HomeMy WebLinkAbout20180340 Ver 1_Approval Letter_20180424cu
ROY COOPER
Governor
MICHAEL S. REGAN
Secretary
LINDA CULPEPPER
Water Resources Interim Director
Environmental Quality 24 April 2018
DWR# 18-0340
Lincoln County
Mr. Lawrence Mashburn
Sylvan Creek Properties, LLC
700 E. Moorhead Street, Ste, 1006
Charlotte, NC 28202
Subject: APPROVAL of 401 Water Quality Certification with Additional Conditions
Sylvan Creek Subdivision
Dear Mr. Mashburn:
You have our approval, in accordance with the General Certification and those conditions listed
below, for the purpose proposed in your application dated March 1, 2018 and received by the Division
of Water Resources (the Division) on March 7, 2018 and subsequent information on April 23, 2018.
After reviewing your application, we have determined that this project is covered by Water Quality
—General -Certification -Number -4 -1 -39 -which can -be -viewed on -our _ web_site_ at
wetlands-buffer-permits/401-401 -isolated-wetlands-waters-prog ram The General Certification allows
you to use Nationwide Permit Number 29 once it is issued to you by the U.S. Army Corps of Engineers
(COE). Please note that you should get any other federal, state or local permits before proceeding with
your project, including those required by (but not limited to) Sediment and Erosion Control, Non -
Discharge, and Water Supply Watershed regulations.
The above noted Certification will expire when the associated 404 permit expires unless
otherwise specified in the General Certification. It is advised that all conditions of the Certification are
reviewed prior to initiation of the project. In addition to the requirements of the Certification, you must
also comply with the following conditions:
This approval is only valid for the purpose and design that you described in your application. If
you change your project, you must notify us in writing, and you may be required to send us a
new application for a new Certification. If total wetland fills for this project (now or in the future)
exceed one acre, or of total impacts to streams (now or in the future) exceed 300 linear feet,
compensatory mitigation may be required. If the property is sold, the new owner must be given
a copy of the Certification and approval letter; and is thereby responsible for complying with all
conditions. 15A NCAC 02H .0506 and 15A NCAC 02H .0507
2. Approved Impacts:
Type of Impact Amount Approved
Amount Approved
Temporary Impact
Permanent Impact
Stream 22 linear ft.
283 linear ft.
Wetland 0 acre
0.06 acre
Nothing Compares 7�.
State of North Carolina I Environmental Quality
1611 Mail Service Center I Raleigh, North Carolina 27699-1611
919-707-9000
3. The Mooresville Regional Office shall be notified in writing once construction at the approved
impact areas has commenced. 15A NCAC 02H .0502 (e)
4. Diversion Ditches and other storm water conveyances as related to the sediment and erosion
control measures shall be matted and/or stabilized to reduce sediment loss and turbidity. This
includes interior/exterior slopes of sediment basins. 15A NCAC 02H .0506 (b)(3) and (c)(3)
5. Bare/fill slopes in excess of 10 feet in height and within 30 feet of surface waters shall be matted
immediately. 15A NCAC 02H .0506 (b)(3) and (c)(3)
6. Please provide documentation showing that water quality from the development will not be
impaired. A storm water management plan in lieu of such documentation is acceptable if
approved by a delegated or state authority. 15A NCAC 2H .1000
7. Stormwater discharge structures at this site shall be constructed in a manner such that the
potential receiving streams (of the discharge) will not be impacted due to sediment accumulations,
scouring or erosion of the stream banks. 15A NCAC 02H .0506(b)(5)
8. Use of native vegetation and other soft stream bank stabilization techniques is recommended
where practicable instead of riprap or other bank hardening methods. If riprap is necessary, it
shall not be placed in the streambed, unless approved by DWR
9. Mitigation [15A NCAC 02H .0500(h)] must be provided for the proposed impacts as specified in
the table below. The Division has received notification/acceptancerof m tfte-Division of Mitigation
Services (DMS) to meet this mitigation requirement. Until the DMS receives and clears your
payment, and proof of payment has been provided to this Office, no impacts specified in this
Authorization Certificate shall occur. For accounting purposes, this Certification authorizes
payment to meet the following compensatory mitigation requirement:
10. Mitigation Credit: Approval of the restoration plan and issuance of the 401 Water Quality
Certification means that DWR has determined that the proposed activity will not remove or
degrade significant existing uses of the surface water . The issuance does not represent an
approval of credit yield for the project. (15A NCAC 2H .0506(a))
11. The Permittee shall ensure that the final design drawings adhere to the permit and to the permit
drawings submitted for approval. 15A NCAC 02H .0507 (c) and 15A NCAC 02H .0506 (b)(2)
and (c)(2)
12. The permittee shall report any violations of this Certification to the Division of Water Resources
within 24 hours of discovery. 15A NCAC 02H .0507(c)
13. Upon completion of the project, the applicant shall complete and return the enclosed "Certificate of
Completion" form to the 401/Wetlands Unit of the Division. 15A NCAC 02H .0507(c)
This Certification can be contested as provided in Articles 3 and 4 of the General Statute 15013
by filing a written petition for an administrative hearing to the Office of the Administrative Hearings
Compensatory Mitigation
River and Sub -basin Number
Required
Stream
2g3 (feet)
Catawba (03050101)
1:1 ratio
Wetlands
0 (acres)
10. Mitigation Credit: Approval of the restoration plan and issuance of the 401 Water Quality
Certification means that DWR has determined that the proposed activity will not remove or
degrade significant existing uses of the surface water . The issuance does not represent an
approval of credit yield for the project. (15A NCAC 2H .0506(a))
11. The Permittee shall ensure that the final design drawings adhere to the permit and to the permit
drawings submitted for approval. 15A NCAC 02H .0507 (c) and 15A NCAC 02H .0506 (b)(2)
and (c)(2)
12. The permittee shall report any violations of this Certification to the Division of Water Resources
within 24 hours of discovery. 15A NCAC 02H .0507(c)
13. Upon completion of the project, the applicant shall complete and return the enclosed "Certificate of
Completion" form to the 401/Wetlands Unit of the Division. 15A NCAC 02H .0507(c)
This Certification can be contested as provided in Articles 3 and 4 of the General Statute 15013
by filing a written petition for an administrative hearing to the Office of the Administrative Hearings
(hereby known as OAH). A petition form may be obtained from the OAH at http://www ncoah.com/or by
calling the OAH Clerk's Office at (919) 431-3000.
Within sixty (60) calendar days of receipt of this notice, a petition must be filed with the OAH. A
petition is considered filed when the original and one (1) copy along with any applicable OAH filing fee
is received in the OAH during normal office hours (Monday through Friday, 8:00 am to 5:00 pm,
excluding state holidays).
The petitions may be faxed to the OAH at (919) 431-3100, provided the original and one (1)
copy of the petition along with any applicable OAH filing fee is received by the OAH within five (5)
business days following the faxed transmission. Mailing address for the OAH:
If sending via US Postal Service:
Office of Administrative Hearings
6714 Mail Service Center
Raleigh, NC 27699-6714
If sending via delivery service (UPS, FedEx, etc.)
Office of Administrative Hearings
1711 New Hope Church Rd.
Raleigh, NC 27609-6285
One (1) copy of the petition must also be served on DEQ as follows:
Mr. William F. Lane, General Counsel
Department of Environmental Quality
1601 Mail Service Center
Raleigh, NC 27699-1601
This letter competes a r� eiew by the Division un erSectiorr-4d1-of the Clean Water Act.- If - you have any questions, please telephone Mr. Alan Johnson in the Mooresville Regional Office at 704-
663-1699.
Sincerely,
W. Corey Basinger, Regional Supervisor
Water Quality Regional Operations Section
Mooresville Regional Office, DEQ
Attachments
cc: Cathy Janiczak, Army Corps of Engineers, Charlotte, email
Tamp Bandy, Wetlands & Waters, email
DWR 401 & Buffer Permitting Branch file
MRO, Land Quality
18-0340
NORTH CAROLINA-DIVISON OF WATER RESOURCES
401 WATER QUALITY CERTIFICATION
SUMMARY OF PERMITTED IMPACTS AND MITIGATION REQUIREMENTS
In accordance with 15A NCAC 2 H .0500, Sylvan Creek Properties, LLC has permission as
outlined below to impact 283 linear feet of stream and 0.06 acre of wetland in order to proceed with the
subdivision in Lincoln County, North Carolina. All activities associated with these authorized impacts
must be conducted with the conditions listed in the attached certification. THIS CERTIFICATION IS
NOT VALID WITHOUT THE ATTACHMENTS.
COMPENSATORY MITIGATION REQUIREMENT: Division of Mitigation Services (DMS)
LOCATION: St. James Road Road
COUNTY: Lincoln
BASIN/SUBBASIN Catawba (03050101)
Impacts:
283 linear feet of stream
0.06 acre wetland
As required by 15A NCAC 2H .0506, and the conditions of this certification, you are required to
compensate for the above impacts through the restoration, creation, enhancement or preservation of
wetlands as outlined below prior to conducting any activities that impact or degrade the waters of the
state.
Note: Linear foot requirements proposed to be mitigated through the DMS must be rounded to the
nearest foot and acreage requirements must be rounded to one-quarter acre increments according
to 15 2r .0503(b).
Mitigation:
283 linear feet total of stream required (1:1)
Mitigation:
283 linear feet of stream by the DMS required for the 401 Water Quality Certification. In
correspondence dated February 28, 2018 the DMS indicated that up to 283 linear feet of stream
mitigation would be conducted by DMS if available within the cataloging unit. More may be required if
mitigation is required outside the unit.
One of the options you have available to satisfy the compensatory mitigation requirements is through
the payment of a fee to the DMS per NCAC 2R .0503. If you choose this option, please sign this form
and mail it to the Ecosystem Enhancement Fund at the address listed below. An invoice for the
appropriate amount of payment will be sent to you upon receipt of this form. PLEASE NOTE, THE
ABOVE IMPACTS ARE NOT AUTHORIZED UNTIL YOU RECEIVE NOTIFICATION THAT YOUR
PAYMENT HAS BEEN PROCESSED BY THE EEP.
Signature Date
ENVIRONMENTAL QUALITY
DIVISION OF MITIGATION SERVICES
1652 Mail Service Center
RALEIGH, N.C. 27669-1652