Loading...
HomeMy WebLinkAbout20090490 Ver 1_401 Application_20090409STROUD ENGINEERING, P.A. 107-B Commerce Street r (IREENVILLE, NC 27858 0®_ 0 4 9 0 (252) 756-9352 TO NL pwQ, 401 IM 41 -? r ut' i \l.so f A63 421CV WE ARE SENDING YOU )( Attached ? Under separate cover via ? Shop drawings ? Prints ? Plans ? Copy of letter ? Change order ? COPIES DATE NO. DESCRIPTION {^? e LY Y (-S " j2 24 I 0-0" THESE ARE TRANSMITTED as checked below: 11jL For approval ? For your use ? As requested ? For review and comment ? FORBIDS DUE REMARKS ? PRINTS RETURNED AFTER LOAN TO US COPY TO SIGNED: III r?U M 1-IL4 If enclosures are not as noted, kindly notify us at once. ? Approved as submitted ? Approved as noted ? Returned for corrections O?Fkr YVAi? 1,100 'Aott ?j?,?dd?J5 A"y'? SJORIAV, ? Resubmit copies for approval ? Submit copies for distribution ? Return corrected prints L?IEUIT[En 0IF M° MULI' Llv UEffu l DATE JOB NO. P -o ATTENTION RE: Q V_ IPA In ? Samples the following items: ? Specifications r 71 09°0490 Ig F_P? O?oi? WATE9QG Office Use Only: APR 3 0 2009 Corps action ID no. ? y o Y CENR - WATER QUP.UTY DWQ project no. WETIAIiDS AND STORM07ER BRANCH Form Version 1.3 Dec 10 2008 Pre-Construction Notification (PCN) Form A. Applicant Information IM Ak_ 1. Processing 1a. Type(s) of approval sought from the Corps: FE ED] Section 404 Permit ? Section 10 Permit 1 b. Specify Nationwide Permit (NWP) number: NW12 or General Permit (GP) number: 1c. Has the NWP or GP number been verified by the Corps? ? Yes ® No 1 d. Type(s) of approval sought from the DWQ (check all that apply): ® 401 Water Quality Certification - Regular ? Non-404 Jurisdictional General Permit ? 401 Water Quality Certification - Express ? Riparian Buffer Authorization 1e. Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification: ? Yes ® No For the record only for Corps Permit: ? Yes ® No 1f. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in-lieu fee program. ? Yes ® No 1 g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1 h below. ® Yes ? No 1h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ? Yes ® No 2. Project Information 2a. Name of project: Webb Creek Sewer Force Main Upgrade 2b. County: Onslow 2c. Nearest municipality / town: Hubert 2d. Subdivision name: Foxtrace 2e. NCDOT only, T.I.P. or state project no: 3. Owner Information 3a. Name(s) on Recorded Deed: Webb Creek Water & Sewage, Inc. 3b. Deed Book and Page No. 1272-723 3c. Responsible Party (for LLC if applicable): J. Hal Kinlaw, Jr., President 3d. Street address: 707 North Chestnut Street 3e. City, state, zip: Lumberton, NC 28538 3f. Telephone no.: 910-739-0621 3g. Fax no.: 910-326-3132 3h. Email address: Page 1 of 10 PCN Form - Version 1.3 December 10, 2008 Version 4. Applicant Information (if different from owner) 4a. Applicant is: ? Agent ? Other, specify: 4b. Name: 4c. Business name (if applicable): 4d. Street address: 4e. City, state, zip: 4f. Telephone no.: 4g. Fax no.: 4h. Email address: 5. Agent/Consultant Information (if applicable) 5a. Name: Andy Munday 5b. Business name (if applicable): Stroud Engineering, P.A. 5c. Street address: 107-B Commerce Street 5d. City, state, zip: Greenville, NC 27858 5e. Telephone no.: 252-756-9352 5f. Fax no.: 252-756-2345 5g. Email address: Amunday@Stroudengineer.com Page 2 of 10 PCN Form - Version 1.3 December 10, 2008 Version B. Project Information and Prior Project History 1. Property Identification 1a. Property identification no. (tax PIN or parcel ID): 46721 1b. Site coordinates (in decimal degrees): Latitude: Longitude: -`tJ ' -7 0 -1-1 wz-3k?AaG z ,,i,).-j7,?u (DD.DDDDDD) (-DD.DDDDDD) 1 c. Property size: acres 2. Surface Waters 2a. Name of nearest body of water (stream, river, etc.) to proposed project: Parrot Swamp 2b. Water Quality Classification of nearest receiving water: SA,HQW 2c. River basin: White Oak River Basin 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: Residential Subdivision 3b. List the total estimated acreage of all existing wetlands on the property: 0.061 AC 3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: No streams involved 3d. Explain the purpose of the proposed project: Upgrade the sewer force main 3e. Describe the overall project in detail, including the type of equipment to be used: Replace the existing 4" Force Main with a new 6" SS Force Main 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / project (including all prior phases) in the past? Comments: Yes ? No ® Unknown 4b. If the Corps made the jurisdictional determination, what type of determination was made? ? preliminary? Final 4c. If yes, who delineated the jurisdictional areas? Name (if known): Agency/Consultant Company: Other: 4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. 5. Project History 5a. Have permits or certifications been requested or obtained for this project (including all prior phases) in the past? ? Yes ? No ® Unknown 5b. If yes, explain in detail according to "help file" instructions. 6. Future Project Plans 6a. Is this a phased project? ? Yes ® No 6b. If yes, explain. Page 3 of 10 PCN Form - Version 1.3 December 10, 2008 Version C. Proposed Impacts Inventory 1. Impacts Summary 1 a. Which sections were completed below for your project (check all that apply): ® Wetlands ? Streams - tributaries ? Buffers ? Open Waters ? Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. 2b. 2c. 2d. 2e. 2f. Wetland impact number - Type of impact Type of wetland Forested Type of jurisdiction (Corps - 404, 10 Area of impact Permanent (P) or (if known) DWQ - non-404, other) (acres) Tempora T Yes Corps 01 0 W1 [:1 P ®T Temporary ? No ? DWQ . ® Yes 9 Corps 04 0 W2 ? P ®T Temporary ?No ?DWQ . ? Yes ? Corps W3 ? P ? T ?No ?DWQ ? Yes ? Corps W4 ? P ? T ? No ? DWQ ? Yes ? Corps W5 ? P ? T ? No ? DWQ ? Yes ? Corps W6 ? P ? T ? No ? DWQ 2g. Total wetland impacts 0.05 2h. Comments: 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. 3b. 3c. 3d. 3e. 3f. 3g• Stream impact Type of impact Stream name Perennial Type of jurisdiction Average Impact number - (PER) or (Corps - 404, 10 stream length Permanent (P) or intermittent DWQ - non-404, width (linear feet) Temporary (T) (INT)? other) (feet) S1 ? P ? T ? PER ? Corps ? INT ? DWQ S2 ? P ? T ? PER ? Corps ? INT ? DWQ S3 ? P ? T ? PER ? Corps ? INT ? DWQ S4 ? P ? T ? PER ? Corps ? INT ? DWQ S5 ? P ? T ? PER ? Corps ? INT ? DWQ S6 ? P ? T ? PER ? Corps ? INT ? DWQ 3h. Total stream and tributary impacts 3i. Comments: Page 4 of 10 PCN Form -Version 1.3 December 10, 2008 Version 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then individually list all open water impacts below. 4a. 4b. 4c. 4d. 4e. Open water Name of waterbody impact number - (if applicable) Type of impact Waterbody type Area of impact (acres) Permanent (P) or Temporary T 01 ?P?T 02 ?P?T 03 ?P?T 04 ?P?T 4f. Total open water impacts 4g. Comments: 5. Pond or Lake Construction If and or lake construction proposed, then complete the chart below. 5a. 5b. 5c. 5d. 5e. Pond ID Proposed use or purpose number of pond Wetland Impacts (acres) Stream impacts (feet) Upland Flooded I Filled I Excavated I Flooded I Filled I Excavated Flooded P1 P2 5f. Total 5g. Comments: 5h. Is a dam high hazard permit required? ? Yes ? No If yes, permit ID no: 5i. Expected pond surface area (acres): 5j. Size of pond watershed (acres): 5k. Method of construction: 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below. If an impacts require mitigation, then you MUST fill out Section D of this form. 6a. Project is in which protected basin? 6b. 6c. 6d. Buffer impact number - Reason Permanent (P) or for Temoorarv (T) imoact B1 ?P?T B2 ?P?T B3 ?P?T 16i. Comments: Buffer Zone 1 impact Zone 2 impact Stream name mitigation (square feet) (square feet) required? ? Yes ? No ? Yes ? No ? Yes ? No 6h. Total buffer impacts ? Neuse ? Tar-Pamlico ? Other: ? Catawba ? Randleman 6e. 6f. 6g. Page 5 of 10 PCN Form - Version 1.3 December 10, 2008 Version D. Impact Justification and Mitigation 1. Avoidance and Minimization 1 a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. The route taken avoided another wetland crossing and less impact area 1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? ? Yes ® No 2b. If yes, mitigation is required by (check all that apply): ? DWQ ? Corps 2c. If yes, which mitigation option will be used for this project? pro [I Mitigation bank E] Payment to in-lieu fee program ? Permittee Responsible Mitigation 3. Complete if Using a Mitigation Bank 3a. Name of Mitigation Bank: 3b. Credits Purchased (attach receipt and letter) Type Quantity 3c. Comments: 4. Complete if Making a Payment to In-lieu Fee Program 4a. Approval letter from in-lieu fee program is attached. ? Yes 4b. Stream mitigation requested: linear feet 4c. If using stream mitigation, stream temperature: ? warm ? cool ?cold 4d. Buffer mitigation requested (DWQ only): square feet 4e. Riparian wetland mitigation requested: acres 4f. Non-riparian wetland mitigation requested: acres 4g. Coastal (tidal) wetland mitigation requested: acres 4h. Comments: 5. Complete if Using a Permittee Responsible Mitigation Plan 5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan. Page 6 of 10 PCN Form - Version 1.3 December 10, 2008 Version 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) - required by DWQ 6a. Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? ? Yes ® No 6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required. Zone 6c. Reason for impact 6d. Total impact (square feet) Multiplier 6e. Required mitigation (square feet) Zone 1 3 (2 for Catawba) Zone 2 1.5 6f. Total buffer mitigation required: 6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in-lieu fee fund). 6h. Comments: Page 7 of 10 PCN Form - Version 1.3 December 10, 2008 Version E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan 1 a. Does the project include or is it adjacent to protected riparian buffers identified ? Yes ® No within one of the NC Riparian Buffer Protection Rules? 1 b. If yes, then is a diffuse flow plan included? If no, explain why. ? Yes ? No Comments: 2. Stormwater Management Plan 2a. What is the overall percent imperviousness of this project? 0% 2b. Does this project require a Stormwater Management Plan? ? Yes ® No 2c. If this project DOES NOT require a Stormwater Management Plan, explain why: No impervious area increase 2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan: ? Certified Local Government 2e. Who will be responsible for the review of the Stormwater Management Plan? ? DWQ Stormwater Program ? DWQ 401 Unit 3. Certified Local Government Stormwater Review 3a. In which local government's jurisdiction is this project? ? Phase II ? NSW 3b. Which of the following locally-implemented stormwater management programs ? USMP apply (check all that apply): ? Water Supply Watershed ? Other: 3c. Has the approved Stormwater Management Plan with proof of approval been ? Yes ? No attached? 4. DWQ Stormwater Program Review ? Coastal counties ? HQW 4a. Which of the following state-implemented stormwater management programs apply ? ORW (check all that apply): ? Session Law 2006-246 ? Other: 4b. Has the approved Stormwater Management Plan with proof of approval been ? Yes ? No attached? 5. DWQ 401 Unit Stormwater Review 5a. Does the Stormwater Management Plan meet the appropriate requirements? ? Yes ? No 5b. Have all of the 401 Unit submittal requirements been met? ? Yes ? No Page 8 of 10 PCN Form - Version 1.3 December 10, 2008 Version F. Supplementary Information 1. Environmental Documentation (DWQ Requirement) 1 a. Does the project involve an expenditure of public (federal/state/local) funds or the ? Yes ® No use of public (federal/state) land? 1 b. If you answered "yes" to the above, does the project require preparation of an St t ? Yes ? No e a environmental document pursuant to the requirements of the National or (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1c. If you answered "yes" to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval letter.) ? Yes ? No Comments: 2. Violations (DWQ Requirement) 2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, ? Yes ® No or Riparian Buffer Rules (15A NCAC 2B .0200)? 2b. Is this an after-the-fact permit application? ? Yes ® No 2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s): 3. Cumulative Impacts (DWQ Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in ? Yes No additional development, which could impact nearby downstream water quality? 3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy. If you answered "no," provide a short narrative description. This project replaces an existing 4" SS Force Main with a 6" SS Force Main 4. Sewage Disposal (DWQ Requirement) 4a. Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. No wastewater is generated from this project Page 9 of 10 PCN Form - Version 1.3 December 10, 2008 Version 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or ? Yes ® No habitat? 5b. Have you checked with the USFWS concerning Endangered Species Act ? Yes ® No impacts? ? Raleigh 5c. If yes, indicate the USFWS Field Office you have contacted. ? Asheville 5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? USGS Map and NC Natural Heritage Program database 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as essential fish habitat? ? Yes ® No 6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat? USGS Map 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation ? Yes ® No status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)? 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? NC State Historic Preservation Office Website 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA-designated 100-year floodplain? ? Yes ® No 8b. If yes, explain how project meets FEMA requirements: 8c. What source(s) did you use to make the floodplain determination? Flood Map J. Hal Kinlaw, Jr: Applicant/Agent's Printed Name Applicant/Agent's ignature ) Date (Agent's signature is valid only if an authorization letter from the ap ht is provided.) Page 10 of 10 PCN Form - Version 1.3 December 10, 2008 Version