Loading...
HomeMy WebLinkAbout20090487 Ver 1_401 Application_20090409Ak?'LMG LAND MANAGEMENT GROUP INC. Environmental Consultants @'2 g Emb72 Do APR 2 9 2009 April 27, 2009 DENR-WATER QUALITY WETLANDS AND STORMWATER BRANCH TO: Mr. Chad Coburn NC Division of Water Quality 9 - 0 4 $ 7 127 Cardinal Drive Extension COURTESY 1 Wilmington, NC 28405 Copy RE: 401 Water Quality Certification, for the record only: Kerr Avenue Water Main New Hanover County, NC Mr. Coburn: Enclosed is a courtesy copy of the 401 Water Quality Certification application for your review. This application is submitted on behalf of Mr. Frank Styers of CFPUA located in New Hanover County for the installation of a new large diameter water transmission main. The applicant is proposing the installation of the main to improve system pressure, reliability, and water quality in the western part of New Hanover County. The main installation will impact .049 acres of RPWs. RPWs have been verbally approved along the water main corridor by the USACE. The Pre- Construction Notification form, associated reaps, and site plan are enclosed for your review. Thank you for your assistance with this project. Environm enta'l,,S ci enti st Encl. C: ._E- s. Kim Garvey, USACE Mr. Frank Styers, CFPUA Mr. Jeremy Blair, Paramounte Engineering www.lmgroup.net • info@lnigroup.net • Phone: 910.452.0001 • Fax: 910.452.0060 3805 Wrightsville Ave., Suite 15, Wilmington, NC 28403 • P.O. Box 2522, Wilmington, NC 28402 A----LMG LAND MANAGEMENT GROUP iNc. I?aw Environmental Consultants April 27, 2009 TO: Ms. Kim Garvey USACE 69 Darlington Avenue Wilmington, NC 28403 RE: Nationwide Permit 12 Application: Kerr Avenue Water Main New Hanover County, NC Ms. Garvey: Enclosed is a Nationwide Permit 12 application for your review. This application is submitted on behalf of Mr. Frank Styers of CFPUA located in New Hanover County for the installation of a new large diameter water transmission main. The applicant is proposing the installation of the main to improve system pressure, reliability, and water quality in the western part of New Hanover County. The main installation will impact.049 acres of RPWs. RPWs have been verbally approved by you along the water main corridor. The preliminary JD from was submitted to you 12/15/2008. An approved JD has not yet been issued. The Pre- Construction Notification form, associated maps, and site plan are enclosed for your review. Thank you for your assistance with this project. Y, Ailey Futral I Environmental cientist Encl. 1777had Coburn, DWQ Mr. Frank Styers, CFPUA Mr. Jeremy Blair, Paramounte Engineering www.lmgroup.net • info@Imgroup.net • Phone: 910.452.0001 • Fax: 910.452.0060 3805 Wrightsville Ave., Suite 15, Wilmington, NC 28403 9 P.O. Box 2522, Wilmington, NC 28402 F NAT?FgQ O -c Office Use Only: 0 4 8 7 Corps action ID no. DWQ project no. Form Version 1.3 Dec 10 2008 Pre-Construction Notification (PCN) Form A. Applicant Information OUR 1 E'SY 1. Processing COPY 1 a. Type(s) of approval sought from the Corps: ®Section 404 Permit El Section 10 Permit 1b. Specify Nationwide Permit (NWP) number: 12 or General Permit (GP) number: 1 c. Has the NWP or GP number been verified by the Corps? ? Yes ® No 1d. Type(s) of approval sought from the DWQ (check all that apply): ® 401 Water Quality Certification - Regular ? Non-404 Jurisdictional General Permit ? 401 Water Quality Certification - Express ? Riparian Buffer Authorization 1e. Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification: ® Yes ? No For the record only for Corps Permit: ? Yes ® No 1f. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in-lieu fee program. ? Yes ® No 1g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1h below. ® Yes ? No 1 h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ? Yes ® No 2. Project Information 2a. Name of project: Kerr Avenue Water Main 2b. County: New Hanover 2c. Nearest municipality / town: Wilmington 2d. Subdivision name: N/A 2e. NCDOT only, T.I.P. or state project no: N/A 3. Owner Information 3a. Name(s) on Recorded Deed: NCDOT/Public Right of Way 3b. Deed Book and Page No. N/A 3c. Responsible Party (for LLC if applicable): N/A 3d. Street address: 1 South Wilmington Street 3e. City, state, zip: Raleigh, NC 27601 3f. Telephone no.: (919)733-7932 3g. Fax no.: (919)733-1390 3h. Email address: N/A Page 1 of 12 PCN Form - Version 1.3 December 10, 2008 Version 4. Applicant Information (if different from owner) 4a. Applicant is: ? Agent ® Other, specify: Utility Authority 4b. Name: Frank Styers 4c. Business name (if applicable): Cape Fear Public Utility Authority 4d. Street address: 235 Government Center Drive 4e. City, state, zip: Wilmington, NC 28403 4f. Telephone no.: (910)332-6670 4g. Fax no.: (910)332-6353 4h. Email address: frank.styers@cpua.org 5. Agent/Consultant Information (if applicable) 5a. Name: Ashley Futral 5b. Business name (if applicable): Land Management Group, Inc. 5c. Street address: 3805 Wrightsville Avenue, Suite 15 5d. City, state, zip: Wilmington, NC 28403 5e. Telephone no.: (910)452-0001 5f. Fax no.: (910)452-0060 5g. Email address: afutral@lmgroup.net Page 2 of 12 B. Project Information and Prior Project History 1. Property Identification 1a. Property identification no. (tax PIN or parcel ID): N/A Latitude: 34.288519 Longitude: - 77.890286 1 b. Site coordinates (in decimal degrees): (DD.DDDDDD) (-DD.DDDDDD) 1 c. Property size: -17,800 linear feet 2. Surface Waters 2a. Name of nearest body of water (stream, river, etc.) to Smith Creek and the Northeast Cape Fear River proposed project: 2b. Water Quality Classification of nearest receiving water: C;Sw: Smith Creek SC;Sw: Northeast Cape Fear River 2c. River basin: Cape Fear 03030007 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: The site is a maintained DOT roadway currently used for general transportation. Land use in the vicinity of the site is mixed commercial and residential. All Relatively Permanent Waters (RPWs) adjacent to the roadway are relic agricultural ditches. 3b. List the total estimated acreage of all existing wetlands on the property: -400 linear feet of RPWs 3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: N/A 3d. Explain the purpose of the proposed project: The purpose of the proposed project is to install a new large diameter water transmission main. As designated in the master planning efforts by the CFPUA, completion of this main will improve system pressure, reliability, and water quality in the western part of New Hanover County. 3e. Describe the overall project in detail, including the type of equipment to be used: The applicant will install a water line within a construction corridor located along the NCDOT right-of-way. All impacts to RPWs will be temporary. Construction will include grading of the right-of-way to its original state after installation of the utility line and culverts where needed. 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / project (including all prior phases) in the past? Comments: A preliminary Jurisdictional Determination form has been submitted (12/15/2008) to the Kim Garvey of the ® Yes ? No ? Unknown USACE along with a wetlands JD package (10/1/2008). A desktop evaluation was done per Kim Garvey. An approved JD has not yet been issued. The project has been assigned Action ID # SAW2008-03191 4b. If the Corps made the jurisdictional determination, what type ®Preliminary ? Final of determination was made? 4c. If yes, who delineated the jurisdictional areas? Agency/Consultant Company: Land Management Group Name (if known): Paul Farley Other: 4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. A JD has not been approved or issued. Page 3 of 12 PCN Form - Version 1.3 December 10, 2008 Version Project Information and Prior Project History 5. Project History 5a. Have permits or certifications been requested or obtained for this project (including all prior phases) in the past? ? Yes ® No ? Unknown 5b. If yes, explain in detail according to "help file" instructions. N/A 6. Future Project Plans 6a. Is this a phased project? ? Yes ® No 6b. If yes, explain. N/A Page 4 of 12 C. Proposed Impacts Inventory 1. Impacts Summary 1 a. Which sections were completed below for your project (check all that apply): ? Wetlands ? Streams - tributaries ? Buffers ® Open Waters ? Pond Construction 2. Wetland Impacts N/A If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. 2b. 2c. 2d. 2e. 2f. Wetland impact Type of jurisdiction number - Type of impact Type of wetland Forested (Corps - 404, 10 Area of impact Permanent (P) or (if known) DWQ - non-404, other) (acres) Temporary T W1 ? P ? T ? Yes ?No ? Corps ?DWQ W2 ? PEI T ? Yes ? No ? Corps ? DWQ W3 ? P ? T ? Yes ? No ? Corps ? DWQ W4 ? P ? T ? Yes ?No ? Corps ?DWQ W5 ? P ? T ? Yes ? Corps ? No ? DWQ W6 ? P ? T ? Yes ? No ? Corps ? DWQ 2g. Total wetland impacts 2h. Comments: 3. Stream Impacts N/A If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. 3b. 3c. 3d. 3e. 3f. 3g. Stream impact Type of impact Stream name Perennial Type of jurisdiction Average Impact number - (PER) or (Corps - 404, 10 stream length Permanent (P) or intermittent DWQ - non-404, width (linear Temporary (T) (INT)? other) (feet) feet) S1 ? P ? T ? PER ? Corps ? INT ? DWQ S2 ? P ? T ? PER ? Corps ? INT ? DWQ S3 ? P ? T ? PER ? Corps ? INT ? DWQ S4 ? P ? T ? PER ? Corps ? INT ? DWQ S5 ? P ? T ? PER ? Corps ? INT ? DWQ S6 ? P ? T ? PER ? Corps ? INT ? DWQ 3h. Total stream and tributary impacts 3i. Comments: Page 5 of 12 PCN Form - Version 1.3 December 10, 2008 Version 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then individual) list all open water impacts below. 4a. Open water impact number - Permanent (P) or Temporary T 4b. Name of waterbody (if applicable) 4c. Type of impact 4d. Waterbody type 4e. Area of impact (acres) 01 ? P ®T N/A Utility Installation RPW .005 02 ? P ®T N/A Utility Installation RPW .009 03 ? P ®T N/A Utility Installation RPW .001 04 ? P ®T N/A Utility Installation RPW .017 05 ? P ®T N/A Utility Installation RPW .017 0. Total open water impacts .049 4g. Comments: N/A 5. Pond or Lake Construction N/A If and or lake construction proposed, then complete the chart below. 5a. Pond ID 5b. Proposed use or purpose 5c. Wetland Impacts (acres) 5d. Stream Impacts (feet) 5e. Upland (acres) number of pond Flooded Filled Excavated Flooded Filled Excavated Flooded P1 P2 5f. Total 5g. Comments: 5h. Is a dam high hazard permit required? ? Yes ®No If yes, permit ID no: 5i. Expected pond surface area (acres): N/A 5j. Size of pond watershed (acres): N/A 5k. Method of construction: N/A Page 6 of 12 6. Buffer Impacts (for DWQ) N/A If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below. If any impacts require mitigation, then you MUST fill out Section D of this form. 6a. ? Neuse ?Tar-Pamlico ? Other: Project is in which protected basin? ? Catawba ? Randleman 6b. 6c. 6d. 6e. 6f. 6g. Buffer impact number - Reason Buffer Zone 1 impact Zone 2 impact Permanent (P) or for Stream name mitigation (square feet) (square feet) Temporary T impact required? 131 ?P?T ?Yes ? No B2 ? P ? T ? Yes ? No B3 ?P?T ?Yes ? No 6h. Total buffer impacts 6i. Comments: Page 7 of 12 D. Impact Justification and Mitigation 1. Avoidance and Minimization 1 a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. All impacts to RPWs will only be temporary. The water line will be installed along with culverts where necessary as not to impede RPWs. Natural grade will be re-established once the line has been installed. 1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. All work will occur within a designated construction corridor to reduce discharge of sediment into RPWs. Silt fences will be used to control sediment erosion. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? ? Yes ® No No mitigation is offered since impacts are small and are to man-made ditches. 2b. If yes, mitigation is required by (check all that apply): N/A ? DWQ ? Corps 2c. If yes, which mitigation option will be used for this project? N/A pro ? Mitigation bank ? Payment to in-lieu fee program ? Permittee Responsible Mitigation 3. Complete if Using a Mitigation Bank N/A 3a. Name of Mitigation Bank: 3b. Credits Purchased (attach receipt and letter) Type Quantity 3c. Comments: 4. Complete if Making a Payment to In-lieu Fee Program N/A 4a. Approval letter from in-lieu fee program is attached. ? Yes 4b. Stream mitigation requested: linear feet 4c. If using stream mitigation, stream temperature: ? warm ? cool ?cold 4d. Buffer mitigation requested (DWQ only): square feet 4e. Riparian wetland mitigation requested: acres 4f. Non-riparian wetland mitigation requested: acres 4g. Coastal (tidal) wetland mitigation requested: acres 4h. Comments: 5. Complete if Using a Permittee Responsible Mitigation Plan N/A 5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan. N/A Page 8 of 12 PCN Form - Version 1.3 December 10, 2008 Version 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) - required by DWQ 6a. Will the project result in an impact within a protected riparian buffer that requires ? Yes ® No buffer mitigation? 6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required. N/A 6c. 6d. 6e. Zone Reason for impact Total impact Multiplier Required mitigation (square feet) (square feet) Zone 1 3 (2 for Catawba) Zone 2 1.5 6f. Total buffer mitigation required: 6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in-lieu fee fund). N/A 6h. Comments: N/A Page 9 of 12 E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan 1a. Does the project include or is it adjacent to protected riparian buffers identified ? Yes ® No within one of the NC Riparian Buffer Protection Rules? 1 b. If yes, then is a diffuse flow plan included? If no, explain why. ? Yes ? No Comments: N/A 2. Stormwater Management Plan 2a. What is the overall percent imperviousness of this project? 0% 2b. Does this project require a Stormwater Management Plan? ? Yes ® No 2c. If this project DOES NOT require a Stormwater Management Plan, explain why: The purpose of the project is for the installation of a utility line. After burial of the utility, the right-of-way will be restored to it's original grade prior to construction. Pavement of the installation area is not necessary. 2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan: N/A ? Certified Local Government 2e. Who will be responsible for the review of the Stormwater Management Plan? N/A ? DWQ Stormwater Program ? DWQ 401 Unit 3. Certified Local Government Stormwater Review 3a. In which local government's jurisdiction is this project? N/A ? Phase II 3b. Which of the following locally-implemented stormwater management programs ? NSW ? USMP apply (check all that apply): N/A ? Water Supply Watershed ? Other: 3c. Has the approved Stormwater Management Plan with proof of approval been ? Yes ? No attached? N/A 4. DWQ Stormwater Program Review ? Coastal counties ? HQW 4a. Which of the following state-implemented stormwater management programs apply ? ORW (check all that apply): N/A ? Session Law 2006-246 ? Other: 4b. Has the approved Stormwater Management Plan with proof of approval been attached? N/A ? Yes ? No 5. DWQ 401 Unit Stormwater Review 5a. Does the Stormwater Management Plan meet the appropriate requirements? N/A ? Yes ? No 5b. Have all of the 401 Unit submittal requirements been met? N/A ? Yes ? No Page 10 of 12 PCN Form - Version 1.3 December 10, 2008 Version F. Supplementary Information 1. Environmental Documentation (DWQ Requirement) 1 a. Does the project involve an expenditure of public (federal/state/local) funds or the ® Yes ? No use of public (federal/state) land? 1 b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State ? Yes ® No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1c. If you answered "yes" to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval ? No ? Yes letter.) Comments: N/A 2. Violations (DWQ Requirement) 2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, ? Yes ® No or Riparian Buffer Rules (15A NCAC 2B .0200)? 2b. Is this an after-the-fact permit application? ? Yes ® No 2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s): N/A 3. Cumulative Impacts (DWQ Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in ? Yes ® No additional development, which could impact nearby downstream water quality? 3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy. If you answered "no," provide a short narrative description. Installation of the utility line will be limited to the described area. The line will improve water quality in the surrounding area. 4. Sewage Disposal (DWQ Requirement) 4a. Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. No wastewater will be generated by project. Page 11 of 12 PCN Form - Version 1.3 December 10, 2008 Version 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or ? Yes ® No habitat? 5b. Have you checked with the USFWS concerning Endangered Species Act ? Yes ® No impacts? ? Raleigh 5c. If yes, indicate the USFWS Field Office you have contacted. N/A ill ? A h ev s e 5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? The NC Natural Heritage Program GIS layer was used to determine the presence of federally listed species. Several rare plant and animal species are known to occur in the vicinity, but not in the specific project area. 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as essential fish habitat? ? Yes ® No 6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat? The NOAA Fisheries Essential Fish Habitat Mapper GIS program was used to determine the presence of Essential Fish Habitat. No data was depicted for the project area. 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation ? Yes ® No status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)? 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? The National Trust for Historic Preservation website mapping resource was used to determine the presence of cultural resources. No cultural resources were found. 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA-designated 100-year floodplain? ? Yes ® No 8b. If yes, explain how project meets FEMA requirements: N/A 8c. What source(s) did you use to make the floodplain determination? The NC Floodplain Mapping Information System website was used to determine the boundaries of the 100-year floodplain. The project site does not fall within these boundaries. Ashley R. Futral 4/27/2009 Applicant/Agent's Printed Name Icant/Agent' Signature Date (Agent's signature is valid only if an autho ization letter from the applicant is provided.) Page 12 of 12 AGENT ALA IORIZATION FORM TO VVI-10 v1 IT MAY CONCERN: ]"we. the undersigned, herchy authorize Land Manauemcnt Group, Inc. to 'let DS Off,11-Mll in the determination of jurisdictional \N'ctlwmcl boundaries on the subject property, here- Ave. Water Maim. Sy- way of this form, l/WC addlflonally authorize access to the site by reln•esentativcs of the US :finny Corps of Engineers (COIF.) and/or the NC Division of'Coastal lvlana,,cmcnt (N(" DCM) for the purpose of'revieming the flaggcd wetland boundary and providing a final jurisdictional determination. Any questions reg,arding the jurisdictional wetland determination should be directed to Land Management Ci7-oup. lnc. Pleas )ro_idc the following information: Property Address and Parcel ID Nlnllber: CC'idun Rd, Kee r Ave, Farley Rd, navariari Ln Current Property Oxvncr Name: NCUOT/FUb is Right of way Owvner Address d': Phone Number: Please circle Yes or No 'or the tollowimu questions: L VC are the current owners: Yes 1/)A'e are under Contract to purchase. the subject property: Yes _(i) I/We are t.lndCI_ option to I-MI-CIasc the subjcCt property: Yes (NOTE: Site access will be restricted without notice/authorization by current ON%ner) 13/A Cape Fear Flublic Ut.i.l.it.y ALithoriry (Tint Owner's Name Pant .-Applicant's Namc N/ _ Owa per's signature Aptlicant•s Signature (rrijun%'d I'M- COF rt? i???t,f ?a cils+nd ciclinc,ttiun) 12- 1 (41404- Date Daie t 'I ,t .,r ?a M E o? A, p "C: C,P? W l l A Z _-, j FVn Cy y Q u„! O x Y ? i 6- m F? WE F? ro ? }. 44??• (// `? ?? (may 7? a? _ a ca - i N C a U > ` ^ VJ O N ~ O O r OD N U .,.., J O Z (1)(.0(0 c QCR C) O ' C ffLnn V: C V O O .? 04 N C 6 Lc) O LL N X O m O CL ?- r~ 7 y 000 ¢ c -a w d a? m ? N cd (B c °5 cu Cl) N ig cu Q ? 'co: ? X w Oho rn ?U O L Fu z Q? U d T L r? O N E C L O C 0 0 O 75 :0: 1 M m?Z w00?UM N?d ? co moC L C C p ?' C7 ?NNC?. -0 a) 0 m E u) E Q O .? ° cg M cc a) m a Yz .?y t Y 4 -Jf A L c i y () N / L O (0 C Z ps? i J lam) k r m L C + T t j : C. co 0 :3 E co ??,??, ?.r r / Y5 f0 +s a '/ h - 11 l ? `? LO CL M J {J. f 1 J { r T7 co V ID 10 -- .._ }l. O 00 . 00 CD O _ Q Co "(4 fVIJI C) C) C) -j C) P O) r ? ?+ C r= O c: w O O O O LL N cu O (n C: i `~ O) X 0 (1) O N l - C ca - L O .0) O O C: co a) co C: C: co _ >O 0 0- w co U) J 77- -0 f l ? \_ ! \._ ? -• It ? '. ? . ( C J I co cu cn C O C cn M w 7. N _ V C 3 C C I. ?v r s o$ r ll 41 J J O JJ?Z 5 Co = O CO N c O O ? c U ` co N m > cu c o? _ ?z Q ? z LL -0 m CU U U ` L C c N @? o _? ch C m U C? M 2 Z co E . L - C: CU Co Q = N C'It 0 "0 Q) 53 E 0 a E m m 3 CO 0 M a Yz i .. O • s� rJ CL LO m t PAco • '� co 4 , c (O O c 00 O O i(V CY) tis, S� p� Lf) c CD `' �'• O O e Y• t "' O LO C14 yt r l y ,� �t tB � �OLN ti ii a r N m IMP ,?�Yt '1 1 R • Vin: •; O t7 F G . T � Q W^` L 0) t.r cr, O ' � a co a) .• N 0 m p r' Cl. V) Z a) � +� Q.-0 i L c (Q O O CO • • �` 1 N ON C:m�Uco` "i • W L 00 N v C O oEll E cL E2 Q — m ca) FAW LA m 0 Y z _ill Y t ? r r :wy 4 IN o t ? LO L G) > n y o0 c r- L O 'a a N w ) a _ a J U- R d Q L rj) 4) 8200 1-12" X 16" MJ REDUCER \ RE n WA?R ENr w 83X00 S , ..... o, 84+00 00 a \ w \ - TEMPORARY RPW R ------------------- IMPACT 41 (±227 SF) /w \ 16" C905 - DR18 WATER MAIN Fkpw Raw RELATIVELY PERMAfJENTWATERS .... -. dL+ Md2i \ TEMPORARY IMPACT AREA NOTE: VERTICAL BENDS FOR PLAN VIEW DITCH CROSSING SHALL BE SCALE: 1" = 50' INSTALLED ACCORDING TO CFPUA STANDARD DETAIL. 35 30 25 / II 215 II PROPOSED C905 16"x12", PVC WATER MAN(TYP.) MJ REDUCER PROPOSED 45* MJ BENDS 35 30 25 82+50 83+00 83+50 84+00 84+50 PROFILE VIEW HORIZ. SCALE: 1" = 50' VERT. SCALE: 1" = 5' Date: 4121109 FIG. Scale: "=50' PA RA l r l O U T 1 v\y' Drawn: JRB TEMPORARY RPW IMPACT #1 ni c : i rd r- r'z I ra ca . i n) c: Chk: JRB Proj. No: 08157.PE KERR AVE. WATER MAIN McLRPW RPW RELATIVELY PERMANENT WATERS Mda TEMPORARY IMPACT AREA RELATIVELY PERMANENT WATERS 16" C905 - DR18 WATER MAIN 105+00 1 103+00 // 0 r? - -- 0 W _-- - - W --4---- W - - - _--- -W---_W--f--- H? W _ W 1?ERR AVE. - SR 1322) (100' ROW . TEMPORARY RPW IMPACT 42 (±428 SF) NOTE: VERTICAL BENDS FOR DITCH CROSSING SHALL BE INSTALLED ACCORDING TO CFPUA STANDARD DETAIL. PLAN VIEW SCALE: 1" = 50' 35 30 25 35 30 25 102+50 103+00 103+50 104+00 104+50 105+00 PROFILE VIEW HORIZ. SCALE: 1" = 50' VERT. SCALE: 1" = 5' Date : 4121109 Scale: 1" = 50' FIG. 3 D A RA ? / OUNT? 11 ?1/ Drawn: JRB TEMPORARY RPW IMPACT #2 Chk: JRB Proj. No: 08157.PE KERR AVE. WATER MAIN FdR?PW RPJ RELATIVELY PERMANENT WATERS Md23 MMENEA TEMPORARY IMPACT AREA PROPOSED TEMPORARY CONSTRUCTION EASEMENT (TO AVOID IMPACT TO "RPW" WITH EXCAVATION STOCKPILE) RELATIVELY PERMANENT I+OO PLAN VIEW SCALE: 1" = 50' 40 35 30 40 35 30 114+00 114+50 115+00 115+50 116+00 116+50 PROFILE VIEW HORIZ. SCALE: 1" = 50' VERT. SCALE: 1" = 5' A Date: 4/21/09 Scale: 50' FIG. `t D A R1[?i/t ? /f /'"1 U\\]jTE 1 B 1 1?V/11 ¦4 J? Drawn: JRB TEMPORARY RPW IMPACT #3 F nt ca [ rv t.; e- r-.t i ra to . rv c: Chk: JRB Proj. No: 08157.PE KERR AVE. WATER MAIN PLAN VIEW SCALE: 1" = 50' 13E 1 30 1 25 22+50 123+00 123+50 124+00 124+50 125+00 125+50 PROFILE VIEW HORIZ. SCALE: 1" = 50' VERT. SCALE: 1" = 5' Date: 4/21/09 F PAJ?{1T) /?GL???MOT 7.? TE Scale: 1"=50' [t V\1J? Drawn: JRB TEMPORARY RPW IMPACT #4 t;- N C, i " P r r i N 1 r,? t, cnk: JRB Proj. No: 08157.PE KERR AVE. WATER MAIN RPW Md RPW Md?i RELATIVELY PERMANENT WATERS WE EM EN TEMPORARY IMPACT AREA NOTE: DITCH CROSISINGSEHALLBEER PLAN VIEW INSTALLED ACCORDING TO SCALE: 1" - 50' CFPUA STANDARD DETAIL. 35 30 25 35 30 25 133+50 134+00 134+50 135+00 135+50 136+00 PROFILE VIEW HORIZ. SCALE: 1" = 50' VERT. SCALE: 1" = 5' Date: 4121109 FIG. 6 PA- ARA ?r? Scale: 1R= 50' A Drawn: JRB TEMPORARY RPW IMPACT #5 F N 14 1 N e F ,? tJ (4, I N C. Chk: JRB Proj. No: 08157.PE KERR AVE. WATER MAIN