Loading...
HomeMy WebLinkAbout20072233 Ver 1_Certification of Completion_20090427 ��rA NCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Coleen H. Sullins Dee Freeman Director -Sccretary Governor DWQ Project No.: ;40-1 - 22 33 County: Ley o i r Applicant: C, cfi` LLL Project Name: Date of Issuance of 401 Water Quality Certification: 2/-7 &o©g Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules,and any subsequent modifications,the applicant is required to return this certificate to the 401/Wetlands Unit,North Carolina Division of Water Quality, 1650 Mail Service Center,Raleigh,NC,27699-1650. This form may be returned to DWQ by the applicant,the applicant's authorized agent,or the project engineer. It is not necessary to send certificates from all of these. Applicant's Certification � 1, ,hereby state that,to the best of my abilities,due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules,the approved plans and specifications, and other supporting materials. Signature: Date: Agent's C rtification hereby state that,to the best of my abilities,due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules,the approved plans and specifications, and other supporti g materials. Signature: _ Date: i{d ,/ a2 �2 0V If this project was designed by a Certified Professional 00 I , as a duly registered Professional {i.e.,Engineer, Landscape Architect, Surveyor,etc.)in the State of North Carolina,having been authorized to observe(periodically, weekly, full time)the construction of the project, for the Permitee hereby state that,to the best of my abilities,due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules,the approved plans and specifications, and other supporting materials. Signature Registration No. Date North Carolina Division of Water Quality 943 Washington Square Mall Washington,NC 27889 one Phone:252-946-64811 FAX:252-946-9215 NorthCarolina Internet:www wwaterqualiiy.org ;Wurally An Equal Opportunity 1 Affirmative Action Employer 09 NCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Coleen H. Sullins Dee Freeman Governor Director Secretary DWQ Project No.: 2,00-7 - 2233 County: l evxoi r p LS n,r=3 15 Applicant: i i.L C_ ` U Project Name: 'T6 i 1 /u loo4e,., 'FckA!m ?-x�i 'Pa�v, APR 2 7 2009 Date of Issuance of 401 Water Quality Certification: 2 L7 f 20og DENR-WATER QUALITY WETLANDS AND STORMWA7B BRANCH Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules,and any subsequent modifications,the applicant is required to return this certificate to the 401/Wetlands Unit,North Carolina Division of Water Quality, 1650 Mail Service Center,Raleigh,NC, 27699-1650. This form may be returned to DWQ by the applicant,the applicant's authorized agent, or the project engineer. It is not necessary to send certificates from all of these. Applicant's Certification 1, ,hereby state that,to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules,the approved plans and specifications, and other supporting materials. Signature: Date: Agent's C rtryli ion I, ,hereby state that,to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules,the approved plans and specifications, and other supporti g materials. Signature: Date: �Z 2 a Utz If this project was designed by a Certified Professional 1, , as a duly registered Professional (i.e.,Engineer, Landscape Architect, Surveyor, etc.) in the State of North Carolina,having been authorized to observe(periodically, weekly, full time)the construction of the project, for the Permitee hereby state that,to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules,the approved plans and specifications, and other supporting materials. Signature Registration No. Date North Carolina Division of Water Quality 943 Washington Square Mall Washington,NC 27889 One Phone:252-946-64811 FAX:252-946-9215 NorthCarolina Internet:www.ncwaterquality.orq �aturall� An Equal Opportunity lAffirmativeAction Employer