HomeMy WebLinkAbout20061416 Ver 1_Email_2006091920061416 Booth Mountain - Chatham Co.
Subject: 20061416 Booth Mountain - Chatham Co.
From: Eric Kulz <eric.kulz@ncmail.net>
Date: Tue, 19 Sep 2006 15:36:16 -0400
To: Ian McMillan <ian. mcmillan@ncmail. net>
CC: Chuck Wakild <chuck.wakild@ncmail.net>
Ian:
I have issues with this one too. They are showing a crossing over an intermittent
stream, and they did not give an indication that DWQ did IP calls out there.
Impact lA and 1B; 1B is a diagonal crossing of an intermittent stream right above
the confluence with a larger perennial UT to Herndon Creek, which is also being
crossed (Impact 1A). The PCN states that the crossing cannot be moved further east
or west because this will cause more impacts to the perennial crossing (Impact 1A).
The property is pretty snug up there, so this may be true.
Impact 3 - 60-65 degree angle. Also, this leads to "future development". Does
this need to be done right away, or can this impact be done when the "future
development" begins?
Imperv. calculation is 23.8%. Site is located within WS-IV protected area.
However, calculations/figures are confusing. The calculations attached with the
PCN use a site area of 948 acres, but in Section VII of the PCN the site is listed
as 314 acres. Also, the calculations list 739 lots, but I count 180 lots on the
plans. I am not sure of the significance of these discrepancies.
My comments are on BIMS.
Eric
Eric Kulz <Eric.Kulzpncmail.net>
Environmental Specialist III
Surface Water Protection
NC Division of Water Quality
I of 1 9/20/2006 8:32 AM