Loading...
HomeMy WebLinkAbout20061416 Ver 1_More Info Requested_20060922 0 VATF9 QG r -I Y Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Alan W. Klimek, P.E. Director Division of Water Quality September 22, 2006 DWQ Project # 06-1416 Chatham County CERTIFIED MAIL: RETURN RECEIPT REQUESTED Mr. Jerry Radman MacGregor Development Company 201 Shannon Oaks Circle, Suite 201 Cary, NC 27511 Subject Property: Booth Mountain Ut to Herndon Creek [030605,16-41-4-1-(0.5), WSIV, NSW] REQUEST FOR MORE INFORMATION Dear Mr. Radman: On August 31, 2006, the Division of Water Quality (DWQ) received your application dated August 31, 2006, to impact 0.249 acres of wetland and 369 linear feet of stream (94 linear feet permanent, perennial stream impact, 232 linear feet permanent, intermittent stream impact, 33 linear feet temporary, perennial stream impact, and 10 linear feet temporary, intermittent stream impact) to construct the proposed residential subdivision. The DWQ has determined that your application was incomplete and/or provided inaccurate information as discussed below. The DWQ will require additional information in order to process your application to impact protected wetlands and/or streams on the subject property. Therefore, unless we receive five copies of the additional information requested below, we will have to move toward denial of your application as required by 15A NCAC 2H .0506 and will place this project on hold as incomplete until we receive this additional information. Please provide the following information so that we may continue to review your project. Additional Information Requested: 1. Please provide documentation indicating how you determined whether onsite streams were perennial or intermittent. This determination must be made by the DWQ. 2. Impact 3 appears to be at a 60° - 65° angle. Please redesign this crossing so that the impact angle is between 75° and 105°. Also, this impact leads to "future development". Does this need to be done right away, or can this impact be done when the "future development" begins? 3. Project imperviousness area is listed as 23.8%. However, calculations/figures are confusing. The calculations attached with the PCN use a site area of 948 acres, but in 401 Oversight(Express Review Permitting Unit ra 24 1650 Mail Service Center, Raleigh, North Carolina 27699-1650 2321 Crabtree Boulevard, Suite 250, Raleigh, North Carolina 27604 Phone: 919-733-1786 / FAX 919-733-6893 / Internet: httn://h2o.enr.state,nc.us/ncwetlands An Equal Opportunity/Affirmative Action Employer- 50% Recycled/10% Post Consumer Paper f macuregor uevelopment Company Page 2 of 2 September 22, 2006 Section VII of the PCN the site is listed as 314 acres. Please reconcile this discrepancy. Also, the calculations list 739 lots, but I count 180 lots on the plans. Please reconcile this discrepancy as well. Please respond within three weeks of the date of this letter by sending this information to me in writing and Eric Kulz of the DWQ Raleigh Regional Office. If we do not hear from you within three weeks, we will assume that you no longer want to pursue this project and we will consider the project as withdrawn. This letter only addresses the application review and does not authorize any impacts to wetlands, waters or protected buffers. Please be aware that any impacts requested within your application are not authorized (at this time) by the DWQ. Please call Ms. Cyndi Karoly or Mr. Ian McMillan at 919-733-1786 if you have any questions regarding or would like to set up a meeting to discuss this matter. Sincerely, Cy di Karoly, Supervisor 401 Oversight/Express Review Permitting Unit CBK/Ym cc: Eric Kulz, DWQ Raleigh Regional Office USACE Raleigh Regulatory Field Office File Copy Central Files Debbie Edwards, S&EC, P.A., 11010 Raven Ridge Road, Raleigh, NC 27614 Filename: 06l4l6BoothMountaio(Chatham)oo_Hold