME SERIES
ASHEVILLE STEAM ELECTRIC PLANT
synTerra
—sm1BR8C.rpoom
T—N.
a� AVR1L201B
DUKE ENERGY PROGRESS
ARDEN, NORTH CAROLINA
..A-
��,���
2026.98
A .0 e2r.
P - ;
AS-
20t-
°
■c
J
O O AO � � � � �� ' , ■ MW -24S - _ � r r.
-�.. �_• �,` �-#.�°�R .r ,.''� �y �, I`••/ • 2162.66
2123.52
CB 8D
_ o
DRY "dr i z .' • ' so ' '"x
`• • ^ •'low
MW -9S
� ..
EXT -1 � - � �-
DRY 2112.71 E ■ `• ! i
• • r I U .
r
2112.34 CCR -102D
2101.10 4 r
B-2 ' ♦ f
2101.10 2097.47 GW -1D GW -1
FB 1-A 2159.57 o2159.90
• LEGEND
e 2101.61 i 'S :a+.�; �._ ` `.
CCR -103D •' MONITORING WELL IN ALLUVIUM
2054.58 ■ - MONITORING WELL IN SAPROLITE
NM P-103 - MONITORING WELL IN TRANSITION ZONE
CB -7 2114.57 i n ' ! •. - MONITORING WELL IN BEDROCK
GW -3 , `+4 ABANDONED MONITORING WELL
2026.90 2057.44
CCR-104DF P-102 0 ■
MW -18D �� 2058.89 2112.86 ri { ` ■ •}$srr ,.47 O PIEZOMETER IN SAPROLITE
2027.46 y�� ` ~• - ■ ��.11.,a„1 Q PIEZOMETER IN TRANSITION ZONE
CB -1D CB -1 y ` Q PIEZOMETER IN BEDROCK
MW -26S '� o 156.07 2160.55
NM N PZ -16 ABANDONED PIEZOMETER
cp 2116.78 ?�40 I �♦ OO EXTRACTION WELL
CB -6 PZ -19 273p `' ■ �' - ` WATER SUPPLY WELL SAMPLED
2032.44 CCR -1 D 2078.40 2r �• ` • WATER SUPPLY WELL NOT SAMPLED
MW -6S 20
2057.48 PZ -23 ♦ ABANDONED WATER SUPPLY WELL
MW -6D GW -5 NM WATER LEVEL CONTOUR IN FEET
• c ,• GW -4 2056.05 2106.43 CB -2 /� ♦. i - - INFERRED WATER LEVEL CONTOUR IN FEET
c DRY CB -3 MW -3D DRY ♦♦ °•.' .,
PZ -22 's 2102.72`, 2103.72 ♦• ✓
ASH BASIN WASTE BOUNDARY
NM FRD eN°R� / 1 t - - - • ASH BASIN COMPLIANCE BOUNDARY
MW -20A CB -3R d • 5
NM MW -5D �'� ''2106.15.. -►�� ° DUKE ENERGY PROGRESS ASHEVILLE PLANT
AS -7 CB -4 2066.93 �y�o r ♦ w ♦ SITE BOUNDARY
2045.82 soca �i , > STREAM
♦ �P AMW-2A �7 °
♦ 2085.46 �� MW-23DU AMW-3A MW -10
CB -5 ` 2098.15 2165.10 2165.61
2037.07 ♦ MW-23DL Po _ NOTES:
t0 MW -21 D ♦ �O s6j9 WATER LEVELS COLLECTED OCTOBER 2017.
O a 00 e�0 ly ELEVATIONS ARE REFERENCED TO THE NORTH AMERICAN VERTICAL DATUM 88
1 00 00 _ (NAVD 88).
do AS -5 P AERIAL PHOTOGRAPHY PROVIDED BY NATIONAL AERIAL IMAGERY PROGRAM (NAIP),
s� AS -3 ?O 0 o��GG� �G UONI�TED STATES DEPARTMENT OF AGRICULTURE (USDA). IMAGE COLLECTED JUNE 10,
5 .," AS -4 Ric PRNG N �L C R DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE PLANE
COORDINATE SYSTEM FIPS 3200 (NAD83).
AS -6 300 150 0 300 600 FIGURE 2-2
GRAPHIC SCALE IN FEET SURFICIAL WATER LEVEL MAP
synTerrd148 RIVER STREET, SUITE 220 (OCTOBER 2017)
�j GREENVILLE, SOUTH CAROLINA 29601 ASHEVILLE STEAM ELECTRIC PLANT
r ! < PHONE 864-421-9999
rr '��;�.. ". /• DUKE `e w.s nterracor .com DUKE ENERGY PROGRESS, LLC
A
AS -14 �� .{i■ ENERGY PROJECT MANAGER: G. PLATING DATE: 04/25/2018 ARDEN, NORTH CAROLINA
PROGRESS CHECKED BY: T. KING
�v t►�� .'� �. '- -- - - - - -- - - -- - -
2026. 2
mw -l9
1
M'
1
MW -17A
2027.89
111' MI
7 •d vA.
A .0 e2r.
P - ;
AS-
20t-
°
■c
J
O O AO � � � � �� ' , ■ MW -24S - _ � r r.
-�.. �_• �,` �-#.�°�R .r ,.''� �y �, I`••/ • 2162.66
2123.52
CB 8D
_ o
DRY "dr i z .' • ' so ' '"x
`• • ^ •'low
MW -9S
� ..
EXT -1 � - � �-
DRY 2112.71 E ■ `• ! i
• • r I U .
r
2112.34 CCR -102D
2101.10 4 r
B-2 ' ♦ f
2101.10 2097.47 GW -1D GW -1
FB 1-A 2159.57 o2159.90
• LEGEND
e 2101.61 i 'S :a+.�; �._ ` `.
CCR -103D •' MONITORING WELL IN ALLUVIUM
2054.58 ■ - MONITORING WELL IN SAPROLITE
NM P-103 - MONITORING WELL IN TRANSITION ZONE
CB -7 2114.57 i n ' ! •. - MONITORING WELL IN BEDROCK
GW -3 , `+4 ABANDONED MONITORING WELL
2026.90 2057.44
CCR-104DF P-102 0 ■
MW -18D �� 2058.89 2112.86 ri { ` ■ •}$srr ,.47 O PIEZOMETER IN SAPROLITE
2027.46 y�� ` ~• - ■ ��.11.,a„1 Q PIEZOMETER IN TRANSITION ZONE
CB -1D CB -1 y ` Q PIEZOMETER IN BEDROCK
MW -26S '� o 156.07 2160.55
NM N PZ -16 ABANDONED PIEZOMETER
cp 2116.78 ?�40 I �♦ OO EXTRACTION WELL
CB -6 PZ -19 273p `' ■ �' - ` WATER SUPPLY WELL SAMPLED
2032.44 CCR -1 D 2078.40 2r �• ` • WATER SUPPLY WELL NOT SAMPLED
MW -6S 20
2057.48 PZ -23 ♦ ABANDONED WATER SUPPLY WELL
MW -6D GW -5 NM WATER LEVEL CONTOUR IN FEET
• c ,• GW -4 2056.05 2106.43 CB -2 /� ♦. i - - INFERRED WATER LEVEL CONTOUR IN FEET
c DRY CB -3 MW -3D DRY ♦♦ °•.' .,
PZ -22 's 2102.72`, 2103.72 ♦• ✓
ASH BASIN WASTE BOUNDARY
NM FRD eN°R� / 1 t - - - • ASH BASIN COMPLIANCE BOUNDARY
MW -20A CB -3R d • 5
NM MW -5D �'� ''2106.15.. -►�� ° DUKE ENERGY PROGRESS ASHEVILLE PLANT
AS -7 CB -4 2066.93 �y�o r ♦ w ♦ SITE BOUNDARY
2045.82 soca �i , > STREAM
♦ �P AMW-2A �7 °
♦ 2085.46 �� MW-23DU AMW-3A MW -10
CB -5 ` 2098.15 2165.10 2165.61
2037.07 ♦ MW-23DL Po _ NOTES:
t0 MW -21 D ♦ �O s6j9 WATER LEVELS COLLECTED OCTOBER 2017.
O a 00 e�0 ly ELEVATIONS ARE REFERENCED TO THE NORTH AMERICAN VERTICAL DATUM 88
1 00 00 _ (NAVD 88).
do AS -5 P AERIAL PHOTOGRAPHY PROVIDED BY NATIONAL AERIAL IMAGERY PROGRAM (NAIP),
s� AS -3 ?O 0 o��GG� �G UONI�TED STATES DEPARTMENT OF AGRICULTURE (USDA). IMAGE COLLECTED JUNE 10,
5 .," AS -4 Ric PRNG N �L C R DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE PLANE
COORDINATE SYSTEM FIPS 3200 (NAD83).
AS -6 300 150 0 300 600 FIGURE 2-2
GRAPHIC SCALE IN FEET SURFICIAL WATER LEVEL MAP
synTerrd148 RIVER STREET, SUITE 220 (OCTOBER 2017)
�j GREENVILLE, SOUTH CAROLINA 29601 ASHEVILLE STEAM ELECTRIC PLANT
r ! < PHONE 864-421-9999
rr '��;�.. ". /• DUKE `e w.s nterracor .com DUKE ENERGY PROGRESS, LLC
A
AS -14 �� .{i■ ENERGY PROJECT MANAGER: G. PLATING DATE: 04/25/2018 ARDEN, NORTH CAROLINA
PROGRESS CHECKED BY: T. KING
�v t►�� .'� �. '- -- - - - - -- - - -- - -
MW_'
2027.17
• ` N
• CB-8BR
• ` CB-8BJRML 2089.91
• t CCR016R
•F CB -g ♦• 2106.2.24
• • 2092.61 ,
` ♦ . MW-9BR
♦ 2110.92
MW-16BR MW-16BRL
2026.83 NM
MW-8BR �
♦ ', ` 2094.75
♦ CCR-102BR
•012094.38
♦ ` =2079T�8
_
• •
MW-17BRL ® GW -2 2090.29
NM •\ 2050.65 CCR -1036R
MW-25BR 2057.46
NM O
MW-256RL
NM MW-7BR
• 2056.62
1 r', MW-18BRL
r W
2027.41
2027.36
i . •
MW-26BRL
2029.33
T PZ -1 7S
MW -196R 2119 98
2035.54
W-19BRL PZ -1
M
0
.1W lirl 1!�
•e a
g At i
MIL
�♦ 2059.79
<A MW-5BR MW-3BR
2064.92 12081.68 •
•
APZ-30
OCB-46 2087.60
AMW-2B20
• ♦♦ 2073.17
• ��p MW-23BR
�\m • AMW-1Be - �0�_ 2076.16
AS•
� NOOS S
O
79nMWM-22BR AS5 AS•
AS -3 sR-Rs NM
AS 14
LL
�0 +
r /
♦ .r+
•
�v+
1 �
AMW-3B
2164.70 V1 ..�
♦, a 'M � -� -
synTerra
4DUKE
n ENERGY
PROGRESS
300 150 0 300 600
GRAPHIC SCALE IN FEET
148 RIVER STREET, SUITE 220
GREENVILLE, SOUTH CAROLINA 29601
PHON E 86
..syn.com4421-9999
DRAWN BY: B. YOUNG DATE: 04/25/2018
PROJECT MANAGER: T. PLATING
CHECKED BY: T. KING
LEGEND
MONITORING WELL IN ALLUVIUM
MONITORING WELL IN SAPROLITE
MONITORING WELL IN TRANSITION ZONE
MONITORING WELL IN BEDROCK
16 ABANDONED MONITORING WELL
O PIEZOMETER IN SAPROLITE
O PIEZOMETER IN TRANSITION ZONE
G PIEZOMETER IN BEDROCK
C ABANDONED PIEZOMETER
OO EXTRACTION WELL
WATER SUPPLY WELL SAMPLED
• WATER SUPPLY WELL NOT SAMPLED
ABANDONED WATER SUPPLY WELL
WATER LEVEL CONTOUR IN FEET
INFERRED WATER LEVEL CONTOUR IN FEET
�--- ASH BASIN WASTE BOUNDARY
- - - ASH BASIN COMPLIANCE BOUNDARY
DUKE ENERGY PROGRESS ASHEVILLE PLANT
SITE BOUNDARY
STREAM
NOTES:
WATER LEVELS COLLECTED OCTOBER 2017
ELEVATIONS ARE REFERENCED TO THE NORTH AMERICAN VERTICAL DATUM 88
(NAVD 88).
AERIAL PHOTOGRAPHY PROVIDED BY NATIONAL AERIAL IMAGERY PROGRAM (NAIP),
UNITED STATES DEPARTMENT OF AGRICULTURE (USDA). IMAGE COLLECTED JUNE 10,
2016.
DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE PLANE
COORDINATE SYSTEM FIPS 3200 (NAD83).
BEDROCK WATER LEVEL MAP
(OCTOBER 2017)
ASHEVILLE STEAM ELECTRIC PLANT
DUKE ENERGY PROGRESS, LLC
ARDEN, NORTH CAROLINA
?O
00
1.
`90
ABMW-11B
2085.64
1982BASIN,
Ylty`
CB-1BR
2155.62 e
Y ��4
CB-1BRL
PZ-17BRL
h
{ ( Y,..
2155.30 s
2092.65
h
�
w
CCR-105BR
N
o
+
2060.91
N
o
�♦ 2059.79
<A MW-5BR MW-3BR
2064.92 12081.68 •
•
APZ-30
OCB-46 2087.60
AMW-2B20
• ♦♦ 2073.17
• ��p MW-23BR
�\m • AMW-1Be - �0�_ 2076.16
AS•
� NOOS S
O
79nMWM-22BR AS5 AS•
AS -3 sR-Rs NM
AS 14
LL
�0 +
r /
♦ .r+
•
�v+
1 �
AMW-3B
2164.70 V1 ..�
♦, a 'M � -� -
synTerra
4DUKE
n ENERGY
PROGRESS
300 150 0 300 600
GRAPHIC SCALE IN FEET
148 RIVER STREET, SUITE 220
GREENVILLE, SOUTH CAROLINA 29601
PHON E 86
..syn.com4421-9999
DRAWN BY: B. YOUNG DATE: 04/25/2018
PROJECT MANAGER: T. PLATING
CHECKED BY: T. KING
LEGEND
MONITORING WELL IN ALLUVIUM
MONITORING WELL IN SAPROLITE
MONITORING WELL IN TRANSITION ZONE
MONITORING WELL IN BEDROCK
16 ABANDONED MONITORING WELL
O PIEZOMETER IN SAPROLITE
O PIEZOMETER IN TRANSITION ZONE
G PIEZOMETER IN BEDROCK
C ABANDONED PIEZOMETER
OO EXTRACTION WELL
WATER SUPPLY WELL SAMPLED
• WATER SUPPLY WELL NOT SAMPLED
ABANDONED WATER SUPPLY WELL
WATER LEVEL CONTOUR IN FEET
INFERRED WATER LEVEL CONTOUR IN FEET
�--- ASH BASIN WASTE BOUNDARY
- - - ASH BASIN COMPLIANCE BOUNDARY
DUKE ENERGY PROGRESS ASHEVILLE PLANT
SITE BOUNDARY
STREAM
NOTES:
WATER LEVELS COLLECTED OCTOBER 2017
ELEVATIONS ARE REFERENCED TO THE NORTH AMERICAN VERTICAL DATUM 88
(NAVD 88).
AERIAL PHOTOGRAPHY PROVIDED BY NATIONAL AERIAL IMAGERY PROGRAM (NAIP),
UNITED STATES DEPARTMENT OF AGRICULTURE (USDA). IMAGE COLLECTED JUNE 10,
2016.
DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE PLANE
COORDINATE SYSTEM FIPS 3200 (NAD83).
BEDROCK WATER LEVEL MAP
(OCTOBER 2017)
ASHEVILLE STEAM ELECTRIC PLANT
DUKE ENERGY PROGRESS, LLC
ARDEN, NORTH CAROLINA
MW -11
2029.30
NW -11 D
2027.49
2028.36
M 51W D
HHOYT RD-
MW -16A D
RY
2028.15
MW -16D
2028.35 MW -0S'
t 2110.21
CCR -10.
2100.
MW -17A
2028.86
I
2127.4=7 ".
b
+r
.�.
CB�9.SL
1
2145.85'
'
YA
_-A y l
LVJY.,Y,Y
a t
20-25SW29.85 �, ®`\ � rr 21P
�B7 GW -3 .
4h^
p gyNNp
M
2058.05 CCR -104D P-102 l
MW -18D �s 2112.50
r (�'
2029.02 � s
2059.32
� Y 8
` f ,re • Y MW -26S, 4t
W.,
2030.93 a , PZ -16
(6)12118.14
".
E F + ,:'` 1' 20322 7 �' CCR -105D DRYS
2060.81 � MW -6S
C4 r'
2058.82
MW -6D
GW_4 2057.73
-3
MW -20A PZ -22 2103.41
2033.20 NM
n !' ?�Sn mw --;n +
' 4M
+, CB -4
' 2048.14
CB -5
2037.11
Is -- a
N-5
06.44
1W -3D
104.49
3-3R
07.86 �;
iir' vi
+-A
GW -1
2160.'
60.21
r 4 �
ly .
{ ` CB -1 216
D
2157.51 ®2I : 62
PZ -23 -
c6 -z
213 .70 'w"26 ; JL
2098.36
M®
2100.40
41
, 4 �♦1
A.
- ♦ .•
MW -24S
2162.60 _
ev �
_ o
� L
I � J16
1 �
t'
o u
I
r
4 A
' m
AMW-3A MW -10 '
2165.47 2165.85 1'
�Z6� '
AS -
IN ` y �o���R
Gy�SPRIN -
ZQ4 Q
synTerra
i<i t vy p
DUKE
AS 14 �, ,.f i,,,,{ '' ENERGY
-v t► `. li j;Eklai' PROGRESS
300 150 0 300 600
GRAPHIC SCALE IN FEET
148 RIVER STREET, SUITE 220
GREENVILLE, SOUTH CAROLINA 29601
PHONE 864-421-9999
www. svnterracoro. com
DRAWN BY: B. YOUNG DATE: 04/25/2018
PROJECT MANAGER: T. PLATING
CHECKED BY: T. KING
LEGEND
MONITORING WELL IN ALLUVIUM
MONITORING WELL IN SAPROLITE
MONITORING WELL IN TRANSITION ZONE
MONITORING WELL IN BEDROCK
Q� ABANDONED MONITORING WELL
O PIEZOMETER IN SAPROLITE
O PIEZOMETER IN TRANSITION ZONE
O PIEZOMETER IN BEDROCK
C ABANDONED PIEZOMETER
(i) EXTRACTION WELL
WATER SUPPLY WELL SAMPLED
• WATER SUPPLY WELL NOT SAMPLED
ABANDONED WATER SUPPLY WELL
- - - INFERRED WATER LEVEL CONTOUR IN FEET
WATER LEVEL CONTOUR IN FEET
ASH BASIN WASTE BOUNDARY
- ASH BASIN COMPLIANCE BOUNDARY
DUKE ENERGY PROGRESS ASHEVILLE PLANT
SITE BOUNDARY
-) STREAM
NOTES:
WATER LEVELS COLLECTED APRIL 2018
ELEVATIONS ARE REFERENCED TO THE NORTH AMERICAN VERTICAL DATUM 88
(NAVD 88).
AERIAL PHOTOGRAPHY PROVIDED BY NATIONAL AERIAL IMAGERY PROGRAM (NAIP),
UNITED STATES DEPARTMENT OF AGRICULTURE (USDA). IMAGE COLLECTED JUNE 10,
2016.
DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE PLANE
COORDINATE SYSTEM FIPS 3200 (NAD83).
FIGURE 2-4
SURFICIAL WATER LEVEL MAP
(APRIL 2018)
ASHEVILLE STEAM ELECTRIC PLANT
DUKE ENERGY PROGRESS, LLC
ARDEN, NORTH CAROLINA
b
+r
1
7
'
YA
y,
t
' 4M
+, CB -4
' 2048.14
CB -5
2037.11
Is -- a
N-5
06.44
1W -3D
104.49
3-3R
07.86 �;
iir' vi
+-A
GW -1
2160.'
60.21
r 4 �
ly .
{ ` CB -1 216
D
2157.51 ®2I : 62
PZ -23 -
c6 -z
213 .70 'w"26 ; JL
2098.36
M®
2100.40
41
, 4 �♦1
A.
- ♦ .•
MW -24S
2162.60 _
ev �
_ o
� L
I � J16
1 �
t'
o u
I
r
4 A
' m
AMW-3A MW -10 '
2165.47 2165.85 1'
�Z6� '
AS -
IN ` y �o���R
Gy�SPRIN -
ZQ4 Q
synTerra
i<i t vy p
DUKE
AS 14 �, ,.f i,,,,{ '' ENERGY
-v t► `. li j;Eklai' PROGRESS
300 150 0 300 600
GRAPHIC SCALE IN FEET
148 RIVER STREET, SUITE 220
GREENVILLE, SOUTH CAROLINA 29601
PHONE 864-421-9999
www. svnterracoro. com
DRAWN BY: B. YOUNG DATE: 04/25/2018
PROJECT MANAGER: T. PLATING
CHECKED BY: T. KING
LEGEND
MONITORING WELL IN ALLUVIUM
MONITORING WELL IN SAPROLITE
MONITORING WELL IN TRANSITION ZONE
MONITORING WELL IN BEDROCK
Q� ABANDONED MONITORING WELL
O PIEZOMETER IN SAPROLITE
O PIEZOMETER IN TRANSITION ZONE
O PIEZOMETER IN BEDROCK
C ABANDONED PIEZOMETER
(i) EXTRACTION WELL
WATER SUPPLY WELL SAMPLED
• WATER SUPPLY WELL NOT SAMPLED
ABANDONED WATER SUPPLY WELL
- - - INFERRED WATER LEVEL CONTOUR IN FEET
WATER LEVEL CONTOUR IN FEET
ASH BASIN WASTE BOUNDARY
- ASH BASIN COMPLIANCE BOUNDARY
DUKE ENERGY PROGRESS ASHEVILLE PLANT
SITE BOUNDARY
-) STREAM
NOTES:
WATER LEVELS COLLECTED APRIL 2018
ELEVATIONS ARE REFERENCED TO THE NORTH AMERICAN VERTICAL DATUM 88
(NAVD 88).
AERIAL PHOTOGRAPHY PROVIDED BY NATIONAL AERIAL IMAGERY PROGRAM (NAIP),
UNITED STATES DEPARTMENT OF AGRICULTURE (USDA). IMAGE COLLECTED JUNE 10,
2016.
DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE PLANE
COORDINATE SYSTEM FIPS 3200 (NAD83).
FIGURE 2-4
SURFICIAL WATER LEVEL MAP
(APRIL 2018)
ASHEVILLE STEAM ELECTRIC PLANT
DUKE ENERGY PROGRESS, LLC
ARDEN, NORTH CAROLINA
O
O
N
MW -15 N N
N
2029.10 N
MW-15BR Com.
2027.90 • 2
CB -86R .�,�,,
CB-86RL 2090.73 •;M
• 2089.56
� CCR -1016R
CB -8 `• 2106.87
■ • 2095.54
♦ . MW-9BR
• � 2107.48
MW-16BR MW-16BRL
2028.14 2028.50 EXT -1
MW -813R 2073.82
•• j 2093.13 CCR -1026
lie 12094.64
s EXT -2
- - *4 2079.07
MW-17BRL GW -2 2092.
2028.61 ` 2050.50 CCR-10
w.� 2057.63
MW-25BRL
•'� 4 MW-18BRL MW-18BR
2029.36
2029.13
MW-26BRL
2029.33
S''Ie,r�3Y'��•ti`� �
E. r MW-19BR
2033.19
MW-196RL
$ 2032.72 A
a
0
AS 14
AS -20;
low
I ' 4
■
/ ■ yl
W - ■
�4di •i«Alli
SETTLING
s ■
POND
• ♦.�.
E{FIR HOT46
,� � Jr� � wry ` • e ■
,. 9
GW -1'
] y c 2156.87
.BR t'w
158.43 ABMW-11BR �• a
2084.66 r `, r • "� ,.54
CB-1BR
�j1321
t' : 2156.95 v a
f;a� 16RL 2150 i , ■
PZ-17BRL �(. ( } 2140 J ` /•
2121.507S 2092.65 2130 • Qt. I /
PZ -17D CCR-105BR--n►;''
2092.02 12061.11 2120 ••
2110
MW-6BR 2100 .^• �� •
2060.08 00 MW <1. ♦ �� •• �,
80
2085.49
O
o`
2096.70 AMW-2B ,
2075.00 e ■ �'
MW-23BR AMW-313
2051.36 2165.00 _ 1. +■e
167
synTerra
4DUKE
n ENERGY
PROGRESS
300 150 0 300 600
GRAPHIC SCALE IN FEET
148 RIVER STREET, SUITE 220
GREENVILLE, SOUTH CAROLINA 29601
PHONE 864-421-9999
DRAWN BY: B. YOUNG DATE: 04/25/2018
PROJECT MANAGER: T. PLATING
CHECKED BY: T. KING
LEGEND
MONITORING WELL IN ALLUVIUM
MONITORING WELL IN SAPROLITE
MONITORING WELL IN TRANSITION ZONE
MONITORING WELL IN BEDROCK
Qi ABANDONED MONITORING WELL
G PIEZOMETER IN SAPROLITE
O PIEZOMETER IN TRANSITION ZONE
O PIEZOMETER IN BEDROCK
V ABANDONED PIEZOMETER
O EXTRACTION WELL
WATER SUPPLY WELL SAMPLED
• WATER SUPPLY WELL NOT SAMPLED
ABANDONED WATER SUPPLY WELL
- - - INFERRED WATER LEVEL CONTOUR IN FEET
WATER LEVEL CONTOUR IN FEET
ASH BASIN WASTE BOUNDARY
• ASH BASIN COMPLIANCE BOUNDARY
DUKE ENERGY PROGRESS ASHEVILLE PLANT
- - SITE BOUNDARY
- > STREAM
NOTES:
WATER LEVELS COLLECTED APRIL 2018
ELEVATIONS ARE REFERENCED TO THE NORTH AMERICAN VERTICAL DATUM 88
(NAVD 88).
AERIAL PHOTOGRAPHY PROVIDED BY NATIONAL AERIAL IMAGERY PROGRAM (NAIP),
UNITED STATES DEPARTMENT OF AGRICULTURE (USDA). IMAGE COLLECTED JUNE 10,
2016.
DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE PLANE
COORDINATE SYSTEM FIPS 3200 (NAD83).
BEDROCK WATER LEVEL MAP
(APRIL 2018)
ASHEVILLE STEAM ELECTRIC PLANT
DUKE ENERGY PROGRESS, LLC
ARDEN, NORTH CAROLINA
CB-8
Water Level Monitoring
February -April
3.
0 os
ru
4F. Sr�1
I
I
dIF ieF 4F 4I tid C w fai w i,4 4ie Sir 44 i i is i. i it
ED
kr�[i�t ii[i+ —a.–C6 Ti rartlon Sperm9tart
FIGURE 2-7
16110CB-8
148 RIVER STREET, SUITE 220 WATER LEVEL MONITORING
synTena GREENVILLE, SOUTH CAROLINA 29601 FEBRUARY –APRIL, 2018
PHONE 884-421-9999 ASHEVILLE STEAM ELECTRIC PLANT
DUKE `DR synt.C.BUCE
DRAWN BY: C.BRUCE DATE: APRIL 25,207 DUKE ENERGY PROGRESS, LLC
ENERGY. PROJECT MWNAGER:T.PLATING ARDEN, NORTH CAROLINA
CH ECKED BY: T. PLA n NG
PROGRESS P:[Duke En;y P.gess.1029102 Asheville Ash Basin GW Assess—Plan OEHS IAP Mmitomg BRepotling\Apn12018 Annud Repa Firyn
CB-8BR
Water Level Monitoring
February - April
5
0.45
0.4
0
L
0.35
Q-
4.5
v
7
O
0.3
rc
_
y
w
0.25
t
O
u
.,
a)
a
o
0.2WV
0
v
a
n
J
V
r_
v
0.15
a
ra
c
3.5
0.1
co
c
ro
t
V
0.05
3
..
_
-
0
w
w w w w w w w w w
w
w w w w
w w w w w w w
NN
�
N N N
lv N N w w
A
NN wN
V W
_N 9-3 3N N N
rN
\N
'N \N N N
\N \N
N
O
N
O O O
N ND1
O O O O
N N \Y
O N \N \N
O
N
0 O O O O O O O O
f— Y Y Y Y Y Y Y Y
O
Y
O O O O
Y Y Y Y
O O C) O O O 0 Y
Y Y Y r 0-'00
Y Y
00 00 co 00
Y � Y Y
00 00 00 00
000 O O O
00 Y Y Y Y
CG
CO W co 00 00 00 00 00 00
OD
00 00 00 00
00
CO 00 03 CON 00 00 00
00 00 00 00
Time (days)
>�Precipitation +C3-8BR Extraction System Start
`
FIGURE 2-8
1r
CB-8BR
Terra
syn
148 RIVER STREET, SUITE 220
WATER LEVEL MONITORING
GREENVILLE, SOUTH CAROLINA 29601
FEBRUARY - APRIL, 2018
r> DUKE
PHONE terrac rp.com
www.sy
ASHEVILLE STEAM ELECTRIC PLANT
ENERGY
DRAWN1-9999
Y: C.BRUCEom
DRAWN BY: C. BRUCE
PROJECT MANAGER: T. PLATING
DATE: APRIL 25,2018
DUKE ENERGY PROGRESS, LLC
PROGRESS
CHECKED BY: T. PLATING
ARDEN, NORTH CAROLINA
P:\Duke Energy Progress.1028\102. Ashwlle Ash Basin GW Assessment Plan\50.EHS IAP Mmkaring & Repa ng\April 2018 Annual RWTigures
CCR-101BR
Water Level Monitoring
February - April
9.0
1.2
c
8.5
1
CL
v
>
0
8.0
0.8
+,
3
7.5
0
s
+'
GJ
7.0
0.6
u
S
_.
v
r_
0
v
6.5
41
ca
a
CU
0.4
�
a
.5
6.0
w
tw
M
0.2
v
5.5
5.0
—
0
N N N N N N N N N N N N N N N N N W W W W W W W W W W
\ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \
W W W W W W W W W W W W W W W W W W W
\ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \
W W �����������4�:. A
\ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \
FJ W N N N N N N N N F, N W U"1 Q1 �I - lD
W lD W Ul \ \ \ \ \ \ \ \ \
F� Fj w 1� F, F 1D N N N N N N N N N N
W lD W Ul lD
W W F" N W � U"1 tT V 00 l0 1-- I--� W F-�
\ \ \ \ \ \ \ \ \
N l!1 Ql �I 00 Ql �I 00
M O F, N O
0
\ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ N N N N N N N N N \
C71 61 v 00 Ql �I 00
F N M J X O F, N
\ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \
O F 0
\ \ N N N N N N N N N \ \ \ \ \
N N N N N N N N N N N N N N N N N O O O O O O O O O N
O O O O O O O O O O O O O O O O O O
N N N N N N N N N N N N N N N N N N N
O O O O O O O O O O O O O O O O O O O
N N O O O O O O O O O N N N N N
O O O O O O O
1 F, 1 F, I 1 F, 1 F,
F_ F_ F_ F_ F_ F_ F_ 1' 00 00 00 00 00 00 00 00 00
F_ F_ F_ F_ F_ F_ F_ F_ F_ F_
F, 1 F, F 1
F_ 00 00 00 00 00 00 00 00 00 F_ I_ F_
00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00
00
00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00
00 00
00 00 00 00 00
Time (days)
Precipitation
tCCR-101BR —Extraction System
Start
FIGURE 2-9
10
CCR-101 BR
Terra
148 RIVER STREET, SUITE 220
WATER LEVEL MONITORING
synGREENVILLE,
SOUTH CAROLINA
29601
FEBRUARY - APRIL, 2018
r' DUKE
PHONE terrac 1-9999
rp.com
www.synterracorp.com
ASHEVILLE
STEAM ELECTRIC PLANT
ENERGY
DRAWN BY: C. BRUCE
PROJECT MANAGER: T. PLATING
DATE: APRIL 25,2018
DUARDEN,
LC
ENERGY OCAROL
-
CHECKED BY: T. PLATING
NORTHKE
NA
P:TD Energy Progress. 102\102. Asheville Ash Basin GW Assessment Plan\50.EHS IAP Monitoring & Rep-,gWpril 2018 Annual Re ftTigu
CCR -102D
Water
Level Monitoring
February - April
14.0
1.2
v
13.5
0
CL
13.0
1
0
0
12.5
w0.8
3
12.0
MMWc
o7114
N
11.5
0.6
11.0
L
M
10.5
0.4
(d
Q
a
tw
10.0
0.2
s
9.5
9.0-T--1
0
1
N N N N N N N N N N N N N N N N NIW W W W W
\ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \
W W W W W W W W W W W W W W W W W W W W W W W W
\ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \
W � � � -P. 4�:- � A � � -P� � � � 4�:-
\ \ \ \ \ \ \ \ \ \ \ \ \ \ \
N N N N N N F N W A U"I Q1
\ \ \ \ \ \
V 00 l0 F- 1.-i 1-, N N N N N N N N N N W
\ \ \
W F� N W A Ln Q1 V 00 I'DF-' F, F- F- I-,
\ \ \ \ \ \ \ \ \
NLn M V 00 lD O I-, N W Un 61 V 00
W U
\ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ N N N N N N"
w M
O F-` N W A UnQl V 00 LD OlD O Ol W F-' N U'I V 00
N N \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \
F
\ N N N N N N N N N \ \ \ \ \
N N N N N N N N N N N N N N N N N O O O O O O
O O O O O O O O O O O O O O O O O F F F F F
O O O N N N N N N N N N N N N N N N N N N N N N
F O O O O O O O O O O O O O O O O O O O O O
N O O O O O O O O O N N N N N
O F F F F F F F O O O O O
F
F-� F_ F_ F_ F-_ F_ F_ F_ F-_ F_ F_ I-_ F- 00 00 00 00 00 00
F F
00 00 00 F_ I-_ F-- F-_ F_ F_ F_ F_ F_ F_ F-_ F_ F_ I-_ F-- F-_ F_ F_ I-_
F F
F_ 00 00 00 00 00 00 00 00 00 F-_ F_ F_ I-_ F--
00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00
00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 co 00
00
00 CO 00 00 00
Time (days)
Precipitation
CCR -102D —Extraction System Started
FIGURE 2-10
10
CCR -102D
Terra
synGREENVILLE,
148 RIVER STREET, SUITE 220
WATER LEVEL MONITORING
SOUTH CAROLINA
29601
FEBRUARY - APRIL, 2018
r' DUKE
PHONE terrac 1-9999
www.synterracorp.com
ASHEVILLE STEAM ELECTRIC PLANT
ENERGY-
DRAWN
DRAWNBY: NAGER:E
PROJECT MANAGER: T. PLATING
DATE: APRIL 25,2018
DUKE ENERGY
CHECKED BY: T. PLATING
NORTHOCAROL CAROLINA
P:\Duke Energy Progress.1026\102. Asheville Ash Basin GW Assessment Plan\50. EHS IAP Monitoring & Rep-,gWpril 2018 Annual Re ftTigu
CCR-103BR
Water Level Monitoring
February - April
19.0
1.2
Q)
18.5
1
ii
Q)
0
M
18.0
0.8
M
o
s
41
U
17.5
0.6
0
v417
L
L
�
i
IT
Q.
17.0
0.4
i
a
v
bb
i
I
1
M
16.5
1
0
1
1
0.2
u
16.0
L
0
N N N N N N N N N N N N N N N N N W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W 4�:- .4- A .P -9, -9, -P� A A A -9, -9,
\ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \
F- F- I--s I-- I-- F- N N N N N N N N N I-- N W A U"I Ol �I 00 l0 N N N N N N N N N N W W I.— N W A Un Ol 00 l0 F- FI I-- I-- I-I
N W U'1 00 l0 O N W �:' Cn 00 \ \ \ \ \ \ \ \ \ O N W Ln 00 lO O N W 4�:' Ln 00 10 O \ \ \ \ \ \ \ \ \ O N W
0) �I Ol V -1�:- 01 J 1-, M V 1-, 1-
\ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ N N N N N N N N N \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ N N N N N N N N N \ \ \ \ \
N N N N N N N N N N N N N N N N N0 O O O O O O O O N N N N N N N N N N N N N N N N N N N N N N O O O O O O O O O N N N N N
O O O O O O O O O O O O O O O O O N N N N O O O O O O O O O O O O O O O O O O O O O O O O O O O
N I.- I-, I.— 1.—
F, F, F- I-- I-- F, F, F- I-- I-- F- F, F, W 00 00 00 00 00 00 W 00 F, F, 1-1--- -- -- F, F, 1-1-F-- -- -- F, F, 00 00 00 00 00 00 00 00 00 F, F, F- I-- I--
00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00
00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00
00 00 00 00 00
Time (days)
Precipitation
CCR-103BR
Extraction System
Start
2-11
101111FIGURE
CCR-103BR
Terra
synGREENVILLE,
148 RIVER STREET, SUITE 220
WATER LEVEL MONITORING
SOUTH CAROLINA 29601
FEBRUARY - APRIL, 2018
r' DUKE
PHONE 864-421-9999
WRW•synterr.BRUCcom
ASHEVILLE STEAM ELECTRIC PLANT
ENERGY.
DRAWN BY: C. BRUCE
PROJECT MANAGER: T. PLATING
DATE: APRIL 25,2018
DUKE ENERGY PROGRESS, LLC
PROGRESS
CHECKED BY: T. PLATING
ARDEN, NORTH CAROLINA
P:\Duke Energy Progress.1026\102, Ashwile Ash Basin GW Assessment PlaM50.E11S IAP Monitoring 8 Rel WingWpnl 2018 Annual RepMlFigures
MW-8BR
Water
Level Monitoring
February - April
22.0
1.2
v
°
21.5
1
a
v
0
s
ca
w
21.0
0.8
Z
3
o
s
N
20.5
0.6
U
v
a,
o
>41
W
ra
J
++
20.0
0.4
3
a`
19.5
0.2
s
U
19.0
0
N N N N N N N N N N N N N N N
\ \ \ \ \ \ \ \ \ \ \ \ \ \ \
N N W W W W W W W W W W W
\ \ \ \ \ \ \ \ \ \ \ \ \
W W W W W W W W W W W W W W W W W W W W
\ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \
A A A A
\ \ \ \ \ \ \ \ \ \ \ \ \ \
F1 N N N N N N N
N N F- N W U"I Ql CO l0 F1 F-s
\ \ \ \ \ \ \ \ \
I— F- I-- F— I-- N N N N N N N N N N W W
N W -P, 111 Ol 00 lD I-- F" F- I-I I-a
\ \ \ \ \ \ \ \ \
N W -P:- Ln M V 00 1.0 O I-a N W -P, Cn M
\ \ \ \ \ \ \ \ \ \ \ \ \ \ \
v 00 O 1-1
\ \ N N N N N N N N N \ \
N W LrI 61 V 00 lD O 1.— N W 4�- Ln M V CO l0 O 1.—
\ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \
O N N W 4�,
N N N N N N N N N ---
NJ
N N N
N N O O O O O O O O O N N
N N N N N N N N N N N N N N N N N N N N
O O O O O O O O O N N N N N
O O O O O O O O O O O O O O O
O O N N N N I-- F- F- 1-- N O O
O O O O O O O O O O O O O O O O O O O O
F- F I-- F- F I-- F- F- 1-- O O O O O
F, 00 00 00 00 00 00 00 00 00 F- F-\
-- I-- F-\ F -- F- F I-- F- F, -- F- F- F
00 00 00 00 00 00 00 00 00 F- F-\ I-- F,
00 00 00 00 00 00 00 00 00 00 00 00 00 00 00
00 00
00 00
00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00
00 00 00 00 00
Time (days)
Precipitation
MW-08BR Extraction System Start
2-12
101111FIGURE
MW-8BR
Terra
synGREENVILLE,
148 RIVER STREET, SUITE 220
WATER LEVEL MONITORING
SOUTH CAROLINA 29601
FEBRUARY - APRIL, 2018
r' DUKE
PHONE 864-421-9999
WRW•synterr.BRUCcom
ASHEVILLE STEAM ELECTRIC PLANT
ENERGY.
DRAWN BY: C. BRUCE DATE: APRIL 25,2018
PROJECT MANAGER: T. PLATING
DUKE ENERGY PROGRESS, LLC
PROGRESS
CHECKED BY: T. PLATING
ARDEN, NORTH CAROLINA
P:\Duke Energy Progress.1026\102, Ashwile Ash Basin GW Assessment
PlaM50.E11S IAP Monitoring 8 Rel WingWpnl 2018 Annual RepMlFigures
MW -913R
Water
Level Monitoring
February - April
15.0
1.2
14.5
v
0
14.0
1
Q.
13.5
>
0oko%
04014M77
0
13.0
Afv�vi
12.5
o.s
3
12.0
c
v
11.5
0.6
v
s
V
,w
>
11.0
°
10.5
w
CL
0.4
v
10.0
a
S
9.5
to
�
z
9.0
0.2
U
8.5
8.0
r
0
N N N N N N N N N N N N N N N N N W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W ����� A �� A �4�. 4�- A
\ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \
F� I N N N N N N N N N - N W U"I 61 - 00 - F-1 I--` F-' F-' F-' F-' F-` N N N N N N N N N N W W F-� N W � U"I Ol -I 00 lD F --
N W V7 Ql �I 00 lD O F-' N W Ul Ql �I 00 \ \ \ \ \ \ \ \ \ O F, N W Ul Ql �I 00 ls) O F-' N W _ Ul Ql �I 00 lD - I� \ \ \ \ \ \ \ \ \
rQ W M W D 0 N J W 0 P J W
\ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ N N N N N N N N N \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ N N N N N N N N N \ \ \ \ \
N N N N N N N N N N N N N N N N N O O O O O O O O O N N N N N N N N N N N N N N N N N N N N N N O O O O O O O O O N N N N N
O O O O O O O O O O O O O O O O O F 1-- F, I- N F F- F, O O O O O O O O O O O O O O O O O O O O O O O O O O O
F_ F_ F-- F" F_ F_ F-- I.- F_ F_ F_ F-- I.- F_ F_ F_ F-- 00 00 00 00 00 00 00 00 00 F_ F� F_ F-_ F" F_ F_ F_ F-_ F" F_ I-- F_ F_ 00 00 00 00 00 00 00 00 00 F_ F-- I-- F_ F_
00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00
Time (days)
Precipitation
BMW-09BR —Extraction
System Start
FIGURE 2-13
10
MW-9BR
Terra
synGREENVILLE,
148 RIVER STREET, SUITE 220
WATER LEVEL MONITORING
SOUTH CAROLINA
29601
FEBRUARY - APRIL, 2018
r' DUKE
PHONE terrac 1-9999
nterr.
ASHEVILLE STEAM ELECTRIC PLANT
ENERGY-
DRAWNwww.s
BRUCE
DRAWN BY: C.BRUCE
PROJECT MANAGER: T. PLATING
DATE: APRIL 25,2018
DUKE ENERGY
CHECKED BY: T. PLATING
NORTHOCAROL CAROLINA
P:TD Energy Progress.1026\102. Asheville Ash Basin GW Assessment Plan\50.EHS IAP Monitoring & Rep-,gWpril 2018 Annual Re ftTigu
MW -9D
Water Level Monitoring
February - April
7.0
1.2
6.5
a,
s
O
1
a
6.0
>
O
s
5.5
0.8
M
M
3
5.0
7
_0
O
v
t
4.5
0.6
U
4.0
J
•L
L
0.4
3.5
a
c
3.0
M
0.2
s
2.5
2.0
0
N N N N N N N N N N N N W W W W W W W W W
\ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \
W W W
\ \ \
W W W W W W W W W W W W W W W W W W
\ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \
W A
\ \ \ \ \ \ \ \ \ \ \ \ \ \
N N N N N N N N N N W Un dl �I W lD
lD \ \ \ \ \ \ \ \ \
N N N N N N N N N N W
w W
W F- N W � U'I Ql W lD
\ \ \ \ \ \ \ \ \
V M O H' N W P. Ln m 65
\ \ \ \ \ \ \ \ \ \ \ \ N N N N N N N N N
O F, N
\ \ \
W P. U'I M �I w O F, N W � Ul C1 V W O
\ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \
F O H' N W
\ N N N N N N N N N \ \ \ \
N N N N N N N N N N N N O O O O O O O O O
O O O O O O O O O O O O
N N N
O O O
N N N N N N N N N N N N N N N N N N
O O O O O O O O O O O O O O O O O O
N O O O O O O O O O N N N N
O F, 1-- F- 1-- 1-- 1— 1— 1— O O O O
I-, F, F F F F F F F F F- F 00 00 00 00 00 00 00 00 00
F- F- F-
F- F F F F F F- I-, I-, I-, I-, I-, I-, I-, I-- I-- I� I-,
I-" 00 00 00 00 00 00 00 00 00 I-_1 F1 I-_1 F1
Time (days)
Precipitation BMW -09D —Extraction
System Start
FIGURE 2-14
10
MW -9D
Terra
synGREENVILLE,
148 RIVER STREET, SUITE 220
WATER LEVEL MONITORING
SOUTH CAROLINA 29601
FEBRUARY - APRIL, 2018
r' DUKE
PHONE terrac 1-9999
nterr.
ASHEVILLE STEAM ELECTRIC PLANT
ENERGY-
DRAWNwww.s
DRAWN BY: C.BRUCE DATE: APRIL 25,2018
BRUCE
PROJECT MANAGER: T. PLATING
DUKE ENERGY
CHECKED BY: T. PLATING
NORTHOCAROL CAROLINA
P:\Duke Energy Progress.1026\100. Sutton Ash Basin GW
Assessment Plan\44. EUS Upd- CSA & CAP\CSA UPDATE JANUARY 20-FIGURES\Time Vs Concentration
MW-16BR
Water
Level Monitoring
February - April
19.0
1.2
18.5
18.0
17.5
°17.0
°-
16.5
1
>
16.0
°
s
15.5
15.0
14.5
14.0
0.8
m
3
13.5
14
°
13.0
1A
12.5
s
c
v
°�-'
12.0
0.6
11.5
11.0
0
10.5
M
v
10.0
a
9.5
0.4
a
9.0
a`
8.5
8.0
tw
7.5
0.2
t
7.0
6.5
6.0
5.5
-
-
5.0
-
0
N
\
N
\
N
\
N
\
N
\
N
\
N
\
N
\
N
\
N
\
N
\
N
\
N
\
N
\
N
\
N
\
N
\
W
\
W
\
W
\
W
\
W
\
W
\
W
\
W
\
W
\
W W
\ \
W W W W W W W W W W
\ \ \ \ \ \ \ \ \ \
W
\
W W W W W W W W W 4:N
\ \ \ \ \ \ \ \ \ \
4�:-
\
A
\
4:�,
\
4�:- A 4�- 4�- 4�- 4�:- 4�- 4�- 4:�-
\ \ \ \ \ \ \ \ \ \
W
Ph
w
_.I
00
F,
to
N
N
N
N
W
N
Ph
N
w
N
N
N
00
\
N
\
W
\
P�
\
U'I
\
Ql
\
V
\
00
\
to
\
N N
W Ln 00 to
N
N N N N N N N W W F_1
W W �,l 00 to \
N
\
W
\
4�-
\
U'I Ql �I 00 to
\ \ \ \ \ W
N
\
\
\
\
M
\
\
\
\
O
\
F-'
\
N
\
\
\
\
M
\
�I
\
\
I'_
F_
F_
I'_
F_
F_
F-
F-�
F-1
O 1�
\ \
N A M -I O 1�
\ \ \ \ \ \ \ \ \ \
N
\
A M O 1--1
\ \ \ \ \ \ \ \ \ F-
I--'
F-�
F-
O 1-, N 4�-
I--' F_ F_ I--' F_ \ \ \ \ \
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
I-_1
00
00
00
00
00
00
00
00
00
00
1-"
00 00
00 00 00 00 00 00 00 00 00 00
00
00
00 00 00 00 00 00 00 00 00
00
00
00
00 00 00 00 00 F-' I-_1 F F F
00 00 00 00 00
Time (days)
Precipitation
BMW-16BR
-Extraction System Start
French Broad River Gauge
2-15
,161pFIGURE
MW-16BR
�/�' �Terra
148 RIVER STREET, SUITE 220
WATER LEVEL MONITORING
s "
GREENVILLE, SOUTH CAROLINA 29601
FEBRUARY - APRIL, 2018
r' DUKE
PHONE terrac 1-9999
nterr.
ASHEVILLE STEAM ELECTRIC PLANT
ENERGY,
DRAWNwww.s
DRAWN BY C BRUCE DATE APRIL 25,2018
BRUCE
PROJECT MANAGER: T. PLATING
DUKE ENERGY
1l f� L
PROGRES,.
CHECKED BY: T. PLATING
NORTHOCAROL CAROLINA
P\Duke Energy Progress 102fi\108 Sutton Ash Basin GW Assessment PI -\44 ENS Upd-CSA&CAP\CSA UPDATE JANUARY 2018\FIGURESM- Vs Concentration
MW -16D
Water Level Monitoring
February - April
Time (days)
=Precipitation BMW -16D —Extraction System Start French Broad River Gauge
10.0
9.5
1.2
9.0
a
8.5
1
>
8.0
so
7.5
M
L
7.0
3
6.5
0.8
•�
6.0
0
5.5
5.0
0.6
4.5
4.0
3.5
0.4
3
3.0
.0
2.5
2.0
f°
s
1.5
0.2
U
1.0
0.5
L
0.0
0
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
P.
A
A
A
A
A
A
A
A
A
A
A
A
NJ
N
O
N
00
wA
N
O
F-`
CO
N
O
CO
N
O
00
N
O
CO
N
O
CO
N
O
00
N
O
CO
N
O
CO
N
N
O
CO
N
N
O
CO
N
N
O
CO
N
N
O
CO
N
N
O
00
N
N
O
00
N
N
O
00
N
N
O
00
N
N
O
CO
N
N
O
CO
W
N
O
00
A
N
O
CO
U,
N
O
CO
00)
N
O
F�
00
V
N
O
N
CO
0000
N
O
N
CO
lD
NCD
O
N
0o
I\-'
N
O
F-`
00
N
N
O
N
00
N
NJ
N
O
N
00
I\-`
U,
N
O
F-`
00
N
A
N
O
N
00
N
N
O
N
00
I\-`
N
O
F-`
CO
N
N
O
N
CO
F\-`
N
O
N
00
I\-`
N
O
F-`
CO
N
N
O
N
CO
N
N
O
N
00
N
N
O
F-`
CO
N
N
O
I--'
CO
N
N
O
N
CO
N
N
O
F-`
CO
N
N
O
I--'
00
N
N
O
F+
00
N
N
O
F-`
00
N
N
O
I--'
00
W
N
O
N
00
W
N
O
F-`
00
N
N
O
N
CO
N
N
O
N
CO
W
N
O
F�
00
A
N
O
CO
U,
N
O
CO
00)
N
O
00
V
N
O
CO
0000
N
O
CO
lD
N
O
00
w
N
O
F-`
00
N
O
N
00
N
O
N
00
N
O
F�
CO CO
A
N
O
N
Time (days)
=Precipitation BMW -16D —Extraction System Start French Broad River Gauge
MW-17BRL
Water Level Monitoring
February - April
20.0
1.2
18.0
0-
1
.
w
0
16.0
m
77
0.8
14.0
3
o
N
v
s
12.0
0.6
V
c
Z
0
a,
10.0
ca
a
0.4
U
�
a
.0
8.0
to
r
M
0.2
�
6.0
t
I -
NNW
4.0iii
I
0
N N N N N N N N N N N N N N N
\ \ \ \ \ \ \ \ \ \ \ \ \ \ \
N N W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W A 4�:- 4�:- A 4�:- 4�:- A 4�:- 4�- � A 4�:- -P� 4�-
\ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \
N W U-1 00 w W
F,
\ \ \ \ \ \ \ \ \ F� I_" F j F� F- l F� I--1 I- -1N N N N N N N N N NW W F� N W A UT M 1,JI 00 lD I j w F,
00 W L 00 00 k.07 N W Ul 00 LDI-, \ \ \ \ \ \ \ \ \ W
01 -I O I—` N U7 01
\ \ \ \ \ \ \ \ \ \ \ \ \ \ \
�I O I-, N Jl Q1 V I-, Q1 V 0 O H' N
O O
\ \ N N N N N N N N N \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ N N N N N N N N N \ \ \ \ \
N N N N N N N N N N N N N N N
O O O O O O O O O O O O O O O
N N O O O O O O O O O N N N N N N N N N N N N N N N N N N N N N N O O O O O O O O O N N N N N
O O O O O O O O O O O O O O O O O O O O O O O O O O O O O
00 00 00 00 00 00 00 00 00 00 00 00 00 00 00
00 00
00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00
00 00 00 00 00
Time (days)
Precipitation
BMW-17BRL
—Extraction System Start
French Broad River Gauge
FIGURE 2-17
10
MW-17BRL
�/�'�Terra
148 RIVER STREET, SUITE 220
WATER LEVEL MONITORING
s "
GREENVILLE, SOUTH CAROLINA 29601
FEBRUARY - APRIL, 2018
r' DUKE
PHONE terrac 1-9999
nterr.
ASHEVILLE STEAM ELECTRIC PLANT
ENERGY-
DRAWNwww.s
DRAWN BY: C.BRUCE DATE: APRIL 25,2018
BRUCE
PROJECT MANAGER: T. PLATING
DUKE ENERGY
CHECKED BY: T. PLATING
NORTHOCAROL CAROLINA
P:\Duke Energy Progress. 102\108. Sutton Ash Basin GW Assessment Plan\44. EUS Upd- CSA & CAP\CSA UPDATE JANUARY 2018\FIGURES\Time Vs Concentration
MW-18BR
Water Level Monitoring
February - April
20.0
1.2
18.0
10
0*0c
1
CLS_
a
16.0
0
ra
+;
0.8
14.0
3
O
N
aJ
s
12.0
0.6
.tea'
c
o
>
a,
4j
M
10.0
a
0.4
3
a
8.0
a)
as
0.2
U
6.0
I4
717
r
4.0
0
N N N N N N N N N N N N N W W W
W W W W W W W W W W W W W W W W W W W W W W W W W W W W .1�. _r� A 4�. .1�. A -rh 4�. A A -rh A
N N N N N N N N N I\-� N W
-,I \ \ \
P. Url D\1 V 0000 l\O I. -a F\ I\-1 I\-� Fa I_a I\-1 N Fa I\-1 N N N N N N N N N N W W I\-� N W P. (\PI D\1 V 0000 1.0 F\ -i I\-1 Fa I\-� F\ -i
\ \ \ \ \ \ 110
M v 00 l0 O F_ N W A Un 01 00
\ \ \ \ \ \ \ \ \ \ \ \ \ N N N
O F' N W A U I 01 _I 00 O I N W U'I 01 V 00 lD O O F" N W A
N N N N N N \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ N N N N N N N N N \ \ \ \ \
N N N N N N N N N N N N N O O O
O O O O O O N N N N N N N N N N N N N N N N N N N N N N O O O O O O O O O N N N N N
O O O O O O O O O O O O O F F_ F_
H` F_ F_ F_ F, F_ F, F_ F_ F_ F, F, F_ 00 00 00
F_ F_ F_ F_ F- F- O O O O O O O O O O O O O O O O O O O O O O F_ F_ F_ F_ F_ F_ F_ F_ F_ O O O O O
00 00 00 00 00 00 F, F, F_ F_ F_ F, F_ F, F_ F_ F_ F, F, F- F- F, F, F- F- F- F- F_ 00 00 00 00 00 00 00 00 00 F_ F_ F_ F, F,
00 00 00 00 00 00 00 00 00 00 00 00 00
00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00
00 00 00 00 00
Time (days)
Precipitation
BMW-18BR
—Extraction System Start
French Broad River Guage
FIGURE 2-18
10
MW-18BR
Terra
synGREENVILLE,
148 RIVER STREET, SUITE 220
WATER LEVEL MONITORING
SOUTH CAROLINA 29601
FEBRUARY - APRIL, 2018
r' DUKE
PHONE terrac 1-9999
nterr.
ASHEVILLE STEAM ELECTRIC PLANT
ENERGY-
DRAWNwww.s
DRAWN BY: C.BRUCE DATE: APRIL 25,2018
BRUCE
PROJECT MANAGER: T. PLATING
DUKE ENERGY
CHECKED BY: T. PLATING
NORTHOCAROL CAROLINA
P:\Duke Energy Progress.1026\100. Sutton Ash Basin GW Assessment Plan\44. EUS Upd- CSA & CAP\CSA UPDATE JANUARY 20-FIGURES\Time Vs Concentration
15000
CB -08
14000
CCB-08BR
13000
CCR-101BR IMP
12000
EXT -01 -GM-EXT-01
11000
EXT -02
MW -08S
10000
MW-09BR
9000
=L
8000
p
7000
I-
0
m
6000
5000
MW -08S
4000
CCR-101BR IMP
3000
MW-09BR
2000
CB -08
1000
2
_
_
CB-08BR
o
���
N
rn
(�O
N
w
rn
o
N
w
0')
�O N w m
N
\
N
N
N
\
N
\\
N
N
O
\
00
\
N0')
v
\
4�:-
\
N
\
N
N
Fl
\
lO
\
-I N a)
\ 0) \ \
OO
N
N
\
N
N
N
\
N
N
N \ N N
I,
F"
O
O
N
O
O
O
N
O
O
O N O O
Ln
In
N
N
O
N
N
N
O
N
N
N O N N
In
ul
01
01
m
-I
-j
00 00
FIGURE 2-19
148 RIVER STREET, SUITE 220 BORON TIME SERIES -CB -8, CB -813R, CCR -101 BR,
GREENvILLE, SOUTH CAROLINA 29661 CCR -102D, EXT -01, EXT -02, MW -8S, MW-9BR
PHONE 864421-9999
ASHEVILLE STEAM ELECTRIC PLANT
synTerrdSYnt_IEMar„p�ERv.°p„N
” ARDEN, NORTH CAROLINA
2018 Startup and Effectiveness Monitoring Report April 27, 2018
Asheville Steam Electric Plant
TABLES
SynTerra
P: \ Duke Energy Progress.1026 \ 102. Asheville Ash Basin GW Assessment Plan \ 50.EHS IAP Monitoring &
Reporting \ April 2018 Annual Report \IAP Effectiveness Monitoring Report 2018.docx
TABLE 2-1
OCTOBER 2017 WATER LEVEL MEASUREMENTS
ASHEVILLE STEAM ELECTRIC PLANT
DUKE ENERGY PROGRESS, LLC, ARDEN, NC
Identification
Date Measured
Measured Well Depth
(Feet TOC)
Measured Depth to Water
(Feet TOC)
Water Level (Feet MSL)
ABMW-11BR
10/24/2017
156
80.29
2085.64
AMW-113
10/24/2017
NM
41.36
2042.22
AMW-2A
10/24/2017
NM
22.47
2085.46
AMW-213
10/24/2017
NM
34.28
2073.17
AMW-3A
10/24/2017
NM
8.27
2165.10
AMW-313
10/24/2017
NM
8.3
2164.70
APZ-30
10/24/2017
NM
15.9
B-1
10/23/2017
48.66
36.35
2090.29
B -1-A
10/23/2017
30.45
25.06
2101.61
B-2
10/23/2017
41.6
28.93
2097.47
CB-01BR
10/24/2017
89.9
41.56
2155.62
CB-01BRL
10/24/2017
NM
42.13
2155.30
CB -01D
10/23/2017
59.2
41.14
2156.07
CB-08BR
10/23/2017
99.3
50.01
2089.91
CB -08D
10/23/2017
39.43
Dry
Dry
CB-09BR
10/23/2017
97.85
47.67
2133.44
CB-09SL
10/23/2017
78.1
36.44
2144.98
CB -1
10/24/2017
62.02
52.36
2160.55
C13-2
10/24/2017
30.25
Dry
Dry
CB -3
10/24/2017
38.53
30.51
2102.72
CB -3R
10/24/2017
38.59
32.82
2106.15
CB -4
10/24/2017
22.77
21.42
2045.82
CB -46
10/24/2017
41.22
24.35
2041.99
CB -5
10/24/2017
9.27
3.42
2037.07
CB -6
10/23/2017
9.73
3.04
2032.44
CB -7
10/23/2017
11.49
7.82
2026.90
CB -8
10/23/2017
60.90
52.58
2092.61
CB -9
10/23/2017
65.60
37.55
2144.53
CCR-101BR
10/23/2017
NM
31.76
2106.235
CCR-102BR
10/23/2017
NM
20.93
2094.375
CCR -102D
10/23/2017
NM
15.06
2101.102
CCR -102S
10/23/2017
NM
14.51
2101.099
CCR-103BR
10/23/2017
NM
14
2057.456
CCR -103D
10/23/2017
NM
15.65
2054.581
CCR -104D
10/23/2017
NM
16.01
2058.886
CCR-105BR
10/24/2017
NM
41.15
2060.905
CCR -105D
10/24/2017
NM
40.54
2060.317
EXT -02
10/23/2017
NM
25.79
2079.68
GW-01BR
10/23/2017
76.44
24.55
2156.94
GW -01D
10/23/2017
46.45
21.75
2159.57
GW -1
10/23/2017
26.60
21.26
2159.90
GW -2
10/23/2017
47.18
43.55
2050.65
GW -3
10/23/2017
19.68
13.66
2057.44
GW -4
10/24/2017
25.90
Dry
Dry
GW -53
10/24/2017
32.37
31.97
2106.43
MW-03BR
10/24/2017
95.00
59.63
2081.68
MW -03D
10/24/2017
42.96
38.32
2103.72
MW-05BR
10/24/2017
43.30
20.82
2064.92
MW -05D
10/24/2017
26.30
18.92
2066.93
MW-06BR
10/24/2017
59.15
2.52
2059.79
MW -06D
10/24/2017
31.25
6.68
2056.05
MW -06S
10/24/2017
21.02
5.64
2057.48
MW-07BR
10/23/2017
72.89
16.96
2056.62
MW-08BR
10/23/2017
82.20
29.14
2094.75
MW -08S
10/23/2017
39.80
11
2112.34
MW-09BR
10/23/2017
65.92
34.51
2110.92
MW -09D
10/23/2017
48.84
32.38
2112.71
Mw -09S
10/23/2017
31.84
Dry
Dry
MW -10
10/24/2017
11.65
5.59
2165.61
MW -11
10/25/2017
11.36
5.14
2029.86
MW -11D
10/23/2017
32.36
9.6
2025.62
MW-13BR
10/23/2017
59.44
30.56
2123.72
MW -13D
10/23/2017
43.06
30.45
2123.52
MW-14BR
10/23/2017
24.38
13.59
2063.28
MW -15A
10/23/2017
9.88
7.62
2026.98
MW-15BR
10/23/2017
116.50
7.45
2027.17
MW -15D
10/23/2017
51.63
6.83
2027.58
MW -16A
10/23/2017
16.22
10.04
2026.92
MW-16BR
10/23/2017
51.52
10.19
2026.83
MW -17A
10/23/2017
10.07
6.92
2027.89
MW-18BR
10/23/2017
35.65
8.18
2027.36
MW-18BRL
10/23/2017
113.47
8.65
2027.41
MW -18D
10/23/2017
24.24
7.98
2027.46
MW-19BR
10/23/2017
58.56
0.64
2035.54
MW -20A
N/A
10.68
N/A
N/A
MW -21D
10/24/2017
NM
1.34
2042.89
MW-22BR
10/24/2017
NM
12.13
2036.85
MW -22D
10/24/2017
NM
2.63
2046.43
MW-23BR
10/24/2017
61.55
30.28
2076.16
MW-23DL
10/24/2017
29.60
5.75
2100.51
MW-23DU
10/24/2017
19.06
8.21
2098.15
MW-24BR
10/24/2017
71.03
9.5
2163.53
MW -24S
10/24/2017
41.24
10.78
2162.66
P-102
10/23/2017
52.60
52.75
2112.86
P-103
10/24/2017
1 54.15
50.38
2114.57
PZ -16
10/23/2017
54.55
50.22
2116.78
PZ -17D
10/23/2017
82.10
58.6
2090.60
PZ -17S
10/23/2017
40.09
28.82
2119.98
PZ -19
10/24/2017
27.05
27
2078.40
Prepared by: TCK Checked by: TDP
Notes:
NA - Not available
NM - Not measured
P:\Duke Energy Progress. 1026\102. Asheville Ash Basin GW Assessment Plan\50.EHS IAP Monitoring & Reporting\April 2018 Annual Report\Tables\Table 2-1 October 2017 Water Level Measurements Page 1 of 1
TABLE 2-2
APRIL 2018 WATER LEVEL MEASUREMENTS
ASHEVILLE STEAM ELECTRIC PLANT
DUKE ENERGY PROGRESS, LLC, ARDEN, NC
Identification
Date
Measured
Measured Well Depth
(Feet TOC)
Measured Depth to Water
(Feet TOC)
Water Level (Feet, MSL)
ABMW-11BR
4/16/2018
156.00
81.27
2084.66
AMW-16
4/16/2018
NM
40.80
2042.78
AMW-2A
4/16/2018
NM
22.47
2085.46
AMW-26
4/16/2018
NM
32.45
2075.00
AMW-3A
4/16/2018
NM
7.90
2165.47
AMW-313
4/16/2018
NM
8.00
2165.00
APZ-30
4/16/2018
NM
6.80
2096.70
AS -5611
4/16/2018
NM
45.19
2088.64
AS-56RL
4/16/2018
NM
63.42
2070.21
B-1
4/16/2018
48.66
34.38
2092.26
13-1-A
4/16/2018
30.45
24.84
2101.83
B-2
4/16/2018
41.60
29.69
2096.71
CB -016R
4/16/2018
89.90
40.23
2156.95
CB-01BRL
4/16/2018
NM
41.19
2156.24
CB -01D
4/16/2018
59.20
39.70
2157.51
CB-08BR
4/16/2018
99.30
49.19
2090.73
CB-08BRL
4/16/2018
225.00
51.03
2089.56
CB -08D
4/16/2018
39.43
DRY
DRY
CB-09BR
4/16/2018
97.85
47.86
2133.25
CB-09SL
4/16/2018
78.10
35.57
2145.85
CB -1
4/16/2018
62.02
50.14
2162.77
CB -2
4/16/2018
30.25
30.09
2137.70
CB -3
4/16/2018
38.53
29.82
2103.41
CB -3R
4/16/2018
38.59
31.11
2107.86
CB -4
4/16/2018
22.77
19.10
2048.14
C13-413
4/16/2018
41.22
23.81
2042.53
CB -5
4/16/2018
9.27
3.38
2037.11
CB -6
4/16/2018
9.73
3.21
2032.27
CB -7
4/16/2018
11.49
6.32
2028.40
CB -8
4/16/2018
60.90
49.65
2095.54
CB -9
4/16/2018
65.60
54.61
2127.47
CB -9611
4/16/2018
97.85
47.86
2133.25
CB-9SL
4/16/2018
78.10
35.57
2145.85
CCR-101BR
4/16/2018
NM
31.13
2106.87
CCR -102D
4/16/2018
NM
16.13
2100.03
CCR -102S
4/16/2018
NM
15.60
2100.01
CCR-102BR
4/16/2018
NM
20.67
2094.64
CCR-103BR
4/16/2018
NM
13.83
2057.63
CCR -103D
4/16/2018
NM
15.49
2054.74
CCR -104D
4/16/2018
NM
15.58
2059.32
CCR-105BR
4/16/2018
NM
40.95
2061.11
CCR -105D
4/16/2018
NM
40.05
2060.81
EXT -2
4/16/2018
NM
26.40
2079.07
GW-01BR
4/16/2018
76.44
24.62
2156.87
GW -01D
4/16/2018
46.45
20.95
2160.37
GW -1
4/16/2018
26.60
20.95
2160.21
GW -2
4/16/2018
47.18
43.70
2050.50
GW -3
4/16/2018
19.68
13.05
2058.05
GW -4
4/16/2018
25.90
23.72
2060.68
GW -5
4/16/2018
32.37
31.96
2106.44
MW-03BR
4/16/2018
95.00
55.82
2085.49
MW -03D
4/16/2018
42.96
37.55
2104.49
MW-05BR
4/16/2018
43.30
17.77
2067.97
MW -05D
4/16/2018
26.30
16.40
2069.45
MW-06BR
4/16/2018
59.15
2.23
2060.08
MW -06D
4/16/2018
31.25
5.00
2057.73
MW -06S
4/16/2018
21.02
4.30
2058.82
MW-07BR
4/16/2018
72.89
15.15
2058.43
MW-08BR
4/16/2018
82.20
30.76
2093.13
MW -08S
4/16/2018
39.80
13.09
2110.25
MW-09BR
4/16/2018
65.92
37.95
2107.48
MW -09D
4/16/2018
48.84
34.08
2111.01
MW -09S
4/16/2018
31.84
DRY
DRY
MW -10
4/16/2018
11.65
5.35
2165.85
MW -11
4/16/2018
11.36
5.70
2029.30
MW -11D
4/16/2018
32.36
7.73
2027.49
MW-13BR
4/16/2018
59.44
29.67
2124.61
MW -13D
4/16/2018
43.06
29.56
2124.41
MW-14BR
4/16/2018
24.38
9.36
2067.51
MW -15A
4/16/2018
9.88
6.24
2028.36
MW-15BR
4/16/2018
116.50
6.72
2027.90
MW-15BRL
4/16/2018
NM
5.70
2029.10
MW -15D
4/16/2018
51.63
5.01
2029.40
MW -16A
4/16/2018
16.22
8.81
2028.15
MW-16BR
4/16/2018
51.52
8.88
2028.14
MW-16BRL
4/16/2018
175.00
7.89
2028.50
MW -16D
4/16/2018
NM
8.64
2028.35
MW -17A
4/16/2018
10.07
5.95
2028.86
MW-17BRL
4/16/2018
175.00
6.30
2028.61
MW-18BR
4/16/2018
35.65
6.41
2029.13
MW-18BRL
4/16/2018
113.47
6.70
2029.36
MW -18D
4/16/2018
24.24
6.42
2029.02
MW-19BR
4/16/2018
58.56
2.99
2033.19
MW-19BRL
6/16/2018
225.00
3.34
2032.72
MW -20A
4/16/2018
10.68
4.18
2033.20
MW -21D
4/16/2018
NM
0.90
2043.33
MW-22BR
4/16/2018
NM
13.16
2035.82
MW -22D
4/16/2018
NM
3.07
2045.99
MW-23BR
4/16/2018
61.55
55.08
2051.36
MW-23DL
4/16/2018
29.60
5.86
2100.40
MW-23DU
4/16/2018
19.06
8.00
2098.36
MW-24BR
4/16/2018
71.03
9.51
2163.52
MW -24S
4/16/2018
41.24
10.84
2162.60
MW -25S
4/16/2018
NM
4.44
2029.85
MW-25BR
4/16/2018
NM
4.95
2029.24
MW-25BRL
4/16/2018
NM
4.96
2029.14
MW -26S
4/16/2018
NM
4.82
2030.93
MW-26BRL
4/16/2018
175.00
3.92
2029.33
P-102
4/16/2018
52.60
52.78
2112.50
P-103
4/16/2018
54.15
49.85
2114.05
PZ -16
4/16/2018
54.55
48.86
2118.14
PZ -17D
4/16/2018
82.10
57.18
2092.02
PZ -17S
4/16/2018
40.09
27.30
2121.50
PZ-17BRL
4/16/2018
NM
58.24
2092.65
PZ -19
4/16/2018
27.05
DRY
DRY
Prepared by: DA Checked by: TCK
Notes:
MSL - Mean Sea Level
NA - Not available
NM - Not measured
TOC - Top of casing
P:\Duke Energy Progress. 1026\102. Asheville Ash Basin GW Assessment Plan\50.EHS IAP Monitoring & Reporting\April 2018 Annual Report\Tables\Table 2-2 April 2018 Water Level MeasurementsTable 2-2 April 2018 Water Level
Measurements Water level elevation Page 1 of 1
TABLE 2-3
ANALYTICAL RESULTS NOTES
ASHEVILLE STEAM ELECTRIC PLANT
DUKE ENERGY PROGRESS, LLC, ARDEN, NC
COLOR NOTES
Bold highlighted concentration indicates exceedance of the 15A NCAC 02L .0202 Standard or the IMAC. (Effective date for 15A NCAC 02L .0202
Standard and IMAC is April 1 2013
Bold highlighted concentration indicates exceedance of the Inactive Hazardous Sites Branch PSRG Table October 2016 for Industrial Health
Bold highlighted concentration indicates exceedance of the Inactive Hazardous Sites Branch PSRG Table October 2016 for Residential Health
Bold highlighted concentration indicates exceedance of the Inactive Hazardous Sites Branch PSRG Table October 2016 for Protection of Groundwater
Bold highlighted concentration indicates exceedance of the current respective standard or criteria [15A NCAC 02B(Class B, WS -IV), NPDES permit
value]. All hardness -dependent dissolved metal standards in this table assume <_ 25 mg/L in -stream hardness.
Turbidity of Sample >_ 10 NTUs
Provisional Background Concentrations updated with Background Results through September 2017.
ABBREVIATION NOTES
BGS - below ground surface
BOD - Biologic Oxygen Demand
CB - Compliance Boundary
COD - Chemical Oxygen Demand
Deg C - Degrees Celsius
DMAs - dimethylarsinic acid
DUP - Duplicate
Eh - Redox Potential
ft - Feet
GPM - gallons per minute
IMAC - Interim Maximum Allowable Concentrations. From the 15A NCAC 02L Standard, Appendix 1, April, 1, 2013.
McSe - Methylseleninic acid
mg/kg - milligrams per kilogram
mg/L - milligrams per liter
mg-N/L - Milligram nitrogen per liter
MMAs - monomethylarsonic acid
mV - millivolts
NA - Not available or Not Applicable
NO - Not detected
NE - Not established
NM - Not measured
NTUs - Nephelometric Turbidity Units
pCi/L - picocuries per liter
PSRG - Primary Soil Remediation Goals
RL - Reporting Limit
SeCN - selnocynante
SeMe (IV) - Selenomethionine
SPLP - Synthetic Precipitation Leaching Procedure
S.U. - Standard Units
TCLP - Toxicity Characteristic Leaching Procedure
ug/L - micrograms per liter
ug/mL - microgram per milliliter
umhos/cm - micromhos per centimenter
Well Locations referenced to NAD83 and elevations referenced to NAVD88
TABLE 2-3
ANALYTICAL RESULTS NOTES
ASHEVILLE STEAM ELECTRIC PLANT
DUKE ENERGY PROGRESS, LLC, ARDEN, NC
LABORATORY FLAGS
< - concentration not detected at or above the adjusted reporting limit.
A - Federal MCL.
* - Interim Maximum Allowable Concentrations (IMACs) of the 15A NCAC 02L Standard, Appendix 1, April 1, 2013.
B - Target analyte detected in method blank at or above the reporting limit. Target analyte concentration in sample is less than 10X the concentration
in the method blank. Analyte concentration in sample could be due to blank contamination.
Bl - Target analyte detected in method blank at or above the reporting limit. Target analyte concentration in sample was greater than 1OX the
concentration in the method blank. Analyte concentration in sample is not affected by blank contamination.
B2 - Target analyte was detected in blank(s) at a concentration greater than 1/2 the reporting limit but less than the reporting limit. Analyte
concentration in sample is valid and may be used for compliance purposes.
133 - Target analyte was detected in Continuing Calibration Blank(s) at a concentration greater than 1/2 the reporting limit but less than the reporting
limit. Analvte concentration in sample is valid and may be used for compliance purposes.
B4 - Target analyte was detected in Continuing Calibration Blank(s) at or above the reporting limit.
135 - Target analyte was present in blank(s) above the method detection limit but less than the reporting limit. Data is valid for compliance purposes.
136 - Target analyte was detected in Continuing Calibration Blank(s) at a concentration greater than the reporting limit.
CH - The continuing calibration for this compound is outside of Pace Analytical acceptance limits. The results may be biased high.
CL - The continuing calibration for this compound is outside of Pace Analytical acceptance limits. The results may be biased low.
CR - The dissolved metal result was greater than the total metal result for this element. Results were confirmed by reanalysis.
CU - The continuing calibration for this compound is outside of Pace Analytical acceptance limits. Analyte presence below reporting limits in associated
samples. Results unaffected by high bias.
D3 - Sample was diluted due to the presence of high levels of non -target analytes or other matrix interference.
D4 - Sample was diluted due to the presence of high levels of target analytes.
D6 - The precision between the sample and sample duplicate exceeded laboratory control limits.
E - Analyte concentration exceeded the calibration range. The reported result is estimated.
H1 - Analysis conducted outside the EPA method holding time.
H2 - Extraction of preparation conducted outside EPA method holding time.
H3 - Sample was received or analysis requested beyond the recognized method holding time.
H6 - Analysis initiated outside of the 15 minute EPA required holding time.
HS - Results are from sample aliquot taken from VOA vial with headspace (air bubble greater than 6 mm diameter).
j - Estimated concentration above the adjusted method detection limit and below the adjusted reporting limit.
j- - Estimated concentration, biased low.
j+ - Estimated concentration, biased high.
Ll - Analyte recovery in the laboratory control sample (LCS) was above quality control (QC) limits. Results may be biased high.
L2 - Analyte recovery in the laboratory control sample (LCS) was below QC limits. Results for this analyte in associated samples may be biased low.
L3 - Analyte recovery in the laboratory control sample (LCS) exceeded quality control (QC) limits. Analyte presence below reporting limits in
associated samples. Results unaffected by hiah bias.
M - Matrix spike / matrix spike dup failure.
M1 - Matrix spike recovery was high: the associated Laboratory Control Spike (LCS) was acceptable.
M2 - Matrix spike recovery was Low: the associated Laboratory Control Spike (LCS) was acceptable.
M4 - The spike recovery value was unusable since the analyte concentration in the sample was disproportionate to the spike level.
M6 - Matrix spike and Matrix spike duplicate recovery not evaluated against control limits due to sample dilution.
N2 - The lab does not hold accreditation for this parameter.
P2 - Re -extraction or re -analysis could not be performed due to insufficient sample amount.
P4 - Sample field preservation does not meet EPA or method recommendations for this analysis.
P8 - Analyte was detected in the method blank. All associated samples had concentrations of at least ten times greater than the blank or were below
the re ortin limit.
Rl - Relative Percent Difference (RPD) value was outside control limits.
IS- Associated calibration check did not meet specified criteria.
R,p-ti.9 Umt,
15A NCAC 0�1 Stand -
P__...' .ackgllu.d (All-ol Unit,
P"""'l B,ckg .... d (S.p,.Ift. Unit,
P-isicm.1 B.ckg,..nd (T,.nafti.n Unit:
P-isicm.l B.ckg .... d (B.d,.ck Unit:
TABLE 2-3
BASELINE GROUNDWATER ANALYTICAL RESULTS
ASHEVILLE STEAM ELECTRIC PLANT
DUKE ENERGY PROGRESS, LLC, ARDEN, NC
-----
FIE,. P.R.METERS1
--
SELECTED �OCFR2SI .PPEN.I. III CONSTITUENTS plus S, I
=
-
INORGANIC PARAMETERS
(TOTAL CONCENTRATION)
1111111111 1111 1111111111111111 - 1111 11111111111111 1111-11111111111
-
I 1111 1111111111 Jill Ill -
I
INORGANIC PARAMETERS
(DISSOLVED CONCENTRATION WITH
FILTER SIZE)
I I I I Ill
1111111 111111 1111111 i
I Ill I I III III III 1 IIIIIII���
'..-..'.....;..'-:-
I
RADIONUCLIDES
---r
iiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiI
SPECIATIONS
I
OTHER PARAMETERS
-
M
S.U.
.,/L m,/L m,/L .,/L m,/L m,/L
.,/L
ug/L
u,/L
ug/L
.,/L
.,/L
ug/L
ug/L
ug/L
ug/L
ug/L
u,/L
ug/L mg/L
.,/L .g/L
ug/L
ug/L
m,-N/L
.g-N/L
mg/L
.g/L
.g/L
mg/L
�g/L
.,/L
.,/L
.,/L
.,/L
.9/L
.g/L
.,/L
.,/L
u,/L
m,/L
.,/L
.,/L
.,/L
.,/L
.,/L
.,/L
mg/L
.,/L
u,/L
u,/L
u,/L
m,/L
m,/L .,/L m,/L
,g/L .g/L .g/L
.g/L
.,/L
.,/L
.,/L
.,/L
u,/L
u,/L
u,/L
ug/L
u,/L
.,/L
.,/L
.9/L
.,/L
.g/L
.,/L
.,/L
.,/L
u,/L
u,/L
ug/L
ug/L
pCi/L
pCi/L
pCl/L
ug/.L
.,/-
u,/mL
u,/mL
ug/mL
u,/L
u,/L
u,/L
u,/L
u,/L
u,/L
ug/L
.g/L ug/L
ug/L
ug/L
.,/L
.,/L
.,/L
.,/L
.,/L
m,/L
m,/L
mg/L
m,/L mg/L
m,/L
m,/L
mg/
6.5-8.5
700 ME �50 ME 250 500
ME
�.
W
700
4-
2
W
W
�.
Woo
300
�5
NE NE
50 1
NE
Wo
W
ME
ME
20
20
ME
0.2-
0.3-
Woo
NE
NE
NI
ME
NI
NE
NE
NE
NE
ME
ME
ME
NE
NE
N
E
NE
NE
NE
NE
NE ME ME
ME ME ME
ME
ME
NE
ME
NE
NE
NE
NE
NE
NE
ME
ME
ME
NE
ME
ME
NE
NE
NE
NE
ME
ME
NE
ME
'.
ME
NE
-
NE
NE
-
4.6-5.1
50 2.6� �5 28 4.6 56
1
73
�
�
59
�
�
.42
5
4.29
5
598
1
_
N' 3-06
_
363 0.1
�
5
NE
0.113
1.55
I
NE
618
_
0.2
-
22
.0
_
NE
E
_
ME
ME
ME
NE
ME
ME
ME
ME
ME
ME
ME
E
NE
NE
_
ME
ME ME ME
ME ME E
ME
ME
NE
NE
NE
J
NE
NE
NE
NE
NE
J
NE
NE
NE
NE
N E
NE
NE
NE
NE
NE
2!
E I
!
NE
E
4.17
2
1
NE
'
NE
7 --
0. 1
1 6 4 50 1 104.9
- 14 43.98
602.2
1
1
143
1
1
1'313
5
6.S
5
941
1
NE 1 8.7
725 0.3
1
_
10
NE
2.8
1.61
1.88
ME
___
40
677t
:
02
0 625
-
454
E
NE
NE
E
NE
NE
NE
-
NE
NE
NEE
NE
NE
NE
NE
ME
E
]
E
NE
-��NE
NE
- - NE
NE ME E
NE
NE
NE
NE
NE I
NE
NE
NE
]E
NE
-
NE
NE !
E
NE
NE
NE
NE
ME
I NE
N E
� ME
6832
N!E
��������������������������������������������������������������������������������I
5
]
NE
--------
3.9-7.0
� -
.
50 3 73 6.7 37.67 4.�67732.�7.7
.9
j.�
346
1
1
41
1
1
0.4261
132
4.60.
2.0.
__
779
1
NE 3331.1
380 0.2
1
-
NE
0.872
1.871
1
ME
_ _
_4 1 97
02
0.41
27.57
E
�N
NE
NE
N
MEN E
NE
NE
NE
NE
NE
NE
NE
NE
NE
NE
NE
N E
NE
�NE
NE
NE NE NE
NE NE NE
EE�
NE
NE
NE
NE
NE �
�NE
NE
NE
_
ME
N
��N
�EN E
NE
NE
ME
NE I
NE
NE
NE
NE
NE
NE
I NE I
NE
NE
6 GI
��������������������������������������������������������������������������������I
5
NE
4.1 -8.1
50 24. 1 5 6. 5 88 5.6 1 13- -
6 I S
- -
1
1
41.16
1
14
_ _
0 . ��
__ 2�3�
�
1.3
1
1
1246 _
1
=N E J:::::::.:
= 3::::::::
93 0.05
3.7
1.77
NE
-
4.785
1 _
NE
9013
02
0.632
5
NE
NE
NE
NE
NE
NE
NE
NE
NE�
NE
NE
NE
NE
NE
NE
NE
N E
NE
NE
NE
NE NE NE
NE N E�
NE
NE
NE
NE
NE
NE
NE
NE
E
NE
NE
NE
����������������������������������������������������iiiiiiiiiiiiiiM
N ,
G .
NE
NE
E
P:\D,ke Ene,gy Pmgmss.1026\102. Ashe,ille Ash Basin GW Assessment Plan\50.EHS IAP Monitoring & Reporting\Aprl 2018 Arm.al Repoft\Tables\Table 2-3 2-4 Baseline Gro.nd.ate, AOW Analyti.1 Res.1ts P,' I 'f 5
=
-
1111111111 1111 1111111111111111 - 1111 11111111111111 1111-11111111111
-
I 1111 1111111111 Jill Ill -
I I I I Ill
1111111 111111 1111111 i
I Ill I I III III III 1 IIIIIII���
'..-..'.....;..'-:-
���
iiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiI
1111i I
����
-
M
... I . -
ilMMMMMM=Mmmmmmmm=mm=omMmm=
�
w
mommmommmmommmmmmmmmmMMMMEMMOMMMOMMOMMMOMMMMOMEMMEMMMMMOMOMMOMMEMoommoommmmmmm-�
�iiiiiiiiiiiiiiiiiiiiiiiiiIiiiiiM
iiiiiiiiiiiiiiii=�
�����������������������������������������������iiiiiiiiiiiiiiM
��������������������������������������������������������������������������������I
1-0-1
����������������������������������������������������iiiiiiiiiiiiiiM
��������������������������������������������������������������������������������I
. ..
-,-
-
�����������������������������������������������������iiiiiiiiiiiiiiM
��������������������������������������������������������������������������������I
1-
�������������������������������������������������������iiiiiiiiiiiiiiM
��������������������������������������������������������������������������������I
I-,
����������������������������������������������������iiiiiiiiiiiiiiM
�������������������������������������������������������������������������������iiiiiiiiiiiiM
I I
-
�����������������������������������������������������iiiiiiiiiiiiiiM
�������������������������������������������������������������������������������iiiiiiiiiiiiM
I
�������������������������������������������������������iiiiiiiiiiiiiiM
�������������������������������������������������������������������������������iiiiiiiiiiiiM
I
I I
����������������������������������������������������iiiiiiiiiiiiiiM
�������������������������������������������������������������������������������iiiiiiiiiiiiM
=
l����������������������������������������������������iiiiiiiiiiiiiiM
�������������������������������������������������������������������������������iiiiiiiiiiiiM
iiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiM�
I
--,
����������������������������������������������������iiiiiiiiiiiiiiM
�������������������������������������������������������������������������������iiiiiiiiiiiiM
iiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiM�
I-
�����������������������������������������������������iiiiiiiiiiiiiiM
�������������������������������������������������������������������������������
-
, I
I--,.
��������������������mm"m�������������������������������iiiiiiiiiiiiiiM
�������������������������������������������������������������������������������iiiiiiiiiiiiM
I
: ":: 11
�����������������������������������������������������iiiiiiiiiiM
�������������������������������������������������������������������������������iiiiiiiiiiiiM
I
�������������������������������������������������������iiiiiiiiiiiiiiM
�������������������������������������������������������������������������������iiiiiiiiiiiiM
I -1--p
����������������������������������������������������iiiiiiiiiiiiiiM
�������������������������������������������������������������������������������iiiiiiiiiiiiM
I
--Ui---,���������������������mn"M�������������������������������iiiiiiiiiiM
�������������������������������������������������������������������������������iiiiiiiiiiiiM
I I
M -P
����������������������������������������������������iiiiiiiiiiiiiiM
�������������������������������������������������������������������������������iiiiiiiiiiiiM
I I
���E�������������������������������������������������iiiiiiiiiiiM
�������������������������������������������������������������������������������iiiiiiiiiiiiM
I
-
IiiiiiiiiiiiiiiiiiiiiiiiiiiiiM�
�������������������������������������������������iiiiiiiiiiM
�������������������������������������������������������������������������������iiiiiiiiiiiiM
1.1-1
iiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiE�
�������������������������������������������������iiiiiiiiiiiiiiM
��������������������������������������������������������������������������������iiiiiiiiiiiiM
I
--Ui-UZA-l������������������������������������������������������iiiiiiiiiiiiiiM
��������������������������������������������������������������������������������iiiiiiiiiiiiM
-
I I
-
��������������������MW"m�������������������������������iiiiiiiiiiiiiiM
������������������������������������������������������������������������������iiiiiiiiiiiiM
, ,
iiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiS��
�����������������WnTm�����������������������������������������������������������������������������������������orrm��������������������������
--.-
I .
����������������=���������������������������������iiiiiiiiiiM
�����������������������=�����������������������������ORT"M������������������������iiiiiiiiiiiiM
I
"
������������������=���������������������������������iiiiiiiiiiiiiiM
�������������������������������������������������������������������������������
.
lll�
��������������������������������������������������iiiiiiiiiiiiiiM
�������������������������������������������������������������������������������
I
����������������������������������������������������iiiiiiiiiiiiiiM
�������������������������������������������������������������������������������iiiiiiiiiiiiM
iwau'
l������������������m���������������������������������iiiiiiiiiiiiiiM
�������������������������������������������������������������������������������iiiiiiiiiiiiM
iiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiM: ll�l
'-"='�����������������������������������������������������iiiiiiiiiiiiiii
����������������������������������������������������iiiiiiiiiiiiiiM
�������������������������������������������������������������������������������iiiiiiiiiiiiM
I
�������������������������������������������������������������������������������lillillililim
�Jillill-M-iiiiiiiiiiiiiiN
. .-,. -���������������������ow""M�������������������������������M"T?m�������������������������������������������������������������������������������iiiiiiiiiiiiM
I �������������������������������������������������������������iiiiiiiiiiiiiiM
�������������������������������������������������������������������������������iiiiiiiiiiiiM
- I
I
I
����������������������������������������������������iiiiiiiiiiiiiiM
�������������������������������������������������������������������������������iiiiiiiiiiiiM
1-
����������������������������������������������������iiiiiiiiiiiiiiM
�������������������������������������������������������������������������������iiiiiiiiiiiiM
-
,
����������������������������������������������������iiiiiiiiiiiiiiM
�������������������������������������������������������������������������������iiiiiiiiiiiiM
I
� I '
�����������������������������������������iiiiiiiiiiiiiiM
�������������������������������������������������������������������������������iiiiiiiiiiiiM
iiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiM ll�
�-.;-V' ... Z������������������������������������������������������iiiiiiiiiiiiiM
����������������������������������m��������������������������������������������iiiiiiiiiiiiM
=
-- -
������������������������������������������������������iiiiiiiiiiiiiM
�������������������������������������������������������������������������������iiiiiiiiiiiiM
iiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiM�-
I ,-.,--,.�����������������������������������������������������iiiiiiiiiiiiiM
�������������������������������������������������������������������������������iiiiiiiiiiiiM
iiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiM�M
����������������������������������������������������iiiiiiiiiiiiiM
�������������������������������������������������������������������������������iiiiiiiiiiiiM
=
--;�������������������������������������������������������iiiiiiiiiiiiiM
�������������������������������������������������������������������������������iiiiiiiiiiiiM
iiiiiiiiiiiiiiiiiiiiiiiiiiiiiii0��-M....
.��������������������������������������������������������iiiiiiiiiiiiiM
����������������������������������m��������������������������������������������iiiiiiiiiiiiM
iiiiiiiiiiiiiiiiiiiiiiiiiiiiiii0�-_0
�������������������������������������������������������iiiiiiiiiiiiiM
�������������������������������������������������������������������������������iiiiiiiiiiiiM
iiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiM�
l�������������������������������������������������������iiiiiiiiiiiiiM
�������������������������������������������������������������������������������iiiiiiiiiiiiM
iiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiM�
--;�
.�' .
����������������������������������������������������iiiiiiiiiiiiiM
�������������������������������������������������������������������������������iiiiiiiiiiiiM
iiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiM�
I
����������������������������������������������������iiiiiiiiiiiiiiiiiI
�������������������������������������������������������������������������������iiiiiiiiiiiiM
������������������������������������������������������������iiiiiiiiiiiiiiiiiI
�������������������������������������������������������������������������������iiiiiiiiiiiiM
iiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiM�
;-
-. . ,-����������������������������������������������������iiiiiiiiiiiiiM
�����������������������=�����������������������������iiiiiiiiiiiiM
iiiiiiiiiiiiiiiiiiiiiiiiiiiiii0�=100-4-
�������������������=���������������������������������iiiiiiiiiiiiiiiiM
�����������������������=�������������������������������������������������������iiiiiiiiiiiiM
iiiiiiiiiiiiiiiiiiiiiiiiiiii=�J-.-
����������������������������������������������������iiiiiiiiiiiiiiiS
�����������������������=�������������������������������������������������������iiiiiiiiiiiiM
����---L--,�����������������������������������������������������iiiiiiiiiiiiiiM
�����������������������=�������������������������������������������������������iiiiiiiiiiiiM
iiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiM��
-
IiiiiiiiiiiiiiiiiiiiiiiiiiiiiM�
���������������m����������������������������������������������������������=�������������������������������������������������������iiiiiiiiiiiiM
iiiiiiiiiiiiiiiiiiiiiiiiiiM����-.111-1
iiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiE�
���������������=����������������������������������������������������������=�������������������������������������������������������iiiiiiiiiiiiM
iiiiiiiiiiiiiiiiiiiiiiiiiiii=�J-.......
...�iiiiiiiiiiiiiiiiiiiii=�
0
��������������������������������������������������������������������������=�������������������������������������������������������iiiiiiiiiiiiM
: I .... .
.
�iiiiiiiiiiiiiiiiiiii=�
��������������������������������������������������������������������������=�������������������������������������������������������iiiiiiiiiiiiM
:
I
- I . .-
����������������������������������������������iiiiiiiiiiiiiiiiiI
������������������������=�������������������������������������������������������iiiiiiiiiiiiM
11'r".T.171.11���
iiiiiiiiiiiiiiMilliiiiiiiiiiiM����
����������=���������������������iiiiiiiiiiiiiiM
iiiiiiiiiiiiiiii=iiiiiiiiiiiM����������
��������������������������������������������������������������������������������iiiiiiiiiiiiM
�
- ...;
iiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiM�
��������������������������������������iiiiiiiiiiiiiiiiiM
iiiiiiiiiiiiiiii=iiiiiiiiiiiM����������
�����������������������=�������������������������������������������������������iiiiiiiiiiiiM
I
�iiiiiiiiiiiiiiiiiiiii=�
��������������������������������������iiiiiiiiiiiiiiiiiM
iiiiiiiiiiiiiiii=iiiiiiiiiiiM����������
�����������������������=�������������������������������������������������������iiiiiiiiiiiiM
�-'
I
. .......... �iiiiiiiiiiiiiiiiiiiiiiiiiiiiiiM�
��������������������������������������iiiiiiiiiiiiiiM
iiiiiiiiiiiiiiii=iiiiiiiiiiiM����������
����������������������������������M��������������������
I
-
1-
I iiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiZ�
��������������������������������������iiiiiiiiiiiiiiM
iiiiiiiiiiiiiiii=iiiiiiiiiiiM����������
�����������������������=�������������������������������������������������������iiiiiiiiiiiiM
- lll-������������
��������������������������������iiiiiiiiiiiiM
iiiiiiiiiiiiiiii=iiiiiiiiiiiM����������
�����������������������=�������������������������������
I
iiiiiiiiiiiiiiiiiiiiiiiiiiiiM���������
��������������������������������iiiiiiiiiiiiiiM
iiiiiiiiiiiiiiiiiiMillillilli�����������
�����������������������=�������������������������������������������������������iiiiiiiiiiiiM
I
�����������������������������������������
iiiiiiiiiiiiiiii=iiiiiiiiiii�����������
iiiiiiiiiiii=iiiiiiiiiiii=��
� �
�������������������������������������������������������������������������iiiiiiiiiiiiM
- lll��
"
����������������������������������������iiiiiiiiiiiiiiiM
iiiiiiiiiiiiiiii=iiiiiiiiiiiM����������
������������������������=����������������������������������������������������m��iiiiiiiiiiiiM
iiiiiiiiiiiiiiiiiiiiiiiiiiiiM��
������������������������m����iiiiiiiiiiiM
iiiiiiiiiiiiiiii=iiiiiiiiiiiM����������
������������������������=����������������������������������������������������m��iiiiiiiiiiiiM
limm".
�����������������������������������m����iiiiiiiiiiiM
iiiiiiiiiiiiiiii=iiiiiiiiiiiM����������
������������������������=����������������������������������������������������m��iiiiiiiiiiiiM
iiiiiiiiiiiiiiiiiiiiiiiiiiiiM��
l����������������������������������������iiiiiiiiiii=
iiiiiiiiiiiiiiii=iiiiiiiiiiiM����������
������������������������=�������������������������������������������������������iiiiiiiiiiiiM
iiiiiiiiiiiiiiiiiiiiiiiiiiiiM��
--�
���������������������������������m����iiiiiiiiiiiiiiiiM
iiiiiiiiiiiiiiii=iiiiiiiiiiiM����������
������������������������=�������������������������������������������������������iiiiiiiiiiiiM
iiiiiiiiiiiiiiiiiiiiiiiiiiiiM�l-
l�����������������������������������m����iiiiiiiiiiiiiiiiM
iiiiiiiiiiiiiiii=iiiiiiiiiiiM����������
������������������������=�������������������������������������������������������iiiiiiiiiiiiM
iiiiiiiiiiiiiiiiiiiiiiiiiiiiM�i-L...-".
iiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiM�������
���������������������������m����iiiiiiiiiiiiiiiM
iiiiiiiiiiiiiiii=iiiiiiiiiiiM����������
��������������������������������������������������������������������������������iiiiiiiiiiiiM
iiiiiiiiiiiiiiiiiiiiiiiiiiiiM�l-
1-1111-11.
iiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiM�������
���������������������������m����iiiiiiiiiiiiiiiM
iiiiiiiiiiiiiiii=iiiiiiiiiiiM����������
��������������������������������������������������������������������������������iiiiiiiiiiiiM
����.""),M.,���������
���������������������������M����iiiiiiiiiiiiiiM
iiiiiiiiiiiiiiii=iiiiiiiiiiiM����������
��������������������������������������������������������������������������������iiiiiiiiiiiiM
iiiiiiiiiiiiiiiiiiiiiiiiiiiiM�
I J- "L,.-.,.���������
���������������������������m����iiiiiiiiiiiiiiiM
iiiiiiiiiiiiiiii=iiiiiiiiiiiM����������
��������������������������������������������������������������������������������iiiiiiiiiiiiM
�; . . . . . .
-
iiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiM�������
���������������������������m����iiiiiiiiiiiiiiM
iiiiiiiiiiiiiiii=iiiiiiiiiiiM����������
��������������������������������������������������������������������������������iiiiiiiiiiiiM
I
�����������������������������������m����iiiiiiiiiiiiiiM
iiiiiiiiiiiiiiii=iiiiiiiiiiiM����������
��������������������������������������������������������������������������������iiiiiiiiiiiiM
iiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiM�
I ..
����������������������������������������������������iiiiiiiiiiiiiiM
������������������������=�������������������������������������������������������iiiiiiiiiiiiM
iiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiM�
-.-�
������������������=���������������������������������iiiiiiiiiiiiiiiM
������������������������=�������������������������������������������������������iiiiiiiiiiiiM
iiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiii1�
���������������������m���������������������������������iiiiiiiiiiiiiiM
������������������������=�������������������������������������������������������iiiiiiiiiiiiM
iiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiM�
- -.����������������������m��������������������������������=iiiiiiiiiiiiiiiiM
������������������������=����������������������������������������������������m��iiiiiiiiiiiiM
iiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiM�
1-.,-.-.,..�������������������M���������������������������������iiiiiiiiiiiiiiiiiE
������������������������=�������������������������������������������������������iiiiiiiiiiiiM
iiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiM�
-;- .....
������������������m���������������������������������iiiiiiiiiiiiiiM
������������������������=�������������������������������������������������������iiiiiiiiiiiiM
=
-
l���������������������m���������������������������������iiiiiiiiiiiiiiM
������������������������=�������������������������������������������������������iiiiiiiiiiiiM
iiiiiiiiiiiiiiiiiiiiiiiiiiiM�
-;-.�����������������������m���������������������������������iiiiiiiiiiiiiiiE
�����������������������=���������������������OMMM��������������������������������iiiiiiiiiiiiM
iiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiii1�
1-.",,-".�������������������m���������������������������������iiiiiiiiiiiiiiM
�����������������������=�������������������������������������������������������iiiiiiiiiiiiM
iiiiiiiiiiiiiiiiiiiiiiiiiiiM��
������������������m���������������������������������iiiiiiiiiiiiiiiiiE
������������������������=���������������������EMM?M��������������������������������iiiiiiiiiiiiM
-.-;-�-�.-.....
-"FA"Z.7n"�������������������m���������������������������������iiiiiiiiiiiiiiiiiE
������������������������=���������������������ME"M=��������������������������������iiiiiiiiiiiiM
=
-
1-"....�-"-������������������m���������������������������������iiiiiiiiiiiiiiM
������������������������=�������������������������������������������������������iiiiiiiiiiiiM
iiiiiiiiiiiiiiiiiiiiiiiiiiiii=�
..
������������������m���������������������������������iiiiiiiiiiiiiiM
������������������������=�������������������������������������������������������iiiiiiiiiiiiM
=
...
���������������������m���������������������������������iiiiiiiiiiiiiiM
������������������������=�������������������������������������������������������iiiiiiiiiiiiM
iiiiiiiiiiiiiiiiiiiiiiiiiiiii=�=01,
������������������������=�������������������������������������������������������iiiiiiiiiiiiM
iiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiM�=
-���������������������m���������������������������������iiiiiiiiiiiiiiM
. . -.11
������������������=���������������������������������iiiiiiiiiiiiiiM
������������������������=�������������������������������������������������������iiiiiiiiiiiiM
iiiiiiiiiiiiiiiiiiiiiiiiiiiiiii0�--
....
. .F"Fzi"-����������������������������������������������������iiiiiiiiiiiiiiM
������������������������=�������������������������������������������������������iiiiiiiiiiiiM
=
--";-".;;
������������������=��������������
��������������������
iiiiiiiiiiiiiiiiiMillillillill=���
�����������������=�������������������������������������������������������iiiiiiiiiiiiM
�.-;-
����������������������������������������������������iiiiiiiiiiiiiR
�����������������������=�������������������������������������������������������iiiiiiiiiiiiM
-.-.,�����������������������������������������������������iiiiiiiiiiiiiiM
�����������������������=�������������������������������������������������������iiiiiiiiiiiiM
�.-;--
--.�;-�������������������=���������������������������������iiiiiiiiiiiiE
������������������������=�������������������������������������������������������iiiiiiiiiiiiM
--.-
����������������������������������orrm�������������������iiiiiiiiiiiiE
������������������������=�������������������������������������������������������iiiiiiiiiiiiM
=
-.--."���������������������������������EMM��m����������������iiiiiiiiiiiiiiM
������������������������=���������������������EEMMM������orrmw������������������������iiiiiiiiiiiiM
�---.�;�.-����������������������������������������������������������iiiiiiiiiiiiE
������������������������=���������������������ME"MM������orr"=������������������������iiiiiiiiiiiiM
����������������������������������������������������������iiiiiiiiiiiiiiS
������������������������=�����������������������������owrT�������������������������iiiiiiiiiiiiM
�:..�;�:,--;-.�-��������������������������������������������������������iiiiiiiiiiiiiiM
������������������������������������������������������owry�������������������������iiiiiiiiiiiiM
I
�����������������������������������������iiiiiiiiiiiiiiM
�����������������������������������������������������ow-r-T.����������������������m��iiiiiiiiiiiiM
iiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiM�--n-
����������������������������������������������������iiiiiiiiiiiiiiM
�����������������������������������������������������mwrn����������������������m��iiiiiiiiiiiiM
������--�;-";�����������������������������������������������������iiiiiiiiiiiiiiM
�����������������������������������������������������our�������������������������iiiiiiiiiiiiM
iiiiiiiiiiiiiiiiiiiiii��-M-1-m-----
-�����������������������������������������������������iiiiiiiiiiiiiiM
���������������������������������������������mEmrnm������MMMM������������������������iiiiiiiiiiiiM
iiiiiiiiiiiiiiiiiiiiii=�J
-,-...
, ����������������������������������������������������iiiiiiiiiiiiiiM
�����������������������������������������������������owry����������������������m��iiiiiiiiiiiiM
=
������������������������������������wrwm���������������iiiiiiiiiiiiiiiiiI
��������������������������������������������OMME��������owrymm������������������������iiiiiiiiiiiiM
I
iiiiiiiiiiiiiiiiiiiiiiiiiiiiiM������
����������������������������
��������������������
�������������������������������������������������������������������������������iiiiiiiiiiiiM
..
�����������������������������������������iiiiiiiiiiiiiiM
������������������������������������������������������m������������������������iiiiiiiiiiiiM
ii -I.....' ....
������������������m���������������������������������iiiiiiiiiiiiiiM
�����������������������������������������������������orr?mm������������������������iiiiiiiiiiiiM
iiiiiiiiiiiiiiiiiiiiiiii=�J
--.".
---";;
�������������������������������������M���������������iiiiiiiiiiiiiiiM
��������������������������������������������Eff"��������orr?n�������������������������iiiiiiiiiiiiM
I'll .
-
l����������������������������������������������������iiiiiiiiiiiiiiM
�������������������������������������������������������������������������������
.1-11-111.�iiiiiiiiiiiiiiiiiiiiiii���
-1�����������������������������������������������������iiiiiiiiiiiiiiM
����������������������������������������������������������������������������m��
I
�����������������������������������iiiiiiiiiiiM
��������������������
��������������������������������������������ERM����������������������������������
;
�������������������������������������������������������iiiiiiiiiiiiiiM
�������������������������������������������������������������������������������iiiiiiiiiiiiM
I-
--le ... m���������������������m���������������������������������iiiiiiiiiiiiiiM
�������������������������������������������������������������������������������iiiiiiiiiiiiM
--I�
1---,,.��������������������������������lill!
�.���n-r-m����������������
iiiiiiiiiiiiiiiiiMillillillill=��M
�����������������������������������������������ErTITW=������������������������iiiiiiiiiiiiiM
���
;
- �.-�����������������������������������������������������iiiiiiiiiiiiiiM
��������������������������������������������Ill=
����������������������������������iiiiiiiiiiiiiM
�
'..
-
l������������������m���������������������������������iiiiiiiiiiiiiiM
����������������������������������m��������������������������������������������iiiiiiiiiiiiiM
���
;
��������������������������������������omm���������������iiiiiiiiiiiiiiiiiiE
�������������������������������������������Ill=
����������������������������������
-
- '-
-=������������������m���������������������������������iiiiiiiiiiiiiii
����������������������������������������������������iiiiiiiiiiiiiiiiM
�������������������������������������������Ill=
����������������������������������
iiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiM��
����������������������������������m�������������������������������������������I
�
---.."-,.��������������������������������������������������������iiiiiiiiiiiiiiM
��������������������������������������������=����������������������������������
�
l���������������������m���������������������������������iiiiiiiiiiiiiiiiiiE
�������������������������������������������������������������������������������
��
���---,-,������m""M���������������������
�
�iiiiiiiiiiiiiiiiiiiiiiiMiN������
������������mrm�����������
� �
������������������������������������������������������������������������I
I
iiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiM��
11,
3-iiiiiiiiiiiiiiiiiiiiiiii=����
�����������������������������
���������������������������m��������������������������������������p�����m
�
-1--"q����W�������������������������������iiiiiiiiiiM
��m����������������������������������������������������m��������������������������������������������iiiiiiiiiiiiiM
11,
. I
���W-EMM�������������������������������m���WT"M������������iiiiiiiiiiiiiiiE
�����������������������������������m��������������������������������������������iiiiiiiiiiiiiM
; "..'
-lull-I'�����������������������������������������������������iiiiiiiiiiiiiiM
��������������������������������������������������������������������������������iiiiiiiiiiiiiM
l���--�����������������������������������������������������iiiiiiiiiiiiiiM
��������������������������������������������������������
iiiiiiiiiiiiiiiiiiiiiiiiiiii=��
�����������������������������������������������������iiiiiiiiiiiiiiiM
iiiiiiiiiiiiiiiiiMillillillill=��=
�������������������������������������������������������������������������iiiiiiiiiiiiiM
I
-�iiiiiiiiiiiiiiiiiiiiiM����
����������������������������
iiiiiiiiiiiiiiiiiiii=�������������������
�������������������������������������������������������
I'll,
,.--
�mm',,,,�����������������������������������������������������iiiiiiiiiiiiiiM
�������������������������������������������������������������������������������iiiiiiiiiiiiiiiiiiN
I-
I 11 -
iiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiM�
�������������������������������������������������iiiiiiiiiiiiiiM
�����������������������������������������������������������������������������m��
I",
--- �=
==
��������������������������������m����������������iiiiiiiiiiiiiiM
�����������������������������������������������������������������������������m��iiiiiiiiiii=
I-
I
m�E��������������������������������m����������������iiiiiiiiiiiiiiM
�����������������������������������������������������������������������������m��iiiiiiiiiiiiM
iiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiM�-
--iiiiiiiiiiiiiiiiiiiiiii�
--. .-
��������������������������������m����������������iiiiiiiiiiiiiiM
�����������������������������������������������������������������������������m��iiiiiiiiiiiiM
iiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiM�--�-
�����������������������������m����������������iiiiiiiiiiiiiiM
�����������������������������������������������������������������������������m��iiiiiiiiiiiiii=
iiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiM�-
I- ; 31
������������������=���������������������������������iiiiiiiiiiiiiiM
��������������������������������������������������������������������������������iiiiiiiiiiiiiM
I
�����������������������������������m����������������iiiiiiiiiiiiiiiM
��������������������������������������������������������������������������������iiiiiiiiiiiiiM
I
l������������������=����������������m����������������iiiiiiiiiiiiiiiiiM
�������������������������������������������������������������������������������iiiiiiiiiiiiiM
.",..--
I
.1.
������������������m�������������EMM��m����������������iiiiiiiiiiiiiiiiiiii!
�������������������������������������������������������������������������������iiiiiiiiiiiiiM
I
1-
�������������������m�������������iiiiiiiiiiM
��������������������
�������������������������������������������������������������������������������iiiiiiiiiiiiiM
iiiiiiiiiiiiiiiiiiiiiiiiiiiiM��
I .
������������������m���������������������������������iiiiiiiiiiiiiiM
����������������������������������m��������������������������������������������iiiiiiiiiiiiiM
I
; I-
-'rmrn.
������������������m���������������������������������iiiiiiiiiiiiiiiiiiE
����������������������������������m��������������������������������������������iiiiiiiiiiiiiM
������������������������m���������������������������������iiiiiiiiiiiiiiM
����������������������������������m���������ORTIO����������������������������������iiiiiiiiiiiiiM
I ,--=���������������������=�������������iiiiiiiiiin
���������������������m���������������������������������iiiiiiiiiiiiiiM
����������������������������������m��������������������������������������������iiiiiiiiiiiiiM
---
��������������������
��������������������������������������������mm4m����������������������������������iiiiiiiiiiiiiM
-'-�
���������������������������������������N�������������iiiiiiiiiiiiiiiiS
�������������������������������������������������������������������������������
=
l���������������������=���������������������������������iiiiiiiiiiiiiiiiM
���������������������������������������������������������������������������iiiiiiiiiiiiiiiiii=
,�L'���������������������������������������������������������iiiiiiiiiiiiiiiiiiE
�����������������������=�������������������������������������������������iiiiiiiiiiiiiM
iiiiiiiiiiiM
1;
l�������������������������������������������������������iiiiiiiiiiiiiiiiiM
�������������������������������������������������������������������������iiiiiiiiiiiiiM
i
lM
����������������������������������������������������iiiiiiiiiiiiiiiii!
�����������������������������������������������������������������������iiiiiiiiiiiiiM
I -
=
I 1.
������������������m��������������������mrmm������������iiiiiiiiiiiiiiiii!
����������������������������������m��������������������������������������iiiiiiiiiiiiiM
iiiiiiiiiiiiiiiii�lM��
'.�
-�.1--�-.1-1�������������������m�������������iiiiiiiiiiW
��������������������
����������������������������������m������������������om-rITMU����������������������
iiiiiiiiiii=� iiiiiiiiiiiiiiiiiiii=IiiiiiiM
1-
l������������������m�������������iiiiiiiiiiM
��������������������
���������������EnTm������������������m���������������������������������������������iiiiiiiiiiiiiM
--�-
.1 -
������������������m�������������iiiiiiiiiiM
��������������������
����������������������������������m�������������������������������������������
iiiiiiiiiiiiiiiiiiii=IiiiiiiM
1-
�������������������m���������������������������������iiiiiiiiiiiiiiM
����������������������������������m���������������������������������������������iiiiiiiiiiiiiM
-�1111111111111111111-
-������������������m����������������������������������iiiiiiiiiiiiiiM
����������������������������������m�����������������������������������������l���iiiiiiiiiiiiiM
.-.,����--�-,����������
iiiiiiiiiiiiiiiiiiiiiiiiiiiiM��
1-
11-iiiiiiiiiiiiiiiiiiiiiii=��������
l������������������=������������������������������������������������������������������������������������������������������������������iiiiiiiiiiiiiM
��������������������m
��������m������������m
m�����������������������
m���������������������������������������������������������������������m
���������������������������������������������m
"Jill
.'��.-.-...'--
-�iiiiiiiiiiiiiiiiiiii=�������10iff
�������������������������������������������iiiiiiiiiiiiiM
�����������������������m���������������������F
1-
�������������������������������������������������iiiiiiiiiiiM
����������������������������������m�����������������������������������������m��iiiiiiiiiiiiiM
..�
---�-
--�
�������������������������������������������������iiiiiiiiiiiE
����������������������������������m�����������������������������������������m��iiiiiiiiiiiiiM
1-
I
�����������������E=�������������������������������iiiiiiiiiiiM
�������������������������������������������������������������������������������iiiiiiiiiiiiiM
.'�
---M`111111111111111111---'�
�����wm�������������������������������������������lilliM
�������������������������������������������������������������������������������iiiiiiiiiiiiiM
1-
100iiiiiiiiiiiiiiii=��iiiiiiiM
millilliMm
m������myrTu�����������m
]�����������������
MilliiiiiiiiiiiiiiM�
�������������������L
=����������������������m
millillilliMillillillilli������������=
l������������������m
IiiiiiiiiiiiiiM
gg�
W-1111-miiiiiiiiiiiiiiiiiiiiiM�������
�--
��������������������������������������������������������������������������������m�����������������������������������������m��iiiiiiiiiiiiiM
li�iiiiiiiiiiiiiiiiiiiiiiM������E
���������m���������������������������������iiiiiiiiiiiiiiM
�����������������������=�������������������������������������������������������iiiiiiiiiiiiM
���������m���������������������������������iiiiiiiiiiiiiiM
�������������������������������������������������������������������������������iiiiiiiiiiiiM
iiiiiiiiiiiiiiiiiiiiiiiiiiiiii=�-
I
��������m�������������������������������������������iiiiiiiiiiM
�����������������������������������������������������mwrn�������������������������iiiiiiiiiiiiM
iiiiiiiiiiiiiiiiiiiiiiiiiiiiiii��-
E7,"'no
iiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiM�����
�������=��������������������N�������������iiiiiiiiiiiiiM
�������������������������������������������Ill=
����������������������������������iiiiiiiiiiiiM
iiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiM�-
J-
N��������������������������������iiiiiiiiiiM
��������������������
����������������������������������m��������������������������������������������iiiiiiiiiiiiM
-, �
111.
---,�����������������������������������������������������iiiiiiiiiiiiM
����������������������������������m��������������������������������������������iiiiiiiiiiiiM
IiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiM��
l������������������=���������������������������������iiiiiiiiiiiiiiE
�������������������������������������������������������������������������������iiiiiiiiiiiiM
I
--L,-;�-,,-,-,,�������������������M���������������������������������iiiiiiiiiiM
��������������������������������������������������������
. ..... -".....J�-1-0,
-.--.".
������������������m���������������������������������iiiiiiiiiiiiiiM
���������������������������������������������OMT"M�����������������������������m��iiiiiiiiiiiiM
l���-"--"'�������������������m�����������������MWO���������������iiiiiiiiiiiiiiM
���������������������������������������������mmffmm�����������������������������m��iiiiiiiiiiiiM
gj-�-;'-;
�,yz,,,M,--������������������M�������������������lililill
�.�������������
���������������������������������������������mmffmm������mmr"=���������������������m��iiiiiiiiiiiiM
- I
0
�������������������m���������������������������������iiiiiiiiiiiiiiiiiI
���������������������������������������������mmffmm�����������������������������m��iiiiiiiiiiiiM
A�������������������������=���������������������������������iiiiiiiiiiiiiiM
�����������������������=�������������������������������������������������������iiiiiiiiiiiiM
l��������������=���������=���������������������������������iiiiiiiiiiiiiiM
�����������������������=�������������������������������������������������������iiiiiiiiiiiiM
� iiiiiiiiiiiiiiiiiiiiiiiiiiiM�����������
���������=���������������������������������iiiiiiiiiiiiiiiiiI
�����������������������=��������������������mun����������������������������������iiiiiiiiiiiiM
j
---.EM
1.-.'�
��������������������������������������������������iiiiiiiiiiiiiM
�����������������������=�������������������������������������������������������iiiiiiiiiiiiM
�-..
---�
���������������m�����������������m����������������������������������������m����������������������������������������������������m��iiiiiiiiiiiiM
I
--"
�==���������������������������m
NEEM��WM�1�M��MMMMMM�MME
iiiiiiiiiiiiiiiiiIiiiiiiiiiiiJAMN
m������������������m����������m����������������I
m�����������������������m���
=
-
-.-.,�����������������������������������������������������������������������������������������m�����������������������������������������m��iiiiiiiiiiiiM
�
--"
"-"'�"'�������������������=�����������������m����������������iiiiiiiiiiiiiiM
�����������������������=����������m�����������������������������������������m��iiiiiiiiiiiiM
- I
�����������������������������������m����������������iiiiiiiiiiiiiiM
�����������������������=�������������������������������������������������������iiiiiiiiiiiiM
���-;--L,.�,��������������������������������������m����������������iiiiiiiiiiiiiiM
iiiiiiiiiiiiMillillillill=��
�������������������=�������������������������������������������������������iiiiiiiiiiiiM
iiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiM����
iiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiM����
�����������������������������������������������iiiiiiiiiiiiiiM
������������������������=��������������������������������������������������������
�- ,
; ..' .
-FIA-110--�iiiiiiiiiiiiiiiiiiiiiiii��
���������������=���������������������������������iiiiiiiiiiiiS
������������������������=�������������������������������������������������������iiiiiiiiiiiiiM
I
; .. .
- .M.M.'�iiiiiiiiiiiiiiiiiiiiiiiiiiiiM�
�������������������������������������������������iiiiiiiiiiiiiN
������������������������=�����������������������������������iiiiiiiiiiiiiM
�- "I
--�
.; .
iiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiM�
�������������������������������������������������iiiiiiiiiiiiiiiiM
������������������������=����������m��������������������������������������������iiiiiiiiiiiiiM
I-
l��iiiiiiiiiiiiiiiiiiiiii=�
�����������������������������Egnm�������������������lillillillillill
������������������������=����������m��������������������������������������������iiiiiiiiiiiiiM
- I
-;-m-iiiiiiiiiiiiiiii0����
������������������������������
��������������������
������������������������=����������m����������EE=I=��������������������������������iiiiiiiiiiiiiM
I .. 11-iiiiiiiiiiiiiiiiiiiiiiii=�
�������������������������������������������������iiiiiiiiiiiiiiiiM
�����������������������=����������m����������EmTnnm��������������������������������iiiiiiiiiiiiiM
=
iiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiS�
������������������������������
��������������������
�����������������������=����������m����������OMT"M��������������������������������iiiiiiiiiiiiiM
1-0-.1iiiiiiiiiiiiiiiiiiiiiiii����
�������������������������������������������������iiiiiiiiiiiiiiiiM
�����������������������=����������m����������OMT"M��������������������������������iiiiiiiiiiiiiM
a- I
-...�-o-,
iiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiS�
I
���������������=���������������������������������iiiiiiiiiiiiiiiM
�����������������������=����������m����������OMT"M��������������������������������iiiiiiiiiiiiiM
1=1
11.
iiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiM�
������������������������������
��������������������
�����������������������=����������m��������������������������������������������iiiiiiiiiiiiiM
iiiiiiiiiiiiiiiiiiiiiiiiiiiiM��
11
iiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiS�
���������������=���������������������������������iiiiiiiiiiiiiiM
�����������������������=����������m���������������������������������������������
���-;-.�m�,.=-.-.,-��
�������������������������������������������������iiiiiiiiiiiiiiM
�����������������������=����������m��������������������������������������������iiiiiiiiiiiiM
iiiiiiiiiiiiiiiiiiiiiiiiiiiii��--.-.�-
l��l�������������������������������������������������iiiiiiiiiiiiiiiiD
�����������������������=�������������������Ill=
����������������������������������iiiiiiiiiiiiM
�
-;--iiiiiiiiiiiiiiii0��
���������������������������
��������������������
�������������������������������������������Ill=
����������������������������������iiiiiiiiiiiiM
I
iiiiiiiiiiiiiiiiiiiiiiiiiiiii=���
������������������������������
��������������������
�����������������������=�������������������������������������������������������iiiiiiiiiiiiM
�-.-
-;--iiiiiiiiiiiiiii�1-1-1-11���
�������������������������������������������������iiiiiiiiiiiiiiiiiiii!
�����������������������=�������������������������������������������������������iiiiiiiiiiiiM
I-
I-
iiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiM�
���������������=���������������������������������iiiiiiiiiiiiiiiiM
�����������������������=��������������������������������������������������������
�-.-
-;-.-�.�-",.,;-"..���
�������������������������������������������������iiiiiiiiiiiiiiiiiE
�����������������������=�������������������������������������������������������iiiiiiiiiiiiiM
I-
I-
iiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiM�
������������������������������
��������������������
�����������������������=�������������������������������������������������������iiiiiiiiiiiiiM
���-;-,-�.�-,-,�;-,,,.���
�������������������������������������������������iiiiiiiiiiiiiiiiiE
�����������������������=�������������������������������������������������������iiiiiiiiiiiiiM
iiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiM�---�-
iiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiM�
�������������������������������������������������iiiiiiiiiiiiiiiiiE
�����������������������=���������������������EMMT=��������������������������������iiiiiiiiiiiiiM
iiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiM��
-1--�����l�������������������������������������������������iiiiiiiiiiiiiiiiiE
�����������������������=���������������������EMMTM��������������������������������iiiiiiiiiiiiiM
�
l������������������������������������������������������iiiiiiiiiiiiiiiiiE
�����������������������=���������������������EMMTM��������������������������������iiiiiiiiiiiiiM
- 1-;-,-�,�-,..-"�����������������������������������������������������iiiiiiiiiiiiiiiiiE
�����������������������=���������������������EMMTM��������������������������������iiiiiiiiiiiiiM
���-;-,-�,�-,--,,�����������������������������������������������������iiiiiiiiiiiiiiM
�����������������������=�������������������������������������������������������iiiiiiiiiiiiiM
iiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiM�-
.
-"-,,�����������������������������������������������������iiiiiiiiiiiiiiM
�����������������������=�������������������������������������������������������iiiiiiiiiiiiiM
--l-iiiiiiiiiiiiii=�����
�����������������������������������������������iiiiiiiiiiiiiiiiiI
�����������������������=��������������������OMM����������������������������������iiiiiiiiiiiiiM
-
-I ... I'�������������������=���������������������������������iiiiiiiiiiiiE
�������������������������������������������������������������������������������iiiiiiiiiiiiiM
. .. .... -..'.
,-;-"�������������������=�������������E"��������������������iiiiiiiiiiiiiM
�����������������������=����������������������������������������offro��������������iiiiiiiiiiiiiM
I
-,-";-"�����������������������������������������������������iiiiiiiiiiiiiiM
����������������������������������m���������������������������������������������
. ... . ... -.,.J
����������������������������������������������������iiiiiiiiiiiiiM
�����������������������=�������������������������������������������������������iiiiiiiiiiiiM
I
&E, =-.FA,J,N,".�������������������M��������������I
��������������������
�����������������������=�������������������������������������������������������iiiiiiiiiiiiM
= iiiiiiiiiiiiiiiiiiiiiiiiiiiiME
l�������������������������������������������������������iiiiiiiiiiiiiiiM
���������������Enrm�������=�������������������������������������������������������iiiiiiiiiiiiM
- iiiiiiiiiiiiiiiiiiiiiiiiiiiiM
"','....'.
; .�����������������������=���������������������������������iiiiiiiiiiiiiiiiiE
�����������������������=�������������������������������������������������������iiiiiiiiiiiiM
iiiiiiiiiiiiiiiiiiiiiiiiiiiM;
. �'�
����������������m���������������������������������iiiiiiiiiiiiiiiiiE
�����������������������=�������������������������������������������������������iiiiiiiiiiiiM
1''..
1-.--�������������������m��������������������mwnm������������iiiiiiiiiiiiiiiiiE
������������������������=�������������������������������������������������������iiiiiiiiiiiiM
; -
- .--
������������������m���������������������������������iiiiiiiiiiiiiiiiiE
����������������EWWM�������=�������������������������������������������������������iiiiiiiiiiiiM
���---,,ri,,-,�����:
��������������M��������������
��������������������
������������������������=�������������������������������������������������������iiiiiiiiiiiiM
: .1
������������������=���������������������������������iiiiiiiiiiiiiiM
������������������������=�������������������������������������������������������iiiiiiiiiiiiM
-
������������������m���������������������������������iiiiiiiiiiiiiiM
�����������������������=��������������������ffm����������������������������������iiiiiiiiiiiiM
I
l������������������=���������������������������������iiiiiiiiiiiiiiiiD
�������������������������������������������Ill=
����������������������������������iiiiiiiiiiiiM
I
--�
iiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiM����
���������������MMM�������������������������������iiiiiiiiiiiE
�������������������������������������������Ill=
����������������������������������iiiiiiiiiiiiM
"A.'�iiiiiiiiiiiiiiiiii��
���������������m����������������m����������������lillilliM
�����������������������=����������m��������������������������������������������iiiiiiiiiiiiM
IiiiiiiiiiiiiiiiiiiiiiiiiiiiiiM�
�������������������������������������������������lillilliM
�����������������������m����������m��������������������������������������������iiiiiiiiiiiiM
--i-�-
14Z 4.
iiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiM�
���������������=�m""M�������������������������������lillilliM
�����������������������=����������m��������������������������������������������iiiiiiiiiiiiiM
J
IiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiM�
�����������������myrTu�������������������������������lillilliM
iiiiiiiiiiiiiiiiiMillillilill=��
� ������������������=����������m��������������������������������������������iiiiiiiiiiiiiM
-
iiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiM�
�����������������or""M��������������m����������������iiiiiiiii=
������������������������=����������m��������������������������������������������iiiiiiiiiiiiiM
-
IiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiM�
�����������������EVT"m�������������������������������lillilliM
�����������������������������������m��������������������������������������������iiiiiiiiiiiiM
-
J
iiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiE�
���������������=�mmrm�������������������������������lillilliM
�����������������������������������m��������������������������������������������iiiiiiiiiiiiM
;
iiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiM�
���������������m�v"rm�������������������������������lillilliM
�����������������������������������m��������������������������������������������iiiiiiiiiiiiM
.
. �1111111111111111111---
iiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiM�
���������������=����������������m����������������lillilliM
������������������������=�������������������������������������������������������iiiiiiiiiiiiM
I-
I
iiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiM�
���������������m�NM"M��������������m����������������lillilliM
������������������������=�������������������������������������������������������iiiiiiiiiiiiM
.=
-
iiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiM�
���������������=���������������������������������iiiiiiiiiiiiiiM
�����������������������=�������������������������������������������������������iiiiiiiiiiiiM
I .-iiiiiiiiiiiiiiiiiiiiiii=�
���������������m�EV"M�������������������������������iiiiiiiiiiiiiiM
�����������������������=����������m��������������������������������������������iiiiiiiiiiiiM
;
-Iffl-k-9ZA., .���l�������������������������������������������������EM?lm�����������������������=��������������������K=M����������������������������������iiiiiiiiiiiiM
I
-
I-
������������=�MMM"�������������������������������iiiiiiiiiiiiiiM
�������������������������������������������������������������������������������iiiiiiiiiiiiM
..'
.
iiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiM����
�������������=���������������������������������iiiiiiiiiiM
�����������������������=�����������������������������offrI�������������������������iiiiiiiiiiiiM
I
-.--'������
�������������=��������������
�������������������ommu�����������������������������������������������������mrrmmm������������������������iiiiiiiiiiiiM
iiiiiiiiiiiiiiiiiiiiiiiiiiiiiiii��-
-
l������������������=���������������������������������iiiiiiiiiiiM
�������������������������������������������������������������������������������iiiiiiiiiiiiM
������----�������������������=����������������M����������������iiiiiiiiiiM
�����������������������=����������������������������������������������������m��iiiiiiiiiiiiM
"Ll--
���----�������������������=���������������������������������iiiiiiiiiiiM
�����������������������=����������������������������������������������������m��iiiiiiiiiiiiM
l���-----,�������������������=���������������������������������iiiiiiiiiiiM
�����������������������=�������������������������������������������������������iiiiiiiiiiiiM
-"L'-- �iiiiiiiiiiiiiiiiiiiiiiM��
. ,-������������������=���������������������������������iiiiiiiiiiiiiiM
�����������������������=�����������������������������
I
-",Aum".-�����������������������������������������������������iiiiiiiiiiiM
�����������������������=����������������������������lilill
= iiiiiiiiiiiiiiiiiiiiiiiiiiiM.
�-J-
�������������������������������������m����������������������������������������=����������m�����������������lilill
-,",-�iiiiiiiiiiiiiiii��--,
������������������=���������������������������������������������������off�������������������m�����������������lilill
an
I
; I ....
. ...
���������������������������
willillo
m�����m����������������������������������������=����������m�����������lilill
-"L'-- �
-IrIA-Frill��������������������������������������������������������������������������������m����������������mm�����������mm�������iiiiiiiiiiiiiM
�
l���-,-.,���������������������������iiiiiiiiiiiiiiiiiiiiiii�
willillm
m�����m�������������������������������������������������������iiiiiiiiiiiiiiii=
iiiiiiiiiiiiiiii�Jillillillill=��������
�
...
�
-"L'-- �
; .....
I
��������=��������������������������������������������iiiiiiiiiiiiiiM
������������������������=��������������������������������������������iiiiiiiiiiii=
iiiiiiiiiiiiM
I
iiiiiiiiiiiiiiiiiii=�
Iiiiiiiiiiiiiiiiiiiiiiiiiiii=��
.... . ... ;iiiiiiiiiiiiiiiiiiiiiiiiiii��������
���������=���������������������������������iiiiiiiiiiiiM
������������������������=����������������������������������������������mm��������
=
iiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiM��
iiiiiiiiiiii�iiiiiiiiiiiiiiiiM
����������������������������
��������������������
iiiiiiiiiiiiiiiiiMillillillill=��=
��������������������������������������mm�������������������������iiiiiiiiiiiiM
I-
1-1-1-11�iiiiiiiiiiiiiiii��������
�������������������������������������������iiiiiiiiiiiiiiiiJI
iiiiiiiiiiiiiiiiiMillillillill=���
���������������������������������������������������������������iiiiiiiiiiii=
iiiiiiiiiiiiiiiiiiiiiMillilliM
iiiiiiiiiiiiiiiiiii��
M
; I . . . . . .
-.-;-..�������������������=���������������������������������iiiiiiiiiiiiiN
�����������������������=����������������������������������������m"TM����iiiiiiiiiiiiM
I-
11
�����������������������������������m����������������iiiiiiiiiiiiiN
����������������������������������m������������������������������iiiiiiiiiiii=
..
. .. I
�-.,,-.,-������������������=���������������������������������iiiiiiiiiiiiiiiiM
�����������������������=���������������������������������������iiiiiiiiiiiiM
-
-
-
-
-
-
I
�����������������������������������������������������iiiiiiiiiiiiiiiiiE
�����������������������=����������������������������������������iiiiiiiiiiiiiM
.
-
-
-
-
�
" �
---M-...
."-��������������������������������iiiiiiiiiiM
��������������������
�����������������������=�������������������������������������������������������iiiiiiiiiiiiM
I
1-
�������������������m���������������������������������iiiiiiiiiiiiiiiiiE
�����������������������=�������������������������������������������������������iiiiiiiiiiiiM
�-.,����-.--.,.�������������������=��������������
I
��������������������
�����������������������=��������������������Em����������������������������������iiiiiiiiiiiiM
Iiiiiiiiiiiiiiiiiiiiiiiiiiii=��
,,,-������������������=���������������������������������iiiiiiiiiiiiiiiD
�����������������������=���������������������ooffrITM��������������������������������iiiiiiiiiiiiM
gl�
; I.
-.11,�:7nll�������������������=���������������������������������������������������������=���������������������OMMM��������������������������������iiiiiiiiiiiiM
I
; 1.
�.-,�-,,�������������������=�������������or-m-m�������������������������������������������=���������������������EMMTM��������������������������������iiiiiiiiiiiiM
;:-
�
-
l������������������=���������������������������������������������������������=���������������������EMMTM��������������������������������iiiiiiiiiiiiM
iiiiiiiiiiiiiiiiiiiiiiiiiiiiii=�-
I
������������������m���������������������������������iiiiiiiiiiiiiiM
�����������������������=�������������������������������������������������������iiiiiiiiiiiiM
iiiiiiiiiiiiiiiiiiiiiiiiiiiiii=�--
. . . ,
��������������������������������iiiiiiiiiiiiiN
��������������������
�����������������������=�������������������������������������������������������iiiiiiiiiiiiM
=
I
���������������������or.nm�������������������iiiiiiiiiiiiiiiiiE
���������������������������������������������ong-r-r-m��������������������������������iiiiiiiiiiiiM
gligiiiiiiiiiiiiiiiiiiiiiiiiiiii�
����������������������������������������������������iiiiiiiiiiiiiM
�����������������������=���������������������OMMM������EWM=������������������������iiiiiiiiiiiiM
I
;;
.
����������������������������������������������������iiiiiiiiiiiiiiN
�����������������������=���������������������EMM?M��������������������������������iiiiiiiiiiiiM
M.1iiiiiiiiiiiiiiiiiiiiiiiiiiii�
-
I
l����������������������������������������������������iiiiiiiiiiiiiM
�����������������������=���������������������EMMTM��������������������������������iiiiiiiiiiiiM
I
W.M.-IM1111111111111111111M.-
......'
����������������������������������������������������iiiiiiiiiiiiiM
������������������������=���������������������ME"MM������wrmm������������������������iiiiiiiiiiiiM
�.=1111!111111
iiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiM�
�������������������������������������������������iiiiiiiiiiiiiiM
������������������������=���������������������ME"MM��������������������������������
IiiiiiiiiiiiiiiiiiiiiiiiiiiiM�J-1-1���
������������������������������������NET?M������������iiiiiiiiiiiiiiM
������������������������=�������������������������������������������������������
g1giiiiiiiiiiiiiiiiiiiiiiiiiiiii��1
.
��E�������������������������������������������������iiiiiiiiiiiiiiiiiI
������������������������=�������������������������������������������������������
1-,-,,,...�-,-,.-,..��������������������������������mr��������������������iiiiiiiiiiiiM
������������������������=�������������������������������
I
�������������������=����������������m����������������iiiiiiiiiiiM
������������������������=�������������������������������������������������������iiiiiiiiiiiiM
11111111111111111111
-1 -P. -M
������������������������������������������������������iiiiiiiiiiiM
������������������������=����������M�����������������������������iiiiiiiiiiiiM
�-;i
l��������������������m���������������������������������iiiiiiiiiiiE
������������������������=�������������������������������������������������������iiiiiiiiiiiiM
l���-.11.-.,,�������������������=���������������������������������iiiiiiiiiiiiE
������������������������=�������������������������������
; ...
-."FA.yn.,,-������������������m���������������������������������iiiiiiiiiiiiE
������������������������=���������������������EEMMM��������������������������������
11111111111111111111-M.N.I..
-"'=������������������m���������������������������������lillillillim
������������������m�������������ERrm�������������������iiiiiiiiiiiiiM
������������������������=���������������������EEMMM��������������������������������
������������������������=���������������������mnmm�������������������������������I
--n."JiM
iiiiiiiiiiiiiiiiiiiiiiiiiiiiiM��������
���������m�������������nmm�������������������iiiiiiiiiiiiM
������������������������=���������������������ME"MM��������������������������������
--;i-�-
iiiiiiiiiiiiiiiiiiiiiiiiiiiiiM��������
���������m���������������������������������iiiiiiiiiiiiiM
������������������������=���������������������EEMMM��������������������������������
1-;-.11�iiiiiiiiiiii���������
o���������m����������������m����������������iiiiiiiiiiiiiiM
���������m��������������
��������������������
������������������������=���������������������EEMMM��������������������������������
. ..... -.:,.
- -11-11�iiiiiiiiiiiiiiiiiM���-
iiiiiiiiiiiiiMilliiiiiiiiiiiii=�
���������m���������������������������������iiiiiiiiiiiiiiM
������������������������=���������������������EEMMM��������������������������������
-
I
.
-
iiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiZ������
�����������������������=���������������������������������������������������iiiiiiiiiiiiiiiii=
iiiiiiiiiiiiiiiiiii=�
.J�
--.s
iiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiZ����
iiiiiiiiiiiiiiiii=
�����������������������������������������iiiiiiiiiiiiiR
�����������������������=�������������������������������������������������������iiiiiiiiiiiiM
P:\D,ke Ene,gy Pmgmss.1026\102. Ashe,ille Ash Basin GW Assessment Plan\50.EHS IAP Monitoring & Reporting\Aprl 2018 Arm.al Repoft\Tables\Table 2-3 2-4 Baseline Gro.nd.ate, AOW Analyti.1 Res.1ts P,' I 'f 5