Loading...
HomeMy WebLinkAbout20090097 Ver 1_Notice of Withdrawal_20090423NCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Coieen H. Sullins Governor Director April 23, 2009 Samuel W. Duncan Sr. PO Box 600 Murphy, NC 28906 Steve Forrister 95 Valley River Ave Murphy, NC 28906 Subject: Return of Application 401 Water Quality Certification Murphy 66 DWQ Project # 09-0097 Cherokee County Dear Messrs. Duncan and Forrister: Dee Freernan Secretary On January 28, 2009, the Division of Water Quality (DWQ) received your application dated January 22, 2009, to impact 115 feet of waters for the purpose of culvert installation for a parking lot. DWQ wrote to you on February 26, 2009 discussing concerns that we have regarding the design of the project and stating that it would be placed on hold for 30 calendar days giving you time to address DWQ's concerns. On March 12, 2009 a site meeting was held to further discuss additional ir. formation needed to process your application. Since this project was put on hold for additional information on February 26, 2009 and a response was not received to address our questions by the deadline, we are returning your application. If you want to carry out this proposed impact, you will need to reapply and pay the 401 Certification fee again. If you want to reapply, please provide the following information so that we may review your project. Please note: No impacts associated with the subject project are approved at this time. To pursue the project further, a new Pre-Construction Notification and applicable fee will be required, as well as the additional information presented below. Additional Information Required: Culvert Cross Section Please provide cross section details showing the provisions for aquatic life passage. Culverts are required to be buried below streambed by approximately 20% of their diameter; a 36 inch culvert should be buried approximately 7 inches. Location: 2090 U.S. Highway 70, Swannanoa, North Carolina 28778 Phone: 828-296-45001 FAX: 828-299-70431 Customer Service: 1-877-623-6748 Internet: www.ncwaterquality.org An Equal Opportunity 1 Affrmative Action Employer NorthCarolina Naturally Murphy 66 April 23, 2009 Page 2 of 3 2. Stream Impacts Please indicate all stream impacts including fill, dissipaters and bank stabilization. You requested installation of a 115-foot culvert with riprap place downstream for erosion control. The riprap placed instream for erosion control or as a dissipater needs to be included in the linear footage of impacts. 3. Site Plan You must provide full sized plans. The following is the minimum list of plans that are typically needed. Proposed conditions - This sheet (or sheets) must include: ¦ All wetland, stream and water features ¦ All built-out structures; including, impervious surfaces ¦ Final grading contours with elevations Drainage Plans - Final drainage plans must include the following: • Locations and pertinent elevations and sizes of the stormwater collection system and drainage ways • Scaled stormwater BMPs must also be indicated as required by DWQ rules and policies 4. Stormwater Management Plan Compacted gravel is considered an impervious surface. If the parking lot will constitute 24% or greater of the area for the Duncan and Forrister lots, then the site will require stormwater Best Mangaement Practices (BMPs) structures. Please provide five (5) copies of stormwater management plans along with all supporting information pertaining to this project including the following: (i) Entire site development/layout plans delineating all drainage areas (ii) Design calculation sheets for all proposed BMP(s) sized for both on-site and off-site drainage (iii)BMP supplements for each proposed BMP and Required Items Check List (http://h2o.enr.state.nc.us/su/bmp forms.htm) along with all required items (iv)A Notarized Operation & Maintenance Agreement for each stormwater management facility (v) Detailed construction drawing sheets shall include: a. Erosion and sediment control plans b. Installation and planting schedules for the proposed BMPs c. Appropriately scaled plan views (1":50' scale) and cross sectional details of all BMPs and associated components - inlet and outlet structures, forebay, respective zones and pertinent elevations. 5. City Approval As discussed at the site meeting March 12, 2009, a sewerline main runs along the stream where you proposed to place the culvert. The appropriate city approval will be needed to assure the structural integrity of that sewerline. l? Murphy 66 April 23, 2009 Page 3 U3 Upon receipt of a complete application along with the applicable fee, the DWQ will promptly review the package and respond accordingly. Please call Linda Wiggs 828-296-4500, if you have any questions. Sincerely, Roger C. Edwards Regional Office Supervisor Surface Water Protection Section cc: US Army Corps of Engineers Asheville Field Office Cyndi Karoly - 401 Permitting Unit Cherokee Planning Office ARO File copy G:\W PDATA\DEM WQ\Cherokee\401 s\09-0097Retum-murphy66.doc