Loading...
HomeMy WebLinkAbout20070108 Ver 1_More Info Letter_20070131~~F W A TF9Q Michael F. Easley, Governor ~~ G William G. Ross Jr., Secretary ~ r North Carolina Department of Environment and Natural Resources ~ ~ p ~ Alan W. Klimek, P.E. Director Division of Water Quality January 31, 2007 DWQ Project # 07-0108 Wake County CERTIFIED MAIL: RETURN RECEIPT REQUESTED Mr. Robert Masengill City of Raleigh -Department of Public Utilities P.O. Box 590 Raleigh, NC 27602 Subject Property: City of Raleigh -House Creek Sewer Replacement Ut to House Creek [030402, 27-33-13), C, NSW] REQUEST FOR MORE INFORMATION Dear Mr. Masengill: On January 17, 2007, the Division of Water Quality (DWQ) received your application dated July 19, 2006, to temporarily impact 724 linear feet of perennial stream as stated on the Supplemental Sheet for Item VI 4 -Stream (597 linear feet was reported in the table of cumulative impacts listed in Section VI Proposed Impacts to Waters of the United States/Waters of the State, No. 6) and 129,221.5 square feet of Zone 1 Neuse River basin protected riparian buffer and 117,628 square feet of Zone 2 Neuse River basin protected riparian buffer to construct the proposed sewer line replacement project. The DWQ has determined that your application was incomplete and/or provided inaccurate information as discussed below. The DWQ will require additional information in order to process your application to impact protected wetlands and/or streams on the subject property. Therefore, unless we receive five copies of the additional information requested below, we will have to move toward denial of your application as required by 15A NCAC 2H .0506 and will place this project on hold as incomplete until we receive this additional information. Please provide the following information so that we may continue to review your project. Additional Information Requested: 1. Please address the: aforementioned discrepancy between the temporary impact of 724 linear feet of perennial stream as stated on the Supplemental Sheet for Item V I 4 -Stream and the 597 linear feet was reported in the table of cumulative impacts listed in Section VI Proposed Impacts to Waters of the United States/Waters of the State, No. 6. 2. Stream crossing Nos. 1 and 10 do not appear to be perpendicular (i.e., between 75° and 105°) Please redesign these to be within 75° and 105°. Additionally, please address whether these are within an existing sewer easement. 3. Please indicate the width of the maintenance corridor for impact Nos. 1, 7, 10, and 11. Perpendicular crossings that disturb greater than 40 linear feet, but equal to less than 150 linear feet of riparian buffer with a maintenance corridor greater than 10' in width are allowable with mitigation. 401 Oversight/Express Review Permitting Unit 1650 Mail Service Center, Raleigh, North Carolina 27699-1650 2321 Crabtree Boulevard, Suite 250, Raleigh, North Carolina 27604 Phone: 919-733-1786 /FAX 919-733-6893 /Internet: http //h2o.enr.state.nc.us/ncwetlands None Carolina ~tura!!y An Equal Opportunity/Affirmative Action Employer - 50% Recycled/10% Post Consumer Paper City of Raleigh Page 2 of 2 January 31, 2007 4. Please clearly indicate which of the impacts are new impacts, not within the existing sanitary sewer easement, but rather parallel. Are sections of the sewer line easement proposed for construction within the easement, but still widening it since this is a new and larger line. 5. In Section VIII Mitigation, your response is "NA", but in the buffer table located in Section X Proposed Impacts on Riparian and Watershed Buffers (required by DWQ), you indicated 564,106 square feet of buffer mitigation credit will be required for this project. Please address this discrepancy. Please contact the DWQ within three weeks of the date of this letter to verify that you have received this letter and that you remain interested in continuing to pursue permitting of your project and will be providing the DWQ the requested information at a later date. Please contact me in writing and Mike Horan of the DWQ Raleigh Regional Office. If we do not hear from you within three weeks, we will assume that you no longer want to pursue this project and we will consider the project as withdrawn. This letter only addresses the application review and does not authorize any impacts to wetlands, waters or protected buffers. Please be aware that any impacts requested within your application are not authorized (at this time) by the DWQ. Please call Ms. Cyndi Karoly or Mr. Ian McMillan at 919-733- 1786 if you have any questions regarding or would like to set up a meeting to discuss this matter. Sincerely, n~~. Cyndi Karoly, Supervisor 401 Oversight/Express Review Permitting Unit CBK/ijm cc: Mike Horan, DWQ Raleigh Regional Office USACE Raleigh Regulatory Field Office File Copy Central Files Filename: 070108CORaleighFlouseCreekSewerReptacement(Wa ke)Oo_Hold