HomeMy WebLinkAbout20090134 Ver 1_Meeting Minutes_20080618 FINAL MINUTES OF INTERAGENCY 4C MEETING MEETING FOR PROJECT U-3826, EDGECOMBE COUNTY HELD ON 6/18/2008 Team Members: Andrew Nottingham NCDOT-Hydraulics (Present) William Wescott USACE (Present, teleconference) Gary Jordan USFWS (present) Travis Wilson NCWRC (present) Rob Ridings NCDWQ (Present) Kathy Matthews EPA (Present) Ron Lucas for Donnie Brew FHWA (Present) Jimmy Goodnight NCDOT-Roadway (Present) Chris Rivenbark NCDOT-NEU (Present) Brian Yamamoto NCDOT-PDEA (absent) Wendi Johnson NCDOT-Division 4 (Present) Kevin Bowen NCDOT-Construction (Present) Omar Azizi NCDOT- Structures (Present) Mark Staley for David Harris NCDOT-REU (Present) Participants: Tim Coggins NCDOT- Structures Melanie Nguyen NCDOT-Hydraulics Chris Underwood NCDOT-NEU LeiLani Paugh NCDOT-NEU Steve Kendall NCDOT-Roadway Jason Mays NCDOT-NEU Lance Fontaine NCDOT-NEU DOT began the meeting at 2:30 P.M. with an overview of the project. Hydraulics reviewed the Stormwater Management Plan included with the permit package. There were no comments. The team then proceeded to review the permit drawings. Site I on plan sheet 5 was reviewed. There were no comments. Site 2 and 3 on plan sheet 6 were then reviewed. It was noted that the drive right of station 38+50- L- was to provide access to parcel 4 as well as provide access to maintain the hazardous spill basin right of station 40+00 -L-. Site 4 on plan sheet 6 and 7 was then reviewed. The existing gravel access road on parcel 5 will have to be maintained during and after construction. A portion of the unnamed tributary to the Tar River will be impacted due to the access road having to be realigned to avoid a proposed bridge pier. Approximately 0.94 acres of wetland restoration is proposed at site 4 by removing a portion of the old railroad fill north of the project as shown on the drawings. The next two permit drawing sheets showing the location of the temporary work bridge and work pad needed to construct the bridge were then reviewed. USFWS noted that they had originally planned on doing a formal section 7 consultation but now intend on doing an informal section 7 consultation. The buffer permit drawings were reviewed and there were no additional comments. The meeting was adjourned at approximately 3:00 p.m. After the meeting was adjourned the USFWS and EPA noted that the gravel access road to parcel 5 appeared to be elevated above the wetland and wetland restoration area. They asked if it could be lowered to the wetland elevation. It was noted that NCDOT designed the grade of the access road to match the existing access road grade through the wetland area which is slightly above the existing wetland elevation. NCDOT will investigate if the access road can be lowered any but noted that it will have to be elevated slightly to maintain the stability of the road.