Loading...
HomeMy WebLinkAbout20180471 Ver 1_ External Missing Info for Hoskins_20180423Strickland, Bev From: Hubert Bryson <brysonstrucking@yahoo.com> Sent: Monday, April 23, 2018 9:32 AM To: Mitchell, Robert K Subject: [External] Missing Info for Hoskins Attachments: Imagejpg; Image (2)jpg; Image (3)jpg; Image (4)jpg ternal email. Do not click links or open attachments unless verified. Send all suspicious email as an attachment to lat2'�Ft! Kevin, here are the things you requested if you need anything else please feel free to call me @828-280-5681 Thanks, Bridgett Hubert Bryson brysonstrucking(d)yahoo.com 828-743-3304 e � t r t , r t � b� r 3 ,n r ' "�'„� � �� bi � �4 �' d� • � : M'Yk tea- .' � as ,m- * Lake (At Full Pond/ Normal Water Level) Full Pond) SFr x 5©o Fr Normal Water Level Shoreline 5'ao t= T— Z �S oa 17- Joao Z. Please approximately sketch the following information on this plan (provide dimensions for each item, such as 10 ft x 100 ft)*: I All proposed vegetation clearing 2. Location of rip rap or fill to be placed above the Full Pond/ Normal Water Level elevation 3. Location of rip rap or fill to be placed below the Full Pond/ Normal Water Level elevation 4. Location of any proposed structures such as buildings, retaining walls, docks, etc. 5. Location of any excavation or dredging below the Full Pond/ Normal Water Level elevation 6. Location of construction access corridors FORM; SGP 10-2013 Page 3 of 3 WdC nIF i n 8 ley, ,,•f � ��°`3 � � q g � � yC � * P•Qp�'�tt n � � $ u� m $ $ � � u � Y p � � � y a� ' m p a• rnmZ r r .9 Co I mO ro m 40Z'mr mD / A ' PP, SO I m Ri \o n e m ja$ o $ �9 m.mz mom•. rp�ir4 tmj td mIA., fI'Y td ms n K Mmm mRa M r v w m YC �N a i m