Loading...
HomeMy WebLinkAbout20170445 Ver 2_Approval Letter_20180427_ ROY COOPER Governor MICHAEL S. REGAN Secretary LINDA CULPEPPER wafer Resources Interim Director ENVIRONMENTAL QUALITY ' April 27, 2018 DWR #17-0445 v2 Franklin County Cedar Creek Franklinton One, LLC . Attn:.Elton, R. Ange III 113 Edinburgh South Drive, Suite 100. ; Cary, NC 27511 Subject: AUTHORIZATION CERTIFICATE, PER THE TAR-PAMLICO RIVER BASIN RIPARIAN BUFFER PROTECTION RULES (15A NCAC 02B .0259) WITH ADDITIONAL CONDITIONS Cedar Creek Subdivision. Offsite Utility Dear Mr. Ange: You have our approval for the impacts listed.below.for the purpose described in your application dated March 7, 2018 and received by the Division of Water. Resources (Division) on March 20, 2018,with additional information received,on April 19, 2018. Please note that you should get,any other federal, state or local permits before proceeding with your project, including'those required by (but not limited to) Sediment and.Erosion Control, Non -Discharge, and Water Supply Watershed regulations This approval requires you to comply with the following conditions: 1. The following impacts are hereby approved provided that all of the other specific and general'conditions of the Buffer Rules are met. No other impacts are approved, including incidental impacts. [15A NCAC 02B .0259,(8)] Type of Impact Amount Approved (units) Permanent Amount Approved (units) Temporary Buffers.- Zone 1 B2 -Sanitary Sewer (B) 4,154 (square feet) 0.(square feet) . Buffers — Zone 2 B1=Sanitary Sewer (A) '35':' 35 (square feet) O'(square feet) B2 -Sanitary Sewer (B) 3;851(square feet) 0 (square'feet) (square feet) 0 (square feet) I. B3 -Sanitary Sewer (C) 360 Division of Water, Resources, Raleigh Regional Office, Water Quality Operations Section 1628 Mail Service Center, Raleigh, NC 27699-1628 Location: 3800 Barrett Drive, Raleigh, NC 27609 I I� http:G'portal.nedeiir. orghveb/wq/aps Phone: (919) 791-4200 Fax: (919) 788-7159 Clearwater Creek Subdivision -Offsite Utility DWR #17-0445 v2 BUFFER APPROVAL Page 2 of 4 2. Diffuse Flow All stormwater must be directed and maintained as diffuse flow at non-erosive velocities through the protected stream buffers such that it will not re -concentrate before discharging into a stream. [15A NCAC 02H .0506(b)(5)] 2. Compensatory Mitigation Using a Private Mitigation Bank . Mitigation must be provided for the proposed impacts as specified in the table below. The. Division has received an acceptance letter from NCDEQ Division of Mitigation Services (DMS) to meet this mitigation requirement. Until DMS receives and clears your payment, and proof of payment has-been provided to this Office; ho impacts specified in this Authorization Certificate shall occur. For accounting purposes, this Authorization Certificate authorizes payment to the DMS to meet the following compensatory mitigation requirement [15A NCAC 02H .0506 (b)(6)]: 3. No Waste,, Spoil, Solids, or Fill of Any Kind No waste, spoil, solids, or fill of any kind shall,occur in wetlands, waters, or riparian areas beyond the footprint of the impacts depicted in the Pre -Construction Notification. All construction attivities, including the design, installation, operation, and maintenance of sediment and erosion control Best Management Practices, shall be performed so that no violations of state water quality standards,'statutes, or rules occur [15A NCAC 02H .0501 and .0502]. 4. Protective Fencing All wetlands, streams, surface waters, and riparian buffers located within 50 feet of the construction area on the project site shall be clearly marked (example- orange.fabric fencing) prior to any land disturbing activities -and must be maintained on the property until the project phase is completed. [15A NCAC 02H .0506 (b)(2) and (c)(2) and 15A NCAC 02H .,0507 (c)] 5. This approval is for the purpose and design described in your application. The plans and specifications for this project are incorporated by reference as part of the Buffer Authorization. If you change your project, you must notify the Division and you may be required to submit a new application package with the appropriate'fee. If the property is sold, the new owner must be given a copy of this approval letter and is responsible for complying.with all conditions. 6. This approval and its conditions are final and binding unless contested. [G.S. 143-215.51 Compensatory Mitigation Required Bank Sponsor River & Sub -basin Number Buffer -Zone 1 12,462 (square feet) NCDEQ DMS Tar -Pamlico: 03020101 3. No Waste,, Spoil, Solids, or Fill of Any Kind No waste, spoil, solids, or fill of any kind shall,occur in wetlands, waters, or riparian areas beyond the footprint of the impacts depicted in the Pre -Construction Notification. All construction attivities, including the design, installation, operation, and maintenance of sediment and erosion control Best Management Practices, shall be performed so that no violations of state water quality standards,'statutes, or rules occur [15A NCAC 02H .0501 and .0502]. 4. Protective Fencing All wetlands, streams, surface waters, and riparian buffers located within 50 feet of the construction area on the project site shall be clearly marked (example- orange.fabric fencing) prior to any land disturbing activities -and must be maintained on the property until the project phase is completed. [15A NCAC 02H .0506 (b)(2) and (c)(2) and 15A NCAC 02H .,0507 (c)] 5. This approval is for the purpose and design described in your application. The plans and specifications for this project are incorporated by reference as part of the Buffer Authorization. If you change your project, you must notify the Division and you may be required to submit a new application package with the appropriate'fee. If the property is sold, the new owner must be given a copy of this approval letter and is responsible for complying.with all conditions. 6. This approval and its conditions are final and binding unless contested. [G.S. 143-215.51 Clearwater Creek Subdivision -Offsite Utility DWR #17-0445 v2 BUFFER APPROVAL. Page 3 of 4 This Buffer Authorization can be contested as provided in Articles 3 and 4 of General Statute 150B by filing a written petition for an administrative hearing to the Office 'of Administrative Hearings (hereby known as OAH). A petition form may be obtained from.the.OAH.at http://www.ncoah.com/ or by calling the OAH Clerk's Office at (919) 431-3000 for information. Within sixty (60) cale'ndar days of receipt of this notice, a petition must be•filed with the OAH. A petition is considered filed when the original and one (1) copy' along with' any applicable OAH filing fee is received in the OAH during normal office hours (Monday through Friday between 8:00am and 5:OOpm, excluding official state holidays). The petition may be faxed to the OAH at (919) 431-3100, provided the original and one copy of the petition along with any applicable OAH filing fee is received'by the OAH within five (5) business days following the faxed transmission. Mailing address.for.the OAH: If sending by First Class Mail via the US Postal Service: Office of Administrative Hearings 6714 Mail Service'Center Raleigh, NC 27699-6714 If sending via delivery service (e.g. UPS, FedEx): Office of Administrative Hearings 1711 New Hope Church Road Raleigh, NC 27609-6285 One (1) copy of the petition must also be served to the Department of Environmental Quality: William.F. Lane, General Counsel Department of Environmental Quality 1601 Mail Service Center Raleigh, NC 27699-1601 Please send one (1) copy of the petition to DWR: If sending by First Class Mail via the US Postal Service: Karen Higgins NC DWR-401 & Buffer Permitting Branch 1617 Mail Service Center Raleigh, NC 27699-1617 If sending via delivery service (e.g. UPS, FedEx): Karen Higgins NC DWR — 401 & Buffer Permitting Branch 512 N. Salisbury Street Raleigh, NC 27604 Clearwater Creek Subdivision -Offsite Utility DWR #17-0445 v2 BUFFER APPROVAL Page 4 of 4 This letter completes the review of the Division under the Tar -Pamlico Buffer Rules as described in 15A NCAC 02B .0259. Please contact Stephanie Goss at 919-791-4256 or Stephanie.Goss@ncdenr.gov if you have �y questions or concerns. Sincerely lery Danny Smith Supervisor, Water Quality Regional Operations Section cc: DWR RRO 401/Buffer Authorization file DWR 401 & Buffer Permitting Unit file Deborah Shirley via e-mail at dshirle�@sandec.coni