Loading...
HomeMy WebLinkAbout20090134 Ver 1_Application_20090328 STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION BEVERLY EAVES PERDUE EUGENE A. CONTt, JR. GOVERNOR SECRETARY March 17, 2009 U. S. Army Corps of Engineers R M ti Regulatory Field Office MAR 3 ZQ0.9 Post Office Box 1000 DENR - WATER-OVALITy Washington, NC 27889-1000 WET X40SANDSTORt.1WATERBRANCH Attention: Mr. William Wescott O _ C) 1 3 NCDOT Coordinator Subject: Revision to the Applications for Section 404 Individual Permit, Section 401 Water Quality Certification, and Tar-Pamlico Buffer Authorization for the extension of SR 1537 (Daniel Street) from SR 1518 (Baker Street) to US 258, Tarboro, Edgecombe County. State Project No. 8.2291201, WBS 34983.1.1, TIP No. U-3826. Reference: Individual Application dated February 4, 2009 Dear Sir: The purpose of this letter is to revise the referenced application in the following sections. On page 5, under section 12.1 Avoidance and Minimization, the last bullet reads: NCDOT proposes to use sheet piles on smaller wetlands to sever the connection to the Tar River in order to avoid impacts to anadromous fish. To clarify this minimization effort, NCDOT will install sheet piles outside the moratorium to allow work during the moratorium. This was discussed and approved on August 23, 2006 at the 4B meeting with the following conditions as required by the NC Wildlife Commission: 1. It is installed when the conditions are dry, and it is not effected by'a moratorium. 2. There are no additional clearing limits due to installing the sheet piling. 3. If there is inundation inside the sheet piling, then BMPs (Best Management Practices) are used for dewatering. Revisions to the Compensation section (12.2) have also occurred. Changes are noted in bold in the following paragraphs. 12.2 Compensation The NCDOT has avoided and minimized impacts to jurisdictional resources to the greatest extent possible as described above. The unavoidable impacts to jurisdictional wetlands will be, offset by MAILING ADDRESS: TELEPHONE: 919431-2000 LOCATION: NC DEPARTMENT OF TRANSPORTATION FAX: 919431-2001 4701 ATLANTIC AVE. PROJECT DEVELOPMENT AND ENVIRONMENTAL ANALYSIS - SUITE 116 1598 MAIL SERVICE CENTER WcaQITF'W Wr.l TnRr RALEIGH. NC 27604 compensatory mitigation provided by on-site mitigation and with assets from the NCDOT Onsite Mitigation Debit Ledger. NCDOT will assume responsibility for satisfying the federal Clean Water Act compensatory mitigation requirements for the unavoidable impacts to 1.48 acres of wetlands resulting from the construction of U-3826. NCDOT is not proposing mitigation for 16 ft. of impacts to a UT to the Tar River as agreed at the 4B field review on Oct. 16, 2006 because it is intermittent. NCDOT proposes to restore 0.86 acre of riparian wetland for this project (see the wetland drawings and Daniel Street Extension Wetland Restoration Plan for details). The remaining 0.62 acre of wetland will be offset with assets from the Mildred Wood Mitigation Site. The Mildred Wood Mitigation Site was constructed as onsite mitigation for T.I.P. R-21I I/R-2112A US 64 relocation in Edgecwmbe and Martin Counties. The 418-acre site is located in Edgecombe County southeast of Tarboro and may be accessed from US 64 on its southern boundary. The site has completed its monitoring period and met prescribed hydrologic and vegetative success criteria. The Site was originally debited for R-2111, R-2112A, and R-509GB and has since been debited for R-2112B, U-2218, U-2720, B-2980, B-4021, and B-4020. To offset the 0.62 acre of unavoidable impacts to riparian wetlands associated with T.I.P. U-3826, the Mildred Wood Mitigation Site will be debited 0.62 acre of riparian wetland restoration. These debits are reflected in the debit ledger below. 16 V1G J. t??,aiV 1 V - ?------ As Built Site name Site TIP HUC River Basin Division County Mitigation Type Amount Riparian Wetland Mil ed R-2111/ Restoration W R-2112A 3020103 Tar-Pamlico 4 Edgecombe 395 Available Debit Debit Debit Debit Debit Debit Debit Debit Debit R-509GB, R-2111, & R- 2112A R-2112B Alterations U-2218 U-2720 B-2980 B-4021 B-4020 U-3826 99.67 217 23 23.5 21.5 6 3 0.25 0.46 0.62 A copy of this revised permit application will be posted on the DOT website at: http://www.ncdot.org/doh/preconstruct/pe/neu/pern-it.html. If you have any questions or need additional information, please contact Chris Underwood at esunderwood&cdot.gov or (919) 431-6662. Sincerely, Gregory J. Thorpe, Ph.D. Environmental Management Director, PDEA Branch cc: W/attachment Mr. Brian Wrenn, NCDWQ (5 Copies) Ms. Kathy Matthews, USEPA W/o attachment (see website for attachments) Dr. David Chang, P.E., Hydraulics Mr. Greg Perfetti; P.E., Structure Design Mr. Victor Barbour, P.E., Project Services Unit Mr. Mark Staley, Roadside Environmental Mr. Richard E. Greene, PE, Div. 4 Engineer Mr. Chad Coggins, Div. 4 Environmental Officer Mr. Scott McLendon, USACE, Wilmington Mr. Gary Jordan, USFWS Mr. Travis Wilson, NCWRC Mr. Ron Sechler, NMFS Ms. Anne Deaton, NCDMF Mr. Jay Bennett, P.E., Roadway Design Mr. Majed Alghandour, P. E., Programming and TIP Mr. Art McMillan, P.E., Highway Design Mr. Bryan Yamamoto, PE, PDEA Mr. Drew Joyner, PE, Human Environment Unit Head Mr. Clarence W. Coleman, P.E., FHWA Ms. LeiLani Paugh, NEU Mr. Randy Griffin, NEU N c r, O Z y m a K N ry OI N N ' [1 Y Y m a F n r n c c u a H m m c v c ° o p m •. z 3 ? ? a E U . ¢ v o C_ H a W w 0 '- n c b O p 0- L' C C U C 1 2 O Q W N N p N 't f0 4 7 41 ?''} ? W U E FF E N U C a U N ° Q C U U ? y N a m ° y F E o ° o ? Ey am . E o 0 ? a cn N V ? ? ? U Irl N N IL S U C o p > > ~ N U rL N W9 LLJ ° o 0 U3 ZO a 0 6 W Z c ? u 3 g W W N a c a N ? ? V F w a ° O c c _ c V w 0 0 O a 3 z `?- w U O ? Q J J J J U ? J J ¢ n U ? ¢ m LL LL LL O ? ? u~ 6 Q f/1 Q f? O 2 a X 3 3 ° N 0 0 0 0 z n _ m y 0 0 w 0 n m w m ? O w 0 m a Z O Y Y F 0 0 o in ¢ 00 00 + + 0 33 of m P Q N H < <, ? ? O V O O N ] 0 0 m Q y ? N a a ~ w w vi y F F- " e ^ z N v O O 0 0 F Z Z z