Loading...
HomeMy WebLinkAboutNC0081621_NOV Response_20180423WSACC ISO 1400:2015 • NC Star Public Sector • OHSAS 18001,2007 CERTIFIED MAIL RETURN RECEIPT REQUESTED Mr. Roberto Scheller Division of Water Resources Water Quality Regional Operations Section 610 E. Center Avenue, Suite 301 Mooresville, North Carolina 28115 WATER & SEWER AUTHORITY OF CABARRUS COUNTY Administrative Offices 232 Davidson Hwy, Concord, NC 28027 704.786.1783 ♦ 704.795.1564 Fax Rocky River Regional WWTP 6400 Breezy Lane, Concord, NC 28025 704.788.4164 ♦ 704.786.1967 Fax www.wsacc.org RECEIVED/NCDENRIDWR April 19, 2018 NPR 2 1a 2018 Subject: NPDES #0081621, Muddy Creek Wastewater Treatment Plant (MCWWTP) Dear Mr. Scheller: WOROS MOORESVILLE REGIONAL OFFICE This is a follow-up to our April 16, 2018 phone conversation informing you that MCWWTP was in violation of the subject permit's monthly average flow limit of .150 MGD during the previous month. The average flow limit was .1535 MGD; I became aware of the violation while preparing the March eDMR. The MCWWTP received 4.5 inches of rain between March 1 and March 31, 2018. In an effort to prevent the sewage from backing up in the collection system and causing an SSO, I ran a higher volume of flow through the Plant. This allowed more water to move through MCWWTP faster while maintaining the other permit limits. Currently MCWWTP is under construction to increase the treatment capacity to .300 MGD. Construction started in February and is expected to be completed June 19, 2019. If you have any questions, please contact me at 704.888.4888, 980.521.8611 and/or via email KimHolt(c WSACC.org. Sincerely,�� {�� ,r '' ` — Kimberly Holt Field Wastewater Services Muddy Creek WWTP Operator in Responsible Charge KH/blc Copy: John Ritchie File